E book - How do you recovery costs from completed energy efficiency upgrades in NSW? Alan 0417238448.pptx
1. þ Verify Upgrade þ Manage All Documentation & Prepare Claim þ Create ESCs þ Trade ESCs þ Pay You $
Haron Robson Energy
is Accredited by the
NSW Government to
create & trade Energy
Savings Certificates
Copyright Haron Robson Energy Pty Ltd 2015.
Haron Robson Energy is an Accredited Certificate Provider (ACP) of Energy Saving Certificates (ESCs)
Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
Energy Savings Certificates
are traded and the money
($) is returned to You.
You recover costs from
energy efficiency upgrade
*Each certificate represents the equivalent of 1 tonne of
CO2-e resulting from energy savings activities.
Under The NSW Energy
Saving Scheme future energy
savings from energy
efficiency upgrades can be
converted to
Energy Savings Certificates
An Energy Savings Certificate (ESC) is a tradable certificate created
under Division 7 of Part 9 of the Electricity Supply Act 1995.
eBook
How do you recovery costs
from completed energy
efficiency upgrades in NSW?
What does Haron Robson Energy do? We provide rapid pain relief from a highly regulated Government scheme
2. þ Verify Upgrade þ Manage All Documentation & Prepare Claim þ Create ESCs þ Trade ESCs þ Pay You $
Haron Robson Energy
is Accredited by the
NSW Government to
create & trade Energy
Savings Certificates
Copyright Haron Robson Energy Pty Ltd 2015.
Haron Robson Energy is an Accredited Certificate Provider (ACP) of Energy Saving Certificates (ESCs)
Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
Energy Savings Certificates
are traded and the money
($) is returned to You.
You recover costs from
energy efficiency upgrade
*Each certificate represents the equivalent
of 1 tonne of CO2-e resulting from energy
savings activities.
Under The NSW Energy
Saving Scheme future energy
savings from upgrades can be
converted to
Energy Savings Certificates
An Energy Savings Certificate (ESC) is a
tradable certificate created under Division 7
of Part 9 of the Electricity Supply Act 1995.
Energy
Savings
Certificates
What are Energy Savings Certificates?
= $
Haron Robson Energy
takes on all risk of
overpayment and
non-compliance
Certificates are created
from future
gas or electricity savings
What does Haron Robson Energy do? We provide rapid pain relief from a highly regulated Government scheme
Certificates
are traded
You may be eligible to
receive a forward
payment
10 years upfront
Create
&
Trade
3. þ Verify Upgrade þ Manage All Documentation & Prepare Claim þ Create ESCs þ Trade ESCs þ Pay You $
Haron Robson Energy
is Accredited by the
NSW Government to
create & trade Energy
Savings Certificates
Copyright Haron Robson Energy Pty Ltd 2015.
Haron Robson Energy is an Accredited Certificate Provider (ACP) of Energy Saving Certificates (ESCs)
Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
Energy Savings Certificates
are traded and the money
($) is returned to You.
You recover costs from
energy efficiency upgrade
*Each certificate represents the equivalent
of 1 tonne of CO2-e resulting from energy
savings activities.
Under The NSW Energy
Saving Scheme future energy
savings from upgrades can be
converted to
Energy Savings Certificates
An Energy Savings Certificate (ESC) is a
tradable certificate created under Division 7
of Part 9 of the Electricity Supply Act 1995.
Energy
Savings
Certificates
What do you do with
Energy Savings Certificates?
= $
Haron Robson Energy
takes on all risk of
overpayment and
non-compliance
Certificates are created
from future
gas or electricity savings
What does Haron Robson Energy do? We provide rapid pain relief from a highly regulated Government scheme
Certificates
are traded
You may be eligible to
receive a forward
payment
10 years upfront
Create
&
Trade
4. E.g. Install VSD to pumps
E.g. Gas efficiency upgrade to
stationary equipment
^ We can also apply Option No.2
to a lighting upgrade or a chiller
(replacement) upgrade
How does Haron Robson Energy create Energy Savings Certificates from
energy efficiency upgrades?
What is calculated?
OLD lighting
equipment (Wattage)
less NEW lighting
equipment (Wattage)
= energy savings and
convert to certificates
How?
Measure energy savings from
upgrade & convert to certificates
When?
We create ESCs and You receive
$ payment after post install
measure period complete
How?
Calculate energy
savings & convert to
certificates
When?
