Purest Silver Publicly Listed Company +90% Revenues from Silver
Corporate Presentation
IPT:TSXV / ISVLF:US / IKL:FR
16 Years of Exploration & Production Success in Mexico
MAR 2022
Disclosure
Forward-Looking Statements
This presentation may contain certain “forward-looking” statements and information relating to IMPACT Silver Corp. (“IMPACT” or the “Company”) that are based on the
beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such statements reflect the current
risks, uncertainties and assumptions related to certain factors including but not limited to, exploration and development risks, expenditure and financing
requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with
vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one
or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary
materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement. The factors that could cause actual results
to differ materially include, but are not limited to, the following: general economic conditions; changes in financial markets; the impact of exchange rates; political
conditions and developments in countries in which the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company
mines or hopes to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and efficiently staff the
Company’s operations; the sufficiency of current working capital and the estimated cost and availability of funding for the continued exploration and development of
the Company’s exploration properties. This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue
reliance on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such future results, levels
of activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy and completeness of these forward-looking
statements.
Cautionary Statement
The Company’s decision to place a mine into production, expand a mine, make other production related decisions or otherwise carry out mining and processing
operations, is largely based on internal non-public Company data and reports based on exploration, development and mining work by the Company’s geologists and
engineers. The results of this work are evident in the discovery and building of multiple mines for the Company, and in the track record of mineral production and
financial returns of the Company since 2006. Under NI43-101 the Company is required to disclose that it has not based its production decisions on NI43-101-
compliant mineral resource or reserve estimates, preliminary economic assessments or feasibility studies, and historically such projects have increased uncertainty
and risk of failure.
NI 43-101 Qualified Person
George Gorzynski, P. Eng., Vice President, Exploration and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the
technical information in this presentation with the exception of the Capire project mineral resource estimate. Steven Ristorcelli, C.P.G. (U.S.A.), Principal Geologist for
Mine Development Associates and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the Capire mineral resource
estimate and directly related information.
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
2
ESG. Silver Capital of World. IPT.
• Largest silver producer in the world.
– Strong geological data and past production records.
Proven 500+ years area of history silver production.
– Focus on ESG (Environmental, Social, Governance)
– Staff is 99% local, job ops, adhering to high environmental
standards.
• Proximity to North America & ports to global customers
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
3
0.00
20.00
40.00
60.00
80.00
100.00
POLICY & MINING POTENTIAL INDEX 2020
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
INVESTMENT ATTRACTIVENESS 2020
MEXICO continues
to rank near top of
South America
mining rich
potential and
investment
attractiveness
Re-forestation efforts
Agave carbon offsets
Royal Mines of Zacualpan
500+ Years of Production
Production summary so far
11 MILLION
silver produced since 2006
One of the purest silver producers with
90%
of revenues from silver in Q1 2021
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
4
457
349
636
824
750
834
621
683
726
950 953
908
744
664 647 634
