Sr. Activity Potential Hazards Control Measures
1.
Mobilization of equipment &
Materials
1.Involvement of unskilled personnel
2.Piling machine hit with plant/equipment & structures
3.Unauthorised/ uninspected equipment/tools at site
4.Personnel injury/property damage
5.Overhead structures/pipe racks
6.Slip, Trip & Fall
7.Inclement weather condition
 Trained & skilled staff to be authorized for working
 Ensure JSA briefing & Daily TBT to all workforce before commencing the
activity
 Use of authorized & designated routes
 Only inspected Equipment/Tools must be allowed at the worksite
 Use the right tools for the right job
 Ensure safe transportation of equipment/materials at the worksite
 Avoid throwing of materials
 All of the materials to be secured while its transportation to work site
 Ensure a safe distance of piling machine from overhead structures/pipe racks
 Water sprinkling to be carried out on regular biases to avoid dust
 Take care of overhead structure/pipe racks
 Keep access/walkways always clear from any obstruction
 Stop work in case of any inclement weather conditions (rain, storm, fog etc.)
 Restrict movement of heavy vehicles/equipment in rain/fog
2. Piling with Piling Machine 1.Uncertified piling Machine & Operator,
2.Personnel hit by the movement of the piling machine,
3.Working in live areas
4.Sling broken, load drop
5.Slip, Trip & Fall
6.Inclement weather condition
7.Fire & explosion
 Pile machine & its operator should be certified
 Banks man should be available at the site to control the movement of heavy
vehicles/equipment
 Keep away all unauthorized people during movement of heavy vehicle/equipment
 Be careful of nearby live areas
 Ensure Close HSE monitoring /supervision
 Ensure proper & inspected accessories being used for drilling
 Ensure that drilling bit is properly fixed with locking pins
 Keep away during the drilling operation
 the working area should properly be barricaded
JSA-Piling or Concreting for Foundations & Building
Project/Facility: Reference No:
Client: Date of Assessments:
Assessed by: Date of Next Assessment:
Reviewed by: Approved by:
Activity: JSA-Piling or Concreting for Foundations & Building
Emergency Plans. Standard PPE’s: First aid kit must be present at the worksite and the HSE personnel will be the first response in case of emergency, ERPs &
Emergency contact numbers to be in place at the job location
Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In case of any new hazard
identified by any of the working team members during the job, the JSA review process should be carried on.
JSA-Piling or Concreting for Foundations & Building
 Ensure proper stacking of all materials at the site
 Keep access/walkways always clear from any obstruction
 Ensure proper housekeeping of the workplace all the time
 Stop work in case of any inclement weather conditions (rain, storm, fog etc.)
 Restrict movement of heavy vehicles/equipment in rain/fog
 Ensure availability of inspected fire extinguishers at site
 Conduct proper gas test before start job
 Flame arrestor to be installed in all vehicles/equipment
3. Lowering of Steel Cage
structure & Concreting of
piles
1.Personnel hand injury while handling with steel
2.People under a suspended load
3.Unbalancing of load
4.Miscommunication between operator & signalman
5.Improper signalling during lowering of the steel cage
structure
6.Inappropriate PPE’s/Tools during concrete work
7.Skin contact with concrete or other chemicals
 Ensure the Involvement of skilled labour
 Ensure use of proper PPE’s
 Deliver TBT before commencing work
 Ensure use of inspected & colour coded hand tools & rigging accessories
 The area should be properly barricaded during lifting operations
 Ensure proper stacking of all materials at the worksite
 Maintain good housekeeping all the time
 Use of appropriate PPE’s during concrete
 Ensure use of inspected tools for the right job
 Availability of freshwater at site
4. Working at night shift hours 1.Poor visibility at night hours
2.Vehicles/equipment hit with people, equipment or
structure
3.Slip, trip & fall
 Ensure proper lighting arrangement for late-night working hours
 Careful movement of vehicles/equipment in night hours
 Place refection tapes at hard barriers, structures
 Banks men should wear high visibility reflection vests
 No working should be allowed in poor lighting conditions
 Ensure proper housekeeping to avoid tripping
1 de 2