We create ESCs and
you receive payment
immediately after
installation of upgrade
lighting equipment
What is measured?*
E.g. Motor / pump energy
consumption by sub-meter over a
period pre & post upgrade install
Option No.2^
Isolated Area or
Specific Plant Upgrade
Option No.1
Lighting & Controls
Upgrade
E.g. Multiple energy efficiency
upgrades (i.e. lighting + chiller
replacement + VSD installed to
motors / pumps + data analytics
overlay to BMS or BMS upgrade
How?
Measure energy savings from
upgrade & convert to certificates
When?
We create ESCs and You
receive $ payment after post
install measure period complete
What is measured?*
E.g. Site energy consumption by
utility (retail) meter over a period
pre & post install
Option No.3
Whole of Site Upgrade
* If energy consumption is directly linked to production output the pre and post
measurement period may only be one week or one month maximum
Gas or Electricity Energy Efficiency Upgrades
What is measured?
Whole of site energy
consumption using utility
(retail) meter data over a
12 month (seasonal)
period pre and post
install
How?
Measure energy savings
& convert to certificates
When?
We create ESCs and
You receive payment 12
months post install
measurement period.
Annual creation ONLY
up to 5 years max.
Option No.4
Chiller (Replacement)
Upgrade
10 year forward $ payment returned to you 5x annual $ payment
5. a. Confirm Nomination
Form signed before
Implementation Date.
b. Kick-off meeting and
issue Project Brief
c. Monitor & assist
d. Confirm the lighting
upgrade will comply
with the Energy
Saving Scheme Rule
e. Client option: request
HRE to verify &
document upgrade
lighting complies with
BCA and ASNZS 1680
What is the process?
a. Receive
documentation
(evidence)
Review
documentation
and stakeholder
sign-offs
b. Site visit to verify
documentation
aligns with site
works
c. Calculate energy
savings & ESCs
d. Confirm final
ESC quantity to
be registered
Step 2
Audit and Verify
ESC Claim
a. Trade
ESCs
with a
liable
party
b. Confirm
ESCs
traded
Step 4
Trade
ESCs
3 days 5 days
Step 1
Timeframe: X days
a. Register
ESCs in
the ESS
Registry
b. Confirm
ESCs
registered
and gain
approval
to trade
ESCs
Step 3
Register
ESCs
1 day
a. Transfer
money from
trade of
ESCs less
commission
and fee into
nominated
bank
account of
the Client
Step 5
Pay
Client
Nomination and Kick-
Off Meeting
Client Yield1 – revenue returned to the client è $100,0001
You
receive
No upfront payment of commission or fees
StartDescription
Fee
$
1. Client Yield calculated as per Table 1 Revenue Return To The Client, next page. This is an indicative value not the realised value.
The realised value will be determined upon trade of ESCs
2. Commission as per Table 2, next page “The Breakdown”
3. Other Fees as Agreed as per Table 3, next page “The Breakdown”
Option No.1 - Lighting Energy Efficiency Upgrade
Lightinginstalledandoperatingatsite
10 year
forward
payment
Commission2 & Other Fees As Agreed3
deducted from Net Revenue
6. What are the
deliverables?
What is calculated?
OLD lighting equipment
(Wattage) less NEW
lighting equipment
(Wattage) = energy
savings and convert to
certificates
How?
Calculate energy
savings and convert to
certificates
using commercial
lighting methodology
When?
We create ESCs and
you receive payment
immediately after
installation and
operation of upgrade
lighting equipment
Lighting
Upgrade
Both
packages
allow for 10
year
forward
creation of
energy
savings.
Energy
savings are
converted
to Energy
Savings
Certificates
Energy
Savings
Certificates
are traded
for revenue
($)
Revenue
($)
is returned
to You.