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Silver Production Since Acquiring the Project in 2006 (000 oz)
Located NW-SE of large silver epithermal belt of
Mexico. NW from Taxco district
$0.00
$0.20
$0.40
$0.60
$0.80
$1.00
$1.20
$1.40
2015 - 2021 IMPACT Share Price
Highly Leveraged to Silver Prices
Silver vs IPT Share Price
• One of the best leveraged silver plays in rising silver market
– In 2016, 2019, and 2020’s recent silver rally, IMPACT’s share price generated significantly higher returns than holding silver bullion
– Every $1 increment in silver prices represents direct increases to profit and value of ounces in ground
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
5
Jan 4 – Aug
2, 2016:
854% return
Jan 4 – Aug 2,
2016: 50% return
Jun 4 –
July 30,
2019:
90%
return
Jun 4 –
July 30,
2019:
12%
return
Mar 2 – July
26, 2020
149% return
Mar 2 – July
26, 2020
37% return
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
$35.00
Silver Prices
Royal Mines of Zacualpan
Property Overview
• 100% ownership of two contiguous mining districts covering
211 km² in south-central Mexico
• A 3.5-hour drive southwest from Mexico City
– Paved road access
• Connected to a modern power grid with ample water supply
and a skilled, 99% Mexican workforce
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
6
• 535 tpd Guadalupe Plant processing mineral from three
underground mines (Guadalupe, San Ramon and Cuchara)
and the Veta Negra open pit mine (all within close proximity)
• 200 tpd Capire Pilot Plant is on care and maintenance
– Most recently used to bulk test the processing of gold and copper
feed from the Carlos Pacheco Zone
Capital Structure
Tickers TSXV:IPT, US:ISVLF, FR:IKL
Share Price (Mar 22, 2022) C$0.60
52-Week Range C$0.43 – C$1.25
Shares Outstanding (basic) 143.8M
Shares Outstanding (FD)* 161.7M
Market Capitalization (basic) C$85.8M
Cash & Cash Equivalents (C$M) C $22.4 M
Debt (C$M) None
Capital Structure 12 Month Share Price Performance
Share Ownership
Retail 70%
Institutional Funds (Sprott, GR Asset, BCV, Commodity
Discovery, EOP, & Crescat)
20%
Management & Insiders 10%
*Includes 5,185,000 options outstanding with a weighted average exercise price of C$0.55 and 30,504,322
warrants outstanding with a weighted average exercise price of C$0.36
Source: Stockwatch / Yahoo Finance Mar 2022
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
7
Summary of Operating Results
Production by Metal Value (Q3 2021)
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
8
Q3 2021 2020
Q4
2020
Q4 2019 2019 2018 2017
Tonnes processed 145,458 140,069 40,815 36,528 140,878 173,217 194,266
Throughput (tonnes/day) 399 383 444 397 386 475 532
Average grade (g/t Ag) 159 172 166 182 173 159 172
Silver production (oz) 617,688 646,534 184,303 180,670 664,056 743,950 907,848
Lead production (tonnes) 250 240 68 78 275 329 481
Gold production (oz) 295 321 92 113 376 469 540
Silver sales (oz) 633,952 633,357 156,885 182,670 667,628 733,267 907,848
Lead sales (tonnes) 213 225 53 76 287 344 481
Gold sales (oz) 283 293 69 112 367 489 540
Revenue per tonne of ore
processed (US$)
$119.04 $116.47 $131.87 $105.47 $92.82 $74.88 $79.62
Direct costs per tonne of
ore processed (US$)
$86.44 $80.82 $92.21 $82.60 $82.55 $83.63 $76.49
Mine-level EBITDA (C$M) $4.70 $2.70 $1.46 $0.87 $1.37 -$1.68 $0.47
Silver
90%
Gold
5%
Lead
5%
• 2018 strategic change led to significant decline in operating costs per tonne
and an improvement in average grade
• Q3 2021 revenue per tonne continues to stay lofty as cost maintained around
$90/tonne. Some delays due to exploration & developments at mine sites.
Veta Negra
• New small open
pit operation
which
commenced
production in
September 2019
• 4 km northwest
of the Guadalupe
mill
• 8% of Q4 2021
production
San Ramon
• Began
production in
2004
• Current high-
grade silver
production
from large vein
at depth – San
Ramon Deeps
• 8% of Q4 2021
production
Cuchara
• Corridor of
epithermal
veins linking new
and legacy
mines
• Production is
from medium
grade
epithermal silver
and lead-zinc
veins
• 27% of Q4 2021
production
Guadalupe
• Historic
producer
located
beside
Guadalupe
mill
• Epithermal
silver-lead-
zinc veins
• 57% of Q4
2021
production
Ore Feed Mine Sources (Q3 2021)
Royal Mines of Zacualpan
