Offshore Drilling
Rig Equipment
Presented To:
Sir Adnan Aftab
Presented By:
Aijaz Ahmed (K-17PG10)
Umar Farooque (K-17PG13)
Abdul Aleem (K-17PG15)
MUET SZAB Campus Khairpur mir's 1
• The rig is a complex system of inter-related subsystems. Here are a few
of those subsystems simply explained.
• The Legs, Chords, Jacking System
• The three legs are what give the jack-up its name. They can be raised
and lowered on ratchets in a process known as jacking up or jacking
down. During jacking up, the legs go down and the rig goes up. During
jacking down, the legs go up and the rig goes down until it floats on the
surface of the water, then the legs continue to travel up until they tower
above it. The verticals that form the outside of the lattice are
called chords. Legs can have a square cross-section with four chords, or
a triangular cross-section with three chords.
MUET SZAB Campus Khairpur mir's
2
• The legs are operated by jacking motors, which drive cogs that
move notches on the jacking chords up and down. This is known as
a rack and pinion system. The rack is the series of notches on the
chord and the pinion is the gear whose teeth interlock with the
rack.
MUET SZAB Campus Khairpur mir's
3
MUET SZAB Campus Khairpur mir's
4
MUET SZAB Campus Khairpur mir's
5
• Hull
• Much like the hull of a boat, a Jack Up unit’s hull is watertight,
and houses or supports the equipment, systems, and personnel
needed to carry out normal operations. While the Jack Up is
afloat, the hull also provides the buoyancy needed to stop the
Jack Up from sinking. The parameters of the hull can vary
depending on the different modes of operation of the unit.
MUET SZAB Campus Khairpur mir's
6
MUET SZAB Campus Khairpur mir's
7
• The Cantilever Deck and Skidding System
• The derrick is where all the drilling equipment is located. If the
rig is not precisely where the well needs to be drilled, it’s
important that the derrick can easily move forward, backwards
and side-to-side to get the drilling equipment exactly where you
need it. This also allows several wells to be drilled by the same
rig, just a few feet apart.
MUET SZAB Campus Khairpur mir's
8
• The cantilever deck is a whole deck that slides backwards and
forwards, left and right, to get the derrick in place. The sliding
process is known as skidding and it’s controlled by gears and
motors a bit like a horizontal version of jacking. The left-right
movement is controlled by the transverse skidding system and the
forward-backward movement by the longitudinal skidding system.
The part of the cantilever deck under and around the derrick,
where the drilling activities take place, is called the rig floor.
MUET SZAB Campus Khairpur mir's
9
MUET SZAB Campus Khairpur mir's
10
MUET SZAB Campus Khairpur mir's
11
Thruster:
MUET SZAB Campus Khairpur mir's
12
MUET SZAB Campus Khairpur mir's
13
5
MUET SZAB Campus Khairpur mir's
14
MUET SZAB Campus Khairpur mir's
15
• The Blow-Out Preventer (BOP)
• Oil and gas underground are frequently under very high pressures. This, combined with
their flammability and explosiveness makes drilling for them potentially dangerous. To
avoid the pressure building up and blasting up the well uncontrollably in what is known as
a blow-out, the rig uses a blow-out preventer (or BOP).
• Subsea BOPs
• A typical subsea BOP weighs in a range from 450‐850,000 lbs.
• They have more complex control systems and usually additional ram and
annular preventers.
• Typical deepwater BOPs today have an internal diameter of 18‐3/4” and are
rated to 15,000 psi maximum wellbore pressure.
• The BOP is run subsea after the surface well has been drilled and a wellhead has
been landed and cemented in the seabed
MUET SZAB Campus Khairpur mir's
16
MUET SZAB Campus Khairpur mir's
17
• Choke and Kill Valves
Valves called choke and kill valves on the BOP allow for high
pressure gas and oil to be transmitted to the drilling rig to bring a
well under control.
MUET SZAB Campus Khairpur mir's
18
MUET SZAB Campus Khairpur mir's
19
• Lower Marine Riser Package
• The BOP has two sections, the Lower Marine Riser Package
(LMRP)and lower stack.
• The LMRP usually has one annular, one connector to attach to
lower BOP, the control system, gas bleed valves and a flex joint.
MUET SZAB Campus Khairpur mir's
20
MUET SZAB Campus Khairpur mir's
21
• Choke Manifold
Choke manifolds are a series of gate valves and valves with variable
orifices which are used to bring a well, which has had an influx of
high pressure fluids into the wellbore, under control.
High pressure wellbore fluid is directed to a degasser where the
drilling mud is separated from the gas and the gas is vented to
atmosphere.
MUET SZAB Campus Khairpur mir's
22
MUET SZAB Campus Khairpur mir's
23
• Pipe-Handling System
• On the derrick there is a system of overhead cranes and platforms for
