The PDCA cycle
P
D
C
A
What is the PDCA cycle?
It is a 4-step methodology for business process improvement – and is sometimes
referred to as the improvement cycle.
Plan Establish objectives and how they will be achieved
Do Put the plan into effect
Check Verify that the process achieved the desired results
Act Analyse any differences and their causes. Take action to
improve things.
The PDCA cycle is an iterative process - so repeat to continue achieving improvement.
It can be applied at a strategic level – for the overall management
system.
OR
An operational level – for an individual process.
On the strategic level, all current ISO management system standards
are based on the concept of the PDCA cycle.
PLAN DO CHECK ACT
4. Context of the
organisation
5. Leadership 6. Planning for the
QMS
7. Support 8. Operation 9. Performance
evaluation
10. Improvement
4.1 Understanding
the organization
and its context
5.1 Leadership and
commitment
6.1 Actions to
address risks and
opportunities
7.1 Resources 8.1 Operational
planning and
control
9.1 Monitoring,
measurement,
analysis and
evaluation
10.1 General
4.2 Understanding
the needs and
expectations of
interested parties
5.2 Quality policy 6.2 Quality
objectives and
planning to achieve
them
7.2 Competence 8.2 Determination
of requirements for
products & services
9.2 Internal audit 10.2 Nonconformity
and corrective
action
4.3 Determining the
scope of the QMS
5.3 Organizational
roles,
responsibilities and
authorities
6.3 Planning of
changes
7.3 Awareness 8.3 Design and
development of
products & services
9.3 Management
review
10.3 Continual
improvement
4.4 QMS and its
processes
7.4 Communication 8.4 Control of
externally provided
products & services
7.5 Documented
information
8.5 Production and
service provision
8.6 Release of
products & services
8.7 Control of
nonconforming
process outputs,
products & services
For example, this is the clause structure of ISO 9001
The same principle applies to other ISO management system standards on different
topics:
Context: Overall management system
PLAN
Policies
Objectives / targets / KPIs
Legal & regulatory requirements
Assigning responsibility & authority
Procedures
Project plans
Risk Assessment
DO
Training / competence
Work as per plans and procedures
Use of equipment and resources
Infrastructure
Work environment
Purchasing
Record keeping
ACT
Reporting nonconformity
Dealing with surface problems
Root cause analysis
Corrective action
Responses to feedback
CHECK
Monitoring
Measuring
Customer / employee surveys
Internal audits
Management review
Complaints and other feedback
Supplier assessments
P
D
C
A
The Planning Stage
Planning your system could involve:
• Setting up an Organisation chart
• Preparing Job descriptions or Role Statements
• A List of authorities – concisely indicating who can
do what
• Establishing and regularly reviewing a register of
relevant standards / legislation
• Establishing policies
• Communicating those policies to workers and
other interested parties
• Setting measurable objectives for the organisation
and business units
• Setting Targets or KPIs for individuals
• Establishing forms of contract – price lists, fee
structures, terms and conditions
• Establishing plans for specific projects
• Risk controls to eliminate the cause(s) of potential
problems
• Change management
• Facilitating a suitable work environment and
infrastructure
• Documentation
• Document management
P
D
C
A
Doing it
Implementing the system could include:
• Ensuring that work is performed by adequately
trained and competent people
• Supervision where necessary
• Performing work in accordance with plans,
contracts, and procedures
• Ensuring that procedures and other documents are
available where needed
• Maintaining control of subcontracted services and
purchased items
• Keeping records of important activities
• Taking care not to have nonconforming processes,
products or services
P
D
C
A
Checking the plan has worked in practice
Checking could mean any form of monitoring or
measurement activity. In quality systems it might include:
• Asking customers about their satisfaction with a
product or service – perhaps via a survey
• Monitoring using any of the senses – visual inspection,
listening, tasting, smelling, feeling
• Monitoring or measuring with equipment – in which
case the equipment may need appropriate care and
calibration
• Other feedback loops – such as product reviews or
media articles, complaints or returned goods, requests
for refunds etc.
• An important pro-active check is performing Internal
audits to verify that procedures and plans are being
followed in practice – and are effective.
• A periodic review of the system by top management
P
D
C
A
Acting on any issues found
Where a check finds discrepancies between the plan
and what was done, we need to analyse the cause(s)
and act to improve the situation. A discrepancy may
be referred to as a nonconformance.
• Action to fix a nonconformity
This is action taken to rectify the immediate problem
• Corrective action
This is action to eliminate the cause or causes of
the nonconformance.
Sometimes we find that a problem only occurs
when two or more contributing factors combine.
P
D
C
A
Summary
The PDCA cycle may be applied on a strategic
(management system) or operational level e.g. to
individual projects, contracts or activities.
Plan - what is intended.
Do – put it into practice.
Check – what happened matched what was planned.
Act – on any differences to rectify problems and address
the cause(s).
It is a virtuous cycle of continuous improvement.
P
D
C
A
Qudos3 is the comprehensive
software solution for all phases of the
PDCA cycle in your management
system.
Want to see a demo?
Contact us now - details below.
Qudos Management Pty. Ltd.
Quality | OHS | Environment | Information Security
Web: qudos-software.com
Email: info@qudos-software.com
+61 (07) 3360 0226 or 13 000 QUDOS