Prolific History of High-Grade Silver Mining
• One of the oldest mining districts in the Americas
– Almost 500 years of recorded mining history
• IMPACT’s exploration work has catalogued over 5,000 old mine workings
and 42 historic processing plants, indicating extensive historical mining,
large exploration potential and forming an invaluable database for modern
and effective exploration
• Taxco has historical records of over 300 million ounces silver produced.
(South of IMPACT projects)
Nombre de
Dios La Cadena
La Zorra El Calvario
La Fortuna
Some of the 42 historic processing plants in the
Zacualpan District
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
9
Guadalupe Processing Plant
• 535 TPD
• Currently processing all ore for IPT
• Running below capacity 400TPD Q1 2021
Capire Processing Plant
• 200TPD
• On care and maintenance since 2014
• Currently checking XRT process to lower cost
Experienced Management & Board
Frederick W. Davidson, CA,
CPA
President, CEO, Director
• +35 years of mining experience, including holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum
Gold Mines. Former CEO of Energold Drilling Corp. and CFO of TOTAL Energold (a partially owned subsidiary of TOTAL Oil of
France with oil, gas and gold production)
• Former Director of Wheaten River Minerals (acquired by Goldcorp in 2014 for $2.4 billion)
• MBA from TUBC and CA, CPA
George Gorzynski, P. Eng.
VP Exploration, Director
• +37 years of exploration and mining experience
• Director of Fireweed Zinc Ltd.
Jerry Huang, MBA
CFO
• +12 years of venture capital markets experience raising over $120 million for various small cap companies.
• Former advisor for HNW at CIBC, director of gold/copper and lithium projects on TSXV, banking advisory roles.
• MBA from University of British Columbia and CPA PEP from CPABC.
Armando Alexandri, P.Eng
COO
• +35 years of mining experience in underground and open-pit mines as well as flotation and cyanidation processing plants
Victor Tanaka, P. Geo
Director
• +40 years of exploration experience
• Current Director of Fjordland Exploration, Westhaven Ventures and Consolidated Woodjam Copper
• Held senior positions at Asamera Inc., Freeport McMoRan Gold Corp., Cominco Ltd., and Aber Resources
Richard Mazur, P. Geo, MBA
Director
• President and CEO of Forum Energy Metals Corp. and CEO of Alto Ventures Ltd.
• Held senior positions at Canamax Resources and IMPACT Minerals
Peter Tredger, P. Eng., MBA
Director
• Former Senior Officer of Thompson Creek Metals Company
• Held senior positions at Glencairn Gold (now B2Gold) and Wheaton River Minerals (now Goldcorp)
Robert W. Lishman
Director
• +40 years of investment industry and business experience with strong portfolio management and financing expertise
• Currently Managing General Partner of investment fund Yellowjacket, LP
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
10
Significant Exploration Upside
• Exploration continues to evaluate the 5,000+ historic
mine workings located on hundreds of mapped veins
(red lines on map) on an extensive mineralizing system
• Area 1: Brownfields exploration for silver veins within
close trucking distance to the Guadalupe plant; area
includes the San Ramon, Cuchara and Veta Negra
mines
• Area 2: Early stage exploration for Zacualpan southeast
extension silver veins
• Area 3: Brownfields and greenfields exploration on
silver-rich VMS and vein targets; includes the open pit
Capire mine
• Area 4: Brownfields and greenfields exploration on
copper-gold and silver vein targets
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
11
Area 1
Guadalupe to Alacran Exploration Area
• Fertile exploration area between two large
historic Mines
• The Guadalupe Mine to the north produced
over 10 million ounces silver between
1972-1991, and much more since first
recorded production in 1529; Sept 2018
drill results:
– 2.61 m of 1,263 g/t Ag & 8.82 m of 306 g/t Ag
• The Alacran Mine to the south is marked by
extensive underground workings with
historic reports of very high-grade (1,000’s
of g/t) silver and gold mining beginning
before 1527
Guadalupe Mine
+10M oz Ag historic production
Drill Targets
Guadalupe Deeps
El Paso
San Ignacio
Remedios
El Progresso
Alacran Deeps
