SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
CURRICULM VITAE
AKHTAR KHAN
Mob. +971 56 4973 786
Objective
To learn & excel while working a professional organization thus giving a bottom line impact. And able to make
use of my capabilities in a company that would need me!
Education
2004. S S C. (Secondary Board of Rajasthan (Ajmer) India)
2006. Sr Sec School (Sr. Secondary Board of Rajasthan (Ajmer) India)
2007. General Construction Course (Leighton International University Gurgoan (HR.)
2008. Bachelor of arts (MDS University Ajmer Rajasthan)
2012. CICA (Tech Point, Nasirabad, Ajmer (RAJASTHAN) )
2012. AutoCAD (Tech Point, Nasirabad, Ajmer (RAJASTHAN) )
Summary
Over 6 years of working experience in which 5 years in Document Control, work collaboratively, responsive to
customer’s needs, strives for achievement of project goals, presents a professional image and promotes the
brand, adopts new ways of working with enthusiasm, shows initiative in resolving problems, delivers a reliable
and timely output of work to meet requirements, willingness to involved in other activities to achieve company
objectives, knowledge in Microsoft office, proficient in English and willing to learn other language as well. With
good personal relationship and good moral character. Can work with least supervision
EDMS: Aconex - Online Document Management and Web Collaboration System & Incite
ERP & Share Point 2010
Specialties:
Ability to Manage large Document Control Team.
Goals:
Seeking responsible position in a large Organization in Consulting / Oil & Gas Sector in which the Document
Management skills, negotiation skills; contacts with clients, manufacturers & suppliers and the result oriented
approach developed during the past ten years can be effectively utilized for advancement of the organization
and own career
INDIA Work Experience
Duration: From Jul 2006 to May 2008
Company Name: Leighton International Limited in Palm spring E0705 Project Gurgoan
Positions: Data Entry Clerk
U.A.E Work Experience
Saadiayt Island Express Way Project - Abu Dhabi(Link)
August 2008
Contract Value: 2.8 Billion AED
Brief Project Description: Worked on the infrastructural development of Saadiyat Island, upon completion it is
supposed to be one amongst the top 10 tourist destinations over the world. The project is a 6.5 km 12 lane
expressway, with tunnels, bridges underpasses, underground tanks and utilities (Storm, sewer, irrigation,
portable waterlines, gas lines and telephone lines).
Saadiyat is a world class leisure, residential, business and tourism hub, 500m of the coast of Abu Dhabi. The
extensive infrastructure development, included the following
• 20.3km of road network including 6.5km of 10 lane expressway,
• 8 major bridges, & 2 Tunnels
• 870m cut and cover tunnel,
• 30km’s of potable water network
• 3 ground water storage tanks with a combined capacity of 25.4 Million Imperial Gallons,
• 10.7km’s of storm water drainage including 3 pumping stations,
• 22.3km’s of sewerage system including a sewage pumping station and sewage treatment plant.
• Medium and low voltage power distribution network, including 17 streetlight substations, Telecommunications
fibre optic cable network ,District Cooling Network
Khalifa Port & Industrial Zone Project 1000-208 & 1001-257 Contract(Link)
June 2010 – Present
Contract Value : 1.8 Billion AED (1000-208 Contract) & 1.5 Billion AED(1001-257 Contract)
KPIZ will be a multi-purpose facility located in Taweelah, Abu Dhabi and strategically placed between Abu
Dhabi and Dubai.
The project includes the construction of a world-class container and industrial port and the development of
industrial, logistics, commercial, educational and residential special economic and free trade zones.
HLG’s scope of work includes the construction of the on-shore port facilities and includes the construction of 58
buildings, the largest being the central facilities building which is over 300 metres long and five stories high. Also
included is the associated infrastructure works which consists of a series of road networks, bridges, utility
installations and hard and soft landscaping.
• 58 Buildings – Largest being 300 meter long and Five Stories High
• 12 million cubic metres of earthworks
• 18 kilometres of 2,3 and 4-lane dual carriageways
• 5 bridges
• 48 major services culverts and bridges
• 7 kilometres MSE walls
• 124 kilometres of electrical reticulation
• 79 kilometres of telecommunications distribution
• 91 kilometres of pipelines
• 13 Substations
• Hard and Soft Landscaping
Previous Project with Leighton :- Saadiyat Island Expressway Project Abu Dhabi, U.A.E. (from 02nd Oct-07 to
9th May 10) as Document Controller
Contract Value : 2.8 Billion AED
Document Controller
Leighton Contracting (Abu Dhabi) L.L.C
August 2008 – May 2010 (2 years 8 months) Saadiyat Island Express Way Project - Abu Dhabi United Arab
Emirates
• Worked in live Electronic Document Management Systems (Aconex)
• Processed one or more document types through all procedural steps
• Ensure that pre-established document control requirements are satisfactorily met throughout the duration of
the project.
• Receive, track, and monitor documents using standard document management programs to register
documents, maintaining databases, and producing logs, transmittal, and other reports.
Document Controller
Al Habtoor Leighton Group
June 2010 – February 2012 Khalifa Port and Industrial Zone Project - Taweelah Abu Dhabi
Worked in live Electronic Document Management Systems (Aconex)
• Leaded a team of Document Controllers and Data Entry Clerks
