Stutter Medical Centre Castro Valley: Case Study of an IPD Project
SMCCV Project – state of the art 130 bed hospital in Castro Valley, CA; a $320 million project
Integrated Project Delivery System – integrates people, systems, business structures and practices into a
process that collaboratively harness the talents and insights of all participants to reduce waste and
optimize efficiency through all phases of design, fabrication and construction
- Tight collaboration between owners, A/Es, and builders from early design till project handover
Reasons to choose IPD for this project as project had many challenges that could not be met by using
traditional DBB process
- Many facilities required mandated seismic improvements – IPD good way to reduce time delays
and budget overruns typically associated with large projects
- Hard deadline for both design and construction
- Accelerated schedule - 30% more than conventional
IPD Team consisting of people from all trades along with the owner and A/E was formed
- No GMP set for project from start, instead profit sharing model adopted to finish the project on
time and under budget; this profit sharing contract will be signed before the construction starts
- Firms devoted full time employees to the project
- State Regulatory Agency takes 16-24 months to review project after submission and provide
approval
o Will lead to delays
o So, team used phased review approach
Complicated shape of design and added schedule and budget constraints led to adoption of BIM model
- BIM model was created first and paper documents were done at later stages when required
- BIM model used for quantity takeoff, estimation and fabrication as well
- Real time access to project information by using Bentley’s ProjectWise information management
and documentation control
o Allowed smooth flow of information without delay
o Allowed for direct inputs from fabricators to increase efficiency
- Continuous design reviews done to allow cross functional teams to collaborate and contribute
their knowledge for better results
- Solibri Model Checker used to check compliance with accessibility and ADA codes
- Value Stream Mapping – visual method of documenting workflow to identify value added and
nonvalue added components – use data to maximize value, eliminate waste and save time by
streamlining workflows
- Team meeting are important for IPD approach - regular meeting held bi-weekly – people attend
the meeting physically or connected remotely (GoToMeeting) if unable to be physically present
o Model reviewed together – questions and doubts that other discipline people have are
cleared by experts from particular discipline in question
o Problems can be detected and resolved almost immediately – example is discussed
where minor structural changes in the model resulted in clashes with other
components, structural team was asked to join the meeting remotely and matter was
resolved in no time.
Advantages of IPD observed on the project
- Structural design time reduced from 15 months to 8 months
- Collaboration from different trades resulted in better design quality
- IPD requires people to meet on regular basis which counts for billable hours towards design
cost, but use of IPD has proved to be overall less costly than conventional approach – time spent
in meetings reduced time that would have been spent on redesigning and remodeling
- Incorporating IPD approach for a project requires strong willingness from the owner, and also
from various trades involved in the project to collaborate effectively for success of the project
o IPD promotes effective communication among various members of team
The VDC Scorecard: Evaluation of AEC Projects and Industry Trends
Most studies regarding planning, adoption, technological use and performance of VDC are based on
case-studies approach. Case Study approach has limitations as it does not provide enough insights and is
not strong as a toll that can be used for making decisions regarding adoption and implementation of
VDC on a project. This paper tries to change that scenario as it provides a statistical approach to it.
Statistically established insights are more powerful toll in aiding decision making easy.
- VDC Scorecard measures project performance in 4 major areas: Planning, Adoption, Technology
and Performance
- Areas are further broken into 10 Divisions, and under each Division there are 56 detailed
practice measurements in total
- VDC Scorecard correlates VDC performance factors with case study based observations and
hypotheses
- 51 correlation pairs observed – 6 VDC Scorecard Area-based correlations, and 45 VDC Scorecard
Division-based correlations – Figure shows the various Areas, Divisions and Measures and
percentage weightage of each in the overall VDC Scorecard