Alacran Mine
Large historic Ag/Au production
1,200 m zone
Alacran Deeps Drill Target
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
12
13
Area 1: Alacran Gold-Silver Mine
Two historic reports indicate super high grades
Lewis (1920) “…At enriched places,
lenses of silver sulphides are found, 30
to 70cm. wide, the ores carrying 20 to
60 kg. silver per metric tonne. The wall-
rock for a short distance is also
impregnated to the point of making
good mill-ore. The unenriched spaces
between the ore bodies usually assay
400 to 500 gm. Silver. All the high-grade
ores carry gold, with a characteristic
accompaniment of iron and copper
sulphides……”
Garcia (1921) reports “The Alacran Mine employed 500
workers who produced 8 to 10 tonnes <per day> of
direct shipping ore assaying 35kg/tonne which was
exported to Penoles in Toluca and 40 tonnes <per day>
of less than 10kg/tonne which was sent to the <Cuchara>
flotation plant.
Do the math: 50 tpd operation producing about 7 million
ounces silver per year
13
Area 2
Tasco North & Pregones Exploration Areas
• Area is synonymous with silver in Mexico – Taxco is the most
famous silver mine in Mexico
• To the north, IMPACT’s early exploration efforts have discovered
numerous old mines and old processing plants
• Taxco district still owned & explored by majors (Grupo Mexico.)
Old Mines Old Processing Plants
Epithermal silver veins
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
14
Area 3
Capire: Potential Quick Expansion of Production
• 43-101openpitresourceof4.5MozSilver@79g/t+lead-zincinopenpitwithexpansion/explorationupside
• 200tpdpilotplantoncare&maintenance; turnkeytorestartwithrisingsilverprices
• Infrastructurepre-builtfor1,000tpdplant
• VMSsilver-lead-zinc(-gold-copper) deposit;otherVMSprospectswithupsidenearby
• XRT sorting technology has potential to materially reduce operating costs and extend mine life
• 30k tonnes produced, 12 million oz silver eq 43-101 resource. Ability to fast-track production
200 tpd pilot plant
Open-pit
3D model of
planned
open-pit
Mill
Tailings Facility
Capire open-pit 3D model
Capire open-pit mine and pilot plant on VMS
Ag-Pb-Zn deposit (currently on standby)
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
15
Area 4
Chapanial Gold Discovery
• Located 7 km west of the Guadalupe processing plant&
southwest of Veta Negra Mine
• Sampling results from 2020 exploration include:
– 97.5 g/t Au and 97.9 g/t Ag over a true width of 0.8 m
– 18.25 g/t Au and 75.4 g/t Ag over a true width of 0.2 m
• Close to historic Chapanial mine which produced on three levels
over 45 m depth and along strike for 100 m
• Vein is associated with a major structure which hosts a sulphide
bearing polymictic breccia up to 8m in width
• Many other veins and anomalies are currently being explored
Chapanial
Highlighted Channel Sampling Results
Chapanial
Norte
Chapania
Sur
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
16
-23
-22
-1.6
0.5
10
-18
23
0.2
18
65
120
Americas Gold
Silver
Santa Cruz
Silver Elephant
Silverbear
Silver Dollar
Excellon
IMPACT
Great Panther
Sierra Metals
GoGold
Endeavour
1
7
Market Capitalization (C$M) Working Capital (C $M)
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
17
Source: S&P Capital IQ and company filings May 2021
IPT – Undervalued Silver Miner
Market Cap low despite higher Working Capital & Leveraged to Silver
34
31
37
85
25
139
143
233
268
893
1050
Silver Dollar
Silver Elephant
Silverbear
IMPACT
Excellon
Santa Cruz
Great Panther
Americas Gold
Silver
Sierra Metals
GoGold
Endeavour
% Revenue to Silver
0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0%100.0%
Americas Gold Silver
Santa Cruz
Silver Elephant
Silverbear
Silver Dollar
Excellon
IMPACT
Great Panther
Sierra Metals
GoGold
`
Rapid Exploration to Mine Development
Exploration and mine development process flowchart
RESEARCH
Compile old
mines/ prospects
from historic
maps
DRILLING
Drilling in
phases based
on success
MINE
DEVELOPMENT
Mine Planning,
Permitting and
Construction
FIELD WORK
Surface &
underground
sampling,
mapping
MINE
PRODUCTION &
CASH FLOW
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
18
• Preliminary test from
Haylard Engineering for pre-
mining treatment was
positive – 20-30% reduction
