Coal–fired Power Plant Boiler Unit Decision Support System

                                                    Ravinder Kumar*
                            Research scholar, Department of Mechanical Engineering,
                                    D.C.R University of Science & Technology,
                                         Murthal, Sonepat (Haryana), India
                                             *
                                                 rav.chauhan@yahoo.co.in


Abstract
The present paper discusses decision support system for boiler unit of a coal-fired thermal power plant. The
boiler unit consists of five subsystems arranged in series and parallel based configurations. The decision
support system for boiler unit has been developed with the help of mathematical formulation based on
Markov Birth-Death process using probabilistic approach. For this purpose, first differential equations have
been generated. These equations are then solved using normalizing condition so as to determine the steady
state availability of boiler unit. After that decision matrices are developed which provide the various
availability levels for different combinations of failure and repair rates for all subsystems. The model
developed helps in the operations and quantitative management of various maintenance decisions and
actions. The results of this paper are therefore beneficial in deciding the relative repair priorities of various
subsystems of boiler unit.
Keywords: Decision Support System, Transition diagram, Probabilistic approach, Availability matrices,
Quantitative Management


1. Introduction
Manufacturing processes involve a continuous flow of raw materials through a series of sequential
operations, which transform the raw materials into the final products. Industries producing products like
paper, chemical and sugar etc. during manufacturing have such continuous operations. The goal of high
productivity supplemented with minimum standby units, storage capacity, production losses and minimum
cost of failure is difficult to achieve in these industries. So the importance of high system reliability and
availability has been realized and this can be achieved by quantitative management methods using various
concepts of Industrial Engineering and Operation Research. The quantitative analysis performed for system
availability and reliability gives the factual knowledge in the form of failure and repair parameters of
various equipments/subsystems. Practically various systems/subsystems are subjected to random failures
due to poor design, lack of operative skills and wrong manufacturing techniques etc. causing heavy
production losses. The failed systems can be brought back to the working state in minimum down time
through effective maintenance planning and control. The factory operating conditions and repair strategic
plans play important role in maintaining the system failure free for maximum duration. This can be
accomplished only through quantitative analysis of each working subsystem of the plant concerned. The
system performance can be quantified in terms of the availability if the real system is modeled
mathematically and analyzed in actual operating conditions. The mechanical systems have attracted the
attention of several researchers in the area of reliability theory. Kumar et.al. [1, 2] discussed about feeding
systems in the sugar industry and paper industry. Kumar and Singh [3] analyzed the Availability of a
washing system in paper industry. Singh and Pandey [4, 5] reported reliability analysis of mechanical
systems in Fertilizer and Sugar industry. Kiureghian and Ditlevson [6] analyzed the availability, reliability
and downtime of system with repairable components. Rajiv Khanduja et. al [7] reported the availability
analysis of the bleaching system of a paper plant. Kumar et.al.[8] discussed the performance evaluation and
availability analysis of ammonia synthesis unit of a fertilizer plant using probabilistic approach. Tewari
et.al. [9] analyzed the performance evaluation and optimization for urea crystallization system in a fertilizer

                                                         7
Innovative Systems Design and Engineering                                                       www.iiste.org
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol 3, No 1, 2012

plant using Genetic Algorithm. Khanduja et.al. [10] developed the decision support system and
performance model of a digesting system of a paper plant using a probabilistic approach. Deepika Garg
et.al. [11] developed the mathematical model of a cattle feed plant using a birth-death Markov Process. The
differential equations have been solved for the steady-state. The system performance has also been studied.
Sanjeev et al. [12] discussed about simulation and modeling of urea decomposition system in a fertilizer
plant. Gupta et al. [13] discussed reliability and availability analysis of boiler unit of a steam thermal power
plant. Jorn Vatn et al. [14] discussed the optimization of maintenance interval using classical cost benefit
analysis approach in Norwegian railways.


2. System description
2.1 The Boiler system consists of five sub-systems:
Furnace, denoted by A, failure of which results into failure of system.
Boiler-drum, denoted by B, having single unit, failure of which results into system failure.
Economizer, denoted by C, failure of which results into system failure.
Super-heater, denoted by D, having single unit, failure of which results into system failure.
Re-heater, denoted by E, having single unit.
2.2 Assumptions and Notations
1. Failure and repair rates for each subsystem are constant and statistically independent.
2. Not more than one failure occurs at a time.
3. A repaired unit is as good as new, performance wise.
4. The standby units are of the same nature and capacity as the active units.
The notations associated with the transition diagram are as follows:
1. A, B, C, D, E: Subsystems in good operating state
2. a, b, c, d, e: Indicates the failed state of A, B, C, D, E.
4. λi : Mean constant failure rates from states A, B, C, D, E to the states a, b, c, d, e.
5. µ i : Mean constant repair rates from states a, b, c, d, e to the states A, B, C, D, E.
6. Pi(t): Probability that at time ‘t’ the system is in ith state.
7. ’: Derivatives w.r.t.‘t’
2.3 Mathematical Analysis of the System
Probability consideration gives following differential equations (Eq. 1 – Eq. 6) associated with the
Transition Diagram (Figure 1).

P (t) + (λ1 + λ2 + λ3 + λ4 + λ5 )P (t ) = µ1P(t) + µ2P (t) + µ3P (t) + µ4P (t) + µ5P (t) (1)
  '
 0                                0          1        2         3         4         5


P1 (t ) + µ 1 P1 (t ) = λ1 P0 (t )
      '
                                                                 (2)

P2 (t ) + µ 2 P2 (t ) = λ 2 P0 (t )
          '
                                                                  (3)

P3 (t ) + µ 3 P3 (t ) = λ 3 P0 (t )
      '
                                                                  (4)

P4 (t ) + µ 4 P4 (t ) = λ 4 P0 (t )
          '
                                                                  (5)

P5 (t ) + µ 5 P5 (t ) = λ 5 P0 (t )
      '
                                                                  (6)
Initial conditions at time t = 0 are


                                                           8
Innovative Systems Design and Engineering                                                      www.iiste.org
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol 3, No 1, 2012

Pi (t ) = 1 for i = 0 and 0 for i ≠ 0
2.4 Steady State Availability
The long run or steady state availability of the System is obtained by putting d/dt→ 0 as t→0, into all
differential equations (1) to (6).
(λ1 + λ 2 + λ3 + λ 4 + λ5 )P0 = µ1 P1 + µ 2 P2 + µ 3 P3 + µ 4 P4 + µ 5 P5        (7)
µ 1 P1 = λ1P0                                     (8)
µ 2 P2 = λ 2 P0                                     (9)
µ 3 P3 = λ3 P0                                      (10)
µ 4 P4 = λ 4 P0                                     (11)
µ 5 P5 = λ5 P0                                      (12)
Solving the above equations, we get:
Let us assume,
P1 = K1 P0 , P2 = K 2 P0 , P3 = K3 P0 , P4 = K 4 P0 , P5 = K 5 P0

           K1 = λ1             λ2        λ3         λ4        λ5
Where,
                     µ1 , K 2 = µ2 , K3 = µ3 , K 4 = µ4 , K5 = µ5
Now using normalizing conditions i.e. sum of all the probabilities is equal to one, we get:
 5
                                                            −1
∑ P = 1i.e P0 = [1+ K1 + K2 + K3 + K4 + K5 ]
i =0
       i

Now, the steady state availability of the system may be obtained as the summation of all the working state
probabilities, i.e.
AV = P0

3. Performance analysis
The failure and repair rates of various subsystems of Boiler system are taken from the maintenance history
sheet of thermal power plant. The decision support system deals with the quantitative analysis of all the
factors viz. courses of action and states of nature, which influence the maintenance decisions associated
with the Boiler system. The decision matrices are developed to determine the various availability levels for
different combinations of failures and repair rates. Table 1, 2, 3, 4, 5 represent the decision matrices for
various subsystems of Boiler system. Accordingly, maintenance decisions can be made for various
subsystems keeping in view the repair criticality and we may select the best possible combinations of
failure and repair rates.