More Related Content

What's hot

Core tools apqp, ppap, fmea, spc and msa
Core tools   apqp, ppap, fmea, spc and msa Core tools   apqp, ppap, fmea, spc and msa
Core tools apqp, ppap, fmea, spc and msa Mouhcine Nahal
 
Overview of the iso 9001:2015
Overview of the iso 9001:2015Overview of the iso 9001:2015
Overview of the iso 9001:2015Enrique Biton
 
Quality objective monitoring chart for geotech div at gc 2
Quality objective monitoring chart for geotech div at gc 2Quality objective monitoring chart for geotech div at gc 2
Quality objective monitoring chart for geotech div at gc 2adly al-saafin
 
7 QC Tools training presentation
7 QC Tools training presentation7 QC Tools training presentation
7 QC Tools training presentationPRASHANT KSHIRSAGAR
 
Road map to iso 9001 certification
Road map to iso 9001 certification  Road map to iso 9001 certification
Road map to iso 9001 certification ssqiindia
 
ISO 9001:2015 Awareness Training
ISO 9001:2015 Awareness TrainingISO 9001:2015 Awareness Training
ISO 9001:2015 Awareness TrainingANUPAM RAY
 
Quality awareness
Quality awarenessQuality awareness
Quality awarenesssmcci
 
Auditing Manufacturing Process and Product and Process Information.pdf
Auditing Manufacturing Process and Product and Process Information.pdfAuditing Manufacturing Process and Product and Process Information.pdf
Auditing Manufacturing Process and Product and Process Information.pdfDr. Dinesh Mehta
 
Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all ANUPAM RAY
 
Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949Pavan Patil
 

What's hot (20)

Corrective Action & Preventive Action
Corrective Action & Preventive ActionCorrective Action & Preventive Action
Corrective Action & Preventive Action
 
Core tools apqp, ppap, fmea, spc and msa
Core tools   apqp, ppap, fmea, spc and msa Core tools   apqp, ppap, fmea, spc and msa
Core tools apqp, ppap, fmea, spc and msa
 
Seven QC Tools Training; Quiz
Seven QC Tools Training; QuizSeven QC Tools Training; Quiz
Seven QC Tools Training; Quiz
 
Overview of the iso 9001:2015
Overview of the iso 9001:2015Overview of the iso 9001:2015
Overview of the iso 9001:2015
 
Iso9001 2015
Iso9001 2015Iso9001 2015
Iso9001 2015
 
Quality objective monitoring chart for geotech div at gc 2
Quality objective monitoring chart for geotech div at gc 2Quality objective monitoring chart for geotech div at gc 2
Quality objective monitoring chart for geotech div at gc 2
 
7 QC Tools training presentation
7 QC Tools training presentation7 QC Tools training presentation
7 QC Tools training presentation
 
Road map to iso 9001 certification
Road map to iso 9001 certification  Road map to iso 9001 certification
Road map to iso 9001 certification
 
Spc training
Spc training Spc training
Spc training
 
ISO 9001:2015 Awareness Training
ISO 9001:2015 Awareness TrainingISO 9001:2015 Awareness Training
ISO 9001:2015 Awareness Training
 
Context of the organization
Context of the organizationContext of the organization
Context of the organization
 
Ppap training ppt
Ppap training   ppt Ppap training   ppt
Ppap training ppt
 
Quality awareness
Quality awarenessQuality awareness
Quality awareness
 
Internal auditor 9001 day 1
Internal auditor 9001 day 1Internal auditor 9001 day 1
Internal auditor 9001 day 1
 
Root Cause Analysis (RCA) Tools
Root Cause Analysis (RCA) ToolsRoot Cause Analysis (RCA) Tools
Root Cause Analysis (RCA) Tools
 
Auditing Manufacturing Process and Product and Process Information.pdf
Auditing Manufacturing Process and Product and Process Information.pdfAuditing Manufacturing Process and Product and Process Information.pdf
Auditing Manufacturing Process and Product and Process Information.pdf
 
Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all
 
Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949
 
Quality induction
Quality inductionQuality induction
Quality induction
 
ISO 9001:2015 Awareness
 ISO 9001:2015 Awareness  ISO 9001:2015 Awareness
ISO 9001:2015 Awareness
 

Similar to An introduction to the PDCA cycle

Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Chetan Rathi
 
Intial Plan and Strategy
Intial Plan and StrategyIntial Plan and Strategy
Intial Plan and StrategyCaven Tootell
 
Internal Audit 03-03-16
Internal Audit 03-03-16Internal Audit 03-03-16
Internal Audit 03-03-16Lisa Barnes
 
xx QMP QMS QA documents full.ppt
xx QMP QMS QA documents full.pptxx QMP QMS QA documents full.ppt
xx QMP QMS QA documents full.pptssusera85eeb1
 
BSBMGT517 Manage operational planPart C– Project Managing an op.docx
BSBMGT517 Manage operational planPart C– Project Managing an op.docxBSBMGT517 Manage operational planPart C– Project Managing an op.docx
BSBMGT517 Manage operational planPart C– Project Managing an op.docxAASTHA76
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingSafetyChain Software
 
Leveraging Gap Assessments and Internal Audits in ISO 22301
Leveraging Gap Assessments and Internal Audits in ISO 22301Leveraging Gap Assessments and Internal Audits in ISO 22301
Leveraging Gap Assessments and Internal Audits in ISO 22301PECB
 
PPT-for-report-march-19.pptx
PPT-for-report-march-19.pptxPPT-for-report-march-19.pptx
PPT-for-report-march-19.pptxzaldymendoza1
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.pptssuserf2880f
 
Integrated Performance Management
Integrated Performance ManagementIntegrated Performance Management
Integrated Performance ManagementGlen Alleman
 
continuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdfcontinuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdflynnmdasuki1
 

Similar to An introduction to the PDCA cycle (20)

Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001
 
Spm ppt
Spm pptSpm ppt
Spm ppt
 
Intial Plan and Strategy
Intial Plan and StrategyIntial Plan and Strategy
Intial Plan and Strategy
 
Internal Audit 03-03-16
Internal Audit 03-03-16Internal Audit 03-03-16
Internal Audit 03-03-16
 
SFC Plan of engagement
SFC Plan of engagementSFC Plan of engagement
SFC Plan of engagement
 
qmpfull.ppt
qmpfull.pptqmpfull.ppt
qmpfull.ppt
 
xx QMP QMS QA documents full.ppt
xx QMP QMS QA documents full.pptxx QMP QMS QA documents full.ppt
xx QMP QMS QA documents full.ppt
 
qmpfull.ppt
qmpfull.pptqmpfull.ppt
qmpfull.ppt
 
BSBMGT517 Manage operational planPart C– Project Managing an op.docx
BSBMGT517 Manage operational planPart C– Project Managing an op.docxBSBMGT517 Manage operational planPart C– Project Managing an op.docx
BSBMGT517 Manage operational planPart C– Project Managing an op.docx
 
Project Metrics & Measures
Project Metrics & MeasuresProject Metrics & Measures
Project Metrics & Measures
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error Proofing
 
Leveraging Gap Assessments and Internal Audits in ISO 22301
Leveraging Gap Assessments and Internal Audits in ISO 22301Leveraging Gap Assessments and Internal Audits in ISO 22301
Leveraging Gap Assessments and Internal Audits in ISO 22301
 
PPT-for-report-march-19.pptx
PPT-for-report-march-19.pptxPPT-for-report-march-19.pptx
PPT-for-report-march-19.pptx
 
Assessment Audits by WHO
Assessment Audits by WHOAssessment Audits by WHO
Assessment Audits by WHO
 
Pdca presentation
Pdca presentationPdca presentation
Pdca presentation
 
Measuring and Improving MP1.ppt
Measuring and Improving MP1.pptMeasuring and Improving MP1.ppt
Measuring and Improving MP1.ppt
 
Integrated Performance Management
Integrated Performance ManagementIntegrated Performance Management
Integrated Performance Management
 
CQE Preparation | The Quality Management System
CQE Preparation | The Quality Management SystemCQE Preparation | The Quality Management System
CQE Preparation | The Quality Management System
 
continuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdfcontinuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdf
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 

Recently uploaded

Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 

Recently uploaded (20)

Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 

An introduction to the PDCA cycle

  • 2. What is the PDCA cycle? It is a 4-step methodology for business process improvement – and is sometimes referred to as the improvement cycle. Plan Establish objectives and how they will be achieved Do Put the plan into effect Check Verify that the process achieved the desired results Act Analyse any differences and their causes. Take action to improve things. The PDCA cycle is an iterative process - so repeat to continue achieving improvement.
  • 3. It can be applied at a strategic level – for the overall management system. OR An operational level – for an individual process. On the strategic level, all current ISO management system standards are based on the concept of the PDCA cycle.
  • 4. PLAN DO CHECK ACT 4. Context of the organisation 5. Leadership 6. Planning for the QMS 7. Support 8. Operation 9. Performance evaluation 10. Improvement 4.1 Understanding the organization and its context 5.1 Leadership and commitment 6.1 Actions to address risks and opportunities 7.1 Resources 8.1 Operational planning and control 9.1 Monitoring, measurement, analysis and evaluation 10.1 General 4.2 Understanding the needs and expectations of interested parties 5.2 Quality policy 6.2 Quality objectives and planning to achieve them 7.2 Competence 8.2 Determination of requirements for products & services 9.2 Internal audit 10.2 Nonconformity and corrective action 4.3 Determining the scope of the QMS 5.3 Organizational roles, responsibilities and authorities 6.3 Planning of changes 7.3 Awareness 8.3 Design and development of products & services 9.3 Management review 10.3 Continual improvement 4.4 QMS and its processes 7.4 Communication 8.4 Control of externally provided products & services 7.5 Documented information 8.5 Production and service provision 8.6 Release of products & services 8.7 Control of nonconforming process outputs, products & services For example, this is the clause structure of ISO 9001
  • 5. The same principle applies to other ISO management system standards on different topics:
  • 6. Context: Overall management system PLAN Policies Objectives / targets / KPIs Legal & regulatory requirements Assigning responsibility & authority Procedures Project plans Risk Assessment DO Training / competence Work as per plans and procedures Use of equipment and resources Infrastructure Work environment Purchasing Record keeping ACT Reporting nonconformity Dealing with surface problems Root cause analysis Corrective action Responses to feedback CHECK Monitoring Measuring Customer / employee surveys Internal audits Management review Complaints and other feedback Supplier assessments P D C A
  • 7. The Planning Stage Planning your system could involve: • Setting up an Organisation chart • Preparing Job descriptions or Role Statements • A List of authorities – concisely indicating who can do what • Establishing and regularly reviewing a register of relevant standards / legislation • Establishing policies • Communicating those policies to workers and other interested parties • Setting measurable objectives for the organisation and business units • Setting Targets or KPIs for individuals • Establishing forms of contract – price lists, fee structures, terms and conditions • Establishing plans for specific projects • Risk controls to eliminate the cause(s) of potential problems • Change management • Facilitating a suitable work environment and infrastructure • Documentation • Document management P D C A
  • 8. Doing it Implementing the system could include: • Ensuring that work is performed by adequately trained and competent people • Supervision where necessary • Performing work in accordance with plans, contracts, and procedures • Ensuring that procedures and other documents are available where needed • Maintaining control of subcontracted services and purchased items • Keeping records of important activities • Taking care not to have nonconforming processes, products or services P D C A
  • 9. Checking the plan has worked in practice Checking could mean any form of monitoring or measurement activity. In quality systems it might include: • Asking customers about their satisfaction with a product or service – perhaps via a survey • Monitoring using any of the senses – visual inspection, listening, tasting, smelling, feeling • Monitoring or measuring with equipment – in which case the equipment may need appropriate care and calibration • Other feedback loops – such as product reviews or media articles, complaints or returned goods, requests for refunds etc. • An important pro-active check is performing Internal audits to verify that procedures and plans are being followed in practice – and are effective. • A periodic review of the system by top management P D C A
  • 10. Acting on any issues found Where a check finds discrepancies between the plan and what was done, we need to analyse the cause(s) and act to improve the situation. A discrepancy may be referred to as a nonconformance. • Action to fix a nonconformity This is action taken to rectify the immediate problem • Corrective action This is action to eliminate the cause or causes of the nonconformance. Sometimes we find that a problem only occurs when two or more contributing factors combine. P D C A
  • 11. Summary The PDCA cycle may be applied on a strategic (management system) or operational level e.g. to individual projects, contracts or activities. Plan - what is intended. Do – put it into practice. Check – what happened matched what was planned. Act – on any differences to rectify problems and address the cause(s). It is a virtuous cycle of continuous improvement. P D C A
  • 12. Qudos3 is the comprehensive software solution for all phases of the PDCA cycle in your management system. Want to see a demo? Contact us now - details below. Qudos Management Pty. Ltd. Quality | OHS | Environment | Information Security Web: qudos-software.com Email: info@qudos-software.com +61 (07) 3360 0226 or 13 000 QUDOS