SlideShare uma empresa Scribd logo
1 de 7
Baixar para ler offline
AHMAD HAZWAN BIN ABDUL MUAAIS
CONTACT INFO
Address : No.1377, Jalan Lavender Height 29, Laman Villa Lavender Height,
70450, Seremban, Negeri Sembilan Darul Khusus.
Telephone No. (H) : 06-6715 747
Mobile No. : 013-969 66 85
Office : 03-2331 0862
Email : ahmad.hazwan@gmail.com
hazwan.muaais@petronas.com.my
PERSONAL PARTICULARS
Age : 27 years
Date of Birth : 17 September 1988
Nationality : Malaysian
Gender : Male
Race : Malay
Religion : Islam
Marital Status : Married
IC No. : 880917-01-5115
EDUCATIONAL BACKGROUND
Degree
Field of Study : Bachelor of Engineering (Hons) Civil Engineering
Majoring : Offshore Structures and Oceanography
Institute/University : University Technology Petronas (UTP)
Duration : January 2007 until December 2010
Grade : CGPA : 3.54 (2nd
Class Upper)
Graduation Data : December 2010
Secondary School
Level : Sijil Pelajaran Malaysia (SPM)
School : Sekolah Menengah (Sains) Sultan Hj Ahmad Shah, Kuantan, Pahang
Duration : 2004-2005
Grade : 9 A1 1 B3
Level : Penilaian Menengah Rendah (PMR)
School : SMK Bandar Pusat 26400 Bandar Jengka.
Duration : 2001-2003
Grade : 8 A 1 B
ACHIEVEMENTS
Dean’s list award 2007, 2008, 2009 and 2010
SILLS AND PROFICIENCY
Language Proficiency Description
English Good Written and oral
Bahasa Melayu Good Written and oral
Computer and ICT Proficiency Description
Microsoft Office Suite Good Office related software
MathCAD Good Mathematical Software
AutoCAD Good Drafting Software
Prokon Good Structural Analysis
Software
Esteem Good Structural Analysis
Software
ACTIVITIES/TRAINING/WORKSHOP
PETRONAS In-house Training
1. Theory of Pipeline Design (Lvl 1)
2. Codes, Standard & Software
3. Pipeline and Riser Design ( Lvl 1 & 2)
4. Civil & Structural Soil Investigation (Lvl 1)
5. Welding & Material Technology (Lvl 1)
6. Civil & Stuctural Metocean (Lvl 1)
7. Environmental Impact Assessment (Lvl 3)
8. Linepipe & Flexible Materials (Lvl 2)
9. Mechanical & Cathodic Protection Design (Lvl 2)
10. Flow Assurance (Lvl 2)
11. Stress Design & Installation (Lvl 2)
12. Soil Investigation (Lvl 2)
13. Pipeline Construction and Precommissioning (Lvl 2)
14. Project Feasibility (Lvl 1)
15. Protective Coating and Lining (Lvl 2)
WORKING EXPERIENCE
2011 – Current : Petronas Carigali Sdn Bhd
Address : Petronas Twin Towers, KLCC
Position : Pipeline Engineer
Department : Civil, Structural & Pipeline Department
Division : Project & Engineering Division
Projects Involvement : 1. Dulang Redevelopment Phase 2
2. Angsi Chemical Enhanced Oil Recovery (CEOR) – First
Concept In The World
3. Dulang East
July 2011 – August 2011 : Loh & Loh Construction Sdn Bhd
Address 19, 21 & 23, Jalan Sri Hartamas 7, Taman Sri Hartamas,
50480 Kuala Lumpur.
Position : Construction Engineer
Project Involvement : Puah Dam Construction, Hulu Terengganu (Client – TNB)
January 2011 – April 2011 : Perunding KKL Sdn Bhd
Address : 3-43B, Jalan Desa 2/4, Desa Aman Puri, Kepong, 52100,
Kuala Lumpur, WP Kuala Lumpur.
Position : Civil & Structural Engineer
Project Involvement : VIVA Mall and VIVA Hotel, Jalan Loke Yew, Kuala Lumpur)
June 2009 – January 2010 : RAD Consultancy Sdn Bhd
Address : 96-M Jalan SS 21/35, Damansara Utama, 47400 Petaling
: Jaya, Selangor.
Position : Civil & Structural Trainee Engineer
PROFESIONAL REGISTRATION
Registered with Board of Engineers Malaysia (BEM) as Civil &Structural Engineer since 25th
March 2013 under CIVIL branch.
CURRENT JOB SCOPE
PETRONAS Carigali Sdn Bhd - Pipeline Engineer
Location - Petronas Twin Towers (KLCC)
PROJECTS :
1. ANGSI CHEMICAL ENHANCED OIL RECOVERY (CEOR)
Project Background
Angsi CEOR main objective is to improve oil recovery factors at Angsi fields with additional
reserves of approx. 60 MMSTB though alkaline and surfactant chemical injection through en
existing pipeline from onshore chemical treatment plant to offshore platform. This project
consist of onshore and offshore scope.
Onshore facility involved Chemical Treatment Plant, Onshore pipelines, Civil and
Infrastructure and Tie-in works from new Facilities to existing Facilities. Offshore facilities on
the other hand are involving small jack-up platform for seawater intake, near shore pipelines
