SlideShare a Scribd company logo
1 of 3
24352 Highlander Rd, Phone: (310) 467-5467
West Hills, CA 91307
AMIR PIA
Mr. Amir Pia has been providing project engineering services for over 12 years for
residential and public works clients. He has been responsible for processing RFIs,
submittals, change orders, resolving field issues, documenting as-built conditions,
preparing progress reports, monitoring resolution of final punchlist items, preparing
independent change order cost estimates, assisting in negotiation of change orders,
closeout activities, prevailing wage verification, document control, coordination
among contractors, architects-Engineers, and owners. Amir is also an expert in
preparing project schedules using Primavera P6. He is detailed-oriented, quality-
focused, possesses excellent written and verbal communication skills, and is a team
player. He is well versed in developing partnerships and coordinating with team
members, and building positive rapport with clients.
Los Angeles World Airports (LAWA) – Airside Element Runway 25R-7L RSA,
Los Angeles, CA
OFFICE ENGINEER II, MAR 2016 – PRESENT
As Office Engineer, Amir’s duties includes: 1) coordinating with Contractors and LAWA
Inspectors to review and process the contractor’ monthly pay request applications; 2)
coordinate with the design engineers to secure review comments for shop drawings
and submittals; 3) coordinate with the design engineers to respond to RFI’s; 4)
distribute shop drawings, submittals, and RFI’s to the project team members; 5)
receive, review, and input correspondences in Prolog and prepare prolog status
reports; 6) maintain project files and document / drawing management systems (hard
and electronic copies); 6) attending progress meetings, documenting, and distributing
minutes of these meetings; and 7) other tasks as assigned by the project team
members. Amir is also responsible for updating and maintaining logs for all RFI’s, Shop
Drawings/submittals, change directives (CD), Contractor Change Request (CCR),
Inspectors Job Memos, Inspectors Notices of Non-Compliance, Safety Notices, and all
incoming and outgoing construction correspondences,
Los Angeles World Airports (LAWA) – Airside Element Runway 24L-6R RSA,
Los Angeles, CA
OFFICE ENGINEER II, AUG 2015 – FEB 2016
LAWA is in the process of implementing modernization of the LAX airport. The
project is part of the federal government requiring US airports to improve the Runway
Safety Area (RSA) zone at the end of each runway. Airside Element Runway 24L-6R
RSA and 25R-7L RSA were part of this program. Amir’s duties and responsibilities
are the same as Airside Element Runway 24L-6R RSA.
Port of Long Beach (POLB) – Middle Harbor Terminal Redevelopment Program,
Marine Ops / Power Shop Building and Slip Fill Projects, Long Beach, CA
PROJECT ENGINEER, 2014 – AUG 2015
Amir Pia served as Project Engineer on POLB Middle Harbor Redevelopment Program,
as part of Marine Operation and Power Shop Building and Slip Fill projects. The Marine
Ops & Power Shop Building involved Construction of a 14,000 S.F. 2-story, steel-framed
marine operations building and a 50,000 S.F. 2-story, steel maintenance and repair
building with automobile parking lot, internal terminal roadway, site improvements,
parameter security fence, landscaping, and site utilities. The Slip Fill project involved
demolition of the existing wharf and bulkhead systems, removal and disposal of treated
wood, marine excavation, dredging, placement of rock slope, wave protection,
installation of a temporary storm drain system, paving, and wick drains installation. Amir
was responsible for evaluating contractor’s change order request for merit, reviewing
and comparing the contractor’s proposed cost proposals and the third-party cost
estimates, investigating and resolving cost discrepancies, preparing independent
12 YEARS OF
EXPERIENCE
Public Buildings
School Facilities
MarineTerminal Facilities
Airport Facilities
Reservoir Covers
Residential Buildings
Sitework
Water Treatment Facilities
EDUCATION
M.S., Geotechnical Engineering,
Azad University, Iran, 2012
B.S., Civil Engineering,Azad
University, Iran, 2006
PROFESSIONAL
AFFILIATION
Member, Iranian Society of Civil
Engineers
Construction Management
Association of America
COMPUTER SKILLS
MS OfficeSuite
Prolog
MS Projects
Primavera P6
Primavera Unifier
Contract Manager
AutoCAD, Civil 3-D,Sap 2000,
ETABS, ABAQUS, Matlab
24352 Highlander Rd, Phone: (310) 467-5467
West Hills, CA 91307
hange order estimates, and participating in change order negotiations. Amir also reviewed and processed
submittals and RFIs, coordinated outstanding field issues with the design engineer and the contractor, prepared
as-built drawings, verified contractors’ prevailing wage reports, and assisted in project closeout activities.
Los AngelesDepartment of Water and Power (LADWP) – Franklin Reservoir No. 2 Floating Cover
PROJECT SCHEDULER, 2015
LADWP Lower Franklin Reservoir No. 2 is a 360-million gallon reservoir in Beverly Hills, CA, which supplies
drinking water to about 375,000 people in Beverly Hills and western Los Angeles. This project consisted of