4. Results and discussion
Tables 1 to 5 show the effect of failure and repair rates of Furnace, Boiler-drum, Economizer, Super-heater,
& Re-heater on the steady state availability of the Boiler system. Table 1 reveals the effect of failure and
repair rates of Furnace subsystem on the availability of the system. It is observed that for some known
values of failure / repair rates of Boiler-drum, Economizer, Super-heater, & Re-heater (λ2=0.0008,
µ 2=0.008, λ3=0.04, µ 3=0.05, λ4=0.00010, µ 4=0.014, λ5=0.0020, µ 5=0.014), as the failure rates of Furnace
increases from 0.0006 to 0.001 the availability decreases by about 1.06%. Similarly as repair rates of
furnace increases from 0.02 to 0.10, the availability increases by about 1.33%.
Table 2 reveals the effect of failure and repair rates of Boiler-drum on the availability of the System. It is
observed that for some known values of failure / repair rates of Furnace, Economizer, Super-heater, & Re-
heater (λ1=0.0006, µ 1=0.02, λ3=0.04, µ 3=0.05, λ4=0.00010, µ 4=0.014, λ5=0.0020, µ 5=0.014), as the failure


                                                        9
Innovative Systems Design and Engineering                                                         www.iiste.org
ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
Vol 3, No 1, 2012

rates of Boiler-drum increases from 0.0008 to 0.0016, the availability decreases by about 5.03%. Similarly
as repair rates of Boiler-drum increases from 0.008 to 0.016, the availability increases by about 2.81%.
Table 3 reveals the effect of failure and repair rates of Economizer on the availability of the System. It is
observed that for some known values of failure / repair rates of Furnace, Boiler-drum, Super-heater, & Re-
heater (λ1=0.0006, µ 1=0.02, λ2=0.0008, µ 2=0.008, λ4=0.00010, µ 4=0.014, λ5=0.0020, µ 5=0.014), as the
failure rates of economizer increases from 0.004 to 0.01, the availability decreases by about 5.96%.
Similarly as repair rates of economizer increases from 0.05 to 0.2, the availability increases by about
3.40%.
Table 4 reveals the effect of failure and repair rates of Super-heater on the availability of the System. It is
observed that for some known values of failure / repair rates of Furnace, Boiler-drum, Economizer, & Re-
heater (λ1=0.0006, µ 1=0.02, λ2=0.0008, µ 2=0.008, λ3=0.04, µ 3=0.05, λ5=0.0020, µ 5=0.014), as the failure
rates of Super-heater increases from 0.00010 to 0.00030, the availability decreases by about 0.76%.
Similarly as repair rates of Super-heater increases from 0.014 to 0.026, the availability increases by about
0.18%.
Table 5 reveals the effect of failure and repair rates of Re-heater on the availability of the System. It is
observed that for some known values of failure / repair rates of Furnace, Boiler-drum, Economizer, &
Super-heater (λ1=0.0006, µ 1=0.02, λ2=0.0008, µ 2=0.008, λ3=0.04, µ 3=0.05, λ4=0.00010, µ 4=0.014), as the
failure rates of Re-heater increases from 0.0020 to 0.0080, the availability decreases by about 17.6%.
Similarly as repair rates of Re-heater increases from 0.014 to 0.050, the availability increases by about
6.02%.
5. Conclusion
The Decision Support System for Boiler system has been developed with the help of mathematical
modeling using probabilistic approach. The decision matrices are also developed. These matrices
facilitate the maintenance decisions to be made at critical points where repair priority should be given to
some particular subsystem of Boiler system. Decision matrix as given in table 5 clearly indicates that the
Re-heater is most critical subsystem as far as maintenance aspect is concerned. So, Re-heater should be
given top priority as the effect of its failure and repair rates on the unit availability is much higher than that
of other sub-systems. Therefore, on the basis of repair rates, the maintenance priority should be given as per
following order:
1.   Re-heater
2.   Economizer
3.   Boiler-drum
4.   Super-heater
5.   Furnace


References
Kumar D., Singh J. and Singh, I.P. (1988). Reliability analysis of the feeding system in the paper
industry. Microelectron Reliability. 28, 213-215.
Kumar, D., Singh J. and Singh I.P. (1988). Availability of the feeding system in the sugar industry.
Microelectron Reliability, 28, 867-871.
Kumar, D. and Singh, J. (1989). Availability of a Washing System in the Paper Industry. Microelectron
Reliability, 29, 775-778.
Singh, J., Pandey P.C. and Kumar, D. (1990). Designing for Reliable Operation of Urea Synthesis in
the Fertilizer Industry. Microelectron. Reliability, 30,1021-1024.
Kumar, D., Singh, J., and Pandey P.C. (1992). Availability of the Crystallization System in the Sugar
Industry under Common – Cause Failure. IEEE Transactions on Reliability, 41(1) 85-91.

                                                       10
Innovative Systems Design and Engineering                                                     www.iiste.org
     ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
     Vol 3, No 1, 2012

     Kiureghian A.D. and Ditlevson O.D. (2007). Availability, Reliability & downtime of system with
     repairable components. Reliability Engineering and System Safety, 92(2 ) 66-72.
     Rajiv Khanduja, Tewari, P.C., Dinesh Kumar, (2008). Availability Analysis of Bleaching System of
     Paper Plant. Journal of Industrial Engineering. Udyog Pragati, N.I.T.I.E. Mumbai (India), 32(1), 24-
     29.
     Kumar, S., Tewari, P.C. and Sunand Kumar, (2009).Performance Evaluation and Availability Analysis
     of Ammonia Synthesis unit in a Fertilizer Plant. Journal of Industrial Engineering International,
     South Tehran Branch, 05(3),17-26.
     Tewari, P.C. Kumar, S., Sunand Kumar and Meenu, (2009). Performance Evaluation and Optimization
     for Urea Crystallization system in a Fertilizer Plant using Genetic Algorithm Technique. International
     Journal of Applied Engineering Research, 04(6),1093-1105.
     Rajiv Khanduja, Tewari, P.C. and Chauhan, R.S., (2009). Decision Support System and Performance
     Evaluation of a Digesting System of a Paper Plant. Prabandhan: Indian Journal of Management,
     02(5), 21-24.
     Garg, Deepika, Singh, Jai and Kumar, Kuldeep, (2009). Performance Analysis of a Cattle Feed Plant.
     The Icfai University Journal of Science & Technology, 5( 2), 83-94.
     Sanjeev Kumar et al., (2009). Simulation Model for evaluating the performance of Urea
     Decomposition System in a Fertilizer Plant. International Journal of Industrial Engineering and
     Practices (I.J.I.E.P.), 1(1), 10-14.
     Gupta, S., Tewari, P. C., & Sharma, A. K. (2009b). Reliability and availability analysis of boiler unit
     of a steam thermal power plant. South African Journal of Industrial Engineering, 20(1), 147-158.
     Jorn Vatn and Terje Aven, (2010). An approach to maintenance optimization where safety issues are
     important. Reliability Engineering and System Safety, 4(3), 58-63.
     Kumar, D., & Pandey, P. C. (1993). Maintenance planning and resource allocation in urea fertilizer
     plant. Quality and reliability Engineering International Journal, 9, 411-423.
     Mishra, R C; & Pathak, K. (2002). Maintenance Engineering and Management, Prentice Hall & India
     Pvt Ltd; New Delhi.
     Srinath, L. S. (1994). Reliability Engineering. 3rd edition, New Delhi, India. East-West Press Pvt. Ltd.
     Wolstenholme, L. C. (1999). Reliability modeling – a statistical approach. Chapman & Hall; CRC.
                       Table 1: Effect of Failure and Repair Rates of Furnace on Availability
         λ1
µ1                  0.0006         0.0007          0.0008         0.0009          0.001                 Constant values