• Processed one or more document types through all procedural steps
• Ensure that pre-established document control requirements are satisfactorily met throughout the duration of
the project.
• Receive, track, and monitor documents using standard document management programs to register
documents, maintaining databases, and producing logs, transmittals, and other reports.
Khalifa Port & Industrial Zone Project 1000-208 & 1001-257 Contract(Link)
June 2010 – February 2012
Contract Value : 1.8 Billion AED (1000-208 Contract) & 1.5 Billion AED(1001-257 Contract)
KPIZ will be a multi-purpose facility located in Taweelah, Abu Dhabi and strategically placed between Abu
Dhabi and Dubai.
The project includes the construction of a world-class container and industrial port and the development of
industrial, logistics, commercial, educational and residential special economic and free trade zones.
HLG’s scope of work includes the construction of the on-shore port facilities and includes the construction of 58
buildings, the largest being the central facilities building which is over 300 metres long and five stories high. Also
included is the associated infrastructure works which consists of a series of road networks, bridges, utility
installations and hard and soft landscaping.
• 58 Buildings – Largest being 300 meter long and Five Stories High
• 12 million cubic meters of earthworks
• 18 kilometers of 2,3 and 4-lane dual carriageways
• 5 bridges
• 48 major services culverts and bridges
• 7 kilometers MSE walls
• 124 kilometers of electrical reticulation
• 79 kilometers of telecommunications distribution
• 91 kilometers of pipelines
• 13 Substations
• Hard and Soft Landscaping
Previous Project with Leighton :- Saadiyat Island Expressway Project Abu Dhabi, U.A.E. (from 02nd Oct-07 to
9th May 10) as Document Controller
Airport Interchange and Airport Region Road Network
August 2014 – to Present
Project Detail
Location: United Arab Emirates
Company: Habtoor Leighton Group
Role: Main contractor
Partner(s):
Share: 100
USD value: 174,000,000
Contract Value: 639,276,000
Contract Type:
Risk Transfer to Contractor - Fixed Price/Lump Sum/Hard
Dollar
Project Type: Infrastructure - Infra - Airport-related
Proj Director/Manager: Mohsen Desouki Gazzaz (PM)
Consultant:
Contract Start: May 2014
Contract Finish: Apr 2017
Actual Start:
Actual Finish:
Client Detail
Name:
Department of Transport (DOT) Client / Abu Dhabi General
Services Company PJSC (Musanada) Employer
Type: Public / Government
Contact Person:
Mr. Omar Al Mansouri (Client) / Mr. Hamdan Almazrouei
(Employer)
Contact Title:
Acting Director - Roads & Infrastructure (Client) / Project
Manager (Employer) for all contractual and commercial
correspondences
Tel/Fax: (D) +971 2 404 2355 - +971 2 404 2222 / +971 2 404 2221
Address:
Email:
amar.almasouri@musanada.com /
hamdan.almazrouei@musanada.com
Website: www.dot.abudhabi.ae / www.musanada.com
The project involves the construction of new airport interchange and airport region road network
in Abu Dhabi.
Scope of works comprises:
 Widening of the E-10 carriageway
 Construction of the interchange to the new airport terminal, including four viaduct bridges
and ramps
 Construction of airport city entrance including 2 bridges and ramps
 Secondary dual 3-lane road networks between Yas Island and the E-10, the new airport
terminal and between interchange 6 and the E12
 Widening of the residential flight road from dual 2-lane to dual 3-lane, and modifying the
presidential flight road access to the E-10
 Extending the northbound on slip ramp of interchange 5, including the construction of a
new over bridge
 A drainage pumping station, and associated drainage network for the E-10 and E-12
interchange
 Drainage street lighting and intelligent traffic system works
Notes:
HR Site No. HLG 284
Coins Project Code P1120
Client: M/s Department of Transport (DOT)
Employer: M/s Abu Dhabi General Services PJSC trading as Musanada
K S A Work Experience
Duration: From Aug 2012 to March 2013
Company Name: SALCO
Positions: Civil Foreman
Duration: From May 2013 to 26 Dec. 2013 Date
Company Name: Almarai Company
Positions: Salesman
Personal Detail
Nationality: Indian
Passport No: G4416925
D/L Saudi light duty Licenses & India LMV Uae: wait final result
Phone: +971 56 4973 786 (uae) +91 8094 862786 (India)
E-mail: akhtar.sherani@gmail.com Akhtar.khan@hlgroup.com
Language
 English
 Arabic
 Urdu, & Hindi
Main Responsibilities.
 CV Screening and follow up.
 Registered in Aconex Online electronic Documents
 Follow up recruitments.
 Arrange with the selected candidates for any missing papers.
 Arranging Interviews,
 Maintain and update the employee’s internal database and system.
 Maintain the Daily attendance for labor and staff, daily reports for all site.
 Familiar with vacancies growth,
 Follow up the execution Motivation plan.
 Follow up the leave application, Labor Transfer and Duty rejoining.
 Generate reports for the employee’s.
 Filing of any documents related to the company.
 Assisting the Manager in any kind of official activities.
 Keeping all the files in the department updated and organized.
 Typing the documents and suggestions.
 Arrange meeting times.
 Arrange and prepare the documents, which are given from director.
 Participate in meetings on Administration issues.
 Under take additional duties as assigned by the line Manager.
 Making electrical Drawing.
 Having the knowledge of immigration and labour.
 Arranger the paper for labour for new visa and medical.
Computer Skill
Ms Excel & Ms Word,
Aconex
 Computer Hardware, Internet

