Case Study
Specialist Expertise in Manufacturing Process Improvement
Andy Dobson, PaCkRaT Ltd.t/a Lean 4 Business Registered in England,
Company no. 4676181 Vat. No. 122 6139 44
Tel: 0845 108 3949 Mob: 07850 776994 E: andy@lean4business.co.uk
An Asset Management Approach to A Strong Future
Tata Steel amongst many global businesses impacted by the onset of the world
recession in 2008.
The immediate actions of cost cutting led to reliability and cost issues over the longer
term; jeopardising the future of the company worldwide as well as the local economy of
South Wales. They needed a well thought through maintenance programme to ensure
production was capable of responding to demand and operational costs were minimised.
Background
The Tata brand is highly respected throughout the
world and is the world’s most geographically
diversified steel producer. They have operations
in 26 countries as well as commercial offices in
over 35 countries.
Tata are the second largest producer of speciality
steels in Europe.
Tata Steel and Strip Products serve demanding
markets worldwide, each with differing needs.
Markets include Aerospace, Automotive,
Construction, Consumer Products, Defence &
Security, Energy & Power, Lifting & Excavating,
Packaging, Rail and Shipbuilding.
Their Issue
In 2008 Tata Steel’s orders dropped 40% almost
overnight with the onset of the global recession
and the subsequent world steel demand and price
slump. They had to cut costs anywhere they
could to be able to stay in business.
One of the items put on hold was equipment
maintenance, meaning that maintenance
compliance was down to as low as 15% at the
Port Talbot site.
The Story
In 2010, with little maintenance being carried out
in the previous year, equipment was unreliable,
resulting in excessive downtime and poor service
to a demanding customer base. Costs were also
starting to rack-up as equipment was failing
prematurely...
This was an unsustainable situation and had to be
addressed. A project was instigated; CAM-F
(Company Asset Management Framework) – a
rigorous methodology to manage assets efficiently
and effectively, reducing downtime and cost of
operation.
Andy Dobson joined the existing team in late
2010 to provide specific support for the Steel and
Slab department. Although not having worked in
Steel-Making before, Andy’s Lean engineering
background, helped the department to develop,
implement and sustain CAM-F. There were
specific issues with Steel and Slab and Andy
worked to fit CAM-F to the specific requirements
of the area.
Previously the maintenance catalogues for each
piece of equipment were kept remotely, however
as maintenance had not been a major priority,
they had not been kept up to date and had been
poorly implemented in SAP.
Changes to the assets had also not been reflected
in the maintenance catalogue so maintenance
was often being neglected.
Andy was responsible for ensuring that weekly
maintenance reviews were carried out and that
maintenance plans were adhered to. Andy
worked in a mentoring role in order to bring up
understanding and increase compliance.
This meant the equipment worked efficiently and
maximum output was achieved. Also, going
forward maintenance costs were reduced by over
£300k with an added benefit of using fewer
external resources, thus further reducing
maintenance expenditure.
As a result of the improvements demonstrated at
the Port Talbot operation, many of the processes
were also implemented in the other global
operations to aid reduce running costs and
stablise production in an over supplied and price
sensitive market.
“Andy worked in our asset management
improvement programme at Tata Steel and made
a very good contribution through his people-
oriented approach to change. He also has a lot
of consultancy experience and a very good
knowledge of operational excellence approaches
such as Lean and Six-Sigma”.
Roger Hammond, CEO Chief Operating Officer
and Partner at Act-3D B.V

More Related Content

Similar to L4B case study tata steel

Gr.5_STM PROJECT PPT - Tata Steel Ltd..pptx
Gr.5_STM PROJECT PPT - Tata Steel Ltd..pptxGr.5_STM PROJECT PPT - Tata Steel Ltd..pptx
Gr.5_STM PROJECT PPT - Tata Steel Ltd..pptx
ISHANRATH
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Doc
karl luke
 
AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17
Charl Du Preez
 
Proactive approach to industry downturn case study
Proactive approach to industry downturn case study Proactive approach to industry downturn case study
Proactive approach to industry downturn case study
Confiance Australia
 
Technology Strategy Jsw Steel
Technology Strategy Jsw SteelTechnology Strategy Jsw Steel
Technology Strategy Jsw Steel
prasenjitdebdas
 