- Weighted Average Percentage of each VDC Area is taken to get the overall score
- Interviews for data collection from 108 unique projects done; over 150 VDC Scorecards made
o Data collected from AEC projects from 13 countries in North America, Europe and Asia
and 15 states across USA
o Project delivery method also range from DBB to IPD and IFoA (Integrated Form of
Agreement) – evaluated from pre-design phase to end of construction and O&M
- VDC Scorecard Results – Average Overall score = 50% ; Planning Average – 50% ; Adoption
Average – 56% ;Technology Average – 48% ; Performance Average – 47%
o Conventional Practices – below 25% - 2 projects
o Typical Practices – 25% to 50% - 49 projects
o Advanced Practices – 50% to 75% - 52 projects
o Best Practices – 75% to 90% - 5 projects
o Innovative Practices - >90% - 0 projects
 Scores show that VDC is commonly used, but yet not adopted as a prominent
tool in AEC industry - Industrial and Healthcare industry scored more than other
industries – stringent norms in these industries make VDC a good choice
Figure: VDC Areas, Divisions and Measures and percentage weightage of each in the overall VDC
Scorecard
Results of Correlation Analysis:-
- Planning Area: Shared belief of VDC among stakeholders is good for implementation of VDC.
Formalized documentation of VDC objectives is first step of VDC collaboration and has
significant effect on the integrated performance of project teams; establishing quantitative
objectives contributes significantly to project’s success. General VDC guidelines should be
developed which can also be adopted by future projects
- Adoption Area: Early engagement of stakeholders and their role in decision making is important
for success of VDC. Frequent meeting should be scheduled to track efficiency and to resolve
issues; promote innovative communication and facilitation methods like Integrated Concurrent
Engineering (ICE) sessions. Incentives should be given to all stakeholders as a motivation to work
together for the overall benefit of project
- Technology Area: Different levels of LOD should be established for different stages of the project
– the amount of detail that is put in LOD should also be decided for every stage in such a way
that enough detail is available for each stakeholder to do their work in that stage. High
interoperability among the softwares used on a project should be encouraged to avoid time lost
in making information from one software to be useful in other software – good interoperability
means data from one software can be imported to another and used readily.
- Performance Area: set up targets for each performance category at the planning stage. Targets
can be broken down to milestones; constant track should be kept on them and performance
report created, readjustments can be done if required. Review of performance and outcomes
should be done on a regular basis – weekly or more often
Case Study 1- Healthcare Project in California
- IPD method used for construction
- High collaboration between owner, end user, designers and general contractor
- VDC consultant kept from pre-design phase till end of construction
- Special contractors involved in the design phase of project to provide inputs for pre-fabrication
- Less RFIs, change orders, accelerated permission process, fast response time of design team on
construction problems, better energy performance
Case Study 2- Museum Project in Europe
- Had many challenges – project team consisted of people from 10 firms located worldwide,
highly complex design of museum
- Team collaborated to include VDC in planning phase with objectives which included better
communication, facility performance, safety and project quality
- Had a separate consulting team for adoption of digital process – it provided training and tutorial
on digital software to design division and developed innovative tools which were specifically
used in this project
- Multidisciplinary collaboration achieved using cloud model management system – effectively
organized and managed large amount of data
- Finished BIM model contained data not only for construction, but also for O&M – provide
maintenance routine for different components
Success and Shortcomings of VDC
- 86% projects agreed towards the value addition to the project by adoption of VDC
o Value addition in form of cost saving, short construction duration, more efficient and
sustainable design, less rework, clash detection and real-time problem solving, and
better collaboration and project delivery
- Many AEC firms used VDC, but failed to track and monitor quantifiable metrics which are key
performance indicators. VDC needs systematic monitoring via quantifiable metrics which is one
of the shortcomings