demolishing the existing Chafer lining, reservoir floating cover, and associated pipelines and electrical systems
and installing new CSPE floating cover & Chafer liner, inlet and outlet structures, concrete vaults, access
roadways, and other various site improvements on this 12 –acre site. Amir prepared the construction project
schedule, using Primavera P6, at the final design phase.
LADWP – River Supply Conduit, Lower Reach No. 3
PROJECT SCHEDULER, 2015
LADWP River Supply Conduit, Lower Reach No. 3 includes construction of over 10,600 lf of 97-inch diameter
welded steel pipe in the heavily populated area of Burbank, CA, using open-cut and tunneling construction
methods. Amir reviewed and analyzed the Contractor cost- and resource-loaded baseline schedule to confirm its
accuracy and reliability. Amir provided the schedule review comments in a written report to LADWP.
Metropolitan Water District (MWD) – F. E. Weymouth Water Treatment Plant Solar Generation Facility, La
Verne, CA
PROJECT SCHEDULER, 2015
This 3 MW photovoltaic solar generation facility will have a 6.19-acre and 8.55-acre solar panel areas, including
ground-mount solar panels on fixed, single, or dual axis tracking platforms, equipment pads, canopies, inverters,
weather station, monitoring system, and other appurtenant work. Amir prepared the construction project
schedule for this project at the final design phase.
MWD – F. E. Weymouth Water Treatment Plant Solar Generation Facility, La Verne, CA
PROJECT SCHEDULER, 2015
This 3 MW photovoltaic solar generation facility will have a 6.19-acre and 8.55-acre solar panel areas, including
ground-mount solar panels on fixed, single, or dual axis tracking platforms, equipment pads, canopies, inverters,
weather station, monitoring system, and other appurtenant work. Amir prepared the construction project schedule
for this project at the final design phase.
Los AngelesUnion School District (LAUSD) – Central Region LosAngelesHigh School No. 12, Los
Angeles, CA
OFFICE ENGINEER, 2013 - 2014
This project involved construction of one 3-story high school building with 19 classrooms over one level of
semi-subterranean parking structure for 47 cars, and B-Permit ramps and sidewalks valued at $22 million.
Amir served as Office Engineer where he was responsible for assisting in reviewing, processing, and
responding to Requests for Information and Submittals; maintaining project records by using Expedition,
documenting field different site conditions, preparing independent change order estimates and assisting with
change order negotiations, and processing change order documents. He was also responsible for
documenting field issues, attending the weekly progress meetings, documenting Contractor’s daily
construction progress, taking project photos, recording unforeseen field conditions, updating as-built
drawings, and assisting with project closeout tasks.
24352 Highlander Rd, Phone: (310) 467-5467
West Hills, CA 91307
Nama Sang Sofeh Construction, Iran
PROJECT ENGINEER, 2008 – 2012
Mr. Pia provided project engineering services for three complete build-out residential concrete/masonry
buildings valued at $5M. In this role, Amir was responsible for reviewing the project scope and permit
requirements to establish the list of pre-construction activities and ensure completion of these activities in a
timely manner. He was also responsible for managing construction activities for excavation, grading,
concrete and masonry structures, site utilities, and building interior and exterior finishes. Amir reviewed the
proposed and existing grading plan, performed quantity take-off on the net borrow/waste, maintained as-built
drawings for all subsurface utilities, and coordinated with the governing agencies. He was also responsible
for coordinating and resolving field issues with the design engineer, creating and managing project schedule,
monitoring project budget and expenditures, and supervising the field crew.
Karestane Sepahan Construction, Iran
ASSISTANT PROJECT ENGINEER, 2004 – 2008
As Assistant Project Engineer for the construction contractor for three residential homes valued at $10M, Amir
was responsible for assisting the project engineer on a wide range of activities including continuously
monitoring the project budget and expenditures, coordinating and resolving field issues by collaborating with
the design engineer, creating and managing project schedule and supervising field crew. Amir’s duties also
included assisting in preparation and processing submittals and RFI’s and procuring construction materials.
He also prepared weekly and monthly progress reports for the client.
Deesman Prefab Concrete Factory, Iran
INTERN, 2003 – 2004
Mr. Pia served as an Intern at a prefabrication concrete factory where he assisted the Project Engineer in
monitoring daily field activities. Amir’s responsibilities included preparing modified constructions plans using
AutoCAD, coordinating daily field activities, procuring construction materials and maintaining daily progress
reports and photographs. He also assisted the Project Manager and Inspector with preparation of the final
punchlist and monitoring their resolution, and performing project cost control.