Recomendados

risk assessment - pile cap.pdf por
risk assessment - pile cap.pdfrisk assessment - pile cap.pdf
risk assessment - pile cap.pdfmydl2
570 visualizações4 slides
JHA HEAVY LIFTING OF VESSEL.pdf por
JHA HEAVY LIFTING OF VESSEL.pdfJHA HEAVY LIFTING OF VESSEL.pdf
JHA HEAVY LIFTING OF VESSEL.pdfHaroon AbdulRahim
11 visualizações11 slides
HAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH BASF DAHEJ GUJARAT.pdf por
HAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH  BASF DAHEJ GUJARAT.pdfHAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH  BASF DAHEJ GUJARAT.pdf
HAZARD IDENTIFICATION RISK ASSESSMENT 561 KWH BASF DAHEJ GUJARAT.pdfMohsinKhan281076
249 visualizações6 slides
Methodstatement welding por
Methodstatement weldingMethodstatement welding
Methodstatement weldingAanand Subi
10.9K visualizações9 slides
Mawaz CV por
Mawaz CVMawaz CV
Mawaz CVMawaz Akhter
240 visualizações5 slides
update 20feb1 por
update 20feb1update 20feb1
update 20feb1CHRISTOPHER Rickie CHRISTIE
149 visualizações6 slides

Mais conteúdo relacionado

Similar a JSA-Piling or Concreting for Foundations & Building

Project por
ProjectProject
ProjectKhurram Shahzad
176 visualizações25 slides
Turn Key Group Services - OHS Toolkit por
Turn Key Group Services - OHS ToolkitTurn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS Toolkitturnkeygroupservices
1.1K visualizações37 slides
Plant ; equipment dismantling of scaffold por
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffoldBimal Chandra Das
211 visualizações3 slides
Lifting equipment at work por
Lifting equipment at workLifting equipment at work
Lifting equipment at workPaul Smith
5.2K visualizações36 slides
AHU.pdf por
AHU.pdfAHU.pdf
AHU.pdfSyedMoazzamAliAli1
34 visualizações6 slides
LPG Chloride treaters foundation execution_Rev.00.pdf por
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
12 visualizações6 slides

Similar a JSA-Piling or Concreting for Foundations & Building (20)

Project por Khurram Shahzad
ProjectProject
Project
Khurram Shahzad176 visualizações
Turn Key Group Services - OHS Toolkit por turnkeygroupservices
Turn Key Group Services - OHS ToolkitTurn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS Toolkit
turnkeygroupservices1.1K visualizações
Plant ; equipment dismantling of scaffold por Bimal Chandra Das
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffold
Bimal Chandra Das211 visualizações
Lifting equipment at work por Paul Smith
Lifting equipment at workLifting equipment at work
Lifting equipment at work
Paul Smith5.2K visualizações
LPG Chloride treaters foundation execution_Rev.00.pdf por JESUSBASILIOANTONIO
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
JESUSBASILIOANTONIO12 visualizações
Construction safety lecture-3 por Saleem Malik
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3
Saleem Malik1.4K visualizações
150 Question Answers | Occupational Health & Safety por Muhammad Usman
150 Question Answers | Occupational Health & Safety150 Question Answers | Occupational Health & Safety
150 Question Answers | Occupational Health & Safety
Muhammad Usman24.6K visualizações
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf por JESUSBASILIOANTONIO
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JESUSBASILIOANTONIO23 visualizações
Safety protocols of construction site.pptx por Zeeshan Yousaf
Safety protocols of construction site.pptxSafety protocols of construction site.pptx
Safety protocols of construction site.pptx
Zeeshan Yousaf8 visualizações
7 Falsework (Temporary Works) Risk Assessment Templates.docx por Dwarika Bhushan Sharma
7 Falsework (Temporary Works) Risk Assessment Templates.docx7 Falsework (Temporary Works) Risk Assessment Templates.docx
7 Falsework (Temporary Works) Risk Assessment Templates.docx
Dwarika Bhushan Sharma147 visualizações
Fire Risk Assessment.pdf por HSEXINYIPROJECT
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
HSEXINYIPROJECT1.5K visualizações
TRA%20of%20Lifting.Tail.docx por PriyaRavirajan
TRA%20of%20Lifting.Tail.docxTRA%20of%20Lifting.Tail.docx
TRA%20of%20Lifting.Tail.docx
PriyaRavirajan53 visualizações
Demolition of existing boiler house por AnatoliZ
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler house
AnatoliZ3.8K visualizações
Hse alert 47 all clear safe to work -11.12.18 por Dwarika Bhushan Sharma
Hse alert 47 all clear safe to work -11.12.18Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18
Dwarika Bhushan Sharma27 visualizações
Excavations ppt por Colleen True
Excavations pptExcavations ppt
Excavations ppt
Colleen True45.4K visualizações
Excavations por FFSafety
ExcavationsExcavations
Excavations
FFSafety1.7K visualizações
Jha rock drill use and maintenance romo por nafable
Jha rock drill use and maintenance romoJha rock drill use and maintenance romo
Jha rock drill use and maintenance romo
nafable1.2K visualizações
Safety_First por Samantha Neri
Safety_FirstSafety_First
Safety_First
Samantha Neri306 visualizações
hot works for construction of temporary facilities por Fãrük Ñäzmî
hot works for construction of temporary facilitieshot works for construction of temporary facilities
hot works for construction of temporary facilities
Fãrük Ñäzmî902 visualizações