Similar to L4B case study tata steel (20)

Gr.5_STM PROJECT PPT - Tata Steel Ltd..pptx
Gr.5_STM PROJECT PPT - Tata Steel Ltd..pptxGr.5_STM PROJECT PPT - Tata Steel Ltd..pptx
Gr.5_STM PROJECT PPT - Tata Steel Ltd..pptx
 
machine2010 (1).pptx
machine2010 (1).pptxmachine2010 (1).pptx
machine2010 (1).pptx
 
A new sewage system with best value procurement van de rijt & van den hoogen ...
A new sewage system with best value procurement van de rijt & van den hoogen ...A new sewage system with best value procurement van de rijt & van den hoogen ...
A new sewage system with best value procurement van de rijt & van den hoogen ...
 
TATA STEEL ANALYSIS
TATA STEEL  ANALYSISTATA STEEL  ANALYSIS
TATA STEEL ANALYSIS
 
2qfy23-results-presentation.pdf
2qfy23-results-presentation.pdf2qfy23-results-presentation.pdf
2qfy23-results-presentation.pdf
 
Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Doc
 
Project rashmi steel
Project rashmi steelProject rashmi steel
Project rashmi steel
 
Combined Case Studies (Short)
Combined Case Studies (Short)Combined Case Studies (Short)
Combined Case Studies (Short)
 
ARC's Andy Chatha's Current Business Drivers & Trends Presentation @ ARC Indu...
ARC's Andy Chatha's Current Business Drivers & Trends Presentation @ ARC Indu...ARC's Andy Chatha's Current Business Drivers & Trends Presentation @ ARC Indu...
ARC's Andy Chatha's Current Business Drivers & Trends Presentation @ ARC Indu...
 
AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17
 
Baobab Operational Improvement
Baobab Operational ImprovementBaobab Operational Improvement
Baobab Operational Improvement
 
Marketing Mix of Tata Steels
Marketing  Mix  of  Tata SteelsMarketing  Mix  of  Tata Steels
Marketing Mix of Tata Steels
 
Roth OC 2009
Roth OC 2009Roth OC 2009
Roth OC 2009
 
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
AB Minerals Corp. - A New Separation Techmology to Process Tantalite Bearing ...
 
Proactive approach to industry downturn case study
Proactive approach to industry downturn case study Proactive approach to industry downturn case study
Proactive approach to industry downturn case study
 
AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...
AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...
AB MINERALS UPDATED PRESENTATION - A New Separation Technology to Process Tan...
 
Technology Strategy Jsw Steel
Technology Strategy Jsw SteelTechnology Strategy Jsw Steel
Technology Strategy Jsw Steel
 
Q2 2013 conferencecall
Q2 2013 conferencecallQ2 2013 conferencecall
Q2 2013 conferencecall
 
An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...
An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...
An incentive mechanism for Industrial CCS? Exploring the findings of the Tees...
 
Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2Corneliu ioan gligor - cv - rev 2
Corneliu ioan gligor - cv - rev 2
 

More from Andy Dobson - BSc. FMM (8)

L4B case study Production Management
L4B case study Production ManagementL4B case study Production Management
L4B case study Production Management
 
L4b case study AK
L4b case study AKL4b case study AK
L4b case study AK
 
Housekeeping - 5 step Programme
Housekeeping - 5 step ProgrammeHousekeeping - 5 step Programme
Housekeeping - 5 step Programme
 
5S game
5S game5S game
5S game
 
7 wastes +
7  wastes +7  wastes +
7 wastes +
 
Case study l4 b ad1
Case study l4 b ad1Case study l4 b ad1
Case study l4 b ad1
 
5 areas for business growth
5 areas for business growth5 areas for business growth
5 areas for business growth
 
Lean operations presentation
Lean operations   presentationLean operations   presentation
Lean operations presentation
 

Recently uploaded

Recently uploaded (20)

Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by AccionSeries A Fundraising Guide (Investing Individuals Improving Our World) by Accion
Series A Fundraising Guide (Investing Individuals Improving Our World) by Accion
 
