SlideShare uma empresa Scribd logo
1 de 1
Baixar para ler offline
National Craft Assessment and Certification Program
                                    B L U E P R I N T

Industrial Maintenance Mechanical                        Written Assessment Contents:
                                                         Industrial Maintenance Mechanical
Overview – This written assessment is a two-hour,        (MEIDMT32) as of 4/2008
closed-book examination. You will be permitted to use
                                                           Module                                            # of
a nonprogrammable, nonprinting calculator during          Numbers                  Topic Area              Questions
the examination. The Assessment Center will provide       00101      Basic Safety (00101)                     5
any necessary pencils. No extra papers, books, notes      00102      Introduction to Construction Math
or study materials are allowed in the testing area.                  (00102)                                  5
                                                          00104      Introduction to Power Tools (00104)      2
Study Material – All NCCER written assessments are        00106      Basic Rigging (00106)                    5
referenced to Contren® Learning Series modules. You       08309-07   Testing Piping Systems and
may order modules from Pearson Education, Inc. by                    Equipment                                5
calling (800) 922.0579 or by logging on to                15104-06   Basic Layout                             4
www.crafttraining.com.                                    15202-07   Field Sketching                          2
                                                          15304      Prealignment for Drilling and
                                                                     Tapping                                  2
Assessment Development – All questions on each            30110      Structural Ironworking: One              2
assessment have been developed and approved by
                                                          32211      Lubrication (25209)                      3
subject matter experts from the respective craft.         32113-07
Assessment development and administration operates        32115      Piping Systems (25210)                   2
under the direction of Prov, NCCER’s testing partner.     08201-06
                                                          32310      Gaskets and Packing (25311)              12
Credentials – NCCER will send appropriate                 32105-07
                                                          32408      Maintaining Valves (25411)               2
credentials (certificate, wallet card, and official       32205-08
transcript) to the Assessment Center upon successful      32409      Identifying and Installing Valves
completion of the written assessment.                     32205-08   (25408)                                  2
                                                          32410      Steam Traps                              2
Training Prescription Reports – Each candidate will       32208-07
                                                          32209-07
have access to individual results of the written
                                                          32411      Steam Systems                            2
assessment on NCCER’s website. This training              32208-07
prescription will include the overall score and           32209-07
results by topic area.                                    32509      Drawings and Symbols (25401)             3
                                                          32110      Oxyfuel Cutting                          2
National Registry – Assessment results will be            32104-07
maintained in NCCER’s National Registry and be a          08308-07   Pipe Hangers and Supports                2
part of each candidate’s training records. These          32103-07   Fasteners                                4
records are stored and become a portable record of        34301      Boiler Pressure Components               3
your training and assessment achievements.                34302      Boiler Nonpressure Components            4
                                                          34306      Boiler Auxiliaries                       7
                                                          34307      Towers and Exchangers                   10
                                                          34403      Advanced Towers and Exchangers           5
                                                          34409      Planning Work Activities                 3
                                                                          Total Number of Questions          100


                                                         Note: (xxxxx) Reference to NCCER’s CD-Rom
                                                                       Module Number

                                                         Additional Approved Reference during Assessment Session:
                                                         The Pipefitters Blue Book; W.V.Graves

                                                         .


                       National Center for Construction Education and Research (NCCER)
  3600 NW 43rd St., Bldg. G • Gainesville, Fl • 32606 • Ph: (352) 334.0911 • Fax: (352) 334.0932 • www.NCCER.org

Mais conteúdo relacionado

Semelhante a Nccer Maintenance

IBL Presentation rev FINAL
IBL Presentation rev FINALIBL Presentation rev FINAL
IBL Presentation rev FINALDion Botha
 
Computer aided analysis_and_design_of_multi-storeyed_buildings
Computer aided analysis_and_design_of_multi-storeyed_buildingsComputer aided analysis_and_design_of_multi-storeyed_buildings
Computer aided analysis_and_design_of_multi-storeyed_buildingsV.m. Rajan
 