for seawater intake and seawater discharge. These onshore and offshore scope are
interrelated to deliver chemical cocktail mix with seawater from onshore to an existing
pipeline 165km from onshore to offshore platform and finally inject it in the reservoir in Angsi
Field.
In this project, several activities which include interfacing with local authorities has to be
done in order to finalized the project location, work scope to be done during construction,
operational and decommissioning and etc. among other local authorities that involved are
Marine Department, Kerteh Port, Local Council, Utilities Department, Public Work
Department and other relevant authorities as listed in the One Stop Center Government
Agencies List.
Chemical cocktail injection will be done in 4 years period with the volume approximately 160
000 bbl/d. This could be achieved by pumping of approximately 400 000 bbl/d of seawater
through seawater intake pipeline into the new Chemical Mixing Plant. Then it will be treated
to certain specification and add with chemical EOR, namely Surfactant and Alkaline. The
chemical cocktail then will be pumped to offshore via an existing pipeline.
2. DULANG EAST DEVELOPMENT
Project Background
Dulang redevelopment including Dulang East field development project has been FEED
studied previously in year 2012 but turned out to be uneconomic. Dulang field production
has been declining from 50,000 bopd to 20,000 bopd from the 30 years of production.
Moreover, the Dulang East field reservoir will be showing a steady decline as it has pressure
communication with Semangkok field reservoir which is also producing.
Thus there is the urgency to produce oil from Dulang East field and it is expected to produce
about 4000 bopd through maximising the use of artificial lift operations.
The main challenge for this project is to make the project economically viable and positive
and to balance the total project cost from optimization of subsurface well costs and
challenging the facilities traditional methodologies.
The stretched milestone set by the stakeholder’s management for the first oil from Dulang
East field is Q3 2017.
New drilling platform (DL-E) has to be constructed about 7.1 km to the east of Dulang B to
accommodate new oil producers, and a NAG well. DL-E shall be host tied–in to DL-B via
subsea pipelines.
New well slot/s required for the new DL-E platforms shall consists as follows:
- 6 nos. of oil producer (full well streams)
- 1 no. of NAG producer (which will then re-cycled back to the oil producing wells)
Activities
1. Conducting project feasibility and conceptual studies for project involved to determine
the feasibility in term of cost and schedule in relating with available technology
currently available.
Project Involved : Angsi CEOR, Dulang East.
Workscope :
I. To design and analyze the pipeline route selection based
on available route survey data available. Several
interfacing with local authorities and stakeholders has been
initiated to finalized the onshore pipeline route for seawater
intake and seawater discharge pipeline (CEOR)
II. To analyze and design pipeline mechanical properties such
as pipeline wall thickness (Barlow theory), concrete coating
(lateral and vertical stability analysis), and pipeline stress
analysis during installation phase. (CEOR & Dulang East)
III. To come up with the overall project cost and project
schedule for pipeline starting from procurement phase,
installation phase, pre-commissioning and commissioning
of the pipeline. Data gathering is done by engaging with
several service provider as well as with in-house database.
(CEOR & Dulang East)
IV. To prepare report and calculation spreadsheet for every
deliverables specified in the scope of work and to ensure
all the information and data stated in the report are valid
and up to date. (Dulang East in-house Conceptual Study).
2. Conducting Front End Engineering Design together with appointed Consultant to
come up with detail-up data for the construction phase.
Project Involved : Angsi CEOR, Dulang Redevelopment Phase 2.
Workscope :
I. To verify and optimize the propose pipeline selection
route in order to ensure the suggested route is fulfill the