maneuvering pieces of drill pipe out of the pipe rack (where they are
stored) to the top of the drill string, where they are screwed in to make
the drill string longer. The same system is used in reverse for dismantling
the drill string and putting the drill pipe back into storage.
• Cranes
• An offshore rig would typically have two to four cranes each sitting on
a pedestal that allows rotational movement. The architect of the rig will
have chosen the location of the cranes so that together they can move
heavy objects anywhere on any of the decks. Where one crane can’t
reach, another crane can.
MUET SZAB Campus Khairpur mir's
24
MUET SZAB Campus Khairpur mir's
25
MUET SZAB Campus Khairpur mir's
26
• The Top Drive and Drawworks
• Suspended on the derrick is the Top Drive. This is a device for
spinning the drill string. It moves up and down the derrick using
the drawworks to control its vertical movement. When it reaches
the bottom of the derrick, a fresh piece of drill pipe is picked up
and screwed on to the top of the drill string; the Top Drive returns
to the top of the derrick and starts spinning it round again.
MUET SZAB Campus Khairpur mir's
27
• Main Engines, Generators and SCRs
• All this drilling equipment needs a lot of power, which is
generated by several main engines that normally run on fuel oil
(same as on most ships). One or more silicon controlled rectifiers
(SCRs) are used to stabilize the level of current that the
generators put out so that it can flow into the rig’s many
electrical systems.
• In the event of a failure, each rig has emergency engines and
generators that can create a bare minimum amount of power for
cooking, heating or air conditioning and making water, but not
enough to continue drilling operations.
MUET SZAB Campus Khairpur mir's
28
MUET SZAB Campus Khairpur mir's
29
• The Flare-boom
• In wells that are producing or are close to producing, you would
expect some gas to come up through the well. To mitigate the
threat of poisoning (via inhalation) and explosions, and to regulate
pressure, excess gas is vented under controlled conditions and
burnt off. It is burnt off in a process known as flaring, and this
happens at the end of a directional boom known as a flare
boom. The flare boom ensures that the flare is several meters
from the rig and pointing in a safe direction.
MUET SZAB Campus Khairpur mir's
30
MUET SZAB Campus Khairpur mir's
31
• Safety Equipment
• The rig is vulnerable to pretty much every natural and man-made
hazard you can think of; fires, explosions, flooding, gas leaks,
helicopter crashes, punch-through, BOP blow-outs and collisions
with other ocean-going vessels.
• Needless to say that considerable amounts of space, time and
thought is dedicated to safety systems such as watertight doors,
spill clean-up kits, lifeboats, life-jackets, fire and gas
alarms/detectors, portable fire extinguishers.
MUET SZAB Campus Khairpur mir's
32
MUET SZAB Campus Khairpur mir's
33
• Supply vessel
• Offshore installations need supplies such as food, fuel, and spare parts.
They also need old machinery, oil parts, sewage and rubbish to be taken
away. Supply ships visit the rig for this. Sometimes supply ships also
bring/take personnel to and from the rig as an alternative to a
helicopter.
• Accommodation Vessel
• Space on any offshore installation is limited according to its size. A
medium sized rig might have beds for about 110-120 people. When more
people are needed, an accommodation vessel is moored nearby to house
the extra people. There are also jack-up accommodation modules that
act like a drilling rig.
MUET SZAB Campus Khairpur mir's
34
• Helicopter
• People come and go via boats or helicopter. Helicopters are
normally organized by the oil and gas company that controls the
oil field, and shared between several drilling contractors and all
their subcontractors. Flights could be several times daily but in
some areas they might be as rare as once a week. All the vessels
mentioned above would normally have a helipad on-board.
MUET SZAB Campus Khairpur mir's
35
Control Systems
• Subsea BOP have control systems that are supplied with fluid from a
pump and accumulator system on the rig.
• Anchored rigs typically have a fully hydraulic system, with hydraulic pilot
signals sent from the surface to operate the functions on the BOP subsea.
• Early dynamically positioned drill ships had electro‐hydraulic systems.
With these systems an electric signal is send to a solenoid on the BOP
which then sends a hydraulic pilot signal to a control valve.
• Multiplex (MUX) systems were developed to enable an ever increasing
number of functions to be operated with just a few conductors in the MUX
cable.
MUET SZAB Campus Khairpur mir's
36
MUET SZAB Campus Khairpur mir's
37
MUET SZAB Campus Khairpur mir's
38