in cost per ounces
• well-known that the
crushing and grinding of ore
consumes around 60 per
cent of a mine’s operating
and energy costs in addition
to creating most of the
greenhouse gas emissions
Ongoing Cost Reduction through technology - XRT
Why IMPACT Silver?
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
19
Thank you.
Questions? inquiries@impactsilver.com
Twitter: @impact_silver
One of the purest
play silver producers
~90% of revenues from
silver in Q4 2021
Long-term, stable
production
Over the last 12 months, sold
~635K oz Ag and generated
C$4.7 million in mine-level
EBITDA
Near-term
development
opportunity at Capire
Expandable 200 tpd mill and
open pit resource with XRT
technology to lower cost
and potential to increase
resource
District exploration
20,000 meters
Hundreds of epithermal vein
targets and >5,000 historic
workings – several to be
explored in 2022
Exciting new Gold-
Copper Chapanial
discovery
Sampled 97.5 g/t Au and 97.9
g/t Ag over true width of 0.8 m
Refurbishing Historic Infrastructure at Guadalupe
• Refurbishing old assets and
equipment – in this case the
mine shaft and underground
railroad to lower cost and speed
up tonnage being hauled out of
mine
20
21
Area 1: Alacran Gold-Silver Mine
1918-1926 Mining Areas Long Section
1.2+ km zone
21
Technical App: Guadalupe (Pachuqueno) Mine
• Over 5,000 underground workings, digitized maps from Sept 1989
22
Technical App: Guadalupe area
• Vein system overhead view
• Sampling and drilling then
determines an internal
tonnage model which then
moves the project to near-
term production stage.
23
Technical App: Long Section
• IMPACT team visits projects and catalogues the
opportunity.
• Sampling and drilling then determines an internal
tonnage model which then moves the project to
near-term production stage.
24
Long Section cont..
25
Photos
• Refurbishing old assets and
equipments – in this case mine
shaft and railroad underground to
lower cost and speed up tonnage
being hauled out
26
Veta Negra
• Open pit low cost expansion
potential
• High grade and past major’s
project (Penoles)
• Already contributing to feed in
Q1 2020
27
Veta Negra
Plan view
• Plan view
Sample average grade
and widths
• Example of how fast
IPT team can explore,
develop, and produce
from vast amount of
geological data
28
XRT Discussions
• Preliminary test from Haylard Engineering
for pre-mining treatment was positive –
20-30% reduction in cost per ounces
• well-known that the crushing and
grinding of ore consumes around 60 per
cent of a mine’s operating and energy
costs in addition to creating most of the
greenhouse gas emissions
• X-ray transmission may be a good solution
if your rock has differences in density,
which usually translate to atomic density
differences. X-ray transmission measures
how many x-rays come through a particle
because when different minerals are x-
rayed, a difference in the attenuation of
the mineral is found.
29
XRT Steiner Facilities Cont..
• Example at MINSUR Peru’s large Tin operation, Osisko’s Cariboo, Fireweed, Renison tin,
Sokamo Silver, Rambler Metals
XRT Discussions
• Added value: XRT sensor-based ore sorting is converting uneconomic waste material
into economic ore, as material below the cut-off for the main plant can be treated with
lower operating costs and converted into reserves.
• Increased capacity in the main plant, from 2,950 tpd before implementation to today’s
3,200 tpd, as a result of the crushing operation at the XRT-sorting plant.
• Significant improvement in the overall recovery in the main plant, from 90.5% to
92.5%. This is because sensor-based ore sorting rejects particles with very fine
mineralized Cassiterite that is too small for detection - resulting in higher grade and
size of mineralization.
• Extended life-of-mine: today, about 24% of the feed to the sensor-based ore sorting
plant is contributed by low grade ore from underground, which in the past would have
been excluded for being below cut-off.
• Elimination of liabilities through the treatment and proper disposal of 100% of the
stockpile.
• Decreased tailings disposal, as the sensor-based ore sorting system reduces the
amount of waste by increasing the grade in the feed to the plant.
30