     0.02           0.7352         0.7326          0.7299         0.7272          0.7246
                                                                                                λ2=0.0008, µ 2=0.008,
     0.04           0.7434         0.7421          0.7407         0.7393          0.7380
                                                                                                λ3=0.04, µ 3=0.05,
     0.06           0.7462         0.7453          0.7444         0.7434          0.7425        λ4=0.00010, µ 4=0.014,
     0.08           0.7476         0.7469          0.7462         0.7455          0.7448        λ5=0.0020, µ 5=0.014

     0.10           0.7485         0.7479          0.7473         0.7468          0.7462




                                                        11
Innovative Systems Design and Engineering                                                   www.iiste.org
     ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
     Vol 3, No 1, 2012

                   Table 2: Effect of Failure and Repair Rates of Boiler drum on Availability
        λ2
µ2                0.0008         0.0010          0.0012          0.0015         0.0016               Constant values

     0.008        0.7352         0.7220          0.7092          0.6968         0.6849
                                                                                             λ1=0.0006, µ 1=0.02,
     0.010        0.7462         0.7352          0.7246          0.7142         0.7042
                                                                                             λ3=0.04, µ 3=0.05,
     0.012        0.7537         0.7444          0.7352          0.7263         0.7177       λ4=0.00010, µ 4=0.014,
     0.014        0.7592         0.7510          0.7430          0.7352         0.7276       λ5=0.0020, µ 5=0.014

     0.016        0.7633         0.7561          0.7490          0.7421         0.7352


                   Table 3: Effect of Failure and Repair Rates of Economizer on Availability
        λ3
µ3                 0.004         0.0055          0.0070          0.0085           0.01               Constant values

     0.05         0.7352         0.7194          0.7042          0.6896         0.6756
                                                                                             λ1=0.0006, µ 1=0.02,
     0.087        0.7541         0.7444          0.7350          0.7258         0.7168
                                                                                             λ2=0.0008, µ 2=0.008,
     0.125        0.7621         0.7552          0.7485          0.7418         0.7352       λ4=0.00010, µ 4=0.014,
     0.162        0.7664         0.7610          0.7557          0.7504         0.7453       λ5=0.0020, µ 5=0.014

      0.2         0.7692         0.7648          0.7604          0.7561         0.7518


                   Table 4: Effect of Failure and Repair Rates of Super-heater on Availability
        λ4
µ4                0.00010        0.00015         0.00020        0.00025         0.00030              Constant values

     0.014        0.7352         0.7333          0.7314          0.7306         0.7276
                                                                                             λ1=0.0006, µ 1=0.02,
     0.017        0.7359         0.7343          0.7328          0.7312         0.7296
                                                                                             λ2=0.0008, µ 2=0.008,
     0.020        0.7364         0.7351          0.7337          0.7324         0.7310       λ3=0.04, µ 3=0.05,
     0.023        0.7368         0.7356          0.7344          0.7332         0.7321       λ5=0.0020, µ 5=0.014

     0.026        0.7370         0.7360          0.7349          0.7339         0.7329




                                                       12
Innovative Systems Design and Engineering                                                             www.iiste.org
     ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online)
     Vol 3, No 1, 2012




                        Table 5: Effect of Failure and Repair Rates of Re-heater on Availability
        λ5
µ5                  0.0020           0.0035          0.0050                0.0065              0.0080           Constant values

     0.014          0.7352           0.6815          0.6352                0.5872              0.5591
                                                                                                        λ1=0.0006, µ 1=0.02,
     0.023          0.7668           0.7302          0.6970                0.6667              0.6389
                                                                                                        λ2=0.0008, µ 2=0.008,
     0.032          0.7814           0.7538          0.7281                0.7040              0.6815   λ3=0.04, µ 3=0.05,
     0.041          0.7899           0.7677          0.7467                0.7269              0.7080   λ4=0.00010, µ 4=0.014

     0.050          0.7954           0.7769          0.7592                0.7423              0.7261



                                                              AbCDE
                                                                2                       aBCDE
               FULL                                                                       1
             CAPACITY
                                                         λ2           µ2    µ1
              STATE
                                                    λ3
                                      ABcDE                   ABCDE
                                                                                 λ1
                                        3                       0
                                                                                  λ5
                                                    µ3
                                                                            µ5
              FAILED                                     λ4           µ4
              STATE                                                                    ABCDe
                                                                                         5
                                                              ABCdE
                                                                4




                                  Figure 1: Transition Diagram of BOILER System.




                                                              13

Mais conteúdo relacionado

Mais procurados

OBSERVER-BASED REDUCED ORDER CONTROLLER DESIGN FOR THE STABILIZATION OF LARGE...
OBSERVER-BASED REDUCED ORDER CONTROLLER DESIGN FOR THE STABILIZATION OF LARGE...OBSERVER-BASED REDUCED ORDER CONTROLLER DESIGN FOR THE STABILIZATION OF LARGE...
OBSERVER-BASED REDUCED ORDER CONTROLLER DESIGN FOR THE STABILIZATION OF LARGE...ijcseit
 
Projectwork on different boundary conditions in FDM.
Projectwork on different boundary conditions in FDM.Projectwork on different boundary conditions in FDM.
Projectwork on different boundary conditions in FDM.Nagesh NARASIMHA PRASAD
 
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...IRJET Journal
 
03 20270 true power loss reduction
03 20270 true power loss reduction03 20270 true power loss reduction
03 20270 true power loss reductionIAESIJEECS
 
THE ACTIVE CONTROLLER DESIGN FOR ACHIEVING GENERALIZED PROJECTIVE SYNCHRONIZA...
THE ACTIVE CONTROLLER DESIGN FOR ACHIEVING GENERALIZED PROJECTIVE SYNCHRONIZA...THE ACTIVE CONTROLLER DESIGN FOR ACHIEVING GENERALIZED PROJECTIVE SYNCHRONIZA...
THE ACTIVE CONTROLLER DESIGN FOR ACHIEVING GENERALIZED PROJECTIVE SYNCHRONIZA...ijait
 
Proposing a New Job Scheduling Algorithm in Grid Environment Using a Combinat...
Proposing a New Job Scheduling Algorithm in Grid Environment Using a Combinat...Proposing a New Job Scheduling Algorithm in Grid Environment Using a Combinat...
Proposing a New Job Scheduling Algorithm in Grid Environment Using a Combinat...Editor IJCATR
 