Mais conteúdo relacionado

Mais procurados

Intruductions about metro jeddah
Intruductions about metro jeddahIntruductions about metro jeddah
Intruductions about metro jeddahKhalid Ibrahim
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016Raed Ramahi
 
L&T DMRC Summer Internship 2017
L&T DMRC Summer Internship 2017 L&T DMRC Summer Internship 2017
L&T DMRC Summer Internship 2017 Sunil Kumar
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16Iain Cameron
 
Ulticon Builders Incorporated: Company Profile
Ulticon Builders Incorporated: Company ProfileUlticon Builders Incorporated: Company Profile
Ulticon Builders Incorporated: Company Profilegianroces61
 
Profesional Engineer c.v
Profesional Engineer c.vProfesional Engineer c.v
Profesional Engineer c.vmohamed almansy
 
Ahmad Anis STR
Ahmad Anis STRAhmad Anis STR
Ahmad Anis STRAhmad Anis
 
Yehia Helmy - CV
Yehia Helmy - CVYehia Helmy - CV
Yehia Helmy - CVyehia helmy
 
Presentation slide
Presentation slidePresentation slide
Presentation slideiekygirl
 
The Jeddah Model: Integrated Public Transport Systems
The Jeddah Model: Integrated Public Transport SystemsThe Jeddah Model: Integrated Public Transport Systems
The Jeddah Model: Integrated Public Transport SystemsIbrahim Al-Hudhaif
 
A presentation on Gammon India Ltd.
A presentation on Gammon India Ltd.A presentation on Gammon India Ltd.
A presentation on Gammon India Ltd.kunal2091
 
Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)Er Mohtisham Ali
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisPiyusha Rustagi
 
Elevated express highway pvnr
Elevated express highway pvnrElevated express highway pvnr
Elevated express highway pvnrAkhil Padiga
 
Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro newRashid Kaskar
 
electronic city elevated highway project.
electronic city elevated highway project. electronic city elevated highway project.
electronic city elevated highway project. MILAN JOSEPH
 

Mais procurados (20)

Intruductions about metro jeddah
Intruductions about metro jeddahIntruductions about metro jeddah
Intruductions about metro jeddah
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016
 
L&T DMRC Summer Internship 2017
L&T DMRC Summer Internship 2017 L&T DMRC Summer Internship 2017
L&T DMRC Summer Internship 2017
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
Ulticon Builders Incorporated: Company Profile
Ulticon Builders Incorporated: Company ProfileUlticon Builders Incorporated: Company Profile
Ulticon Builders Incorporated: Company Profile
 
Profesional Engineer c.v
Profesional Engineer c.vProfesional Engineer c.v
Profesional Engineer c.v
 
Ahmad Anis STR
Ahmad Anis STRAhmad Anis STR
Ahmad Anis STR
 
Yehia Helmy - CV
Yehia Helmy - CVYehia Helmy - CV
Yehia Helmy - CV
 
Sr Civil Engineer
Sr Civil EngineerSr Civil Engineer
Sr Civil Engineer
 
Presentation slide
Presentation slidePresentation slide
Presentation slide
 
Crispan Falcao-2017
Crispan Falcao-2017Crispan Falcao-2017
Crispan Falcao-2017
 
The Jeddah Model: Integrated Public Transport Systems
The Jeddah Model: Integrated Public Transport SystemsThe Jeddah Model: Integrated Public Transport Systems
The Jeddah Model: Integrated Public Transport Systems
 
A presentation on Gammon India Ltd.
A presentation on Gammon India Ltd.A presentation on Gammon India Ltd.
A presentation on Gammon India Ltd.
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 
Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)
 
shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysis
 
Elevated express highway pvnr
Elevated express highway pvnrElevated express highway pvnr
Elevated express highway pvnr
 
Navi mumbai metro new
Navi mumbai metro newNavi mumbai metro new
Navi mumbai metro new
 
electronic city elevated highway project.
electronic city elevated highway project. electronic city elevated highway project.
electronic city elevated highway project.
 

Destaque (20)

Nadeem Purchasing Manager h
Nadeem Purchasing  Manager hNadeem Purchasing  Manager h
Nadeem Purchasing Manager h
 
Visual Resume
Visual ResumeVisual Resume
Visual Resume
 
Akhtar Khan sherani pdf
Akhtar Khan sherani pdfAkhtar Khan sherani pdf
Akhtar Khan sherani pdf
 
Fashion Consultant
Fashion ConsultantFashion Consultant
Fashion Consultant
 
Akhtar
AkhtarAkhtar
Akhtar
 
umer sharif cv
umer sharif cvumer sharif cv
umer sharif cv
 
Newsletter November 2014 final
Newsletter November 2014 finalNewsletter November 2014 final
Newsletter November 2014 final
 
THOMAS RIES Selected Portfolios_20150604
THOMAS RIES Selected Portfolios_20150604THOMAS RIES Selected Portfolios_20150604
THOMAS RIES Selected Portfolios_20150604
 
umer_sharif_cv
umer_sharif_cvumer_sharif_cv
umer_sharif_cv
 
Teach meet dec2014 v1.0
Teach meet dec2014 v1.0Teach meet dec2014 v1.0
Teach meet dec2014 v1.0
 
Newsletter December 2014 final
Newsletter December 2014 finalNewsletter December 2014 final
Newsletter December 2014 final
 
Connectives fruit machine
Connectives fruit machineConnectives fruit machine
Connectives fruit machine
 
Chanakya013
Chanakya013Chanakya013
Chanakya013
 
Chanakya013
Chanakya013Chanakya013
Chanakya013
 
Omokhaiye Aideloje CV 2014
Omokhaiye Aideloje CV 2014Omokhaiye Aideloje CV 2014
Omokhaiye Aideloje CV 2014
 