More Related Content

What's hot

Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
2013 IMPACT Silver Corporate Presentation
2013 IMPACT Silver Corporate Presentation2013 IMPACT Silver Corporate Presentation
2013 IMPACT Silver Corporate PresentationAdnet Communications
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationAdnet Communications
 
Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018Adnet Communications
 
Corporate Presentation September
Corporate Presentation SeptemberCorporate Presentation September
Corporate Presentation SeptemberCarolynGraham14
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Joe Gray
 
July 2018 ir presentation
July 2018 ir presentationJuly 2018 ir presentation
July 2018 ir presentationguygold2016
 
Corporate Presentation - November 2015
Corporate Presentation - November 2015Corporate Presentation - November 2015
Corporate Presentation - November 2015Adnet Communications
 
TriStar Gold Corporate Presentation - February 2022
TriStar Gold Corporate Presentation - February 2022TriStar Gold Corporate Presentation - February 2022
TriStar Gold Corporate Presentation - February 2022Adnet Communications
 
GoldQuest Corporate Presentation - June 2016
GoldQuest Corporate Presentation - June 2016GoldQuest Corporate Presentation - June 2016
GoldQuest Corporate Presentation - June 2016GoldQuest Mining Corp.
 
Granada Gold Mine - Corporate Presentation - August 2020
Granada Gold Mine - Corporate Presentation - August 2020Granada Gold Mine - Corporate Presentation - August 2020
Granada Gold Mine - Corporate Presentation - August 2020MomentumPR
 
June 2017 investor_presentation_final_2017_07_05_cp
June 2017 investor_presentation_final_2017_07_05_cpJune 2017 investor_presentation_final_2017_07_05_cp
June 2017 investor_presentation_final_2017_07_05_cpAdnet Communications
 
NAR Corporate Update - wide screen presentation (july 2021)
NAR Corporate Update - wide screen presentation (july 2021)NAR Corporate Update - wide screen presentation (july 2021)
NAR Corporate Update - wide screen presentation (july 2021)narminerals
 

What's hot (20)

Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
2013 IMPACT Silver Corporate Presentation
2013 IMPACT Silver Corporate Presentation2013 IMPACT Silver Corporate Presentation
2013 IMPACT Silver Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
201307 presentation
201307 presentation201307 presentation
201307 presentation
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018Energold Drilling Corp. Corporate Presentation May 2018
Energold Drilling Corp. Corporate Presentation May 2018
 
September 2021 mnd gf
September 2021 mnd gfSeptember 2021 mnd gf
September 2021 mnd gf
 
Corporate Presentation September
Corporate Presentation SeptemberCorporate Presentation September
Corporate Presentation September
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021
 
July 2018 ir presentation
July 2018 ir presentationJuly 2018 ir presentation
July 2018 ir presentation
 
Corporate Presentation - November 2015
Corporate Presentation - November 2015Corporate Presentation - November 2015
Corporate Presentation - November 2015
 
TriStar Gold Corporate Presentation - February 2022
TriStar Gold Corporate Presentation - February 2022TriStar Gold Corporate Presentation - February 2022
TriStar Gold Corporate Presentation - February 2022
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
GoldQuest Corporate Presentation - June 2016
GoldQuest Corporate Presentation - June 2016GoldQuest Corporate Presentation - June 2016
GoldQuest Corporate Presentation - June 2016
 
Granada Gold Mine - Corporate Presentation - August 2020
Granada Gold Mine - Corporate Presentation - August 2020Granada Gold Mine - Corporate Presentation - August 2020
Granada Gold Mine - Corporate Presentation - August 2020
 
June 2017 investor_presentation_final_2017_07_05_cp
June 2017 investor_presentation_final_2017_07_05_cpJune 2017 investor_presentation_final_2017_07_05_cp
June 2017 investor_presentation_final_2017_07_05_cp
 
NAR Corporate Update - wide screen presentation (july 2021)
NAR Corporate Update - wide screen presentation (july 2021)NAR Corporate Update - wide screen presentation (july 2021)
NAR Corporate Update - wide screen presentation (july 2021)
 

Similar to IMPACTSilver-CorpPres-Mar2022-Q4.pdf

IMPACTSilver-CorpPres-May2021draft.pdf
IMPACTSilver-CorpPres-May2021draft.pdfIMPACTSilver-CorpPres-May2021draft.pdf
IMPACTSilver-CorpPres-May2021draft.pdfjerry308821
 
Impact silver corp-pres-dec2021
Impact silver corp-pres-dec2021Impact silver corp-pres-dec2021
Impact silver corp-pres-dec2021AdnetNew
 
Impact Silver Corporate Presentation July 2021
Impact Silver Corporate Presentation July 2021Impact Silver Corporate Presentation July 2021
Impact Silver Corporate Presentation July 2021Adnet Communications
 
IMPACTSilver-CorpPres-Q2-Nov2022.pdf
IMPACTSilver-CorpPres-Q2-Nov2022.pdfIMPACTSilver-CorpPres-Q2-Nov2022.pdf
IMPACTSilver-CorpPres-Q2-Nov2022.pdfAdnet Communications
 
Impact Silver Corporate Presentation May 2023
Impact Silver Corporate Presentation May 2023Impact Silver Corporate Presentation May 2023
Impact Silver Corporate Presentation May 2023Adnet Communications
 
Impact Silver Corporate Presentation March 31 2023
Impact Silver Corporate Presentation March 31 2023Impact Silver Corporate Presentation March 31 2023
Impact Silver Corporate Presentation March 31 2023Adnet Communications
 
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdfIMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdfSelinaFay
 
Impact Silver Corporate Presentation May 2020
Impact Silver Corporate Presentation May 2020Impact Silver Corporate Presentation May 2020
Impact Silver Corporate Presentation May 2020Adnet Communications
 
Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020Adnet Communications
 
Impact silver corporate presentation-sept2020
Impact silver   corporate presentation-sept2020Impact silver   corporate presentation-sept2020
Impact silver corporate presentation-sept2020Adnet Communications
 