project requirement in term of cost, safety and local
regulation. (CEOR & DULANG REDEV PHASE 2)
II. To ensure the deliverables, project progress and scope
of work as specified in the contract with the contractor
are fully comply by the contractor. (CEOR & DULANG
REDEV PHASE 2)
III. Liaise and conduct presentation as well as engagement
with local authorities and stakeholders in order to
gather critical information for the design and project
and also their buy-in for certain task. Among local
authorities that has been regularly involved in the past
projects are Syarikat Air Terengganu (SATU), Majlis
Perbandaran Kemaman (MPK), Department of
Environment (DOE) Kuala Terengganu and Jabatan
Pengaliran dan Saliran (JPS) Kuala Lumpur among
others. (CEOR)
IV. Lead the initiative in preparing the site survey
(topographical survey as well as ground penetrating
radar survey for future construction phase). This
initiative has involved local authorities and stakeholders
in nearby area and every necessary steps has been
taken to ensure the overall activity is as per plan.
(CEOR)
3. Involved in Technical Evaluation for Engineering, Procurement, Construction,
Installation and Commissioning (EPCC) Bidding.
Project Involved : Angsi CEOR.
Workscope :
I. To clarify all the project’s technical proposal from all
bidders for Angsi CEOR EPCC project tender
evaluation. This involve with technical clarification
submission to each bidder to clarify and verify all the
proposal submitted to the tender evaluation for further
explanation and to confirm that they are comply with all
relevant project requirement, safety aspect, schedule,
cost as well as local codes and regulation.
II. To lead the technical evaluation bidding for pipeline
design, proposal and technical specification for each
bidders. It involves in-house technical studies to
compare the advantages and disadvantages of
proposals submitted by bidders to check their
competitiveness in terms of cost, technical and
feasibility during construction.
III. To lead technical clarification presentation during face
to face session with each bidders for pipeline design
aspect. All the technical aspect, work proposals and
compliance to project requirements (as per Invitation to
Bid (ITB) documents). During this session, all bidders
will be interviewed by respective discipline leader from
project team to define all their proposals.
PREVIOUS JOB SCOPE/COMPANY
Loh & Loh Construction Sdn Bhd - Construction Engineer
Location - Construction Site at Hulu Terengganu
(Puah River)
1. Responsible to monitor the progress and logistic aspect of the construction materials
for construction of the Puah Dam Project. This Project is constructed by its main
contractor – Loh & Loh Construction Sdn Bhd, for Tenaga Nasional Berhad (TNB).
2. Involve in site preparation for Puah Dam construction, Earth work (cut and fill), Silt
trap preparation (part of the EIA compliance) and site camp/accommodation
preparation.
Perunding KKL Sdn Bhd - Civil & Structural Engineer
Location - Design Office and Construction Site
1. Responsible in analyzing and designing structural aspect of the VIVA Mall building
and VIVA Hotel in Jalan Loke Yew.
2. Interfacing with local authorities such as SYABAS, TNB and local council as part of
the authorities approval in the project.
INTERNSHIP
RAD Consultancy Sdn Bhd - Civil & Structural Trainee Engineer
Location - Design Office and Construction Site
Work Description
1. Analyze and design buildings block for schools, bungalows and structural trusses.
2. Draw key plan for tendering stage and submission to the authority.
3. Design building and structures using latest softwares such as Prokon, Esteem and
spreadsheet.
4. Site visit to the project site to monitor construction flow.
REFERENCES
Pn. Suhana Bt Safie
Head Of Facilities,
Angsi CEOR Project,
Project and Engineering Division,
PETRONAS Carigali Sdn Bhd.
Contact no: 012 – 334 5443
En. Jami’an Bin Jaharudin
Senior Process Engineer,
Angsi CEOR Project,
Project and Engineering Division,
PETRONAS Carigali Sdn Bhd.
Contact no: 019 – 357 2100
En. Izwan Nizam Bin Mahbob
Project Manager,
Angsi CEOR Project,
Project and Engineering Division,
PETRONAS Carigali Sdn Bhd.
Contact no: 012 - 201 0170