More Related Content

What's hot (20)

Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
WILSON SAPIEN CV
WILSON SAPIEN CVWILSON SAPIEN CV
WILSON SAPIEN CV
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-na
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
KDK RES 2016 Sunoco
KDK RES 2016 SunocoKDK RES 2016 Sunoco
KDK RES 2016 Sunoco
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Peter McGough CV 2010
Peter McGough CV 2010Peter McGough CV 2010
Peter McGough CV 2010
 
Siemens_CV1
Siemens_CV1Siemens_CV1
Siemens_CV1
 
PMC 1.1- 22jul16
PMC 1.1- 22jul16PMC 1.1- 22jul16
PMC 1.1- 22jul16
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
2016 j
2016 j2016 j
2016 j
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 
Ahmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedin
 

Viewers also liked

FíSica Aula 4 Primeira Lei Da TermodinâMica
FíSica Aula 4   Primeira Lei Da TermodinâMicaFíSica Aula 4   Primeira Lei Da TermodinâMica
FíSica Aula 4 Primeira Lei Da TermodinâMica
educacao f
 
BelIntelForce_presentation of the company
BelIntelForce_presentation of the companyBelIntelForce_presentation of the company
BelIntelForce_presentation of the company
Олег Казаков
 
SMITA Student File saral 6 D
SMITA Student File saral 6 DSMITA Student File saral 6 D
SMITA Student File saral 6 D
SMITA MAHESHI
 
Matematica slides habitacional2
Matematica slides habitacional2Matematica slides habitacional2
Matematica slides habitacional2
educacao f
 
Matematica slides capitalizacao composta
Matematica slides capitalizacao compostaMatematica slides capitalizacao composta
Matematica slides capitalizacao composta
educacao f
 
Presentación Maravillados
Presentación MaravilladosPresentación Maravillados
Presentación Maravillados
Maravillados
 
Matematica exercicios lista amortiza_o_i
Matematica exercicios lista amortiza_o_iMatematica exercicios lista amortiza_o_i
Matematica exercicios lista amortiza_o_i
educacao f
 
Matematica slides descontos
Matematica slides descontosMatematica slides descontos
Matematica slides descontos
educacao f
 
3examples of work in architecture
3examples of work in architecture3examples of work in architecture
3examples of work in architecture
Farzan Khosroshahi
 
Questoes matematica concurso
Questoes matematica concursoQuestoes matematica concurso
Questoes matematica concurso
educacao f
 
методичні рекомендації щодо викладання інформатики2016 2017 н р.pptm
методичні рекомендації щодо викладання інформатики2016 2017 н р.pptmметодичні рекомендації щодо викладання інформатики2016 2017 н р.pptm
методичні рекомендації щодо викладання інформатики2016 2017 н р.pptm
Владимир Кобыляцкий
 

Viewers also liked (20)

Девиз
ДевизДевиз
Девиз
 
La naturaleza
La naturalezaLa naturaleza
La naturaleza
 
Decreto 90393
Decreto 90393Decreto 90393
Decreto 90393
 
FíSica Aula 4 Primeira Lei Da TermodinâMica
FíSica Aula 4   Primeira Lei Da TermodinâMicaFíSica Aula 4   Primeira Lei Da TermodinâMica
FíSica Aula 4 Primeira Lei Da TermodinâMica
 
BelIntelForce_presentation of the company
BelIntelForce_presentation of the companyBelIntelForce_presentation of the company
BelIntelForce_presentation of the company
 