Ipt mar2021-pdac
Ipt mar2021-pdacIpt mar2021-pdac
Ipt mar2021-pdacAdnetNew
 
Impact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate PresentationImpact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate PresentationAdnet Communications
 
2019 05 30 Corporate Presentation Impact Silver
2019 05 30 Corporate Presentation Impact Silver2019 05 30 Corporate Presentation Impact Silver
2019 05 30 Corporate Presentation Impact SilverAdnet Communications
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 

Similar to IMPACTSilver-CorpPres-Mar2022-Q4.pdf (20)

IMPACTSilver-CorpPres-May2021draft.pdf
IMPACTSilver-CorpPres-May2021draft.pdfIMPACTSilver-CorpPres-May2021draft.pdf
IMPACTSilver-CorpPres-May2021draft.pdf
 
Impact silver corp-pres-dec2021
Impact silver corp-pres-dec2021Impact silver corp-pres-dec2021
Impact silver corp-pres-dec2021
 
Impact Silver Corporate Presentation July 2021
Impact Silver Corporate Presentation July 2021Impact Silver Corporate Presentation July 2021
Impact Silver Corporate Presentation July 2021
 
IMPACTSilver-CorpPres-Q2-Nov2022.pdf
IMPACTSilver-CorpPres-Q2-Nov2022.pdfIMPACTSilver-CorpPres-Q2-Nov2022.pdf
IMPACTSilver-CorpPres-Q2-Nov2022.pdf
 
Impact Silver Corporate Presentation May 2023
Impact Silver Corporate Presentation May 2023Impact Silver Corporate Presentation May 2023
Impact Silver Corporate Presentation May 2023
 
Impact Silver Corporate Presentation March 31 2023
Impact Silver Corporate Presentation March 31 2023Impact Silver Corporate Presentation March 31 2023
Impact Silver Corporate Presentation March 31 2023
 
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdfIMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
 
20230901-IPT-PPT.pdf
20230901-IPT-PPT.pdf20230901-IPT-PPT.pdf
20230901-IPT-PPT.pdf
 
20230701-IPT-PPT.pdf
20230701-IPT-PPT.pdf20230701-IPT-PPT.pdf
20230701-IPT-PPT.pdf
 
2023-11-01-IPT-PPT.pdf
2023-11-01-IPT-PPT.pdf2023-11-01-IPT-PPT.pdf
2023-11-01-IPT-PPT.pdf
 
Impact Silver Corporate Presentation May 2020
Impact Silver Corporate Presentation May 2020Impact Silver Corporate Presentation May 2020
Impact Silver Corporate Presentation May 2020
 
Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020
 
Impact silver corporate presentation-sept2020
Impact silver   corporate presentation-sept2020Impact silver   corporate presentation-sept2020
Impact silver corporate presentation-sept2020
 
Ipt mar2021-pdac
Ipt mar2021-pdacIpt mar2021-pdac
Ipt mar2021-pdac
 
Impact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate PresentationImpact Silver January 2020 Corporate Presentation
Impact Silver January 2020 Corporate Presentation
 
Nov2019 ipt
Nov2019 iptNov2019 ipt
Nov2019 ipt
 
Aug2019 ipt-final
Aug2019 ipt-finalAug2019 ipt-final
Aug2019 ipt-final
 
Presentation
PresentationPresentation
Presentation
 
2019 05 30 Corporate Presentation Impact Silver
2019 05 30 Corporate Presentation Impact Silver2019 05 30 Corporate Presentation Impact Silver
2019 05 30 Corporate Presentation Impact Silver
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 

More from AdnetNew

Strategic Resources - Corporate Presentation December 2023
Strategic Resources - Corporate Presentation December 2023Strategic Resources - Corporate Presentation December 2023
Strategic Resources - Corporate Presentation December 2023AdnetNew
 
Silver One Corporate Presentation - March 2023
Silver One Corporate Presentation - March 2023Silver One Corporate Presentation - March 2023
Silver One Corporate Presentation - March 2023AdnetNew
 
Q4 2022 Conference Call Presentation FINAL (updated).pdf
Q4 2022 Conference Call Presentation FINAL (updated).pdfQ4 2022 Conference Call Presentation FINAL (updated).pdf
Q4 2022 Conference Call Presentation FINAL (updated).pdfAdnetNew
 