APPLICATION OF PARTICLE SWARM OPTIMIZATION FOR ENHANCED CYCLIC STEAM STIMULAT...
APPLICATION OF PARTICLE SWARM OPTIMIZATION FOR ENHANCED CYCLIC STEAM STIMULAT...APPLICATION OF PARTICLE SWARM OPTIMIZATION FOR ENHANCED CYCLIC STEAM STIMULAT...
APPLICATION OF PARTICLE SWARM OPTIMIZATION FOR ENHANCED CYCLIC STEAM STIMULAT...Zac Darcy
 
Section3 containment and methods
Section3 containment and methodsSection3 containment and methods
Section3 containment and methodsDương Tùng
 
The variational iteration method for calculating carbon dioxide absorbed into...
The variational iteration method for calculating carbon dioxide absorbed into...The variational iteration method for calculating carbon dioxide absorbed into...
The variational iteration method for calculating carbon dioxide absorbed into...iosrjce
 
Compensating Joint Configuration through Null Space Control in Composite Weig...
Compensating Joint Configuration through Null Space Control in Composite Weig...Compensating Joint Configuration through Null Space Control in Composite Weig...
Compensating Joint Configuration through Null Space Control in Composite Weig...Waqas Tariq
 
Paper id 71201933
Paper id 71201933Paper id 71201933
Paper id 71201933IJRAT
 
Dynamic Programming approach in Two Echelon Inventory System with Repairable ...
Dynamic Programming approach in Two Echelon Inventory System with Repairable ...Dynamic Programming approach in Two Echelon Inventory System with Repairable ...
Dynamic Programming approach in Two Echelon Inventory System with Repairable ...IOSR Journals
 

Mais procurados (16)

Fortran induction project. DGTSV DGESV
Fortran induction project. DGTSV DGESVFortran induction project. DGTSV DGESV
Fortran induction project. DGTSV DGESV
 
OBSERVER-BASED REDUCED ORDER CONTROLLER DESIGN FOR THE STABILIZATION OF LARGE...
OBSERVER-BASED REDUCED ORDER CONTROLLER DESIGN FOR THE STABILIZATION OF LARGE...OBSERVER-BASED REDUCED ORDER CONTROLLER DESIGN FOR THE STABILIZATION OF LARGE...
OBSERVER-BASED REDUCED ORDER CONTROLLER DESIGN FOR THE STABILIZATION OF LARGE...
 
Gy3312241229
Gy3312241229Gy3312241229
Gy3312241229
 
A0750105
A0750105A0750105
A0750105
 
Projectwork on different boundary conditions in FDM.
Projectwork on different boundary conditions in FDM.Projectwork on different boundary conditions in FDM.
Projectwork on different boundary conditions in FDM.
 
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
Optimization of Unit Commitment Problem using Classical Soft Computing Techni...
 
03 20270 true power loss reduction
03 20270 true power loss reduction03 20270 true power loss reduction
03 20270 true power loss reduction
 
THE ACTIVE CONTROLLER DESIGN FOR ACHIEVING GENERALIZED PROJECTIVE SYNCHRONIZA...
THE ACTIVE CONTROLLER DESIGN FOR ACHIEVING GENERALIZED PROJECTIVE SYNCHRONIZA...THE ACTIVE CONTROLLER DESIGN FOR ACHIEVING GENERALIZED PROJECTIVE SYNCHRONIZA...
THE ACTIVE CONTROLLER DESIGN FOR ACHIEVING GENERALIZED PROJECTIVE SYNCHRONIZA...
 
Master thesis report
Master thesis reportMaster thesis report
Master thesis report
 
Proposing a New Job Scheduling Algorithm in Grid Environment Using a Combinat...
Proposing a New Job Scheduling Algorithm in Grid Environment Using a Combinat...Proposing a New Job Scheduling Algorithm in Grid Environment Using a Combinat...
Proposing a New Job Scheduling Algorithm in Grid Environment Using a Combinat...
 
APPLICATION OF PARTICLE SWARM OPTIMIZATION FOR ENHANCED CYCLIC STEAM STIMULAT...
APPLICATION OF PARTICLE SWARM OPTIMIZATION FOR ENHANCED CYCLIC STEAM STIMULAT...APPLICATION OF PARTICLE SWARM OPTIMIZATION FOR ENHANCED CYCLIC STEAM STIMULAT...
APPLICATION OF PARTICLE SWARM OPTIMIZATION FOR ENHANCED CYCLIC STEAM STIMULAT...
 
Section3 containment and methods
Section3 containment and methodsSection3 containment and methods
Section3 containment and methods
 
The variational iteration method for calculating carbon dioxide absorbed into...
The variational iteration method for calculating carbon dioxide absorbed into...The variational iteration method for calculating carbon dioxide absorbed into...
The variational iteration method for calculating carbon dioxide absorbed into...
 
Compensating Joint Configuration through Null Space Control in Composite Weig...
Compensating Joint Configuration through Null Space Control in Composite Weig...Compensating Joint Configuration through Null Space Control in Composite Weig...
Compensating Joint Configuration through Null Space Control in Composite Weig...
 
Paper id 71201933
Paper id 71201933Paper id 71201933
Paper id 71201933
 
Dynamic Programming approach in Two Echelon Inventory System with Repairable ...
Dynamic Programming approach in Two Echelon Inventory System with Repairable ...Dynamic Programming approach in Two Echelon Inventory System with Repairable ...
Dynamic Programming approach in Two Echelon Inventory System with Repairable ...
 

Destaque

Case study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessoriesCase study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessoriesYagnesh Virani
 
Boiler mountings and accessories
Boiler mountings and accessoriesBoiler mountings and accessories
Boiler mountings and accessoriesMohammad Mudassir
 
Boiler mountings & accessories
Boiler mountings & accessoriesBoiler mountings & accessories
Boiler mountings & accessoriesMalav Patel
 

Destaque (6)

Case study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessoriesCase study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessories
 
Boiler mountings and accessories
Boiler mountings and accessoriesBoiler mountings and accessories
Boiler mountings and accessories
 
Boiler mountings & accessories
Boiler mountings & accessoriesBoiler mountings & accessories
Boiler mountings & accessories
 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentation
 
Boiler Introduction
Boiler IntroductionBoiler Introduction
Boiler Introduction
 
Boiler operation
Boiler operationBoiler operation
Boiler operation
 

Semelhante a Coalfired power plant boiler unit decision support system

Behavioural analysis of a complex manufacturing system having queue in the ma...
Behavioural analysis of a complex manufacturing system having queue in the ma...Behavioural analysis of a complex manufacturing system having queue in the ma...
Behavioural analysis of a complex manufacturing system having queue in the ma...Alexander Decker
 
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...IRJET Journal
 
Measures of different reliability parameters for a complex redundant system u...
Measures of different reliability parameters for a complex redundant system u...Measures of different reliability parameters for a complex redundant system u...
Measures of different reliability parameters for a complex redundant system u...Alexander Decker
 
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...IRJET Journal
 
MATHEMATICAL MODELING OF COMPLEX REDUNDANT SYSTEM UNDER HEAD-OF-LINE REPAIR
MATHEMATICAL MODELING OF COMPLEX REDUNDANT SYSTEM UNDER HEAD-OF-LINE REPAIRMATHEMATICAL MODELING OF COMPLEX REDUNDANT SYSTEM UNDER HEAD-OF-LINE REPAIR
MATHEMATICAL MODELING OF COMPLEX REDUNDANT SYSTEM UNDER HEAD-OF-LINE REPAIREditor IJMTER
 
IRJET- A Study on Some Repairable Systems
IRJET- A Study on Some Repairable SystemsIRJET- A Study on Some Repairable Systems
IRJET- A Study on Some Repairable SystemsIRJET Journal
 
