PUBLIC WORKS DEPARTMENT- AN
OVERVIEW
 Public Works Department (PWD), under the Ministry of
Public Works department, is the pioneer in construction
arena of Uttar Pradesh.
 It plays a pivotal role in the implementation of government
construction projects
 To accelerate the construction of bridges in the state, Uttar
Pradesh State Bridge Corporation was founded in 1973.
 In year 2004-05, Uttar Pradesh state highways authority
was established to overcome with problem of pavements in
state.
4
5
INTRODUCTION
 Development of a country depends on the connectivity of various places with adequate
road network.
 Roads constitute the most important mode of communication in areas where railways
have not developed much.
 India has one of the largest road networks in the world (over 3 million km at
present).For the purpose of management and administration, roads in India are divided
into the following five categories:
• National Highways (NH)
• State Highways (SH)
• Major District Roads (MDR)
• Other District Roads (ODR)
• Village Roads (VR)
WHAT IS ROAD AND PAVEMENT ?
 Road is an open, generally public way for the passage of vehicles,
people, and animals.
 Pavement is finished with a hard smooth surface. It helped make
them durable and able to withstand traffic and the environment.
They have a life span of between 20 – 30 years.
• FUNCTIONS
• One of the primary functions of pavement is load distribution. It
can be characterized by the tire loads, tire configurations, repetition
of loads, and distribution of traffic across the pavement, and vehicle
speed
6
7
TYPES OF PAVEMENTS
There are various types of pavements depending upon the materials used; a briefs
description of all types is given here-
FLEXIBLE PAVEMENT
Bitumen has been widely used in the construction of flexible pavements for a long time.
This is the most convenient and simple type of construction. The cost of construction of
single lane bituminous pavement varies from 20 to 30 lakhs per km in plain area.
Flexible pavement have-
 Have low flexural strength
 Load is transferred by grain to grain contact
 Have low completion cost but repairing cost is high
 Have low life span (High Maintenance Cost)
RIGID PAVEMENT
• Rigid pavements, though costly in initial investment, are cheap in long run because
of low maintenance costs, The cost of construction of single lane rigid pavement
varies from 35 to 50 lakhs per km in plain area,
• Rigid pavement have-
 Deformation in the sub grade is not transferred to subsequent layers
 Design is based on flexural strength or slab action
 Have high flexural strength
 No such phenomenon of grain to grain load transfer exists
 Have low repairing cost but completion cost is high
 Life span is more as compare to flexible (Low Maintenance Cost)
8
9
Longitudinal joint
Transverse joint
Subgrade
Base
Surface Texture
Surface smoothness Thickness Design
Dowel bars
Concrete materials
Tiebars
Basic Components of a Concrete
Pavement
1. Preparation of base
2. Form working
3. Preparation of subgrade
4. Watering of base
5. Joints
6. Material mix & placing
7. Compaction
10
Using mix Concrete , there some
Point to construct the road
11
8. Finishing of surface
8A. Floating
8B. Belting
8C. Brooming
9. Curing
10. Joint filling
11. Edging
12. Open to traffic
1. Rolling on sub grade by roller
2. Filling the granular soil in the weak part and
pot holes
3. Correct the soil coat , Camber , longitudinal
slop
When concrete direct laid on subgrade, For
preventing the water-seepaging into the soil ,
used water proof paper on entire length.
12
13
PREPERATION OF SUB GRADE
14
ROLLING OF SUBGRADE
Choose any one type of base
1. W.B.M. base
As base material of W.B.M. Road; stone ballast,
concrete 10-15cm layer are used. For bonding
between concrete slab & W.B.M. used 1:2 cement
wash on W.B.M.
2. Concrete base
On the road used 10cm Cement concrete(1:2:4) or
lime concrete(16:32:64)
15
3. Granular medium material layer
10-15cm composite layer of sand , moorum ,
bajri are used for better drainage facilities
4. Stabilization soil
16
Material for form work-
Wooden sheets, battens, plywood, fibre hard
board, steel plates, angles, rope, minerals.
1. before using form work, it should free from all
type material like as dust ,cement.
2. To placing the concrete in appropriate depth
used 2.5-5cm thick and 3mtr long wooden sheeting.
17
3. The depth of wooden block must be same
as level of slab thick.
4. After 24hrs form work displaced next length
of road.
18
If base is dry
Than using the sprinkling process on it properly
after that placing the concrete.
19
Where is necessary to provide transverse,
Longitudinal joints; there wedge of woods,
metals fix on level of concrete.
After setting of concrete it should be pull
out.
If provided the dowel bar in joints, bars
should be fit at right position.
20
Mixer is equipment that mix the concrete using distinct
amount of cement , concrete, sand and water. Concrete
slab should have more than 5-10cm thick cause of drying.
Used two type mixer-
1. Batch mixer-
at site, used for small road construction
2. Continuous mixer-
Continuous mixer used for large construction .
if distance is more from site , mix concrete
transported at site within setting time.
21
22
23
Laying of polyethylene sheet over DLC
24
Two methods generally used in placing of
concrete-
1. Alternate bay method-
Placed the concrete on both side of road
alternatively like as1,3,5… part at one side and
2,4,6… part other side .
1st side
2nd side
This method have slow process due to road
traffic problems.
25
2. Continuous bay method-
construct one side of road regularly, if
completed some part of first side than
construct other side.
this method have fast process without no
obstruction of traffic
26
Purpose of compaction is that to pull out air
from void and make concrete harden.
Compaction done by-
1.mechanically surface vibrator
2. manually hand tempers
27
8. Finishing of surface
1.Floating-
For levelling the surface use floating, scree-
ding , power trowel. So that there is no acceptable
more than 3mm variation in concrete level surface.
2.Belting-
For making surface clean used belting process.
Belt is nothing but a 15-30cm thick sheets of
canvass which have more length than road.
28
29
3. Brooming-
Brooming is the process in which we made
rough surface parallel to road by brush.
It useful in avoiding slip & comfortable
travelling on road .
the depth of line on road no more than
1.5mm.
30
31
Texturing of finished surface by texturing machine
9. Curing
Curing is the name of increasing the
hydration process of cement.
after setting the concrete , curing process
done till 14-28days.
32
Some method of curing are-
1.Shading concrete works
2. Covering with hessian & gunny bags
3. Sprinkling of water
4.By ponding
5. Membrane curing
6. Steam curing
33
34
CURING
10. Filling joint
After drying road, clean the joints and fill the
shelling compound or hot bitumen .
also bitumen fill road bank.
35
11. Edging
To protect damaging the sides of concrete
pavements used over burnt brick work.
in place of brick, provided kerb of pre mix
concrete.
36
Generally after a month, road should be open
to traffic.
If used rapid hardening cement it take 7 days to
open traffic.
37
Advantages of Concrete Road
• Durability and maintenance free life
• Vehicles consume less fuel
• Resistant to automobile fuel spillage and
extreme weather
• Greener process
• Saving of natural resources
• Eco friendly process
38
39
40