More Related Content

What's hot

Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnents
RIZWAN KHAN
 

What's hot (20)

Presentation 1 drilling rigs
Presentation 1 drilling rigsPresentation 1 drilling rigs
Presentation 1 drilling rigs
 
Rotary System
Rotary SystemRotary System
Rotary System
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Drilling tools
Drilling toolsDrilling tools
Drilling tools
 
Oil & gas
Oil & gasOil & gas
Oil & gas
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling
 
Operações especiais de perfuração
Operações especiais de perfuraçãoOperações especiais de perfuração
Operações especiais de perfuração
 
Well completion equipment 2. landing nipples
Well completion equipment  2. landing nipplesWell completion equipment  2. landing nipples
Well completion equipment 2. landing nipples
 
Drilling rigs main compnents
Drilling rigs main compnentsDrilling rigs main compnents
Drilling rigs main compnents
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
Introduction to directional drilling and its applications
Introduction to directional drilling and its applicationsIntroduction to directional drilling and its applications
Introduction to directional drilling and its applications
 
Drill string
Drill stringDrill string
Drill string
 
Drilling equipment
Drilling equipmentDrilling equipment
Drilling equipment
 
Basic drilling engineering
Basic drilling engineeringBasic drilling engineering
Basic drilling engineering
 
Herramientas y equipos de perforacion conceptos basicos
Herramientas y equipos de perforacion conceptos basicosHerramientas y equipos de perforacion conceptos basicos
Herramientas y equipos de perforacion conceptos basicos
 
Introduction to drilling
Introduction to drillingIntroduction to drilling
Introduction to drilling
 
Rig components
Rig componentsRig components
Rig components
 
Type of rig
Type of rigType of rig
Type of rig
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 

Similar to Offshore Drilling Rig Equipment

Airport aircraft information review ppt
Airport aircraft information review pptAirport aircraft information review ppt
Airport aircraft information review ppt
CelineWykowski
 
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
ahmdrabymnswr
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
Chieu Nguyen
 
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
PE 305 Drilling Engineering 1 Ch-3=  1-2.pdfPE 305 Drilling Engineering 1 Ch-3=  1-2.pdf
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
roaaahmed36
 

Similar to Offshore Drilling Rig Equipment (20)

Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4
 
AMV WITH FOCUS ON HOVERCRAFT
AMV WITH FOCUS ON HOVERCRAFT AMV WITH FOCUS ON HOVERCRAFT
AMV WITH FOCUS ON HOVERCRAFT
 
Auxiliary marine machinery systems
Auxiliary marine machinery systemsAuxiliary marine machinery systems
Auxiliary marine machinery systems
 
Airport aircraft information review ppt
Airport aircraft information review pptAirport aircraft information review ppt
Airport aircraft information review ppt
 
Offshore platforms
Offshore platformsOffshore platforms
Offshore platforms
 
Offshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsOffshore Oil & Gas Production Systems
Offshore Oil & Gas Production Systems
 
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
PE 305 Drilling Engineering 1 Ch-3=  1-2.pdfPE 305 Drilling Engineering 1 Ch-3=  1-2.pdf
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Dragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauliDragline machine at dhudhichua project ,singrauli
Dragline machine at dhudhichua project ,singrauli
 
6 day.pptx
6 day.pptx6 day.pptx
6 day.pptx
 
anchorage Fondeo
anchorage Fondeoanchorage Fondeo
anchorage Fondeo
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
Cac loai gian khoan
Cac loai gian khoanCac loai gian khoan
Cac loai gian khoan
 
176589.pptx.ppt
176589.pptx.ppt176589.pptx.ppt
176589.pptx.ppt
 
Obstacles, Flaps And Ground Effect
Obstacles, Flaps And Ground EffectObstacles, Flaps And Ground Effect
Obstacles, Flaps And Ground Effect
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Recently uploaded (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