Specifying Requirements for Electrical and Lighting Management Systems (ELMS)...
Specifying Requirements for Electrical and Lighting Management Systems (ELMS)...Specifying Requirements for Electrical and Lighting Management Systems (ELMS)...
Specifying Requirements for Electrical and Lighting Management Systems (ELMS)...Jim Frazer
 
CSWIP_3_2_Senior_Welding_Inspector_WIS10.pdf
CSWIP_3_2_Senior_Welding_Inspector_WIS10.pdfCSWIP_3_2_Senior_Welding_Inspector_WIS10.pdf
CSWIP_3_2_Senior_Welding_Inspector_WIS10.pdfAhmadRizki84
 
TRAINING REGULATIONS.docx
TRAINING REGULATIONS.docxTRAINING REGULATIONS.docx
TRAINING REGULATIONS.docxjhunbagain
 
CEN TC350 - status standards 1-4-2012 & background
CEN TC350 - status standards 1-4-2012 & backgroundCEN TC350 - status standards 1-4-2012 & background
CEN TC350 - status standards 1-4-2012 & backgroundChris Hamans
 
DESIGN AND FABRICATION OF EXHAUST GAS ANALYZER
DESIGN AND FABRICATION OF EXHAUST GAS ANALYZERDESIGN AND FABRICATION OF EXHAUST GAS ANALYZER
DESIGN AND FABRICATION OF EXHAUST GAS ANALYZERvivatechijri
 
Staad Pro, Open Jump and Geo five software training report
Staad Pro, Open Jump and Geo five software training reportStaad Pro, Open Jump and Geo five software training report
Staad Pro, Open Jump and Geo five software training reportRam1239
 
Co with mapping mech nc 10 24 01-2020 (3) (1)
Co with mapping mech  nc 10 24 01-2020 (3) (1)Co with mapping mech  nc 10 24 01-2020 (3) (1)
Co with mapping mech nc 10 24 01-2020 (3) (1)nityamoza
 
Bachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docxBachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docxUIET,KUK
 
B.E.Mech.pdf for regulation 2021 anna university students
B.E.Mech.pdf for regulation 2021 anna university studentsB.E.Mech.pdf for regulation 2021 anna university students
B.E.Mech.pdf for regulation 2021 anna university studentsRajasekaran Ponnuswamy
 
Case study on scheduling
Case study on schedulingCase study on scheduling
Case study on schedulingNewGate India
 
Engineering symbology-prints-and-drawings-2
Engineering symbology-prints-and-drawings-2Engineering symbology-prints-and-drawings-2
Engineering symbology-prints-and-drawings-2Souvik Dutta
 

Semelhante a Nccer Maintenance (20)

cSte map
cSte mapcSte map
cSte map
 
IBL Presentation rev FINAL
IBL Presentation rev FINALIBL Presentation rev FINAL
IBL Presentation rev FINAL
 
Computer aided analysis_and_design_of_multi-storeyed_buildings
Computer aided analysis_and_design_of_multi-storeyed_buildingsComputer aided analysis_and_design_of_multi-storeyed_buildings
Computer aided analysis_and_design_of_multi-storeyed_buildings
 
Specifying Requirements for Electrical and Lighting Management Systems (ELMS)...
Specifying Requirements for Electrical and Lighting Management Systems (ELMS)...Specifying Requirements for Electrical and Lighting Management Systems (ELMS)...
Specifying Requirements for Electrical and Lighting Management Systems (ELMS)...
 
CSWIP_3_2_Senior_Welding_Inspector_WIS10.pdf
CSWIP_3_2_Senior_Welding_Inspector_WIS10.pdfCSWIP_3_2_Senior_Welding_Inspector_WIS10.pdf
CSWIP_3_2_Senior_Welding_Inspector_WIS10.pdf
 
TRAINING REGULATIONS.docx
TRAINING REGULATIONS.docxTRAINING REGULATIONS.docx
TRAINING REGULATIONS.docx
 
CEN TC350 - status standards 1-4-2012 & background
CEN TC350 - status standards 1-4-2012 & backgroundCEN TC350 - status standards 1-4-2012 & background
CEN TC350 - status standards 1-4-2012 & background
 