More Related Content

What's hot

PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
Satyam Anand
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
aryan kumar
 
Construction of roads presentations
Construction of roads presentationsConstruction of roads presentations
Construction of roads presentations
Ijaz Hassan Khan
 

What's hot (20)

BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07Aryan k tranning file road ppt 07
Aryan k tranning file road ppt 07
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
 
Irc 37-2018
Irc 37-2018Irc 37-2018
Irc 37-2018
 
Construction of roads presentations
Construction of roads presentationsConstruction of roads presentations
Construction of roads presentations
 
Road construction
Road constructionRoad construction
Road construction
 
training report on pwd
training report on pwdtraining report on pwd
training report on pwd
 
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
 
Construction Of Road
Construction Of RoadConstruction Of Road
Construction Of Road
 
Construction of Road
Construction of RoadConstruction of Road
Construction of Road
 
Sachin gupta summer training in pwd
Sachin gupta summer training in pwdSachin gupta summer training in pwd
Sachin gupta summer training in pwd
 
Highway & road geomatric and its component
Highway & road geomatric and its component Highway & road geomatric and its component
Highway & road geomatric and its component
 
Cc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumarCc road summer training ppt @akshay kumar
Cc road summer training ppt @akshay kumar
 
Traning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavementTraning report on pwd cement concrete road pavement
Traning report on pwd cement concrete road pavement
 
Highway failure & their maintenance seminar report
Highway failure & their maintenance seminar reportHighway failure & their maintenance seminar report
Highway failure & their maintenance seminar report
 

Viewers also liked

Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...
Mannu Amrit
 

Viewers also liked (13)

Final Year Project Report
Final Year Project ReportFinal Year Project Report
Final Year Project Report
 
Stv cc ppt unit i (1.1)em&ce introduction-construction layout
Stv cc ppt unit i (1.1)em&ce  introduction-construction layoutStv cc ppt unit i (1.1)em&ce  introduction-construction layout
Stv cc ppt unit i (1.1)em&ce introduction-construction layout
 
building construction,ppt
building construction,pptbuilding construction,ppt
building construction,ppt
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
Selecting topic 4 FYP v3
Selecting topic 4 FYP v3Selecting topic 4 FYP v3
Selecting topic 4 FYP v3
 
final year Project (civil)
final year Project (civil)final year Project (civil)
final year Project (civil)
 
JYOTI THAKURIA CV
JYOTI THAKURIA CVJYOTI THAKURIA CV
JYOTI THAKURIA CV
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...Final year design project report - Studies in application of augmented realit...
Final year design project report - Studies in application of augmented realit...
 