IRJET- Two-Class Priority Queueing System with Restricted Number of Priority ...
IRJET- Two-Class Priority Queueing System with Restricted Number of Priority ...IRJET- Two-Class Priority Queueing System with Restricted Number of Priority ...
IRJET- Two-Class Priority Queueing System with Restricted Number of Priority ...IRJET Journal
 
Stochastic Analysis of a Cold Standby System with Server Failure
Stochastic Analysis of a Cold Standby System with Server FailureStochastic Analysis of a Cold Standby System with Server Failure
Stochastic Analysis of a Cold Standby System with Server Failureinventionjournals
 
NONLINEAR BATCH REACTOR TEMPERATURE CONTROL BASED ON ADAPTIVE FEEDBACK-BASED ILC
NONLINEAR BATCH REACTOR TEMPERATURE CONTROL BASED ON ADAPTIVE FEEDBACK-BASED ILCNONLINEAR BATCH REACTOR TEMPERATURE CONTROL BASED ON ADAPTIVE FEEDBACK-BASED ILC
NONLINEAR BATCH REACTOR TEMPERATURE CONTROL BASED ON ADAPTIVE FEEDBACK-BASED ILCijcisjournal
 
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...Satyendra Singh
 
Sonendra kumar gupta operational readiness of a complex system under differen...
Sonendra kumar gupta operational readiness of a complex system under differen...Sonendra kumar gupta operational readiness of a complex system under differen...
Sonendra kumar gupta operational readiness of a complex system under differen...Alexander Decker
 
Optimization of Corridor Observation Method to Solve Environmental and Econom...
Optimization of Corridor Observation Method to Solve Environmental and Econom...Optimization of Corridor Observation Method to Solve Environmental and Econom...
Optimization of Corridor Observation Method to Solve Environmental and Econom...ijceronline
 
New controllers efficient model based design method
New controllers efficient model based design methodNew controllers efficient model based design method
New controllers efficient model based design methodAlexander Decker
 
Feedback control of_dynamic_systems
Feedback control of_dynamic_systemsFeedback control of_dynamic_systems
Feedback control of_dynamic_systemskarina G
 
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...cscpconf
 
Metamodel-based Optimization of a PID Controller Parameters for a Coupled-tan...
Metamodel-based Optimization of a PID Controller Parameters for a Coupled-tan...Metamodel-based Optimization of a PID Controller Parameters for a Coupled-tan...
Metamodel-based Optimization of a PID Controller Parameters for a Coupled-tan...TELKOMNIKA JOURNAL
 
New calculation of thetray numbers for Debutanizer Tower in BIPC
New calculation of thetray numbers for Debutanizer Tower in BIPCNew calculation of thetray numbers for Debutanizer Tower in BIPC
New calculation of thetray numbers for Debutanizer Tower in BIPCinventionjournals
 
New calculation of thetray numbers for Debutanizer Tower in BIPC
New calculation of thetray numbers for Debutanizer Tower in BIPCNew calculation of thetray numbers for Debutanizer Tower in BIPC
New calculation of thetray numbers for Debutanizer Tower in BIPCinventionjournals
 
Analysis of single server queueing system with batch service
Analysis of single server queueing system with batch serviceAnalysis of single server queueing system with batch service
Analysis of single server queueing system with batch serviceAlexander Decker
 

Semelhante a Coalfired power plant boiler unit decision support system (20)

Behavioural analysis of a complex manufacturing system having queue in the ma...
Behavioural analysis of a complex manufacturing system having queue in the ma...Behavioural analysis of a complex manufacturing system having queue in the ma...
Behavioural analysis of a complex manufacturing system having queue in the ma...
 
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
Robust PID Controller Design for Non-Minimum Phase Systems using Magnitude Op...
 
Measures of different reliability parameters for a complex redundant system u...
Measures of different reliability parameters for a complex redundant system u...Measures of different reliability parameters for a complex redundant system u...
Measures of different reliability parameters for a complex redundant system u...
 
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
Computation of Simple Robust PI/PID Controller Design for Time-Delay Systems ...
 
MATHEMATICAL MODELING OF COMPLEX REDUNDANT SYSTEM UNDER HEAD-OF-LINE REPAIR
MATHEMATICAL MODELING OF COMPLEX REDUNDANT SYSTEM UNDER HEAD-OF-LINE REPAIRMATHEMATICAL MODELING OF COMPLEX REDUNDANT SYSTEM UNDER HEAD-OF-LINE REPAIR
MATHEMATICAL MODELING OF COMPLEX REDUNDANT SYSTEM UNDER HEAD-OF-LINE REPAIR
 
Bv36438443
Bv36438443Bv36438443
Bv36438443
 
IRJET- A Study on Some Repairable Systems
IRJET- A Study on Some Repairable SystemsIRJET- A Study on Some Repairable Systems
IRJET- A Study on Some Repairable Systems
 
IRJET- Two-Class Priority Queueing System with Restricted Number of Priority ...
IRJET- Two-Class Priority Queueing System with Restricted Number of Priority ...IRJET- Two-Class Priority Queueing System with Restricted Number of Priority ...
IRJET- Two-Class Priority Queueing System with Restricted Number of Priority ...
 
Stochastic Analysis of a Cold Standby System with Server Failure
Stochastic Analysis of a Cold Standby System with Server FailureStochastic Analysis of a Cold Standby System with Server Failure
Stochastic Analysis of a Cold Standby System with Server Failure
 
NONLINEAR BATCH REACTOR TEMPERATURE CONTROL BASED ON ADAPTIVE FEEDBACK-BASED ILC
NONLINEAR BATCH REACTOR TEMPERATURE CONTROL BASED ON ADAPTIVE FEEDBACK-BASED ILCNONLINEAR BATCH REACTOR TEMPERATURE CONTROL BASED ON ADAPTIVE FEEDBACK-BASED ILC
NONLINEAR BATCH REACTOR TEMPERATURE CONTROL BASED ON ADAPTIVE FEEDBACK-BASED ILC
 
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
PuShort Term Hydrothermal Scheduling using Evolutionary Programmingblished pa...
 
Sonendra kumar gupta operational readiness of a complex system under differen...
Sonendra kumar gupta operational readiness of a complex system under differen...Sonendra kumar gupta operational readiness of a complex system under differen...
Sonendra kumar gupta operational readiness of a complex system under differen...
 
Optimization of Corridor Observation Method to Solve Environmental and Econom...
Optimization of Corridor Observation Method to Solve Environmental and Econom...Optimization of Corridor Observation Method to Solve Environmental and Econom...
Optimization of Corridor Observation Method to Solve Environmental and Econom...
 
New controllers efficient model based design method
New controllers efficient model based design methodNew controllers efficient model based design method
New controllers efficient model based design method
 
Feedback control of_dynamic_systems
Feedback control of_dynamic_systemsFeedback control of_dynamic_systems
Feedback control of_dynamic_systems
 
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
 
Metamodel-based Optimization of a PID Controller Parameters for a Coupled-tan...
Metamodel-based Optimization of a PID Controller Parameters for a Coupled-tan...Metamodel-based Optimization of a PID Controller Parameters for a Coupled-tan...
Metamodel-based Optimization of a PID Controller Parameters for a Coupled-tan...
 