Offshore Drilling Rig Equipment

  • 1. Offshore Drilling Rig Equipment Presented To: Sir Adnan Aftab Presented By: Aijaz Ahmed (K-17PG10) Umar Farooque (K-17PG13) Abdul Aleem (K-17PG15) MUET SZAB Campus Khairpur mir's 1
  • 2. • The rig is a complex system of inter-related subsystems. Here are a few of those subsystems simply explained. • The Legs, Chords, Jacking System • The three legs are what give the jack-up its name. They can be raised and lowered on ratchets in a process known as jacking up or jacking down. During jacking up, the legs go down and the rig goes up. During jacking down, the legs go up and the rig goes down until it floats on the surface of the water, then the legs continue to travel up until they tower above it. The verticals that form the outside of the lattice are called chords. Legs can have a square cross-section with four chords, or a triangular cross-section with three chords. MUET SZAB Campus Khairpur mir's 2
  • 3. • The legs are operated by jacking motors, which drive cogs that move notches on the jacking chords up and down. This is known as a rack and pinion system. The rack is the series of notches on the chord and the pinion is the gear whose teeth interlock with the rack. MUET SZAB Campus Khairpur mir's 3
  • 4. MUET SZAB Campus Khairpur mir's 4
  • 5. MUET SZAB Campus Khairpur mir's 5
  • 6. • Hull • Much like the hull of a boat, a Jack Up unit’s hull is watertight, and houses or supports the equipment, systems, and personnel needed to carry out normal operations. While the Jack Up is afloat, the hull also provides the buoyancy needed to stop the Jack Up from sinking. The parameters of the hull can vary depending on the different modes of operation of the unit. MUET SZAB Campus Khairpur mir's 6
  • 7. MUET SZAB Campus Khairpur mir's 7
  • 8. • The Cantilever Deck and Skidding System • The derrick is where all the drilling equipment is located. If the rig is not precisely where the well needs to be drilled, it’s important that the derrick can easily move forward, backwards and side-to-side to get the drilling equipment exactly where you need it. This also allows several wells to be drilled by the same rig, just a few feet apart. MUET SZAB Campus Khairpur mir's 8
  • 9. • The cantilever deck is a whole deck that slides backwards and forwards, left and right, to get the derrick in place. The sliding process is known as skidding and it’s controlled by gears and motors a bit like a horizontal version of jacking. The left-right movement is controlled by the transverse skidding system and the forward-backward movement by the longitudinal skidding system. The part of the cantilever deck under and around the derrick, where the drilling activities take place, is called the rig floor. MUET SZAB Campus Khairpur mir's 9
  • 10. MUET SZAB Campus Khairpur mir's 10
  • 11. MUET SZAB Campus Khairpur mir's 11
  • 12. Thruster: MUET SZAB Campus Khairpur mir's 12
  • 13. MUET SZAB Campus Khairpur mir's 13
  • 14. 5 MUET SZAB Campus Khairpur mir's 14
  • 15. MUET SZAB Campus Khairpur mir's 15
  • 16. • The Blow-Out Preventer (BOP) • Oil and gas underground are frequently under very high pressures. This, combined with their flammability and explosiveness makes drilling for them potentially dangerous. To avoid the pressure building up and blasting up the well uncontrollably in what is known as a blow-out, the rig uses a blow-out preventer (or BOP). • Subsea BOPs • A typical subsea BOP weighs in a range from 450‐850,000 lbs. • They have more complex control systems and usually additional ram and annular preventers. • Typical deepwater BOPs today have an internal diameter of 18‐3/4” and are rated to 15,000 psi maximum wellbore pressure. • The BOP is run subsea after the surface well has been drilled and a wellhead has been landed and cemented in the seabed MUET SZAB Campus Khairpur mir's 16
  • 17. MUET SZAB Campus Khairpur mir's 17
  • 18. • Choke and Kill Valves Valves called choke and kill valves on the BOP allow for high pressure gas and oil to be transmitted to the drilling rig to bring a well under control. MUET SZAB Campus Khairpur mir's 18
  • 19. MUET SZAB Campus Khairpur mir's 19
  • 20. • Lower Marine Riser Package • The BOP has two sections, the Lower Marine Riser Package (LMRP)and lower stack. • The LMRP usually has one annular, one connector to attach to lower BOP, the control system, gas bleed valves and a flex joint. MUET SZAB Campus Khairpur mir's 20
  • 21. MUET SZAB Campus Khairpur mir's 21
  • 22. • Choke Manifold Choke manifolds are a series of gate valves and valves with variable orifices which are used to bring a well, which has had an influx of high pressure fluids into the wellbore, under control. High pressure wellbore fluid is directed to a degasser where the drilling mud is separated from the gas and the gas is vented to atmosphere. MUET SZAB Campus Khairpur mir's 22
  • 23. MUET SZAB Campus Khairpur mir's 23