CV_Mahesh Prajapati
CV_Mahesh PrajapatiCV_Mahesh Prajapati
CV_Mahesh Prajapati
 
Newsletter October 2014 final
Newsletter October 2014 finalNewsletter October 2014 final
Newsletter October 2014 final
 
Stya nadela
Stya nadelaStya nadela
Stya nadela
 
Ameer Akhtar 2015
Ameer Akhtar 2015Ameer Akhtar 2015
Ameer Akhtar 2015
 
Lec 15 consumer protection act
Lec 15 consumer protection actLec 15 consumer protection act
Lec 15 consumer protection act
 

Semelhante a Akhtar Resume

My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDFKarim Ashry
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)AHMED SAKR
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction Manish Barwal
 
Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael Cruz
 
Michael e. cruz c.v.
Michael e. cruz   c.v.Michael e. cruz   c.v.
Michael e. cruz c.v.Michael Cruz
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande
 
updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015Hossam Lotfi
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad Sahi
 

Semelhante a Akhtar Resume (20)

C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDF
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction
 
Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.
 
Michael e. cruz c.v.
Michael e. cruz   c.v.Michael e. cruz   c.v.
Michael e. cruz c.v.
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
CV
CVCV
CV
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
Ahmed CV OCT16
Ahmed CV OCT16Ahmed CV OCT16
Ahmed CV OCT16
 
updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015
 
Ahmed CV OCT16
Ahmed CV OCT16Ahmed CV OCT16
Ahmed CV OCT16
 
Chandra Sekhar Reddy
Chandra Sekhar ReddyChandra Sekhar Reddy
Chandra Sekhar Reddy
 
CV1
CV1CV1
CV1
 
Khaled HSE
Khaled HSEKhaled HSE
Khaled HSE
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)
 