Mais conteúdo relacionado

Mais procurados

Building information modeling & value to the AEC industry Part 1 v1
Building information modeling &  value to the AEC industry   Part 1 v1Building information modeling &  value to the AEC industry   Part 1 v1
Building information modeling & value to the AEC industry Part 1 v1Stephen Au
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIMCCT International
 
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadFiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadCCT International
 
BIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journeyBIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journeyBuiltEnvironmentUBM
 
Implementing BIM for Owners
Implementing BIM for OwnersImplementing BIM for Owners
Implementing BIM for OwnersDLT Solutions
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controlsOmar Selim
 
Delivering Projects Better with BIM
Delivering Projects Better with BIMDelivering Projects Better with BIM
Delivering Projects Better with BIMAlex Ferguson
 
Optimize bim for reducing errors
Optimize bim for reducing errorsOptimize bim for reducing errors
Optimize bim for reducing errorsTesla CAD Solutions
 
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplarBIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplarBuiltEnvironmentUBM
 
BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...Ravindra SSK Medicharla
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015Aconex
 
Lean construction & BIM
Lean construction & BIMLean construction & BIM
Lean construction & BIMStephen Au
 
BIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case studyBIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case studyBuiltEnvironmentUBM
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIMBIM User Day
 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)CCT International
 
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureEngineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureLaurianneSchillesDur
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionReshma Philip
 

Mais procurados (20)

Building Information Modeling Services New Zealand
Building Information Modeling Services New ZealandBuilding Information Modeling Services New Zealand
Building Information Modeling Services New Zealand
 
Building information modeling & value to the AEC industry Part 1 v1
Building information modeling &  value to the AEC industry   Part 1 v1Building information modeling &  value to the AEC industry   Part 1 v1
Building information modeling & value to the AEC industry Part 1 v1
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
 
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair HaddadFiatech 2014 - Big BIM Implementation, Zuhair Haddad
Fiatech 2014 - Big BIM Implementation, Zuhair Haddad
 
BIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journeyBIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journey
 
Implementing BIM for Owners
Implementing BIM for OwnersImplementing BIM for Owners
Implementing BIM for Owners
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 
Delivering Projects Better with BIM
Delivering Projects Better with BIMDelivering Projects Better with BIM
Delivering Projects Better with BIM
 
Optimize bim for reducing errors
Optimize bim for reducing errorsOptimize bim for reducing errors
Optimize bim for reducing errors
 
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplarBIM Show Live 2015: 110 Queen Street – A BIM exemplar
BIM Show Live 2015: 110 Queen Street – A BIM exemplar
 
BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...BIM Usage in Construction Industry and An application of Clash Detection and ...
BIM Usage in Construction Industry and An application of Clash Detection and ...
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
 
Lean construction & BIM
Lean construction & BIMLean construction & BIM
Lean construction & BIM
 
BIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case studyBIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case study
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)
 
Bim Facades.Final
Bim Facades.FinalBim Facades.Final
Bim Facades.Final
 
BIM_ME_EBrochure
BIM_ME_EBrochureBIM_ME_EBrochure
BIM_ME_EBrochure
 
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureEngineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 

Destaque

Level of development - BIM
Level of development - BIMLevel of development - BIM
Level of development - BIMAnkit Singhai
 
BIM for Infrastructure
BIM for InfrastructureBIM for Infrastructure
BIM for InfrastructureAnkit Singhai
 
Ligjrata 10 shtimi i multimedias ne web faqe
Ligjrata 10 shtimi i multimedias ne web faqeLigjrata 10 shtimi i multimedias ne web faqe
Ligjrata 10 shtimi i multimedias ne web faqeGjimnazi " Gjon Buzuku"
 
BIMplement INC Presentation
BIMplement INC PresentationBIMplement INC Presentation
BIMplement INC PresentationAnkit Singhai
 
BIMplement inc_proposal
BIMplement inc_proposalBIMplement inc_proposal
BIMplement inc_proposalAnkit Singhai
 
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTIONTHE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTIONAnkit Singhai
 
Role of Prefabrication in the Construction Industry to improve sustainability...
Role of Prefabrication in the Construction Industry to improve sustainability...Role of Prefabrication in the Construction Industry to improve sustainability...
Role of Prefabrication in the Construction Industry to improve sustainability...Ankit Singhai
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction FormworkAnkit Singhai
 
3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction3 d and 4d modeling for design and construction
3 d and 4d modeling for design and constructionAnkit Singhai
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated designAnkit Singhai
 
Атлас Економічна і соціальна географія України 9 клас Балабанов Г.В.
Атлас Економічна і соціальна географія України 9 клас Балабанов Г.В.Атлас Економічна і соціальна географія України 9 клас Балабанов Г.В.
Атлас Економічна і соціальна географія України 9 клас Балабанов Г.В.oleg379
 

Destaque (20)

Level of development - BIM
Level of development - BIMLevel of development - BIM
Level of development - BIM
 