  • 24. • Pipe-Handling System • On the derrick there is a system of overhead cranes and platforms for maneuvering pieces of drill pipe out of the pipe rack (where they are stored) to the top of the drill string, where they are screwed in to make the drill string longer. The same system is used in reverse for dismantling the drill string and putting the drill pipe back into storage. • Cranes • An offshore rig would typically have two to four cranes each sitting on a pedestal that allows rotational movement. The architect of the rig will have chosen the location of the cranes so that together they can move heavy objects anywhere on any of the decks. Where one crane can’t reach, another crane can. MUET SZAB Campus Khairpur mir's 24
  • 25. MUET SZAB Campus Khairpur mir's 25
  • 26. MUET SZAB Campus Khairpur mir's 26
  • 27. • The Top Drive and Drawworks • Suspended on the derrick is the Top Drive. This is a device for spinning the drill string. It moves up and down the derrick using the drawworks to control its vertical movement. When it reaches the bottom of the derrick, a fresh piece of drill pipe is picked up and screwed on to the top of the drill string; the Top Drive returns to the top of the derrick and starts spinning it round again. MUET SZAB Campus Khairpur mir's 27
  • 28. • Main Engines, Generators and SCRs • All this drilling equipment needs a lot of power, which is generated by several main engines that normally run on fuel oil (same as on most ships). One or more silicon controlled rectifiers (SCRs) are used to stabilize the level of current that the generators put out so that it can flow into the rig’s many electrical systems. • In the event of a failure, each rig has emergency engines and generators that can create a bare minimum amount of power for cooking, heating or air conditioning and making water, but not enough to continue drilling operations. MUET SZAB Campus Khairpur mir's 28
  • 29. MUET SZAB Campus Khairpur mir's 29
  • 30. • The Flare-boom • In wells that are producing or are close to producing, you would expect some gas to come up through the well. To mitigate the threat of poisoning (via inhalation) and explosions, and to regulate pressure, excess gas is vented under controlled conditions and burnt off. It is burnt off in a process known as flaring, and this happens at the end of a directional boom known as a flare boom. The flare boom ensures that the flare is several meters from the rig and pointing in a safe direction. MUET SZAB Campus Khairpur mir's 30
  • 31. MUET SZAB Campus Khairpur mir's 31
  • 32. • Safety Equipment • The rig is vulnerable to pretty much every natural and man-made hazard you can think of; fires, explosions, flooding, gas leaks, helicopter crashes, punch-through, BOP blow-outs and collisions with other ocean-going vessels. • Needless to say that considerable amounts of space, time and thought is dedicated to safety systems such as watertight doors, spill clean-up kits, lifeboats, life-jackets, fire and gas alarms/detectors, portable fire extinguishers. MUET SZAB Campus Khairpur mir's 32
  • 33. MUET SZAB Campus Khairpur mir's 33
  • 34. • Supply vessel • Offshore installations need supplies such as food, fuel, and spare parts. They also need old machinery, oil parts, sewage and rubbish to be taken away. Supply ships visit the rig for this. Sometimes supply ships also bring/take personnel to and from the rig as an alternative to a helicopter. • Accommodation Vessel • Space on any offshore installation is limited according to its size. A medium sized rig might have beds for about 110-120 people. When more people are needed, an accommodation vessel is moored nearby to house the extra people. There are also jack-up accommodation modules that act like a drilling rig. MUET SZAB Campus Khairpur mir's 34
  • 35. • Helicopter • People come and go via boats or helicopter. Helicopters are normally organized by the oil and gas company that controls the oil field, and shared between several drilling contractors and all their subcontractors. Flights could be several times daily but in some areas they might be as rare as once a week. All the vessels mentioned above would normally have a helipad on-board. MUET SZAB Campus Khairpur mir's 35
  • 36. Control Systems • Subsea BOP have control systems that are supplied with fluid from a pump and accumulator system on the rig. • Anchored rigs typically have a fully hydraulic system, with hydraulic pilot signals sent from the surface to operate the functions on the BOP subsea. • Early dynamically positioned drill ships had electro‐hydraulic systems. With these systems an electric signal is send to a solenoid on the BOP which then sends a hydraulic pilot signal to a control valve. • Multiplex (MUX) systems were developed to enable an ever increasing number of functions to be operated with just a few conductors in the MUX cable. MUET SZAB Campus Khairpur mir's 36
  • 37. MUET SZAB Campus Khairpur mir's 37