NEC3 to NE4 webinar
NEC3 to NE4 webinarNEC3 to NE4 webinar
NEC3 to NE4 webinar
 
DESIGN AND FABRICATION OF EXHAUST GAS ANALYZER
DESIGN AND FABRICATION OF EXHAUST GAS ANALYZERDESIGN AND FABRICATION OF EXHAUST GAS ANALYZER
DESIGN AND FABRICATION OF EXHAUST GAS ANALYZER
 
Staad Pro, Open Jump and Geo five software training report
Staad Pro, Open Jump and Geo five software training reportStaad Pro, Open Jump and Geo five software training report
Staad Pro, Open Jump and Geo five software training report
 
BCA GGSIPU OLD SYALLBUS
BCA GGSIPU OLD SYALLBUSBCA GGSIPU OLD SYALLBUS
BCA GGSIPU OLD SYALLBUS
 
Co with mapping mech nc 10 24 01-2020 (3) (1)
Co with mapping mech  nc 10 24 01-2020 (3) (1)Co with mapping mech  nc 10 24 01-2020 (3) (1)
Co with mapping mech nc 10 24 01-2020 (3) (1)
 
Bachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docxBachelor of Technology ME Scheme.docx
Bachelor of Technology ME Scheme.docx
 
B.E.Mech.pdf for regulation 2021 anna university students
B.E.Mech.pdf for regulation 2021 anna university studentsB.E.Mech.pdf for regulation 2021 anna university students
B.E.Mech.pdf for regulation 2021 anna university students
 
EC3 MANUAL FOR SAP2000
EC3 MANUAL FOR SAP2000EC3 MANUAL FOR SAP2000
EC3 MANUAL FOR SAP2000
 
Final Year Review
Final Year ReviewFinal Year Review
Final Year Review
 
Case study on scheduling
Case study on schedulingCase study on scheduling
Case study on scheduling
 
RESUME REV.05
RESUME REV.05RESUME REV.05
RESUME REV.05
 
Dustin Marshall OQ Report (NCCER)
Dustin Marshall OQ Report (NCCER)Dustin Marshall OQ Report (NCCER)
Dustin Marshall OQ Report (NCCER)
 
Engineering symbology-prints-and-drawings-2
Engineering symbology-prints-and-drawings-2Engineering symbology-prints-and-drawings-2
Engineering symbology-prints-and-drawings-2
 

Mais de AmericanMillwright (20)

Triangle Chart
Triangle ChartTriangle Chart
Triangle Chart
 
Steam Turbinesforcombinedcycle
Steam TurbinesforcombinedcycleSteam Turbinesforcombinedcycle
Steam Turbinesforcombinedcycle
 
10 Inch Diameter
10 Inch Diameter10 Inch Diameter
10 Inch Diameter
 
How To Use A Transit Final2
How To Use A Transit Final2How To Use A Transit Final2
How To Use A Transit Final2
 
Ge Steam Turbinesfor Industrial
Ge Steam Turbinesfor IndustrialGe Steam Turbinesfor Industrial
Ge Steam Turbinesfor Industrial
 
Ge Steam Turbine Products
Ge Steam Turbine ProductsGe Steam Turbine Products
Ge Steam Turbine Products
 
Inch To Millimeter Conversion Table
Inch To Millimeter Conversion TableInch To Millimeter Conversion Table
Inch To Millimeter Conversion Table
 
Layout Basics I Ne
Layout Basics I NeLayout Basics I Ne
Layout Basics I Ne
 
Metric & Inch Equivalent
Metric & Inch EquivalentMetric & Inch Equivalent
Metric & Inch Equivalent
 
Millimeter Tap Drill Sizes
Millimeter Tap Drill SizesMillimeter Tap Drill Sizes
Millimeter Tap Drill Sizes
 
Millimeter To Inch Conversion Table
Millimeter To Inch Conversion TableMillimeter To Inch Conversion Table
Millimeter To Inch Conversion Table
 