BIM for Infrastructure
BIM for InfrastructureBIM for Infrastructure
BIM for Infrastructure
 
Ligjrata 10 shtimi i multimedias ne web faqe
Ligjrata 10 shtimi i multimedias ne web faqeLigjrata 10 shtimi i multimedias ne web faqe
Ligjrata 10 shtimi i multimedias ne web faqe
 
Hoteles santos nevla
Hoteles santos nevlaHoteles santos nevla
Hoteles santos nevla
 
Pro y contras
Pro y contrasPro y contras
Pro y contras
 
Tarea
TareaTarea
Tarea
 
Análisis PROINSICA
Análisis PROINSICAAnálisis PROINSICA
Análisis PROINSICA
 
BIMplement INC Presentation
BIMplement INC PresentationBIMplement INC Presentation
BIMplement INC Presentation
 
BIMplement inc_proposal
BIMplement inc_proposalBIMplement inc_proposal
BIMplement inc_proposal
 
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTIONTHE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
THE SYNERGY BETWEEN VALUE ENGINEERING AND SUSTAINABLE CONSTRUTION
 
Role of Prefabrication in the Construction Industry to improve sustainability...
Role of Prefabrication in the Construction Industry to improve sustainability...Role of Prefabrication in the Construction Industry to improve sustainability...
Role of Prefabrication in the Construction Industry to improve sustainability...
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
4D bim
4D bim4D bim
4D bim
 
3 d laser scanning
3 d laser scanning3 d laser scanning
3 d laser scanning
 
3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction3 d and 4d modeling for design and construction
3 d and 4d modeling for design and construction
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated design
 
Social Marketing
Social MarketingSocial Marketing
Social Marketing
 
[Tu sach trong veo] final report
[Tu sach trong veo] final report[Tu sach trong veo] final report
[Tu sach trong veo] final report
 
Атлас Економічна і соціальна географія України 9 клас Балабанов Г.В.
Атлас Економічна і соціальна географія України 9 клас Балабанов Г.В.Атлас Економічна і соціальна географія України 9 клас Балабанов Г.В.
Атлас Економічна і соціальна географія України 9 клас Балабанов Г.В.
 
CV-Dr. Komalam
CV-Dr. KomalamCV-Dr. Komalam
CV-Dr. Komalam
 

Semelhante a Virtual design and construction

Mike_Kuenkel_Complete Resume_20150422
Mike_Kuenkel_Complete Resume_20150422Mike_Kuenkel_Complete Resume_20150422
Mike_Kuenkel_Complete Resume_20150422Mike Kuenkel
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Aconex
 
ETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightComit Projects Ltd
 
14.15 andrew killander, aconex for distribution
14.15 andrew killander, aconex   for distribution14.15 andrew killander, aconex   for distribution
14.15 andrew killander, aconex for distributionIbrahim Al-Hudhaif
 
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.pptProfDrAnbalaganChinn
 
Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and controlJanak Singh Chauhan
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul ResumeRajib Paul
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFRubab Tanveer
 
Construction project management
Construction project managementConstruction project management
Construction project managementsaif hasan
 
Tips and hints for an effective cosmic learning process gained from industria...
Tips and hints for an effective cosmic learning process gained from industria...Tips and hints for an effective cosmic learning process gained from industria...
Tips and hints for an effective cosmic learning process gained from industria...IWSM Mensura
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1ghulam MUSTAFA
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesaAconex
 
Project/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chronProject/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chronKevinJosephFox
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approachJames (JD) Dimas
 
Dealing with Extra Long Duration Megaprojects
Dealing with Extra Long Duration MegaprojectsDealing with Extra Long Duration Megaprojects
Dealing with Extra Long Duration MegaprojectsJeremie Averous
 

Semelhante a Virtual design and construction (20)

Mike_Kuenkel_Complete Resume_20150422
Mike_Kuenkel_Complete Resume_20150422Mike_Kuenkel_Complete Resume_20150422
Mike_Kuenkel_Complete Resume_20150422
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
 
ETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEight
 
14.15 andrew killander, aconex for distribution
14.15 andrew killander, aconex   for distribution14.15 andrew killander, aconex   for distribution
14.15 andrew killander, aconex for distribution
 