$
*** The Client can request Haron Robson Energy to document and verify the upgrade lighting complies with the Building Code of Australia (BCA) and
AS/NZS 1680. Alternatively, the Client can engage Haron Robson to prepare a lighting design to comply with the BCA and AS/NZS 1680
Deliverable By whom Deliverable By whom
Prepare existing and upgrade lighting
plans; and take photos of existing
luminaires in accordance with
Schedule 1
Client
Complete lighting register, prepare
existing and upgrade lighting plans;
and take photos of existing luminaires
in accordance with Schedule 1
HRE
Fixed
Fee
Prepare scope of works and
contractor specifications Client
Prepare scope of works and
contractor specifications
HRE
Fixed
Fee
Complete lighting design to comply
with the Building Code of Australia
and ASNZS 1680
Client
Complete lighting design to comply
with the Building Code of Australia
and ASNZS 1680
HRE
Fixed
Fee
Project manage the supply, install
and commissioning of upgrade
lighting
Client
Project manage the supply, install
and commissioning of upgrade
lighting
HRE
Fixed
Fee
Manage and coordinate all ESC
documentation (evidence)
requirements in accordance with
IPART Evidence Pack & Schedule 1
Client
Manage and coordinate all ESC
documentation (evidence)
requirements in accordance with
IPART Evidence Pack & Schedule 1
HRE
Fixed
Fee
Complete the IPART Evidence Pack
and arrange for sign-offs
HRE -
Included in
HRE % Fee
Complete the IPART Evidence Pack
including and arrange for sign-offs
HRE -
Included in
HRE % Fee
Verify and document upgrade lighting
complies with the Building Code of
Australia and ASNZS 1680***
Client
Not required if
lighting design
completed
Verify and document upgrade lighting
complies with the BCA and ASNZS
1680
HRE
Fixed
Fee
Submit IPART Evidence Pack and
documentation in accordance with
NSW Energy Saving Scheme Rule
and methodology
HRE -
Included in
HRE % Fee
Submit IPART Evidence Pack and
documentation in accordance with
NSW Energy Saving Scheme Rule
and methodology
HRE -
Included in
HRE % Fee
Create and trade ESCs
HRE –
Included in
HRE % Fee
Create and trade ESCs
HRE –
Included in
HRE % Fee
Client BYO
Evidence Package
Client Select
Flexible Package
7. Project Impact Assessment with
Measurement & Verification
Upgradeinstalledandoperatingat
site
What is the process?
StepsTime
a. Develop
Baseline
Energy Model
b. Prepare M&V
Plan, the
“RESA
Accreditation”
in accordance
with the NSW
ESS Rule
2009
c. Obtain all
stakeholder
sign offs
Step 2
Plan & Submit
Application
a. Register
ESCS in the
GGAS
Registry
b. Confirm
ESCs in
GGAS
registry with
the Client
c. Trade ESCs
with a liable
party
d. Confirm
trade with
the Client
Step 4
Register &
Trade ESCs
a. Define
boundary
motor/pump
only. Measure
baseline
energy use
Note: Temporary
or permanent
sub-metering will
be required
enabling
measurement of
baseline energy
use
Commission
Step 1
a. Measure
operating energy
use
b. Develop
Operating
Energy Model
c. Calculate lifetime
energy savings
for ESC creation
Note: Temporary or
permanent sub-
metering will be
required enabling
measurement of
operating energy use
Step 3
Measure NEW
Operating Energy
a. Transfer money
from trade of
ESCs less: IPART
& brokerage fees
and Haron
Robson Energy
commission
Note: PIAM&V allows
forward ESC creation
for the expected
lifetime of upgrades &
additional “Top-Up”
ESC creation
permitted annually up
to 10 years
Step 5
Pay ClientMeasure
Baseline Energy
Client Yield1 – Revenue returned to the Client from ESC creation & trade è $250,0001
10 year forward
payment
$
$
1. Client Yield calculated as per Table 1 Revenue Return To The Client. This is an indicative value not the
realised value. The realised value will be determined upon trade of ESCs at a future date. A significant factor in
the realised value is the ESC Spot Price at the time of trade.
Completed
before
upgrade
Measurement
period 1 week
only or 12 mths
Measurement
period 1 week only
or 12 months
Pay client post
measurement
period
5 day minimum
Progress
Payment
Progress
Payment
Progress
Payment
Upgrade
installedand
operatingat
site
Option No.2 - Isolated Area or Specific Plant
Energy Efficiency Upgrade
8. Step 1 - Measure Baseline Energy Who completes? Fee
Measure baseline energy use to complete item 2a.
a. Client supply and install sub-metering, collection and
sending of data to HRE
OR
b. HRE supply and install sub-metering and collection of data
Haron Robson
Energy
Or
Client
POA
from
Haron
Robson
Energy
Step 2 - Plan and Submit Application Who completes? Fee
2a. HRE develop “Baseline Energy Model” using PIAM&V
tool.
Haron Robson
Energy
POA
2b. M&V Professional from Other to validate “Baseline
Energy Model” as per “Method Guide PIAM&V” and Part B of
Evidence Package.