Minor Project Report On Construction of Pipe Culvert
Minor Project Report  On Construction of  Pipe CulvertMinor Project Report  On Construction of  Pipe Culvert
Minor Project Report On Construction of Pipe Culvert
 
project final year civil
project final year civilproject final year civil
project final year civil
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
Smart card system ppt
Smart card system ppt Smart card system ppt
Smart card system ppt
 

Similar to RIGID PAVEMENT -ANIL GUPTA (P.W.D)

FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
DolanGhosh4
 
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptxfoundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
fazl ullah
 

Similar to RIGID PAVEMENT -ANIL GUPTA (P.W.D) (20)

CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Naresh kumar ppt
Naresh kumar  pptNaresh kumar  ppt
Naresh kumar ppt
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
Highway report
Highway reportHighway report
Highway report
 
MD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptxMD NEHAL 8TH SEM PPT- 2pptx.pptx
MD NEHAL 8TH SEM PPT- 2pptx.pptx
 
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
Roadconstructionequipment pptx2-130310150329-phpapp01 - copy (2)
 
Low cost road
Low cost roadLow cost road
Low cost road
 
Concrete (types of road)
Concrete (types of road)Concrete (types of road)
Concrete (types of road)
 
EM-203 Final MTE PPT 141-152.pptx
EM-203 Final MTE PPT 141-152.pptxEM-203 Final MTE PPT 141-152.pptx
EM-203 Final MTE PPT 141-152.pptx
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
 
Highway construction and equipments
Highway construction and equipmentsHighway construction and equipments
Highway construction and equipments
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
 
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptxfoundation and pavement lec 3 Road Construction Methods and Techniques.pptx
foundation and pavement lec 3 Road Construction Methods and Techniques.pptx
 
PPT FINAL.pptx
PPT FINAL.pptxPPT FINAL.pptx
PPT FINAL.pptx
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
 
Road bridge & railway construction pdf
Road bridge & railway construction pdfRoad bridge & railway construction pdf
Road bridge & railway construction pdf
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 

RIGID PAVEMENT -ANIL GUPTA (P.W.D)