Siemens1000 Mw
Siemens1000 MwSiemens1000 Mw
Siemens1000 Mw
 
Siemens Fuel Gasifier
Siemens Fuel GasifierSiemens Fuel Gasifier
Siemens Fuel Gasifier
 
Siemens Gas Turbine4000 F
Siemens Gas Turbine4000 FSiemens Gas Turbine4000 F
Siemens Gas Turbine4000 F
 
Soft Foot
Soft FootSoft Foot
Soft Foot
 
Ge Combined Cycle
Ge Combined CycleGe Combined Cycle
Ge Combined Cycle
 
Easy Laser Shaft Alignment Worksheet
Easy Laser   Shaft Alignment WorksheetEasy Laser   Shaft Alignment Worksheet
Easy Laser Shaft Alignment Worksheet
 
Decimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size DrillsDecimal Equivalents Of Number Size Drills
Decimal Equivalents Of Number Size Drills
 
Carbon Capture
Carbon CaptureCarbon Capture
Carbon Capture
 
Compressor Valves
Compressor ValvesCompressor Valves
Compressor Valves
 

Nccer Maintenance

  • 1. National Craft Assessment and Certification Program B L U E P R I N T Industrial Maintenance Mechanical Written Assessment Contents: Industrial Maintenance Mechanical Overview – This written assessment is a two-hour, (MEIDMT32) as of 4/2008 closed-book examination. You will be permitted to use Module # of a nonprogrammable, nonprinting calculator during Numbers Topic Area Questions the examination. The Assessment Center will provide 00101 Basic Safety (00101) 5 any necessary pencils. No extra papers, books, notes 00102 Introduction to Construction Math or study materials are allowed in the testing area. (00102) 5 00104 Introduction to Power Tools (00104) 2 Study Material – All NCCER written assessments are 00106 Basic Rigging (00106) 5 referenced to Contren® Learning Series modules. You 08309-07 Testing Piping Systems and may order modules from Pearson Education, Inc. by Equipment 5 calling (800) 922.0579 or by logging on to 15104-06 Basic Layout 4 www.crafttraining.com. 15202-07 Field Sketching 2 15304 Prealignment for Drilling and Tapping 2 Assessment Development – All questions on each 30110 Structural Ironworking: One 2 assessment have been developed and approved by 32211 Lubrication (25209) 3 subject matter experts from the respective craft. 32113-07 Assessment development and administration operates 32115 Piping Systems (25210) 2 under the direction of Prov, NCCER’s testing partner. 08201-06 32310 Gaskets and Packing (25311) 12 Credentials – NCCER will send appropriate 32105-07 32408 Maintaining Valves (25411) 2 credentials (certificate, wallet card, and official 32205-08 transcript) to the Assessment Center upon successful 32409 Identifying and Installing Valves completion of the written assessment. 32205-08 (25408) 2 32410 Steam Traps 2 Training Prescription Reports – Each candidate will 32208-07 32209-07 have access to individual results of the written 32411 Steam Systems 2 assessment on NCCER’s website. This training 32208-07 prescription will include the overall score and 32209-07 results by topic area. 32509 Drawings and Symbols (25401) 3 32110 Oxyfuel Cutting 2 National Registry – Assessment results will be 32104-07 maintained in NCCER’s National Registry and be a 08308-07 Pipe Hangers and Supports 2 part of each candidate’s training records. These 32103-07 Fasteners 4 records are stored and become a portable record of 34301 Boiler Pressure Components 3 your training and assessment achievements. 34302 Boiler Nonpressure Components 4 34306 Boiler Auxiliaries 7 34307 Towers and Exchangers 10 34403 Advanced Towers and Exchangers 5 34409 Planning Work Activities 3 Total Number of Questions 100 Note: (xxxxx) Reference to NCCER’s CD-Rom Module Number Additional Approved Reference during Assessment Session: The Pipefitters Blue Book; W.V.Graves . National Center for Construction Education and Research (NCCER) 3600 NW 43rd St., Bldg. G • Gainesville, Fl • 32606 • Ph: (352) 334.0911 • Fax: (352) 334.0932 • www.NCCER.org