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
20160704 Carline_Andrew
20160704 Carline_Andrew20160704 Carline_Andrew
20160704 Carline_Andrew
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Trdrag 04 13 16
Trdrag 04 13 16Trdrag 04 13 16
Trdrag 04 13 16
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Subsea Pipeline Engineering
Subsea Pipeline EngineeringSubsea Pipeline Engineering
Subsea Pipeline Engineering
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Updated CV-Issam
Updated CV-IssamUpdated CV-Issam
Updated CV-Issam
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
CV-Priono_Update
CV-Priono_UpdateCV-Priono_Update
CV-Priono_Update
 
projects
projectsprojects
projects
 
Hassby's CV 2015
Hassby's CV 2015Hassby's CV 2015
Hassby's CV 2015
 
MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)MIDEL C resume013[1] (1)
MIDEL C resume013[1] (1)
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 

Destaque

Epic research daily agri report 19th may 2016
Epic research daily agri report 19th may 2016Epic research daily agri report 19th may 2016
Epic research daily agri report 19th may 2016Epic Research
 
Cambiar mentalidad de empleado 2
Cambiar mentalidad de empleado 2Cambiar mentalidad de empleado 2
Cambiar mentalidad de empleado 2Josh EA
 
Roy Hams - Trade test CITIFICET PDF
Roy Hams - Trade test CITIFICET PDFRoy Hams - Trade test CITIFICET PDF
Roy Hams - Trade test CITIFICET PDFroy hamusute
 
Family Therapy: Relationship Satisfaction & Marital Adjustment
Family Therapy: Relationship Satisfaction & Marital AdjustmentFamily Therapy: Relationship Satisfaction & Marital Adjustment
Family Therapy: Relationship Satisfaction & Marital AdjustmentUnmana123
 
Personality and marital adjustment among alcoholics
Personality and marital adjustment among alcoholicsPersonality and marital adjustment among alcoholics
Personality and marital adjustment among alcoholicsVinodmohanan55
 

Destaque (7)

Epic research daily agri report 19th may 2016
Epic research daily agri report 19th may 2016Epic research daily agri report 19th may 2016
Epic research daily agri report 19th may 2016
 
Cambiar mentalidad de empleado 2
Cambiar mentalidad de empleado 2Cambiar mentalidad de empleado 2
Cambiar mentalidad de empleado 2
 
WWMetalwork PT LT
WWMetalwork PT LTWWMetalwork PT LT
WWMetalwork PT LT
 
Endomarketing para dentistas
Endomarketing para dentistasEndomarketing para dentistas
Endomarketing para dentistas
 
Roy Hams - Trade test CITIFICET PDF
Roy Hams - Trade test CITIFICET PDFRoy Hams - Trade test CITIFICET PDF
Roy Hams - Trade test CITIFICET PDF
 
Family Therapy: Relationship Satisfaction & Marital Adjustment
Family Therapy: Relationship Satisfaction & Marital AdjustmentFamily Therapy: Relationship Satisfaction & Marital Adjustment
Family Therapy: Relationship Satisfaction & Marital Adjustment
 
Personality and marital adjustment among alcoholics
Personality and marital adjustment among alcoholicsPersonality and marital adjustment among alcoholics
Personality and marital adjustment among alcoholics
 

Semelhante a CV_Hazwan Updated (20)

CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
CV of Sachin Gupta
CV of Sachin GuptaCV of Sachin Gupta
CV of Sachin Gupta
 
CV~PW~02-02-16 Opus
CV~PW~02-02-16 OpusCV~PW~02-02-16 Opus
CV~PW~02-02-16 Opus
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Ugeshan Naidoo1
Ugeshan Naidoo1Ugeshan Naidoo1
Ugeshan Naidoo1
 