Último

Plumbing por
PlumbingPlumbing
PlumbingIwiss Tools Co.,Ltd
15 visualizações14 slides
7_DVD_Combinational_MOS_Logic_Circuits.pdf por
7_DVD_Combinational_MOS_Logic_Circuits.pdf7_DVD_Combinational_MOS_Logic_Circuits.pdf
7_DVD_Combinational_MOS_Logic_Circuits.pdfUsha Mehta
59 visualizações133 slides
A multi-microcontroller-based hardware for deploying Tiny machine learning mo... por
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...A multi-microcontroller-based hardware for deploying Tiny machine learning mo...
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...IJECEIAES
12 visualizações10 slides
Activated sludge process .pdf por
Activated sludge process .pdfActivated sludge process .pdf
Activated sludge process .pdf8832RafiyaAltaf
8 visualizações32 slides
NEW SUPPLIERS SUPPLIES (copie).pdf por
NEW SUPPLIERS SUPPLIES (copie).pdfNEW SUPPLIERS SUPPLIES (copie).pdf
NEW SUPPLIERS SUPPLIES (copie).pdfgeorgesradjou
14 visualizações30 slides
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,... por
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...AakashShakya12
57 visualizações115 slides

Último(20)

7_DVD_Combinational_MOS_Logic_Circuits.pdf por Usha Mehta
7_DVD_Combinational_MOS_Logic_Circuits.pdf7_DVD_Combinational_MOS_Logic_Circuits.pdf
7_DVD_Combinational_MOS_Logic_Circuits.pdf
Usha Mehta59 visualizações
A multi-microcontroller-based hardware for deploying Tiny machine learning mo... por IJECEIAES
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...A multi-microcontroller-based hardware for deploying Tiny machine learning mo...
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...
IJECEIAES12 visualizações
Activated sludge process .pdf por 8832RafiyaAltaf
Activated sludge process .pdfActivated sludge process .pdf
Activated sludge process .pdf
8832RafiyaAltaf8 visualizações
NEW SUPPLIERS SUPPLIES (copie).pdf por georgesradjou
NEW SUPPLIERS SUPPLIES (copie).pdfNEW SUPPLIERS SUPPLIES (copie).pdf
NEW SUPPLIERS SUPPLIES (copie).pdf
georgesradjou14 visualizações
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,... por AakashShakya12
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
AakashShakya1257 visualizações
Digital Watermarking Of Audio Signals.pptx por AyushJaiswal781174
Digital Watermarking Of Audio Signals.pptxDigital Watermarking Of Audio Signals.pptx
Digital Watermarking Of Audio Signals.pptx
AyushJaiswal7811748 visualizações
CHEMICAL KINETICS.pdf por AguedaGutirrez
CHEMICAL KINETICS.pdfCHEMICAL KINETICS.pdf
CHEMICAL KINETICS.pdf
AguedaGutirrez8 visualizações
Object Oriented Programming with JAVA por Demian Antony D'Mello
Object Oriented Programming with JAVAObject Oriented Programming with JAVA
Object Oriented Programming with JAVA
Demian Antony D'Mello95 visualizações
Update 42 models(Diode/General ) in SPICE PARK(DEC2023) por Tsuyoshi Horigome
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Update 42 models(Diode/General ) in SPICE PARK(DEC2023)
Tsuyoshi Horigome19 visualizações
13_DVD_Latch-up_prevention.pdf por Usha Mehta
13_DVD_Latch-up_prevention.pdf13_DVD_Latch-up_prevention.pdf
13_DVD_Latch-up_prevention.pdf
Usha Mehta10 visualizações
_MAKRIADI-FOTEINI_diploma thesis.pptx por fotinimakriadi
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptx
fotinimakriadi6 visualizações
MK__Cert.pdf por Hassan Khan
MK__Cert.pdfMK__Cert.pdf
MK__Cert.pdf
Hassan Khan8 visualizações
Dynamics of Hard-Magnetic Soft Materials por Shivendra Nandan
Dynamics of Hard-Magnetic Soft MaterialsDynamics of Hard-Magnetic Soft Materials
Dynamics of Hard-Magnetic Soft Materials
Shivendra Nandan13 visualizações
LFA-NPG-Paper.pdf por harinsrikanth
LFA-NPG-Paper.pdfLFA-NPG-Paper.pdf
LFA-NPG-Paper.pdf
harinsrikanth40 visualizações
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th... por ahmedmesaiaoun
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
ahmedmesaiaoun12 visualizações
SWM L1-L14_drhasan (Part 1).pdf por MahmudHasan747870
SWM L1-L14_drhasan (Part 1).pdfSWM L1-L14_drhasan (Part 1).pdf
SWM L1-L14_drhasan (Part 1).pdf
MahmudHasan74787048 visualizações