  • 1. 1 PRESENTATION ON SUMMER TRAINING UTTAR PRADESH PUBLIC WORKS DEPARTMENT VARANASI
  • 2. 2
  • 3. 3 SUBMITTED TO - SUBMITTED BY- H.O.D CIVIL ENGINEERING Dr .V.K.GUPTA HINDUSTAN COLLEGE OF SCIENCE & TECHNOLOGY ANIL GUPTA VII SEM 1206400013
  • 4. PUBLIC WORKS DEPARTMENT- AN OVERVIEW  Public Works Department (PWD), under the Ministry of Public Works department, is the pioneer in construction arena of Uttar Pradesh.  It plays a pivotal role in the implementation of government construction projects  To accelerate the construction of bridges in the state, Uttar Pradesh State Bridge Corporation was founded in 1973.  In year 2004-05, Uttar Pradesh state highways authority was established to overcome with problem of pavements in state. 4
  • 5. 5 INTRODUCTION  Development of a country depends on the connectivity of various places with adequate road network.  Roads constitute the most important mode of communication in areas where railways have not developed much.  India has one of the largest road networks in the world (over 3 million km at present).For the purpose of management and administration, roads in India are divided into the following five categories: • National Highways (NH) • State Highways (SH) • Major District Roads (MDR) • Other District Roads (ODR) • Village Roads (VR)
  • 6. WHAT IS ROAD AND PAVEMENT ?  Road is an open, generally public way for the passage of vehicles, people, and animals.  Pavement is finished with a hard smooth surface. It helped make them durable and able to withstand traffic and the environment. They have a life span of between 20 – 30 years. • FUNCTIONS • One of the primary functions of pavement is load distribution. It can be characterized by the tire loads, tire configurations, repetition of loads, and distribution of traffic across the pavement, and vehicle speed 6
  • 7. 7 TYPES OF PAVEMENTS There are various types of pavements depending upon the materials used; a briefs description of all types is given here- FLEXIBLE PAVEMENT Bitumen has been widely used in the construction of flexible pavements for a long time. This is the most convenient and simple type of construction. The cost of construction of single lane bituminous pavement varies from 20 to 30 lakhs per km in plain area. Flexible pavement have-  Have low flexural strength  Load is transferred by grain to grain contact  Have low completion cost but repairing cost is high  Have low life span (High Maintenance Cost)
  • 8. RIGID PAVEMENT • Rigid pavements, though costly in initial investment, are cheap in long run because of low maintenance costs, The cost of construction of single lane rigid pavement varies from 35 to 50 lakhs per km in plain area, • Rigid pavement have-  Deformation in the sub grade is not transferred to subsequent layers  Design is based on flexural strength or slab action  Have high flexural strength  No such phenomenon of grain to grain load transfer exists  Have low repairing cost but completion cost is high  Life span is more as compare to flexible (Low Maintenance Cost) 8
  • 9. 9 Longitudinal joint Transverse joint Subgrade Base Surface Texture Surface smoothness Thickness Design Dowel bars Concrete materials Tiebars Basic Components of a Concrete Pavement
  • 10. 1. Preparation of base 2. Form working 3. Preparation of subgrade 4. Watering of base 5. Joints 6. Material mix & placing 7. Compaction 10
  • 11. Using mix Concrete , there some Point to construct the road 11 8. Finishing of surface 8A. Floating 8B. Belting 8C. Brooming 9. Curing 10. Joint filling 11. Edging 12. Open to traffic
  • 12. 1. Rolling on sub grade by roller 2. Filling the granular soil in the weak part and pot holes 3. Correct the soil coat , Camber , longitudinal slop When concrete direct laid on subgrade, For preventing the water-seepaging into the soil , used water proof paper on entire length. 12
  • 15. Choose any one type of base 1. W.B.M. base As base material of W.B.M. Road; stone ballast, concrete 10-15cm layer are used. For bonding between concrete slab & W.B.M. used 1:2 cement wash on W.B.M. 2. Concrete base On the road used 10cm Cement concrete(1:2:4) or lime concrete(16:32:64) 15
  • 16. 3. Granular medium material layer 10-15cm composite layer of sand , moorum , bajri are used for better drainage facilities 4. Stabilization soil 16
  • 17. Material for form work- Wooden sheets, battens, plywood, fibre hard board, steel plates, angles, rope, minerals. 1. before using form work, it should free from all type material like as dust ,cement. 2. To placing the concrete in appropriate depth used 2.5-5cm thick and 3mtr long wooden sheeting. 17
  • 18. 3. The depth of wooden block must be same as level of slab thick. 4. After 24hrs form work displaced next length of road. 18
  • 19. If base is dry Than using the sprinkling process on it properly after that placing the concrete. 19
  • 20. Where is necessary to provide transverse, Longitudinal joints; there wedge of woods, metals fix on level of concrete. After setting of concrete it should be pull out. If provided the dowel bar in joints, bars should be fit at right position. 20
  • 21. Mixer is equipment that mix the concrete using distinct amount of cement , concrete, sand and water. Concrete slab should have more than 5-10cm thick cause of drying. Used two type mixer- 1. Batch mixer- at site, used for small road construction 2. Continuous mixer- Continuous mixer used for large construction . if distance is more from site , mix concrete transported at site within setting time. 21
  • 22. 22
  • 23. 23 Laying of polyethylene sheet over DLC
  • 24. 24
  • 25. Two methods generally used in placing of concrete- 1. Alternate bay method- Placed the concrete on both side of road alternatively like as1,3,5… part at one side and 2,4,6… part other side . 1st side 2nd side This method have slow process due to road traffic problems. 25
  • 26. 2. Continuous bay method- construct one side of road regularly, if completed some part of first side than construct other side. this method have fast process without no obstruction of traffic 26
  • 27. Purpose of compaction is that to pull out air from void and make concrete harden. Compaction done by- 1.mechanically surface vibrator 2. manually hand tempers 27
  • 28. 8. Finishing of surface 1.Floating- For levelling the surface use floating, scree- ding , power trowel. So that there is no acceptable more than 3mm variation in concrete level surface. 2.Belting- For making surface clean used belting process. Belt is nothing but a 15-30cm thick sheets of canvass which have more length than road. 28
  • 29. 29
  • 30. 3. Brooming- Brooming is the process in which we made rough surface parallel to road by brush. It useful in avoiding slip & comfortable travelling on road . the depth of line on road no more than 1.5mm. 30
  • 31. 31 Texturing of finished surface by texturing machine
  • 32. 9. Curing Curing is the name of increasing the hydration process of cement. after setting the concrete , curing process done till 14-28days. 32
  • 33. Some method of curing are- 1.Shading concrete works 2. Covering with hessian & gunny bags 3. Sprinkling of water 4.By ponding 5. Membrane curing 6. Steam curing 33
  • 35. 10. Filling joint After drying road, clean the joints and fill the shelling compound or hot bitumen . also bitumen fill road bank. 35
  • 36. 11. Edging To protect damaging the sides of concrete pavements used over burnt brick work. in place of brick, provided kerb of pre mix concrete. 36
  • 37. Generally after a month, road should be open to traffic. If used rapid hardening cement it take 7 days to open traffic. 37
  • 38. Advantages of Concrete Road • Durability and maintenance free life • Vehicles consume less fuel • Resistant to automobile fuel spillage and extreme weather • Greener process • Saving of natural resources • Eco friendly process 38
  • 39. 39