Resume Tanawat
Resume TanawatResume Tanawat
Resume Tanawat
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
CV
CVCV
CV
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
SR. SITE ENGINEER
SR. SITE ENGINEERSR. SITE ENGINEER
SR. SITE ENGINEER
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
Regidor A. Manalo Sub-Agent (Corporate C.V)
Regidor A. Manalo Sub-Agent  (Corporate C.V)Regidor A. Manalo Sub-Agent  (Corporate C.V)
Regidor A. Manalo Sub-Agent (Corporate C.V)
 

CV_Hazwan Updated

  • 1. AHMAD HAZWAN BIN ABDUL MUAAIS CONTACT INFO Address : No.1377, Jalan Lavender Height 29, Laman Villa Lavender Height, 70450, Seremban, Negeri Sembilan Darul Khusus. Telephone No. (H) : 06-6715 747 Mobile No. : 013-969 66 85 Office : 03-2331 0862 Email : ahmad.hazwan@gmail.com hazwan.muaais@petronas.com.my PERSONAL PARTICULARS Age : 27 years Date of Birth : 17 September 1988 Nationality : Malaysian Gender : Male Race : Malay Religion : Islam Marital Status : Married IC No. : 880917-01-5115 EDUCATIONAL BACKGROUND Degree Field of Study : Bachelor of Engineering (Hons) Civil Engineering Majoring : Offshore Structures and Oceanography Institute/University : University Technology Petronas (UTP) Duration : January 2007 until December 2010 Grade : CGPA : 3.54 (2nd Class Upper) Graduation Data : December 2010 Secondary School Level : Sijil Pelajaran Malaysia (SPM) School : Sekolah Menengah (Sains) Sultan Hj Ahmad Shah, Kuantan, Pahang Duration : 2004-2005 Grade : 9 A1 1 B3 Level : Penilaian Menengah Rendah (PMR) School : SMK Bandar Pusat 26400 Bandar Jengka. Duration : 2001-2003 Grade : 8 A 1 B ACHIEVEMENTS Dean’s list award 2007, 2008, 2009 and 2010
  • 2. SILLS AND PROFICIENCY Language Proficiency Description English Good Written and oral Bahasa Melayu Good Written and oral Computer and ICT Proficiency Description Microsoft Office Suite Good Office related software MathCAD Good Mathematical Software AutoCAD Good Drafting Software Prokon Good Structural Analysis Software Esteem Good Structural Analysis Software ACTIVITIES/TRAINING/WORKSHOP PETRONAS In-house Training 1. Theory of Pipeline Design (Lvl 1) 2. Codes, Standard & Software 3. Pipeline and Riser Design ( Lvl 1 & 2) 4. Civil & Structural Soil Investigation (Lvl 1) 5. Welding & Material Technology (Lvl 1) 6. Civil & Stuctural Metocean (Lvl 1) 7. Environmental Impact Assessment (Lvl 3) 8. Linepipe & Flexible Materials (Lvl 2) 9. Mechanical & Cathodic Protection Design (Lvl 2) 10. Flow Assurance (Lvl 2) 11. Stress Design & Installation (Lvl 2) 12. Soil Investigation (Lvl 2) 13. Pipeline Construction and Precommissioning (Lvl 2) 14. Project Feasibility (Lvl 1) 15. Protective Coating and Lining (Lvl 2) WORKING EXPERIENCE 2011 – Current : Petronas Carigali Sdn Bhd Address : Petronas Twin Towers, KLCC Position : Pipeline Engineer Department : Civil, Structural & Pipeline Department Division : Project & Engineering Division Projects Involvement : 1. Dulang Redevelopment Phase 2 2. Angsi Chemical Enhanced Oil Recovery (CEOR) – First Concept In The World 3. Dulang East
  • 3. July 2011 – August 2011 : Loh & Loh Construction Sdn Bhd Address 19, 21 & 23, Jalan Sri Hartamas 7, Taman Sri Hartamas, 50480 Kuala Lumpur. Position : Construction Engineer Project Involvement : Puah Dam Construction, Hulu Terengganu (Client – TNB) January 2011 – April 2011 : Perunding KKL Sdn Bhd Address : 3-43B, Jalan Desa 2/4, Desa Aman Puri, Kepong, 52100, Kuala Lumpur, WP Kuala Lumpur. Position : Civil & Structural Engineer Project Involvement : VIVA Mall and VIVA Hotel, Jalan Loke Yew, Kuala Lumpur) June 2009 – January 2010 : RAD Consultancy Sdn Bhd Address : 96-M Jalan SS 21/35, Damansara Utama, 47400 Petaling : Jaya, Selangor. Position : Civil & Structural Trainee Engineer PROFESIONAL REGISTRATION Registered with Board of Engineers Malaysia (BEM) as Civil &Structural Engineer since 25th March 2013 under CIVIL branch. CURRENT JOB SCOPE PETRONAS Carigali Sdn Bhd - Pipeline Engineer Location - Petronas Twin Towers (KLCC) PROJECTS : 1. ANGSI CHEMICAL ENHANCED OIL RECOVERY (CEOR) Project Background Angsi CEOR main objective is to improve oil recovery factors at Angsi fields with additional reserves of approx. 