JSA-Piling or Concreting for Foundations & Building

  • 1. JSA-Piling or Concreting for Foundations & Building Sr. Activity Potential Hazards Control Measures 1. Mobilization of equipment & Materials 1.Involvement of unskilled personnel 2.Piling machine hit with plant/equipment & structures 3.Unauthorised/ uninspected equipment/tools at site 4.Personnel injury/property damage 5.Overhead structures/pipe racks 6.Slip, Trip & Fall 7.Inclement weather condition  Trained & skilled staff to be authorized for working  Ensure JSA briefing & Daily TBT to all workforce before commencing the activity  Use of authorized & designated routes  Only inspected Equipment/Tools must be allowed at the worksite  Use the right tools for the right job  Ensure safe transportation of equipment/materials at the worksite  Avoid throwing of materials  All of the materials to be secured while its transportation to work site  Ensure a safe distance of piling machine from overhead structures/pipe racks  Water sprinkling to be carried out on regular biases to avoid dust  Take care of overhead structure/pipe racks  Keep access/walkways always clear from any obstruction  Stop work in case of any inclement weather conditions (rain, storm, fog etc.)  Restrict movement of heavy vehicles/equipment in rain/fog 2. Piling with Piling Machine 1.Uncertified piling Machine & Operator, 2.Personnel hit by the movement of the piling machine, 3.Working in live areas 4.Sling broken, load drop 5.Slip, Trip & Fall 6.Inclement weather condition 7.Fire & explosion  Pile machine & its operator should be certified  Banks man should be available at the site to control the movement of heavy vehicles/equipment  Keep away all unauthorized people during movement of heavy vehicle/equipment  Be careful of nearby live areas  Ensure Close HSE monitoring /supervision  Ensure proper & inspected accessories being used for drilling  Ensure that drilling bit is properly fixed with locking pins  Keep away during the drilling operation  the working area should properly be barricaded JSA-Piling or Concreting for Foundations & Building Project/Facility: Reference No: Client: Date of Assessments: Assessed by: Date of Next Assessment: Reviewed by: Approved by: Activity: JSA-Piling or Concreting for Foundations & Building Emergency Plans. Standard PPE’s: First aid kit must be present at the worksite and the HSE personnel will be the first response in case of emergency, ERPs & Emergency contact numbers to be in place at the job location Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In case of any new hazard identified by any of the working team members during the job, the JSA review process should be carried on.
  • 2. JSA-Piling or Concreting for Foundations & Building  Ensure proper stacking of all materials at the site  Keep access/walkways always clear from any obstruction  Ensure proper housekeeping of the workplace all the time  Stop work in case of any inclement weather conditions (rain, storm, fog etc.)  Restrict movement of heavy vehicles/equipment in rain/fog  Ensure availability of inspected fire extinguishers at site  Conduct proper gas test before start job  Flame arrestor to be installed in all vehicles/equipment 3. Lowering of Steel Cage structure & Concreting of piles 1.Personnel hand injury while handling with steel 2.People under a suspended load 3.Unbalancing of load 4.Miscommunication between operator & signalman 5.Improper signalling during lowering of the steel cage structure 6.Inappropriate PPE’s/Tools during concrete work 7.Skin contact with concrete or other chemicals  Ensure the Involvement of skilled labour  Ensure use of proper PPE’s  Deliver TBT before commencing work  Ensure use of inspected & colour coded hand tools & rigging accessories  The area should be properly barricaded during lifting operations  Ensure proper stacking of all materials at the worksite  Maintain good housekeeping all the time  Use of appropriate PPE’s during concrete  Ensure use of inspected tools for the right job  Availability of freshwater at site 4. Working at night shift hours 1.Poor visibility at night hours 2.Vehicles/equipment hit with people, equipment or structure 3.Slip, trip & fall  Ensure proper lighting arrangement for late-night working hours  Careful movement of vehicles/equipment in night hours  Place refection tapes at hard barriers, structures  Banks men should wear high visibility reflection vests  No working should be allowed in poor lighting conditions  Ensure proper housekeeping to avoid tripping