New calculation of thetray numbers for Debutanizer Tower in BIPC
New calculation of thetray numbers for Debutanizer Tower in BIPCNew calculation of thetray numbers for Debutanizer Tower in BIPC
New calculation of thetray numbers for Debutanizer Tower in BIPC
 
New calculation of thetray numbers for Debutanizer Tower in BIPC
New calculation of thetray numbers for Debutanizer Tower in BIPCNew calculation of thetray numbers for Debutanizer Tower in BIPC
New calculation of thetray numbers for Debutanizer Tower in BIPC
 
Analysis of single server queueing system with batch service
Analysis of single server queueing system with batch serviceAnalysis of single server queueing system with batch service
Analysis of single server queueing system with batch service
 

Mais de Alexander Decker

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Alexander Decker
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inAlexander Decker
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesAlexander Decker
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksAlexander Decker
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dAlexander Decker
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceAlexander Decker
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifhamAlexander Decker
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaAlexander Decker
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenAlexander Decker
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksAlexander Decker
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget forAlexander Decker
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabAlexander Decker
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...Alexander Decker
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalAlexander Decker
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesAlexander Decker
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbAlexander Decker
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloudAlexander Decker
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveragedAlexander Decker
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenyaAlexander Decker
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health ofAlexander Decker
 

Mais de Alexander Decker (20)

Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...Abnormalities of hormones and inflammatory cytokines in women affected with p...
Abnormalities of hormones and inflammatory cytokines in women affected with p...
 
A validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale inA validation of the adverse childhood experiences scale in
A validation of the adverse childhood experiences scale in
 
A usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websitesA usability evaluation framework for b2 c e commerce websites
A usability evaluation framework for b2 c e commerce websites
 
A universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banksA universal model for managing the marketing executives in nigerian banks
A universal model for managing the marketing executives in nigerian banks
 
A unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized dA unique common fixed point theorems in generalized d
A unique common fixed point theorems in generalized d
 
A trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistanceA trends of salmonella and antibiotic resistance
A trends of salmonella and antibiotic resistance
 
A transformational generative approach towards understanding al-istifham
A transformational  generative approach towards understanding al-istifhamA transformational  generative approach towards understanding al-istifham
A transformational generative approach towards understanding al-istifham
 
A time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibiaA time series analysis of the determinants of savings in namibia
A time series analysis of the determinants of savings in namibia
 
A therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school childrenA therapy for physical and mental fitness of school children
A therapy for physical and mental fitness of school children
 
A theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banksA theory of efficiency for managing the marketing executives in nigerian banks
A theory of efficiency for managing the marketing executives in nigerian banks
 
A systematic evaluation of link budget for
A systematic evaluation of link budget forA systematic evaluation of link budget for
A systematic evaluation of link budget for
 
A synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjabA synthetic review of contraceptive supplies in punjab
A synthetic review of contraceptive supplies in punjab
 
A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...A synthesis of taylor’s and fayol’s management approaches for managing market...
A synthesis of taylor’s and fayol’s management approaches for managing market...
 
A survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incrementalA survey paper on sequence pattern mining with incremental
A survey paper on sequence pattern mining with incremental
 
A survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniquesA survey on live virtual machine migrations and its techniques
A survey on live virtual machine migrations and its techniques
 
A survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo dbA survey on data mining and analysis in hadoop and mongo db
A survey on data mining and analysis in hadoop and mongo db
 
A survey on challenges to the media cloud
A survey on challenges to the media cloudA survey on challenges to the media cloud
A survey on challenges to the media cloud
 
A survey of provenance leveraged
A survey of provenance leveragedA survey of provenance leveraged
A survey of provenance leveraged
 
A survey of private equity investments in kenya
A survey of private equity investments in kenyaA survey of private equity investments in kenya
A survey of private equity investments in kenya
 
A study to measures the financial health of
A study to measures the financial health ofA study to measures the financial health of
A study to measures the financial health of
 

Último

The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesThousandEyes
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Scott Andery
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 

Último (20)

