Off-site and On-Site Extrusion Decommissioning
Scheduling/Plan
Presented by: Arleen Pena, 10Dec2014
Dot Color Definition
Green Dot BSC Off-siteCalibrations
Yellow Dot BSC On-siteCalibrations
Red Dot Failed Calibration = NCEP
Blue Dot Retired Status for Calibration
 Calibration will usea colored dot systemto identify retired instruments.
The purposeis to mitigate the potential risk of instruments migrating to
non-decommissioned areas. Instrumentswith completed exit calibration
will be labeled, per procedureand receive an additional Blue colored dot to
indicate retirement
Off-Site Calibrations:
 Green Dot placed on instruments on 12Dec2014
 Start Exit Calibrations week of 15Dec to 19Dec2014
 3 stages to be sent-out (see Checklist/B1 Toolroom/Grey Cabinets)
 SCHEDULING: 15Dec2014, 17Dec2014and 19Dec2014
- Need items by 10:00amin Cal Lab in order to ship-outby noon
On-Site Calibrations:
 Yellow Dot placed on instruments on 24Dec2014
 Preparation Walk-through Inspection Meeting on 5Jan2015
 SCHEDULING:
DATE ON-SITE LINE #
1/6/2015 Line 1 Extruder
1/7/2015 Line 2 andLine 6 Extruder
1/9/2015 Line 3 Killion¾”ExtruderKL-075
1/12/2015 Line 5
1/12/2015 Line 9
1/14/2015 Line 10
2/9/2015 Line 7
Off-site and On-Site Extrusion Decommissioning
Scheduling/Plan
Presented by: Arleen Pena, 10Dec2014
Off-Site andOn-Site Calibrations Internal Processing:
 Check-off list created fromIM&Tspreadsheet
- Date-out/Date-in Check-off List/Comments
 Review Calibration Certificates and update CalMan
 If it “Passes,” placea Blue Dot atop the Green/Yellow Dot
- Indicates “Retired” Status
 If it “Fails,” place a Red Dot atop the Green/Yellow Dot; initiate NCEP
 After NCEP completion, place a Blue Dot atop the Red Dot
- Indicates“Retired” Status
 Process status of any incoming Calibration Certificates/update CalMan
 Process any related OOT/NCEPs
 Instruments to be disposition by Owner and stored in segregated area
Status: Retired

Mais conteúdo relacionado

Destaque (11)

Lbst hs
Lbst hsLbst hs
Lbst hs
 
Sai
SaiSai
Sai
 
Page5
Page5Page5
Page5
 
Políticas de I+D en la UE
Políticas de I+D en la UEPolíticas de I+D en la UE
Políticas de I+D en la UE
 
MedSpa
MedSpaMedSpa
MedSpa
 
TCP3 IFRJ [ resumo experiência ]
TCP3 IFRJ [ resumo experiência ]TCP3 IFRJ [ resumo experiência ]
TCP3 IFRJ [ resumo experiência ]
 
Crisis Economica EspañOla
Crisis Economica EspañOlaCrisis Economica EspañOla
Crisis Economica EspañOla
 
LOS ACUARIOS
LOS ACUARIOSLOS ACUARIOS
LOS ACUARIOS
 
çoklu zeka kuramı
çoklu zeka kuramıçoklu zeka kuramı
çoklu zeka kuramı
 
Final Project
Final Project Final Project
Final Project
 
Acuariofilia 1
Acuariofilia 1Acuariofilia 1
Acuariofilia 1
 

Off-site and On-Site Extrusion Decommissioning Scheduling Plan

  • 1. Off-site and On-Site Extrusion Decommissioning Scheduling/Plan Presented by: Arleen Pena, 10Dec2014 Dot Color Definition Green Dot BSC Off-siteCalibrations Yellow Dot BSC On-siteCalibrations Red Dot Failed Calibration = NCEP Blue Dot Retired Status for Calibration  Calibration will usea colored dot systemto identify retired instruments. The purposeis to mitigate the potential risk of instruments migrating to non-decommissioned areas. Instrumentswith completed exit calibration will be labeled, per procedureand receive an additional Blue colored dot to indicate retirement Off-Site Calibrations:  Green Dot placed on instruments on 12Dec2014  Start Exit Calibrations week of 15Dec to 19Dec2014  3 stages to be sent-out (see Checklist/B1 Toolroom/Grey Cabinets)  SCHEDULING: 15Dec2014, 17Dec2014and 19Dec2014 - Need items by 10:00amin Cal Lab in order to ship-outby noon On-Site Calibrations:  Yellow Dot placed on instruments on 24Dec2014  Preparation Walk-through Inspection Meeting on 5Jan2015  SCHEDULING: DATE ON-SITE LINE # 1/6/2015 Line 1 Extruder 1/7/2015 Line 2 andLine 6 Extruder 1/9/2015 Line 3 Killion¾”ExtruderKL-075 1/12/2015 Line 5 1/12/2015 Line 9 1/14/2015 Line 10 2/9/2015 Line 7
  • 2. Off-site and On-Site Extrusion Decommissioning Scheduling/Plan Presented by: Arleen Pena, 10Dec2014 Off-Site andOn-Site Calibrations Internal Processing:  Check-off list created fromIM&Tspreadsheet - Date-out/Date-in Check-off List/Comments  Review Calibration Certificates and update CalMan  If it “Passes,” placea Blue Dot atop the Green/Yellow Dot - Indicates “Retired” Status  If it “Fails,” place a Red Dot atop the Green/Yellow Dot; initiate NCEP  After NCEP completion, place a Blue Dot atop the Red Dot - Indicates“Retired” Status  Process status of any incoming Calibration Certificates/update CalMan  Process any related OOT/NCEPs  Instruments to be disposition by Owner and stored in segregated area Status: Retired