The Ultimate Guide to IPTV App Development Process_ Step-By-Step Instructions
The Ultimate Guide to IPTV App Development Process_ Step-By-Step InstructionsThe Ultimate Guide to IPTV App Development Process_ Step-By-Step Instructions
The Ultimate Guide to IPTV App Development Process_ Step-By-Step Instructions
 
Revolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon ComponentsRevolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon Components
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
How to Maintain Healthy Life style.pptx
How to Maintain  Healthy Life style.pptxHow to Maintain  Healthy Life style.pptx
How to Maintain Healthy Life style.pptx
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptxUnveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
Falcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small BusinessesFalcon Invoice Discounting Setup for Small Businesses
Falcon Invoice Discounting Setup for Small Businesses
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
FEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service LightningFEXLE- Salesforce Field Service Lightning
FEXLE- Salesforce Field Service Lightning
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
Stages of Startup Funding - An Explainer
Stages of Startup Funding - An ExplainerStages of Startup Funding - An Explainer
Stages of Startup Funding - An Explainer
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team Presentations
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
Potato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdfPotato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdf
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob Badgett
 

L4B case study tata steel

  • 1. Case Study Specialist Expertise in Manufacturing Process Improvement Andy Dobson, PaCkRaT Ltd.t/a Lean 4 Business Registered in England, Company no. 4676181 Vat. No. 122 6139 44 Tel: 0845 108 3949 Mob: 07850 776994 E: andy@lean4business.co.uk An Asset Management Approach to A Strong Future Tata Steel amongst many global businesses impacted by the onset of the world recession in 2008. The immediate actions of cost cutting led to reliability and cost issues over the longer term; jeopardising the future of the company worldwide as well as the local economy of South Wales. They needed a well thought through maintenance programme to ensure production was capable of responding to demand and operational costs were minimised. Background The Tata brand is highly respected throughout the world and is the world’s most geographically diversified steel producer. They have operations in 26 countries as well as commercial offices in over 35 countries. Tata are the second largest producer of speciality steels in Europe. Tata Steel and Strip Products serve demanding markets worldwide, each with differing needs. Markets include Aerospace, Automotive, Construction, Consumer Products, Defence & Security, Energy & Power, Lifting & Excavating, Packaging, Rail and Shipbuilding. Their Issue In 2008 Tata Steel’s orders dropped 40% almost overnight with the onset of the global recession and the subsequent world steel demand and price slump. They had to cut costs anywhere they could to be able to stay in business. One of the items put on hold was equipment maintenance, meaning that maintenance compliance was down to as low as 15% at the Port Talbot site. The Story In 2010, with little maintenance being carried out in the previous year, equipment was unreliable, resulting in excessive downtime and poor service to a demanding customer base. Costs were also starting to rack-up as equipment was failing prematurely... This was an unsustainable situation and had to be addressed. A project was instigated; CAM-F (Company Asset Management Framework) – a rigorous methodology to manage assets efficiently and effectively, reducing downtime and cost of operation. Andy Dobson joined the existing team in late 2010 to provide specific support for the Steel and Slab department. Although not having worked in Steel-Making before, Andy’s Lean engineering background, helped the department to develop, implement and sustain CAM-F. There were specific issues with Steel and Slab and Andy worked to fit CAM-F to the specific requirements of the area. Previously the maintenance catalogues for each piece of equipment were kept remotely, however as maintenance had not been a major priority, they had not been kept up to date and had been poorly implemented in SAP. Changes to the assets had also not been reflected in the maintenance catalogue so maintenance was often being neglected. Andy was responsible for ensuring that weekly maintenance reviews were carried out and that maintenance plans were adhered to. Andy worked in a mentoring role in order to bring up understanding and increase compliance. This meant the equipment worked efficiently and maximum output was achieved. Also, going forward maintenance costs were reduced by over £300k with an added benefit of using fewer external resources, thus further reducing maintenance expenditure. As a result of the improvements demonstrated at the Port Talbot operation, many of the processes were also implemented in the other global operations to aid reduce running costs and stablise production in an over supplied and price sensitive market. “Andy worked in our asset management improvement programme at Tata Steel and made a very good contribution through his people- oriented approach to change. He also has a lot of consultancy experience and a very good knowledge of operational excellence approaches such as Lean and Six-Sigma”. Roger Hammond, CEO Chief Operating Officer and Partner at Act-3D B.V