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
4. PAE AcFn621Ch-4a Project Alaysis and Selection.ppt
 
REYNAUD_Michel_-_Resume2015
REYNAUD_Michel_-_Resume2015REYNAUD_Michel_-_Resume2015
REYNAUD_Michel_-_Resume2015
 
Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and control
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul Resume
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
VASUDEO RANE
VASUDEO RANEVASUDEO RANE
VASUDEO RANE
 
Tips and hints for an effective cosmic learning process gained from industria...
Tips and hints for an effective cosmic learning process gained from industria...Tips and hints for an effective cosmic learning process gained from industria...
Tips and hints for an effective cosmic learning process gained from industria...
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
 
Project/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chronProject/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chron
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
 
Dealing with Extra Long Duration Megaprojects
Dealing with Extra Long Duration MegaprojectsDealing with Extra Long Duration Megaprojects
Dealing with Extra Long Duration Megaprojects
 

Último

Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 

Último (20)

Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 

Virtual design and construction

  • 1. Stutter Medical Centre Castro Valley: Case Study of an IPD Project SMCCV Project – state of the art 130 bed hospital in Castro Valley, CA; a $320 million project Integrated Project Delivery System – integrates people, systems, business structures and practices into a process that collaboratively harness the talents and insights of all participants to reduce waste and optimize efficiency through all phases of design, fabrication and construction - Tight collaboration between owners, A/Es, and builders from early design till project handover Reasons to choose IPD for this project as project had many challenges that could not be met by using traditional DBB process - Many facilities required mandated seismic improvements – IPD good way to reduce time delays and budget overruns typically associated with large projects - Hard deadline for both design and construction - Accelerated schedule - 30% more than conventional IPD Team consisting of people from all trades along with the owner and A/E was formed - No GMP set for project from start, instead profit sharing model adopted to finish the project on time and under budget; this profit sharing contract will be signed before the construction starts - Firms devoted full time employees to the project - State Regulatory Agency takes 16-24 months to review project after submission and provide approval o Will lead to delays o So, team used phased review approach Complicated shape of design and added schedule and budget constraints led to adoption of BIM model - BIM model was created first and paper documents were done at later stages when required - BIM model used for quantity takeoff, estimation and fabrication as well - Real time access to project information by using Bentley’s ProjectWise information management and documentation control o Allowed smooth flow of information without delay o Allowed for direct inputs from fabricators to increase efficiency - Continuous design reviews done to allow cross functional teams to collaborate and contribute their knowledge for better results - Solibri Model Checker used to check compliance with accessibility and ADA codes - Value Stream Mapping – visual method of documenting workflow to identify value added and nonvalue added components – use data to maximize value, eliminate waste and save time by streamlining workflows - Team meeting are important for IPD approach - regular meeting held bi-weekly – people attend the meeting physically or connected remotely (GoToMeeting) if unable to be physically present o Model reviewed together – questions and doubts that other discipline people have are cleared by experts from particular discipline in question o Problems can be detected and resolved almost immediately – example is discussed where minor structural changes in the model resulted in clashes with other
  • 2. components, structural team was asked to join the meeting remotely and matter was resolved in no time. Advantages of IPD observed on the project - Structural design time reduced from 15 months to 8 months - Collaboration from different trades resulted in better design quality - IPD requires people to meet on regular basis which counts for billable hours towards design cost, but use of IPD has proved to be overall less costly than conventional approach – time spent in meetings reduced time that would have been spent on redesigning and remodeling - Incorporating IPD approach for a project requires strong willingness from the owner, and also from various trades involved in the project to collaborate effectively for success of the project o IPD promotes effective communication among various members of team The VDC Scorecard: Evaluation of AEC Projects and Industry Trends Most studies regarding planning, adoption, technological use and performance of VDC are based on case-studies approach. Case Study approach has limitations as it does not provide enough insights and is not strong as a toll that can be used for making decisions regarding adoption and implementation of VDC on a project. This paper tries to change that scenario