Akhtar Resume

  • 1. CURRICULM VITAE AKHTAR KHAN Mob. +971 56 4973 786 Objective To learn & excel while working a professional organization thus giving a bottom line impact. And able to make use of my capabilities in a company that would need me! Education 2004. S S C. (Secondary Board of Rajasthan (Ajmer) India) 2006. Sr Sec School (Sr. Secondary Board of Rajasthan (Ajmer) India) 2007. General Construction Course (Leighton International University Gurgoan (HR.) 2008. Bachelor of arts (MDS University Ajmer Rajasthan) 2012. CICA (Tech Point, Nasirabad, Ajmer (RAJASTHAN) ) 2012. AutoCAD (Tech Point, Nasirabad, Ajmer (RAJASTHAN) ) Summary Over 6 years of working experience in which 5 years in Document Control, work collaboratively, responsive to customer’s needs, strives for achievement of project goals, presents a professional image and promotes the brand, adopts new ways of working with enthusiasm, shows initiative in resolving problems, delivers a reliable and timely output of work to meet requirements, willingness to involved in other activities to achieve company objectives, knowledge in Microsoft office, proficient in English and willing to learn other language as well. With good personal relationship and good moral character. Can work with least supervision EDMS: Aconex - Online Document Management and Web Collaboration System & Incite ERP & Share Point 2010 Specialties: Ability to Manage large Document Control Team. Goals: Seeking responsible position in a large Organization in Consulting / Oil & Gas Sector in which the Document Management skills, negotiation skills; contacts with clients, manufacturers & suppliers and the result oriented approach developed during the past ten years can be effectively utilized for advancement of the organization and own career INDIA Work Experience Duration: From Jul 2006 to May 2008 Company Name: Leighton International Limited in Palm spring E0705 Project Gurgoan Positions: Data Entry Clerk U.A.E Work Experience Saadiayt Island Express Way Project - Abu Dhabi(Link)
  • 2. August 2008 Contract Value: 2.8 Billion AED Brief Project Description: Worked on the infrastructural development of Saadiyat Island, upon completion it is supposed to be one amongst the top 10 tourist destinations over the world. The project is a 6.5 km 12 lane expressway, with tunnels, bridges underpasses, underground tanks and utilities (Storm, sewer, irrigation, portable waterlines, gas lines and telephone lines). Saadiyat is a world class leisure, residential, business and tourism hub, 500m of the coast of Abu Dhabi. The extensive infrastructure development, included the following • 20.3km of road network including 6.5km of 10 lane expressway, • 8 major bridges, & 2 Tunnels • 870m cut and cover tunnel, • 30km’s of potable water network • 3 ground water storage tanks with a combined capacity of 25.4 Million Imperial Gallons, • 10.7km’s of storm water drainage including 3 pumping stations, • 22.3km’s of sewerage system including a sewage pumping station and sewage treatment plant. • Medium and low voltage power distribution network, including 17 streetlight substations, Telecommunications fibre optic cable network ,District Cooling Network Khalifa Port & Industrial Zone Project 1000-208 & 1001-257 Contract(Link) June 2010 – Present Contract Value : 1.8 Billion AED (1000-208 Contract) & 1.5 Billion AED(1001-257 Contract) KPIZ will be a multi-purpose facility located in Taweelah, Abu Dhabi and strategically placed between Abu Dhabi and Dubai. The project includes the construction of a world-class container and industrial port and the development of industrial, logistics, commercial, educational and residential special economic and free trade zones. HLG’s scope of work includes the construction of the on-shore port facilities and includes the construction of 58 buildings, the largest being the central facilities building which is over 300 metres long and five stories high. Also included is the associated infrastructure works which consists of a series of road networks, bridges, utility installations and hard and soft landscaping. • 58 Buildings – Largest being 300 meter long and Five Stories High • 12 million cubic metres of earthworks • 18 kilometres of 2,3 and 4-lane dual carriageways • 5 bridges • 48 major services culverts and bridges • 7 kilometres MSE walls • 124 kilometres of electrical reticulation • 79 kilometres of telecommunications distribution • 91 kilometres of pipelines • 13 Substations • Hard and Soft Landscaping Previous Project with Leighton :- Saadiyat Island Expressway Project Abu Dhabi, U.A.E. (from 02nd Oct-07 to 9th May 10) as Document Controller Contract Value : 2.8 Billion AED Document Controller Leighton Contracting (Abu Dhabi) L.L.C August 2008 – May 2010 (2 years 8 months) Saadiyat Island Express Way Project - Abu Dhabi United Arab Emirates • Worked in live Electronic Document Management Systems (Aconex) • Processed one or more document types through all procedural steps • Ensure that pre-established document control requirements are satisfactorily met throughout the duration of