The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 

Coalfired power plant boiler unit decision support system

  • 1. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 Coal–fired Power Plant Boiler Unit Decision Support System Ravinder Kumar* Research scholar, Department of Mechanical Engineering, D.C.R University of Science & Technology, Murthal, Sonepat (Haryana), India * rav.chauhan@yahoo.co.in Abstract The present paper discusses decision support system for boiler unit of a coal-fired thermal power plant. The boiler unit consists of five subsystems arranged in series and parallel based configurations. The decision support system for boiler unit has been developed with the help of mathematical formulation based on Markov Birth-Death process using probabilistic approach. For this purpose, first differential equations have been generated. These equations are then solved using normalizing condition so as to determine the steady state availability of boiler unit. After that decision matrices are developed which provide the various availability levels for different combinations of failure and repair rates for all subsystems. The model developed helps in the operations and quantitative management of various maintenance decisions and actions. The results of this paper are therefore beneficial in deciding the relative repair priorities of various subsystems of boiler unit. Keywords: Decision Support System, Transition diagram, Probabilistic approach, Availability matrices, Quantitative Management 1. Introduction Manufacturing processes involve a continuous flow of raw materials through a series of sequential operations, which transform the raw materials into the final products. Industries producing products like paper, chemical and sugar etc. during manufacturing have such continuous operations. The goal of high productivity supplemented with minimum standby units, storage capacity, production losses and minimum cost of failure is difficult to achieve in these industries. So the importance of high system reliability and availability has been realized and this can be achieved by quantitative management methods using various concepts of Industrial Engineering and Operation Research. The quantitative analysis performed for system availability and reliability gives the factual knowledge in the form of failure and repair parameters of various equipments/subsystems. Practically various systems/subsystems are subjected to random failures due to poor design, lack of operative skills and wrong manufacturing techniques etc. causing heavy production losses. The failed systems can be brought back to the working state in minimum down time through effective maintenance planning and control. The factory operating conditions and repair strategic plans play important role in maintaining the system failure free for maximum duration. This can be accomplished only through quantitative analysis of each working subsystem of the plant concerned. The system performance can be quantified in terms of the availability if the real system is modeled mathematically and analyzed in actual operating conditions. The mechanical systems have attracted the attention of several researchers in the area of reliability theory. Kumar et.al. [1, 2] discussed about feeding systems in the sugar industry and paper industry. Kumar and Singh [3] analyzed the Availability of a washing system in paper industry. Singh and Pandey [4, 5] reported reliability analysis of mechanical systems in Fertilizer and Sugar industry. Kiureghian and Ditlevson [6] analyzed the availability, reliability and downtime of system with repairable components. Rajiv Khanduja et. al [7] reported the availability analysis of the bleaching system of a paper plant. Kumar et.al.[8] discussed the performance evaluation and availability analysis of ammonia synthesis unit of a fertilizer plant using probabilistic approach. Tewari et.al. [9] analyzed the performance evaluation and optimization for urea crystallization system in a fertilizer 7
  • 2. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 plant using Genetic Algorithm. Khanduja et.al. [10] developed the decision support system and performance model of a digesting system of a paper plant using a probabilistic approach. Deepika Garg et.al. [11] developed the mathematical model of a cattle feed plant using a birth-death Markov Process. The differential equations have been solved for the steady-state. The system performance has also been studied. Sanjeev et al. [12] discussed about simulation and modeling of urea decomposition system in a fertilizer plant. Gupta et al. [13] discussed reliability and availability analysis of boiler unit of a steam thermal power plant. Jorn Vatn et al. [14] discussed the optimization of maintenance interval using classical cost benefit analysis approach in Norwegian railways. 2. System description 2.1 The Boiler system consists of five sub-systems: Furnace, denoted by A, failure of which results into failure of system. Boiler-drum, denoted by B, having single unit, failure of which results into system failure. Economizer, denoted by C, failure of which results into system failure. Super-heater, denoted by D, having single unit, failure of which results into system failure. Re-heater, denoted by E, having single unit. 2.2 Assumptions and Notations 1. Failure and repair rates for each subsystem are constant and statistically independent. 2. Not more than one failure occurs at a time. 3. A repaired unit is as good as new, performance wise. 4. The standby units are of the same nature and capacity as the active units. The notations associated with the transition diagram are as follows: 1. A, B, C, D, E: Subsystems in good operating state 2. a, b, c, d, e: Indicates the failed state of A, B, C, D, E. 4. λi : Mean constant failure rates from states A, B, C, D, E to the states a, b, c, d, e. 5. µ i : Mean constant repair rates from states a, b, c, d, e to the states A, B, C, D, E. 6. Pi(t): Probability that at time ‘t’ the system is in ith state. 7. ’: Derivatives w.r.t.‘t’ 2.3 Mathematical Analysis of the System Probability consideration gives following differential equations (Eq. 1 – Eq. 6) associated with the Transition Diagram (Figure 1). P (t) + (λ1 + λ2 + λ3 + λ4 + λ5 )P (t ) = µ1P(t) + µ2P (t) + µ3P (t) + µ4P (t) + µ5P (t) (1) ' 0 0 1 2 3 4 5 P1 (t ) + µ 1 P1 (t ) = λ1 P0 (t ) ' (2) P2 (t ) + µ 2 P2 (t ) = λ 2 P0 (t ) ' (3) P3 (t ) + µ 3 P3 (t ) = λ 3 P0 (t ) ' (4) P4 (t ) + µ 4 P4 (t ) = λ 4 P0 (t ) ' (5) P5 (t ) + µ 5 P5 (t ) = λ 5 P0 (t ) ' (6) Initial conditions at time t = 0 are 8
  • 3. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 Pi (t ) = 1 for i = 0 and 0 for i ≠ 0 2.4 Steady State Availability The long run or steady state availability of the System is obtained by putting d/dt→ 0 as t→0, into all differential equations (1) to (6). (λ1 + λ 2 + λ3 + λ 4 + λ5 )P0 = µ1 P1 + µ 2 P2 + µ 3 P3 + µ 4 P4 + µ 5 P5 (7) µ 1 P1 = λ1P0 (8) µ 2 P2 = λ 2 P0 (9) µ 3 P3 = λ3 P0 (10) µ 4 P4 = λ 4 P0 (11) µ 5 P5 = λ5 P0 (12) Solving the above equations, we get: Let us assume, P1 = K1 P0 , P2 = K 2 P0 , P3 = K3 P0 , P4 = K 4 P0 , P5 = K 5 P0 K1 = λ1 λ2 λ3 λ4 λ5 Where, µ1 , K 2 = µ2 , K3 = µ3 , K 4 = µ4 , K5 = µ5 Now using normalizing conditions i.e. sum of all the probabilities is equal to one, we get: 5 −1 ∑ P = 1i.e P0 = [1+ K1 + K2 + K3 + K4 + K5 ] i =0 i Now, the steady state availability of the system may be obtained as the summation of all the working state probabilities, i.e. AV = P0 3. Performance analysis The failure and repair rates of various subsystems of Boiler system are taken from the maintenance history sheet of thermal power plant. The decision support system deals with the quantitative analysis of all the factors viz. courses of action and states of nature, which influence the maintenance decisions associated with the Boiler system. The decision matrices are developed to determine the various availability levels for different combinations of failures and repair rates. Table 1, 2, 3, 4, 5 represent the decision matrices for various subsystems of Boiler system. Accordingly, maintenance decisions can be made for various subsystems keeping in view the repair criticality and we may select the best possible combinations of failure and repair rates. 4. Results and discussion Tables 1 to 5 show the effect of failure and repair rates of Furnace, Boiler-drum, Economizer, Super-heater, & Re-heater on the steady state availability of the Boiler system. Table 1 reveals the effect of failure and repair rates of Furnace subsystem on the availability of the system. It is observed that for some known values of failure / repair rates of Boiler-drum, Economizer, Super-heater, & Re-heater (λ2=0.0008, µ 2=0.008, λ3=0.04, µ 3=0.05, λ4=0.00010, µ 4=0.014, λ5=0.0020, µ 5=0.014), as the failure rates of Furnace increases from 0.0006 to 0.001 the availability decreases by about 1.06%. Similarly as repair rates of furnace increases from 0.02 to 0.10, the availability increases by about 1.33%. Table 2 reveals the effect of failure and repair rates of Boiler-drum on the availability of the System. It is observed that for some known values of failure / repair rates of Furnace, Economizer, Super-heater, & Re- heater (λ1=0.0006, µ 1=0.02, λ3=0.04, µ 3=0.05, λ4=0.00010, µ 4=0.014, λ5=0.0020, µ 5=0.014), as the failure 9
