Reference list for contractor Co.
1. Definition
We are Solar systems installation team.
Our team includes best installers, technicians
…...and engineers ever in Egypt.
Our team consists of:
2 Engineers, 1Supervisor, 6technicians and
…..3Helpers.
We have ability to construct and install small,
…. .medium, large and huge Solar Plants.
Fastest installers ever in Egypt.
2. Sites we are installed shown below:
Reference List
1- Vodafone communication towers in Egypt, Assiut Sohag road, 7
Sites – for each site = 8.5KW off-grid.
2- Mobinil communication towers in Egypt, Assiut Oasis Kharga road,
10 Sites – for each site = 6.5KW off- grid.
3- All Vodafone and Mobinil’s sites all over Sharm El Sheikh, Dahab
and Nuweibaa roads, Ahmed hamdy tunnel Nikhil road and Nikhil el
nakab road.
4- Mobinil communication towers in Egypt, Safaga Qena road, 25 Sites
for each site = 8KW off-grid.
5- Mobinil communication towers in Egypt ,El Dakhlah and El Khargah
Oasis road , 20 Sites – for each site = 6.5KW off-grid.
6- Mobinil and Vodafone communication towers in Egypt, Shark el
Owainat, 40 Sites – for each site = 6.5KW off-grid.
7- Fees gate for Ain Sokhna old road site, 35KW off-grid.
3. 8- Truck Scale Suez road in Egypt, 20 lighting streets lampposts and
main building = 16KW off-grid.
9- In Morocco 15 Sites Meditel Co., 8KW for each site off-grid.
10- In Jordan Zain Telecom Co. Site 8KW, hybrid System.
11- All Ambulance point in Egypt 40 points , red sea road , ras
Mohamed road , dahab road and dakhlah paris oasis road in Egypt ,
2KW for every point.
12- Telecom Egypt site, East Owainat 6KW on-grid.
13- Giftun Island in Egypt site 8KW off-grid.
14- Europe grant in Egypt South Sinai, Bedouin houses -1 KW for each
house off-grid.
2015&2016 Sites:
15- Badr eldin Petroleum Co. in Egypt, 2 sites, Assel and Karam - 5KW
for each site.
16- MIDTAP Egypt Co. 18KW on-grid.
17- ECHEM Egypt Co. 10KW on-grid.
18- Ministry of Electricity -North Cairo stations - 4 Sites On-grid
a) Nabeel el Waad Station 40KW.
b) Shoubra El Kema Station 40KW.
c) Rod El Farg Station 40KW.
d) 5th Settlement station 40KW.
4. 19- Egyptian General Petroleum Co. on-grid, 106KW.
20- CIB bank in Egypt 5th settlement 8.5KW on-grid.
21- Gulf of Suez Petroleum Co. on-grid 212
22- Alkaram Site (1) (Egyptian Western desert) BAPETCo. 4.8 KW
off-grid.
23-Alkaram Site (2) (Egyptian Western desert) BAPETCo. 1.6 KW
off-grid.
24- 30 solar street lighting Abd Al-Mona’m Reyad Square in Al-
Fayoum City .
25- AMG Co. Uni-Pole Advertising panel Cairo-Alex. Desert road after
fees gate..
-Projects in Progress:
1- 2 Sites in (Egyptian Western desert (Monkhafad El-katara & Wadi
El-Natroon) BAPETCo. 5 KW & 3.4 KW off-grid.
2- 160 street lighting poles in Fayoum City.
Never hesitate to contact us
Eng. Ahmed Emad Mr. Amr Ouda