Independent M&V
Professional
2c. HRE prepare and submit application for RESA
Accreditation.
HRE POA
Step 3 - Measure NEW Operating Energy Who completes? Fee
3a. Measure operating energy use to complete item 3b.
a. Client supply and install sub-metering, collection and
sending of data to HRE
OR
b. HRE supply and install sub-metering and collection of data
Haron Robson
Energy
Or
Client
POA
from
Haron
Robson
Energy
3b. HRE develop “Operating Energy Model” using PIAM&V
tool.
Haron Robson
Energy
POA
3c. M&V Professional from Other to validate “Operating
Energy Model” as per "Method Guide PIAM&V" and Part B
of the Evidence Package.
Independent M&V
Professional
POA
3d. HRE verifies RESA, calculate energy savings and ESCs
using PIAM&V tool, complete record keeping in accordance
with PIAM&V requirements.
Haron Robson
Energy
POA
Step 4 – Register and
Trade ESCs
Who
completes?
Fee
4b. HRE Registration of
ESCs in ESS Registry
Haron
Robson
Energy
Nil
4c. ESS ESC Registration
Fee^^
• IPART ESC
Registration Fee $0.70
per ESC registered
Haron
Robson
Energy
$0.70
per
ESC
4d. ESS Independent Audit
Fee
• HRE / ESS
Independent Audit Fee
Haron
Robson
Energy
4e. Haron Robson Energy
retains ownership of X% of
all ESCs registered
Haron
Robson
Energy
What are the deliverables?
^^ Fee as per published IPART Schedule of Fees and
subject to change
Option No.2 - Isolated Area or Specific Plant
Energy Efficiency Upgrade
Copyright Haron Robson Energy Pty Ltd 2015
Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
9. Project Impact Assessment with
Measurement & Verification
upgradesinstalled&operatingatsite
What is the process?
StepsTime
a. Develop
Baseline
Energy Model
b. Prepare M&V
Plan, the
“RESA
Accreditation”
in accordance
with the NSW
ESS Rule
2009
c. Obtain all
stakeholder
sign offs
Step 2
Plan & Submit
Application
a. Register
ESCS in the
GGAS
Registry
b. Confirm
ESCs in
GGAS
registry with
the Client
c. Trade ESCs
with a liable
party
d. Confirm
trade with
the Client
Step 4
Register &
Trade ESCs
a. Define
boundary all
of site.
Measure
baseline
energy use
Commission
Step 1
a. Measure
operating energy
use
b. Develop
Operating
Energy Model
c. Calculate lifetime
energy savings
for ESC creation
Step 3
Measure NEW
Operating Energy
a. Transfer money
from trade of
ESCs less: ESC
registration &
brokerage fees
and Haron
Robson
commission
Note: PIAM&V allows
forward ESC creation
for the expected
lifetime of upgrades &
additional “Top-Up”
ESC creation
permitted annually up
to 10 years.
Step 5
Pay ClientMeasure
Baseline Energy
Client Yield1 – Revenue returned to the Client from ESC creation & trade è $550,0001
10 year forward
payment
$
$
1. Client Yield calculated as per Table 1 Revenue Return To The Client. This is an indicative value not the
realised value. The realised value will be determined upon trade of ESCs at a future date. A significant factor in
the realised value is the ESC Spot Price at the time of trade.
Completed
before upgrade
Measurement
period 1 week
only or 12 mths
Measurement
period 1 week only
or 12 months
Pay client post
measurement
period
5 day minimum
Progress
Payment Fee
Progress
Payment Fee
Progress
Payment Fee
Upgrade
installedand
operatingat
site
Option No.3 - Whole of Site
Energy Efficiency Upgrade
10. Step 1 - Measure Baseline Energy Who completes? Fee
1. Measure baseline energy use to complete item 2a.
a. Client collection of NMI data from retail energy provider
and send to HRE
OR
b. HRE arrange for collection of NMI data from retail energy
provider
Haron Robson
Energy
Or
Client
POA
from
Haron
Robson
Energy
Step 2 - Plan and Submit Application Who completes? Fee
2a. HRE develop “Baseline Energy Model” using PIAM&V
tool.
Haron Robson
Energy
POA
2b. M&V Professional from Other to validate “Baseline
Energy Model” as per “Method Guide PIAM&V” and Part B of
Evidence Package.
Independent M&V
Professional
2c. HRE prepare and submit application for RESA
Accreditation.