Antomia de la piel
Antomia de la pielAntomia de la piel
Antomia de la piel
 
SMITA Student File saral 6 D
SMITA Student File saral 6 DSMITA Student File saral 6 D
SMITA Student File saral 6 D
 
Presentation8
Presentation8Presentation8
Presentation8
 
Matematica slides habitacional2
Matematica slides habitacional2Matematica slides habitacional2
Matematica slides habitacional2
 
Matematica slides capitalizacao composta
Matematica slides capitalizacao compostaMatematica slides capitalizacao composta
Matematica slides capitalizacao composta
 
Test
TestTest
Test
 
Presentación Maravillados
Presentación MaravilladosPresentación Maravillados
Presentación Maravillados
 
Rrttyy.pdf
Rrttyy.pdfRrttyy.pdf
Rrttyy.pdf
 
Calendari d'Excursions Quart Trimestre 2012
Calendari d'Excursions Quart Trimestre 2012Calendari d'Excursions Quart Trimestre 2012
Calendari d'Excursions Quart Trimestre 2012
 
Matematica exercicios lista amortiza_o_i
Matematica exercicios lista amortiza_o_iMatematica exercicios lista amortiza_o_i
Matematica exercicios lista amortiza_o_i
 
Matematica slides descontos
Matematica slides descontosMatematica slides descontos
Matematica slides descontos
 
Educomunicaciòn
EducomunicaciònEducomunicaciòn
Educomunicaciòn
 
3examples of work in architecture
3examples of work in architecture3examples of work in architecture
3examples of work in architecture
 
Questoes matematica concurso
Questoes matematica concursoQuestoes matematica concurso
Questoes matematica concurso
 
методичні рекомендації щодо викладання інформатики2016 2017 н р.pptm
методичні рекомендації щодо викладання інформатики2016 2017 н р.pptmметодичні рекомендації щодо викладання інформатики2016 2017 н р.pptm
методичні рекомендації щодо викладання інформатики2016 2017 н р.pptm
 

Similar to AMIR PIA_Resume_7-16

Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resume
Zade Couch
 
2016-0429 John Szadzinski
2016-0429 John Szadzinski2016-0429 John Szadzinski
2016-0429 John Szadzinski
John Szadzinski
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
Karl Keller
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
Paul Blaetz
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
Randy Seperak
 

Similar to AMIR PIA_Resume_7-16 (20)

Resume
ResumeResume
Resume
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resume
 
Project list
Project listProject list
Project list
 
Resume of Eng.Ali
Resume of  Eng.AliResume of  Eng.Ali
Resume of Eng.Ali
 
Scott_Molstad 8
Scott_Molstad 8Scott_Molstad 8
Scott_Molstad 8
 
2016-0429 John Szadzinski
2016-0429 John Szadzinski2016-0429 John Szadzinski
2016-0429 John Szadzinski
 
Culanag, Desideria
Culanag, DesideriaCulanag, Desideria
Culanag, Desideria
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
CM Resume
CM Resume CM Resume
CM Resume
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
Scott resume
Scott resumeScott resume
Scott resume
 
Resume.Brian Murphree
Resume.Brian MurphreeResume.Brian Murphree
Resume.Brian Murphree
 
Aaron zambo - Civil Engineer
Aaron  zambo - Civil EngineerAaron  zambo - Civil Engineer
Aaron zambo - Civil Engineer
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
Ed resume 2017.docx current
Ed resume   2017.docx currentEd resume   2017.docx current
Ed resume 2017.docx current
 
Lou Houlemarde
Lou HoulemardeLou Houlemarde
Lou Houlemarde
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
Daniel Andrescavage
Daniel AndrescavageDaniel Andrescavage
Daniel Andrescavage
 