  • 4. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 rates of Boiler-drum increases from 0.0008 to 0.0016, the availability decreases by about 5.03%. Similarly as repair rates of Boiler-drum increases from 0.008 to 0.016, the availability increases by about 2.81%. Table 3 reveals the effect of failure and repair rates of Economizer on the availability of the System. It is observed that for some known values of failure / repair rates of Furnace, Boiler-drum, Super-heater, & Re- heater (λ1=0.0006, µ 1=0.02, λ2=0.0008, µ 2=0.008, λ4=0.00010, µ 4=0.014, λ5=0.0020, µ 5=0.014), as the failure rates of economizer increases from 0.004 to 0.01, the availability decreases by about 5.96%. Similarly as repair rates of economizer increases from 0.05 to 0.2, the availability increases by about 3.40%. Table 4 reveals the effect of failure and repair rates of Super-heater on the availability of the System. It is observed that for some known values of failure / repair rates of Furnace, Boiler-drum, Economizer, & Re- heater (λ1=0.0006, µ 1=0.02, λ2=0.0008, µ 2=0.008, λ3=0.04, µ 3=0.05, λ5=0.0020, µ 5=0.014), as the failure rates of Super-heater increases from 0.00010 to 0.00030, the availability decreases by about 0.76%. Similarly as repair rates of Super-heater increases from 0.014 to 0.026, the availability increases by about 0.18%. Table 5 reveals the effect of failure and repair rates of Re-heater on the availability of the System. It is observed that for some known values of failure / repair rates of Furnace, Boiler-drum, Economizer, & Super-heater (λ1=0.0006, µ 1=0.02, λ2=0.0008, µ 2=0.008, λ3=0.04, µ 3=0.05, λ4=0.00010, µ 4=0.014), as the failure rates of Re-heater increases from 0.0020 to 0.0080, the availability decreases by about 17.6%. Similarly as repair rates of Re-heater increases from 0.014 to 0.050, the availability increases by about 6.02%. 5. Conclusion The Decision Support System for Boiler system has been developed with the help of mathematical modeling using probabilistic approach. The decision matrices are also developed. These matrices facilitate the maintenance decisions to be made at critical points where repair priority should be given to some particular subsystem of Boiler system. Decision matrix as given in table 5 clearly indicates that the Re-heater is most critical subsystem as far as maintenance aspect is concerned. So, Re-heater should be given top priority as the effect of its failure and repair rates on the unit availability is much higher than that of other sub-systems. Therefore, on the basis of repair rates, the maintenance priority should be given as per following order: 1. Re-heater 2. Economizer 3. Boiler-drum 4. Super-heater 5. Furnace References Kumar D., Singh J. and Singh, I.P. (1988). Reliability analysis of the feeding system in the paper industry. Microelectron Reliability. 28, 213-215. Kumar, D., Singh J. and Singh I.P. (1988). Availability of the feeding system in the sugar industry. Microelectron Reliability, 28, 867-871. Kumar, D. and Singh, J. (1989). Availability of a Washing System in the Paper Industry. Microelectron Reliability, 29, 775-778. Singh, J., Pandey P.C. and Kumar, D. (1990). Designing for Reliable Operation of Urea Synthesis in the Fertilizer Industry. Microelectron. Reliability, 30,1021-1024. Kumar, D., Singh, J., and Pandey P.C. (1992). Availability of the Crystallization System in the Sugar Industry under Common – Cause Failure. IEEE Transactions on Reliability, 41(1) 85-91. 10
  • 5. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 Kiureghian A.D. and Ditlevson O.D. (2007). Availability, Reliability & downtime of system with repairable components. Reliability Engineering and System Safety, 92(2 ) 66-72. Rajiv Khanduja, Tewari, P.C., Dinesh Kumar, (2008). Availability Analysis of Bleaching System of Paper Plant. Journal of Industrial Engineering. Udyog Pragati, N.I.T.I.E. Mumbai (India), 32(1), 24- 29. Kumar, S., Tewari, P.C. and Sunand Kumar, (2009).Performance Evaluation and Availability Analysis of Ammonia Synthesis unit in a Fertilizer Plant. Journal of Industrial Engineering International, South Tehran Branch, 05(3),17-26. Tewari, P.C. Kumar, S., Sunand Kumar and Meenu, (2009). Performance Evaluation and Optimization for Urea Crystallization system in a Fertilizer Plant using Genetic Algorithm Technique. International Journal of Applied Engineering Research, 04(6),1093-1105. Rajiv Khanduja, Tewari, P.C. and Chauhan, R.S., (2009). Decision Support System and Performance Evaluation of a Digesting System of a Paper Plant. Prabandhan: Indian Journal of Management, 02(5), 21-24. Garg, Deepika, Singh, Jai and Kumar, Kuldeep, (2009). Performance Analysis of a Cattle Feed Plant. The Icfai University Journal of Science & Technology, 5( 2), 83-94. Sanjeev Kumar et al., (2009). Simulation Model for evaluating the performance of Urea Decomposition System in a Fertilizer Plant. International Journal of Industrial Engineering and Practices (I.J.I.E.P.), 1(1), 10-14. Gupta, S., Tewari, P. C., & Sharma, A. K. (2009b). Reliability and availability analysis of boiler unit of a steam thermal power plant. South African Journal of Industrial Engineering, 20(1), 147-158. Jorn Vatn and Terje Aven, (2010). An approach to maintenance optimization where safety issues are important. Reliability Engineering and System Safety, 4(3), 58-63. Kumar, D., & Pandey, P. C. (1993). Maintenance planning and resource allocation in urea fertilizer plant. Quality and reliability Engineering International Journal, 9, 411-423. Mishra, R C; & Pathak, K. (2002). Maintenance Engineering and Management, Prentice Hall & India Pvt Ltd; New Delhi. Srinath, L. S. (1994). Reliability Engineering. 3rd edition, New Delhi, India. East-West Press Pvt. Ltd. Wolstenholme, L. C. (1999). Reliability modeling – a statistical approach. Chapman & Hall; CRC. Table 1: Effect of Failure and Repair Rates of Furnace on Availability λ1 µ1 0.0006 0.0007 0.0008 0.0009 0.001 Constant values 0.02 0.7352 0.7326 0.7299 0.7272 0.7246 λ2=0.0008, µ 2=0.008, 0.04 0.7434 0.7421 0.7407 0.7393 0.7380 λ3=0.04, µ 3=0.05, 0.06 0.7462 0.7453 0.7444 0.7434 0.7425 λ4=0.00010, µ 4=0.014, 0.08 0.7476 0.7469 0.7462 0.7455 0.7448 λ5=0.0020, µ 5=0.014 0.10 0.7485 0.7479 0.7473 0.7468 0.7462 11
  • 6. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 Table 2: Effect of Failure and Repair Rates of Boiler drum on Availability λ2 µ2 0.0008 0.0010 0.0012 0.0015 0.0016 Constant values 0.008 0.7352 0.7220 0.7092 0.6968 0.6849 λ1=0.0006, µ 1=0.02, 0.010 0.7462 0.7352 0.7246 0.7142 0.7042 λ3=0.04, µ 3=0.05, 0.012 0.7537 0.7444 0.7352 0.7263 0.7177 λ4=0.00010, µ 4=0.014, 0.014 0.7592 0.7510 0.7430 0.7352 0.7276 λ5=0.0020, µ 5=0.014 0.016 0.7633 0.7561 0.7490 0.7421 0.7352 Table 3: Effect of Failure and Repair Rates of Economizer on Availability λ3 µ3 0.004 0.0055 0.0070 0.0085 0.01 Constant values 0.05 0.7352 0.7194 0.7042 0.6896 0.6756 λ1=0.0006, µ 1=0.02, 0.087 0.7541 0.7444 0.7350 0.7258 0.7168 λ2=0.0008, µ 2=0.008, 0.125 0.7621 0.7552 0.7485 0.7418 0.7352 λ4=0.00010, µ 4=0.014, 0.162 0.7664 0.7610 0.7557 0.7504 0.7453 λ5=0.0020, µ 5=0.014 0.2 0.7692 0.7648 0.7604 0.7561 0.7518 Table 4: Effect of Failure and Repair Rates of Super-heater on Availability λ4 µ4 0.00010 0.00015 0.00020 0.00025 0.00030 Constant values 0.014 0.7352 0.7333 0.7314 0.7306 0.7276 λ1=0.0006, µ 1=0.02, 0.017 0.7359 0.7343 0.7328 0.7312 0.7296 λ2=0.0008, µ 2=0.008, 0.020 0.7364 0.7351 0.7337 0.7324 0.7310 λ3=0.04, µ 3=0.05, 0.023 0.7368 0.7356 0.7344 0.7332 0.7321 λ5=0.0020, µ 5=0.014 0.026 0.7370 0.7360 0.7349 0.7339 0.7329 12
  • 7. Innovative Systems Design and Engineering www.iiste.org ISSN 2222-1727 (Paper) ISSN 2222-2871 (Online) Vol 3, No 1, 2012 Table 5: Effect of Failure and Repair Rates of Re-heater on Availability λ5 µ5 0.0020 0.0035 0.0050 0.0065 0.0080 Constant values 0.014 0.7352 0.6815 0.6352 0.5872 0.5591 λ1=0.0006, µ 1=0.02, 0.023 0.7668 0.7302 0.6970 0.6667 0.6389 λ2=0.0008, µ 2=0.008, 0.032 0.7814 0.7538 0.7281 0.7040 0.6815 λ3=0.04, µ 3=0.05, 0.041 0.7899 0.7677 0.7467 0.7269 0.7080 λ4=0.00010, µ 4=0.014 0.050 0.7954 0.7769 0.7592 0.7423 0.7261 AbCDE 2 aBCDE FULL 1 CAPACITY λ2 µ2 µ1 STATE λ3 ABcDE ABCDE λ1 3 0 λ5 µ3 µ5 FAILED λ4 µ4 STATE ABCDe 5 ABCdE 4 Figure 1: Transition Diagram of BOILER System. 13