as it provides a statistical approach to it. Statistically established insights are more powerful toll in aiding decision making easy. - VDC Scorecard measures project performance in 4 major areas: Planning, Adoption, Technology and Performance - Areas are further broken into 10 Divisions, and under each Division there are 56 detailed practice measurements in total - VDC Scorecard correlates VDC performance factors with case study based observations and hypotheses - 51 correlation pairs observed – 6 VDC Scorecard Area-based correlations, and 45 VDC Scorecard Division-based correlations – Figure shows the various Areas, Divisions and Measures and percentage weightage of each in the overall VDC Scorecard - Weighted Average Percentage of each VDC Area is taken to get the overall score - Interviews for data collection from 108 unique projects done; over 150 VDC Scorecards made o Data collected from AEC projects from 13 countries in North America, Europe and Asia and 15 states across USA o Project delivery method also range from DBB to IPD and IFoA (Integrated Form of Agreement) – evaluated from pre-design phase to end of construction and O&M - VDC Scorecard Results – Average Overall score = 50% ; Planning Average – 50% ; Adoption Average – 56% ;Technology Average – 48% ; Performance Average – 47% o Conventional Practices – below 25% - 2 projects o Typical Practices – 25% to 50% - 49 projects o Advanced Practices – 50% to 75% - 52 projects o Best Practices – 75% to 90% - 5 projects o Innovative Practices - >90% - 0 projects  Scores show that VDC is commonly used, but yet not adopted as a prominent tool in AEC industry - Industrial and Healthcare industry scored more than other industries – stringent norms in these industries make VDC a good choice
  • 3. Figure: VDC Areas, Divisions and Measures and percentage weightage of each in the overall VDC Scorecard Results of Correlation Analysis:- - Planning Area: Shared belief of VDC among stakeholders is good for implementation of VDC. Formalized documentation of VDC objectives is first step of VDC collaboration and has significant effect on the integrated performance of project teams; establishing quantitative objectives contributes significantly to project’s success. General VDC guidelines should be developed which can also be adopted by future projects - Adoption Area: Early engagement of stakeholders and their role in decision making is important for success of VDC. Frequent meeting should be scheduled to track efficiency and to resolve issues; promote innovative communication and facilitation methods like Integrated Concurrent Engineering (ICE) sessions. Incentives should be given to all stakeholders as a motivation to work together for the overall benefit of project - Technology Area: Different levels of LOD should be established for different stages of the project – the amount of detail that is put in LOD should also be decided for every stage in such a way that enough detail is available for each stakeholder to do their work in that stage. High interoperability among the softwares used on a project should be encouraged to avoid time lost in making information from one software to be useful in other software – good interoperability means data from one software can be imported to another and used readily. - Performance Area: set up targets for each performance category at the planning stage. Targets can be broken down to milestones; constant track should be kept on them and performance
  • 4. report created, readjustments can be done if required. Review of performance and outcomes should be done on a regular basis – weekly or more often Case Study 1- Healthcare Project in California - IPD method used for construction - High collaboration between owner, end user, designers and general contractor - VDC consultant kept from pre-design phase till end of construction - Special contractors involved in the design phase of project to provide inputs for pre-fabrication - Less RFIs, change orders, accelerated permission process, fast response time of design team on construction problems, better energy performance Case Study 2- Museum Project in Europe - Had many challenges – project team consisted of people from 10 firms located worldwide, highly complex design of museum - Team collaborated to include VDC in planning phase with objectives which included better communication, facility performance, safety and project quality - Had a separate consulting team for adoption of digital process – it provided training and tutorial on digital software to design division and developed innovative tools which were specifically used in this project - Multidisciplinary collaboration achieved using cloud model management system – effectively organized and managed large amount of data - Finished BIM model contained data not only for construction, but also for O&M – provide maintenance routine for different components Success and Shortcomings of VDC - 86% projects agreed towards the value addition to the project by adoption of VDC o Value addition in form of cost saving, short construction duration, more efficient and sustainable design, less rework, clash detection and real-time problem solving, and better collaboration and project delivery - Many AEC firms used VDC, but failed to track and monitor quantifiable metrics which are key performance indicators. VDC needs systematic monitoring via quantifiable metrics which is one of the shortcomings