60 MMSTB though alkaline and surfactant chemical injection through en existing pipeline from onshore chemical treatment plant to offshore platform. This project consist of onshore and offshore scope. Onshore facility involved Chemical Treatment Plant, Onshore pipelines, Civil and Infrastructure and Tie-in works from new Facilities to existing Facilities. Offshore facilities on the other hand are involving small jack-up platform for seawater intake, near shore pipelines for seawater intake and seawater discharge. These onshore and offshore scope are interrelated to deliver chemical cocktail mix with seawater from onshore to an existing pipeline 165km from onshore to offshore platform and finally inject it in the reservoir in Angsi Field. In this project, several activities which include interfacing with local authorities has to be done in order to finalized the project location, work scope to be done during construction, operational and decommissioning and etc. among other local authorities that involved are Marine Department, Kerteh Port, Local Council, Utilities Department, Public Work Department and other relevant authorities as listed in the One Stop Center Government Agencies List.
  • 4. Chemical cocktail injection will be done in 4 years period with the volume approximately 160 000 bbl/d. This could be achieved by pumping of approximately 400 000 bbl/d of seawater through seawater intake pipeline into the new Chemical Mixing Plant. Then it will be treated to certain specification and add with chemical EOR, namely Surfactant and Alkaline. The chemical cocktail then will be pumped to offshore via an existing pipeline. 2. DULANG EAST DEVELOPMENT Project Background Dulang redevelopment including Dulang East field development project has been FEED studied previously in year 2012 but turned out to be uneconomic. Dulang field production has been declining from 50,000 bopd to 20,000 bopd from the 30 years of production. Moreover, the Dulang East field reservoir will be showing a steady decline as it has pressure communication with Semangkok field reservoir which is also producing. Thus there is the urgency to produce oil from Dulang East field and it is expected to produce about 4000 bopd through maximising the use of artificial lift operations. The main challenge for this project is to make the project economically viable and positive and to balance the total project cost from optimization of subsurface well costs and challenging the facilities traditional methodologies. The stretched milestone set by the stakeholder’s management for the first oil from Dulang East field is Q3 2017. New drilling platform (DL-E) has to be constructed about 7.1 km to the east of Dulang B to accommodate new oil producers, and a NAG well. DL-E shall be host tied–in to DL-B via subsea pipelines. New well slot/s required for the new DL-E platforms shall consists as follows: - 6 nos. of oil producer (full well streams) - 1 no. of NAG producer (which will then re-cycled back to the oil producing wells) Activities 1. Conducting project feasibility and conceptual studies for project involved to determine the feasibility in term of cost and schedule in relating with available technology currently available. Project Involved : Angsi CEOR, Dulang East. Workscope : I. To design and analyze the pipeline route selection based on available route survey data available. Several interfacing with local authorities and stakeholders has been initiated to finalized the onshore pipeline route for seawater intake and seawater discharge pipeline (CEOR) II. To analyze and design pipeline mechanical properties such as pipeline wall thickness (Barlow theory), concrete coating (lateral and vertical stability analysis), and pipeline stress analysis during installation phase. (CEOR & Dulang East) III. To come up with the overall project cost and project schedule for pipeline starting from procurement phase, installation phase, pre-commissioning and commissioning