AMIR PIA_Resume_7-16

  • 1. 24352 Highlander Rd, Phone: (310) 467-5467 West Hills, CA 91307 AMIR PIA Mr. Amir Pia has been providing project engineering services for over 12 years for residential and public works clients. He has been responsible for processing RFIs, submittals, change orders, resolving field issues, documenting as-built conditions, preparing progress reports, monitoring resolution of final punchlist items, preparing independent change order cost estimates, assisting in negotiation of change orders, closeout activities, prevailing wage verification, document control, coordination among contractors, architects-Engineers, and owners. Amir is also an expert in preparing project schedules using Primavera P6. He is detailed-oriented, quality- focused, possesses excellent written and verbal communication skills, and is a team player. He is well versed in developing partnerships and coordinating with team members, and building positive rapport with clients. Los Angeles World Airports (LAWA) – Airside Element Runway 25R-7L RSA, Los Angeles, CA OFFICE ENGINEER II, MAR 2016 – PRESENT As Office Engineer, Amir’s duties includes: 1) coordinating with Contractors and LAWA Inspectors to review and process the contractor’ monthly pay request applications; 2) coordinate with the design engineers to secure review comments for shop drawings and submittals; 3) coordinate with the design engineers to respond to RFI’s; 4) distribute shop drawings, submittals, and RFI’s to the project team members; 5) receive, review, and input correspondences in Prolog and prepare prolog status reports; 6) maintain project files and document / drawing management systems (hard and electronic copies); 6) attending progress meetings, documenting, and distributing minutes of these meetings; and 7) other tasks as assigned by the project team members. Amir is also responsible for updating and maintaining logs for all RFI’s, Shop Drawings/submittals, change directives (CD), Contractor Change Request (CCR), Inspectors Job Memos, Inspectors Notices of Non-Compliance, Safety Notices, and all incoming and outgoing construction correspondences, Los Angeles World Airports (LAWA) – Airside Element Runway 24L-6R RSA, Los Angeles, CA OFFICE ENGINEER II, AUG 2015 – FEB 2016 LAWA is in the process of implementing modernization of the LAX airport. The project is part of the federal government requiring US airports to improve the Runway Safety Area (RSA) zone at the end of each runway. Airside Element Runway 24L-6R RSA and 25R-7L RSA were part of this program. Amir’s duties and responsibilities are the same as Airside Element Runway 24L-6R RSA. Port of Long Beach (POLB) – Middle Harbor Terminal Redevelopment Program, Marine Ops / Power Shop Building and Slip Fill Projects, Long Beach, CA PROJECT ENGINEER, 2014 – AUG 2015 Amir Pia served as Project Engineer on POLB Middle Harbor Redevelopment Program, as part of Marine Operation and Power Shop Building and Slip Fill projects. The Marine Ops & Power Shop Building involved Construction of a 14,000 S.F. 2-story, steel-framed marine operations building and a 50,000 S.F. 2-story, steel maintenance and repair building with automobile parking lot, internal terminal roadway, site improvements, parameter security fence, landscaping, and site utilities. The Slip Fill project involved demolition of the existing wharf and bulkhead systems, removal and disposal of treated wood, marine excavation, dredging, placement of rock slope, wave protection, installation of a temporary storm drain system, paving, and wick drains installation. Amir was responsible for evaluating contractor’s change order request for merit, reviewing and comparing the contractor’s proposed cost proposals and the third-party cost estimates, investigating and resolving cost discrepancies, preparing independent 12 YEARS OF EXPERIENCE Public Buildings School Facilities MarineTerminal Facilities Airport Facilities Reservoir Covers Residential Buildings Sitework Water Treatment Facilities EDUCATION M.S., Geotechnical Engineering, Azad University, Iran, 2012 B.S., Civil Engineering,Azad University, Iran, 2006 PROFESSIONAL AFFILIATION Member, Iranian Society of Civil Engineers Construction Management Association of America COMPUTER SKILLS MS OfficeSuite Prolog MS Projects Primavera P6 Primavera Unifier Contract Manager AutoCAD, Civil 3-D,Sap 2000, ETABS, ABAQUS, Matlab