Haron Robson
Energy
POA
Step 3 - Measure NEW Operating Energy Who completes? Fee
3. Measure operating energy use to complete item 3b.
a. Client collection of NMI data from retail energy provider
and send to HRE
OR
b. HRE arrange for collection of NMI data from retail energy
provider
Haron Robson
Energy
Or
Client
POA
from
Haron
Robson
Energy
3b. HRE develop “Operating Energy Model” using PIAM&V
tool.
Haron Robson
Energy
POA
3c. M&V Professional from Other to validate “Operating
Energy Model” as per "Method Guide PIAM&V" and Part B
of the Evidence Package.
Independent M&V
Professional
POA
3d. HRE verifies RESA, calculate energy savings and ESCs
using PIAM&V tool, complete record keeping in accordance
with PIAM&V requirements.
Haron Robson
Energy
POA
Step 4 – Register &
Trade ESCs
Who
completes?
Fee
4b. HRE Registration of
ESCs in ESS Registry
Haron
Robson
Energy
Nil
4c. ESS ESC Registration
Fee^^
• IPART ESC
Registration Fee $0.70
per ESC registered
Haron
Robson
Energy
$0.70
per
ESC
4d. ESS Independent Audit
Fee
• HRE / ESS
Independent Audit Fee
Haron
Robson
Energy
4e. Haron Robson Energy
retains ownership of X% of
all ESCs registered
Haron
Robson
Energy
POA
What are the deliverables?
^^ Fee as per published IPART Schedule of Fees and
subject to change
Copyright Haron Robson Energy Pty Ltd 2015
Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
Option No.3 - Whole of Site Energy Efficiency Upgrade
11. Metered Baseline Methodology
What is the process?
Start
a. HRE - Collect and
assemble all
documentation
HRE - Verify
documents
b. HRE - Prepare
claim in
accordance with
the NSW ESS Rule
c. HRE - Verify
upgrade works in
accordance with
the NSW ESS Rule
d. HRE - Calculate
ESCs
Step 2
Prepare ESC Claim
a. HRE -
Sell
ESCs to
the
highest
bidder
(liable
party)
b. HRE -
Confirm
sale of
ESCs
with the
Client
Step 4
Trade
ESCs
a. Haron Robson
Energy Pty Ltd
(HRE) - Arrange
for sign-offs on
Nomination
Form before the
Implementation
Date
No up-front fees or progress payments required
Step 1
a. HRE -
Register
ESCs in
ESS
Registry
b. HRE -
Confirm
ESCs
registered
with the
Client
Step 3
Register
ESCs
a. HRE - Transfer money
from sale of ESCs less
commission and fees into
the nominated bank
account
Step 5
Pay Client
Nomination and
Kick-Off Meeting
Client Revenue1 – money returned to the client from ESC creation & trade è $110K1 / over 5x yrs
Commission2 & Fees3 deducted
from Gross Revenue
1. Client Revenue calculated as per Table 1 Slide: Breakdown. This is an indicative value not the realised value. The realised value will be determined upon
sale of ESCs at a future date.
2. Commission as per Table 2 Slide: Breakdown
3. Fees as per Table 3 Slide: Breakdown
Note: Metered Baseline Methodology for chiller upgrades allows ESCs to be created annually for a maximum period of 5 years only.
Verify energy savings for a
minimum of 12 months
Chiller upgrade
completed
Create and trade ESCs
12 months post chiller CX
Pay client 12 months post
chiller upgrade & annually 5x
Net
Amount
Deliverables-Description
Fee
Time
$
E.g. Client Year 1 - $22K1
E.g. Client Year 2 - $22K1
E.g. Client Year 3 - $22K1
E.g. Client Year 4 - $22K1
E.g. Client Year 5 - $22K1
Option No.4 - chiller (replacement) upgrade
Upgradeinstalledandoperatingatsite
12. Who else does Haron Robson create
Energy Savings Certificates for?
NSW Health, Commonwealth
Superannuation Fund, Rooty Hill RSL
Club, Colliers, Knight Frank, Eureka
Funds Management and Lend Lease
Who do I contact at Haron Robson
for more information or confirm an
opportunity?
Alan Richardson
Sustainability & Compliance Manager
Email: alanr@haronrobson.com.au
Phone: 7903 4567 or 0417 238 448
Thank you
Before any upgrade works
commence on site simply
confirm by telephone or email
You want to create
certificates.
Sign our Nomination Form
before the implementation
date.
What is your next step?