  • 3. the project. • Receive, track, and monitor documents using standard document management programs to register documents, maintaining databases, and producing logs, transmittal, and other reports. Document Controller Al Habtoor Leighton Group June 2010 – February 2012 Khalifa Port and Industrial Zone Project - Taweelah Abu Dhabi Worked in live Electronic Document Management Systems (Aconex) • Leaded a team of Document Controllers and Data Entry Clerks • Processed one or more document types through all procedural steps • Ensure that pre-established document control requirements are satisfactorily met throughout the duration of the project. • Receive, track, and monitor documents using standard document management programs to register documents, maintaining databases, and producing logs, transmittals, and other reports. Khalifa Port & Industrial Zone Project 1000-208 & 1001-257 Contract(Link) June 2010 – February 2012 Contract Value : 1.8 Billion AED (1000-208 Contract) & 1.5 Billion AED(1001-257 Contract) KPIZ will be a multi-purpose facility located in Taweelah, Abu Dhabi and strategically placed between Abu Dhabi and Dubai. The project includes the construction of a world-class container and industrial port and the development of industrial, logistics, commercial, educational and residential special economic and free trade zones. HLG’s scope of work includes the construction of the on-shore port facilities and includes the construction of 58 buildings, the largest being the central facilities building which is over 300 metres long and five stories high. Also included is the associated infrastructure works which consists of a series of road networks, bridges, utility installations and hard and soft landscaping. • 58 Buildings – Largest being 300 meter long and Five Stories High • 12 million cubic meters of earthworks • 18 kilometers of 2,3 and 4-lane dual carriageways • 5 bridges • 48 major services culverts and bridges • 7 kilometers MSE walls • 124 kilometers of electrical reticulation • 79 kilometers of telecommunications distribution • 91 kilometers of pipelines • 13 Substations • Hard and Soft Landscaping Previous Project with Leighton :- Saadiyat Island Expressway Project Abu Dhabi, U.A.E. (from 02nd Oct-07 to 9th May 10) as Document Controller Airport Interchange and Airport Region Road Network August 2014 – to Present Project Detail Location: United Arab Emirates Company: Habtoor Leighton Group Role: Main contractor Partner(s): Share: 100 USD value: 174,000,000 Contract Value: 639,276,000 Contract Type: Risk Transfer to Contractor - Fixed Price/Lump Sum/Hard Dollar Project Type: Infrastructure - Infra - Airport-related Proj Director/Manager: Mohsen Desouki Gazzaz (PM)
  • 4. Consultant: Contract Start: May 2014 Contract Finish: Apr 2017 Actual Start: Actual Finish: Client Detail Name: Department of Transport (DOT) Client / Abu Dhabi General Services Company PJSC (Musanada) Employer Type: Public / Government Contact Person: Mr. Omar Al Mansouri (Client) / Mr. Hamdan Almazrouei (Employer) Contact Title: Acting Director - Roads & Infrastructure (Client) / Project Manager (Employer) for all contractual and commercial correspondences Tel/Fax: (D) +971 2 404 2355 - +971 2 404 2222 / +971 2 404 2221 Address: Email: amar.almasouri@musanada.com / hamdan.almazrouei@musanada.com Website: www.dot.abudhabi.ae / www.musanada.com The project involves the construction of new airport interchange and airport region road network in Abu Dhabi. Scope of works comprises:  Widening of the E-10 carriageway  Construction of the interchange to the new airport terminal, including four viaduct bridges and ramps  Construction of airport city entrance including 2 bridges and ramps  Secondary dual 3-lane road networks between Yas Island and the E-10, the new airport terminal and between interchange 6 and the E12  Widening of the residential flight road from dual 2-lane to dual 3-lane, and modifying the presidential flight road access to the E-10  Extending the northbound on slip ramp of interchange 5, including the construction of a new over bridge  A drainage pumping station, and associated drainage network for the E-10 and E-12 interchange  Drainage street lighting and intelligent traffic system works Notes: HR Site No. HLG 284 Coins Project Code P1120 Client: M/s Department of Transport (DOT) Employer: M/s Abu Dhabi General Services PJSC trading as Musanada K S A Work Experience Duration: From Aug 2012 to March 2013 Company Name: SALCO Positions: Civil Foreman Duration: From May 2013 to 26 Dec. 2013 Date Company Name: Almarai Company Positions: Salesman
  • 5. Personal Detail Nationality: Indian Passport No: G4416925 D/L Saudi light duty Licenses & India LMV Uae: wait final result Phone: +971 56 4973 786 (uae) +91 8094 862786 (India) E-mail: akhtar.sherani@gmail.com Akhtar.khan@hlgroup.com Language  English  Arabic  Urdu, & Hindi Main Responsibilities.  CV Screening and follow up.  Registered in Aconex Online electronic Documents  Follow up recruitments.  Arrange with the selected candidates for any missing papers.  Arranging Interviews,  Maintain and update the employee’s internal database and system.  Maintain the Daily attendance for labor and staff, daily reports for all site.  Familiar with vacancies growth,  Follow up the execution Motivation plan.  Follow up the leave application, Labor Transfer and Duty rejoining.  Generate reports for the employee’s.  Filing of any documents related to the company.  Assisting the Manager in any kind of official activities.  Keeping all the files in the department updated and organized.  Typing the documents and suggestions.  Arrange meeting times.  Arrange and prepare the documents, which are given from director.  Participate in meetings on Administration issues.  Under take additional duties as assigned by the line Manager.  Making electrical Drawing.  Having the knowledge of immigration and labour.  Arranger the paper for labour for new visa and medical. Computer Skill Ms Excel & Ms Word, Aconex  Computer Hardware, Internet