  • 2. 24352 Highlander Rd, Phone: (310) 467-5467 West Hills, CA 91307 hange order estimates, and participating in change order negotiations. Amir also reviewed and processed submittals and RFIs, coordinated outstanding field issues with the design engineer and the contractor, prepared as-built drawings, verified contractors’ prevailing wage reports, and assisted in project closeout activities. Los AngelesDepartment of Water and Power (LADWP) – Franklin Reservoir No. 2 Floating Cover PROJECT SCHEDULER, 2015 LADWP Lower Franklin Reservoir No. 2 is a 360-million gallon reservoir in Beverly Hills, CA, which supplies drinking water to about 375,000 people in Beverly Hills and western Los Angeles. This project consisted of demolishing the existing Chafer lining, reservoir floating cover, and associated pipelines and electrical systems and installing new CSPE floating cover & Chafer liner, inlet and outlet structures, concrete vaults, access roadways, and other various site improvements on this 12 –acre site. Amir prepared the construction project schedule, using Primavera P6, at the final design phase. LADWP – River Supply Conduit, Lower Reach No. 3 PROJECT SCHEDULER, 2015 LADWP River Supply Conduit, Lower Reach No. 3 includes construction of over 10,600 lf of 97-inch diameter welded steel pipe in the heavily populated area of Burbank, CA, using open-cut and tunneling construction methods. Amir reviewed and analyzed the Contractor cost- and resource-loaded baseline schedule to confirm its accuracy and reliability. Amir provided the schedule review comments in a written report to LADWP. Metropolitan Water District (MWD) – F. E. Weymouth Water Treatment Plant Solar Generation Facility, La Verne, CA PROJECT SCHEDULER, 2015 This 3 MW photovoltaic solar generation facility will have a 6.19-acre and 8.55-acre solar panel areas, including ground-mount solar panels on fixed, single, or dual axis tracking platforms, equipment pads, canopies, inverters, weather station, monitoring system, and other appurtenant work. Amir prepared the construction project schedule for this project at the final design phase. MWD – F. E. Weymouth Water Treatment Plant Solar Generation Facility, La Verne, CA PROJECT SCHEDULER, 2015 This 3 MW photovoltaic solar generation facility will have a 6.19-acre and 8.55-acre solar panel areas, including ground-mount solar panels on fixed, single, or dual axis tracking platforms, equipment pads, canopies, inverters, weather station, monitoring system, and other appurtenant work. Amir prepared the construction project schedule for this project at the final design phase. Los AngelesUnion School District (LAUSD) – Central Region LosAngelesHigh School No. 12, Los Angeles, CA OFFICE ENGINEER, 2013 - 2014 This project involved construction of one 3-story high school building with 19 classrooms over one level of semi-subterranean parking structure for 47 cars, and B-Permit ramps and sidewalks valued at $22 million. Amir served as Office Engineer where he was responsible for assisting in reviewing, processing, and responding to Requests for Information and Submittals; maintaining project records by using Expedition, documenting field different site conditions, preparing independent change order estimates and assisting with change order negotiations, and processing change order documents. He was also responsible for documenting field issues, attending the weekly progress meetings, documenting Contractor’s daily construction progress, taking project photos, recording unforeseen field conditions, updating as-built drawings, and assisting with project closeout tasks.
  • 3. 24352 Highlander Rd, Phone: (310) 467-5467 West Hills, CA 91307 Nama Sang Sofeh Construction, Iran PROJECT ENGINEER, 2008 – 2012 Mr. Pia provided project engineering services for three complete build-out residential concrete/masonry buildings valued at $5M. In this role, Amir was responsible for reviewing the project scope and permit requirements to establish the list of pre-construction activities and ensure completion of these activities in a timely manner. He was also responsible for managing construction activities for excavation, grading, concrete and masonry structures, site utilities, and building interior and exterior finishes. Amir reviewed the proposed and existing grading plan, performed quantity take-off on the net borrow/waste, maintained as-built drawings for all subsurface utilities, and coordinated with the governing agencies. He was also responsible for coordinating and resolving field issues with the design engineer, creating and managing project schedule, monitoring project budget and expenditures, and supervising the field crew. Karestane Sepahan Construction, Iran ASSISTANT PROJECT ENGINEER, 2004 – 2008 As Assistant Project Engineer for the construction contractor for three residential homes valued at $10M, Amir was responsible for assisting the project engineer on a wide range of activities including continuously monitoring the project budget and expenditures, coordinating and resolving field issues by collaborating with the design engineer, creating and managing project schedule and supervising field crew. Amir’s duties also included assisting in preparation and processing submittals and RFI’s and procuring construction materials. He also prepared weekly and monthly progress reports for the client. Deesman Prefab Concrete Factory, Iran INTERN, 2003 – 2004 Mr. Pia served as an Intern at a prefabrication concrete factory where he assisted the Project Engineer in monitoring daily field activities. Amir’s responsibilities included preparing modified constructions plans using AutoCAD, coordinating daily field activities, procuring construction materials and maintaining daily progress reports and photographs. He also assisted the Project Manager and Inspector with preparation of the final punchlist and monitoring their resolution, and performing project cost control.