  • 5. of the pipeline. Data gathering is done by engaging with several service provider as well as with in-house database. (CEOR & Dulang East) IV. To prepare report and calculation spreadsheet for every deliverables specified in the scope of work and to ensure all the information and data stated in the report are valid and up to date. (Dulang East in-house Conceptual Study). 2. Conducting Front End Engineering Design together with appointed Consultant to come up with detail-up data for the construction phase. Project Involved : Angsi CEOR, Dulang Redevelopment Phase 2. Workscope : I. To verify and optimize the propose pipeline selection route in order to ensure the suggested route is fulfill the project requirement in term of cost, safety and local regulation. (CEOR & DULANG REDEV PHASE 2) II. To ensure the deliverables, project progress and scope of work as specified in the contract with the contractor are fully comply by the contractor. (CEOR & DULANG REDEV PHASE 2) III. Liaise and conduct presentation as well as engagement with local authorities and stakeholders in order to gather critical information for the design and project and also their buy-in for certain task. Among local authorities that has been regularly involved in the past projects are Syarikat Air Terengganu (SATU), Majlis Perbandaran Kemaman (MPK), Department of Environment (DOE) Kuala Terengganu and Jabatan Pengaliran dan Saliran (JPS) Kuala Lumpur among others. (CEOR) IV. Lead the initiative in preparing the site survey (topographical survey as well as ground penetrating radar survey for future construction phase). This initiative has involved local authorities and stakeholders in nearby area and every necessary steps has been taken to ensure the overall activity is as per plan. (CEOR) 3. Involved in Technical Evaluation for Engineering, Procurement, Construction, Installation and Commissioning (EPCC) Bidding. Project Involved : Angsi CEOR. Workscope : I. To clarify all the project’s technical proposal from all bidders for Angsi CEOR EPCC project tender evaluation. This involve with technical clarification submission to each bidder to clarify and verify all the proposal submitted to the tender evaluation for further explanation and to confirm that they are comply with all relevant project requirement, safety aspect, schedule, cost as well as local codes and regulation. II. To lead the technical evaluation bidding for pipeline design, proposal and technical specification for each bidders. It involves in-house technical studies to
  • 6. compare the advantages and disadvantages of proposals submitted by bidders to check their competitiveness in terms of cost, technical and feasibility during construction. III. To lead technical clarification presentation during face to face session with each bidders for pipeline design aspect. All the technical aspect, work proposals and compliance to project requirements (as per Invitation to Bid (ITB) documents). During this session, all bidders will be interviewed by respective discipline leader from project team to define all their proposals. PREVIOUS JOB SCOPE/COMPANY Loh & Loh Construction Sdn Bhd - Construction Engineer Location - Construction Site at Hulu Terengganu (Puah River) 1. Responsible to monitor the progress and logistic aspect of the construction materials for construction of the Puah Dam Project. This Project is constructed by its main contractor – Loh & Loh Construction Sdn Bhd, for Tenaga Nasional Berhad (TNB). 2. Involve in site preparation for Puah Dam construction, Earth work (cut and fill), Silt trap preparation (part of the EIA compliance) and site camp/accommodation preparation. Perunding KKL Sdn Bhd - Civil & Structural Engineer Location - Design Office and Construction Site 1. Responsible in analyzing and designing structural aspect of the VIVA Mall building and VIVA Hotel in Jalan Loke Yew. 2. Interfacing with local authorities such as SYABAS, TNB and local council as part of the authorities approval in the project. INTERNSHIP RAD Consultancy Sdn Bhd - Civil & Structural Trainee Engineer Location - Design Office and Construction Site Work Description 1. Analyze and design buildings block for schools, bungalows and structural trusses. 2. Draw key plan for tendering stage and submission to the authority. 3. Design building and structures using latest softwares such as Prokon, Esteem and spreadsheet. 4. Site visit to the project site to monitor construction flow.
  • 7. REFERENCES Pn. Suhana Bt Safie Head Of Facilities, Angsi CEOR Project, Project and Engineering Division, PETRONAS Carigali Sdn Bhd. Contact no: 012 – 334 5443 En. Jami’an Bin Jaharudin Senior Process Engineer, Angsi CEOR Project, Project and Engineering Division, PETRONAS Carigali Sdn Bhd. Contact no: 019 – 357 2100 En. Izwan Nizam Bin Mahbob Project Manager, Angsi CEOR Project, Project and Engineering Division, PETRONAS Carigali Sdn Bhd. Contact no: 012 - 201 0170