Clean Air Metals - Corporate Presentation - feb2023.pdf
Clean Air Metals - Corporate Presentation - feb2023.pdfClean Air Metals - Corporate Presentation - feb2023.pdf
Clean Air Metals - Corporate Presentation - feb2023.pdfAdnetNew
 
January PP 2023 short_V2.FINAL.pdf
January PP 2023 short_V2.FINAL.pdfJanuary PP 2023 short_V2.FINAL.pdf
January PP 2023 short_V2.FINAL.pdfAdnetNew
 
Lundin Gold_Corporate Presentation (new) Renmark August.pdf
Lundin Gold_Corporate Presentation (new) Renmark August.pdfLundin Gold_Corporate Presentation (new) Renmark August.pdf
Lundin Gold_Corporate Presentation (new) Renmark August.pdfAdnetNew
 
Calibre Investor Presentation July 2022 FINAL.pdf
Calibre Investor Presentation July 2022 FINAL.pdfCalibre Investor Presentation July 2022 FINAL.pdf
Calibre Investor Presentation July 2022 FINAL.pdfAdnetNew
 
Calibre Investor Presentation May 2022 Final.pdf
Calibre Investor Presentation May 2022 Final.pdfCalibre Investor Presentation May 2022 Final.pdf
Calibre Investor Presentation May 2022 Final.pdfAdnetNew
 
COPR_IR_17May2022_FINAL3.pdf
COPR_IR_17May2022_FINAL3.pdfCOPR_IR_17May2022_FINAL3.pdf
COPR_IR_17May2022_FINAL3.pdfAdnetNew
 
Ero Copper - GS HY Conference vF2.pdf
Ero Copper - GS HY Conference vF2.pdfEro Copper - GS HY Conference vF2.pdf
Ero Copper - GS HY Conference vF2.pdfAdnetNew
 
LUG Q1 2022 Conf Call v5.pdf
LUG Q1 2022 Conf Call v5.pdfLUG Q1 2022 Conf Call v5.pdf
LUG Q1 2022 Conf Call v5.pdfAdnetNew
 
Bmo presentation final-feb28-2022
Bmo presentation   final-feb28-2022Bmo presentation   final-feb28-2022
Bmo presentation final-feb28-2022AdnetNew
 
20220223 calibre fy 2021 earnings and outlook deck (fin v2
20220223 calibre fy 2021 earnings and outlook deck (fin v220220223 calibre fy 2021 earnings and outlook deck (fin v2
20220223 calibre fy 2021 earnings and outlook deck (fin v2AdnetNew
 
20220223 calibre fy 2021 earnings and outlook deck (fin
20220223 calibre fy 2021 earnings and outlook deck (fin20220223 calibre fy 2021 earnings and outlook deck (fin
20220223 calibre fy 2021 earnings and outlook deck (finAdnetNew
 
Lug q4 2021 conf call final
Lug q4 2021 conf call finalLug q4 2021 conf call final
Lug q4 2021 conf call finalAdnetNew
 
Clean air metals corporate presentation - full versio-jan27
Clean air metals   corporate presentation - full versio-jan27Clean air metals   corporate presentation - full versio-jan27
Clean air metals corporate presentation - full versio-jan27AdnetNew
 
Clean air metals corporate presentation - jan262022
Clean air metals   corporate presentation - jan262022Clean air metals   corporate presentation - jan262022
Clean air metals corporate presentation - jan262022AdnetNew
 
Clean air metals corporate presentation - full versio
Clean air metals   corporate presentation - full versioClean air metals   corporate presentation - full versio
Clean air metals corporate presentation - full versioAdnetNew
 
Clean air metals corporate presentation - full versio-dec-23-2021
Clean air metals   corporate presentation - full versio-dec-23-2021Clean air metals   corporate presentation - full versio-dec-23-2021
Clean air metals corporate presentation - full versio-dec-23-2021AdnetNew
 
Coyote sinter slides_final_2021-11-30
Coyote sinter slides_final_2021-11-30Coyote sinter slides_final_2021-11-30
Coyote sinter slides_final_2021-11-30AdnetNew
 

More from AdnetNew (20)

Strategic Resources - Corporate Presentation December 2023
Strategic Resources - Corporate Presentation December 2023Strategic Resources - Corporate Presentation December 2023
Strategic Resources - Corporate Presentation December 2023
 
Silver One Corporate Presentation - March 2023
Silver One Corporate Presentation - March 2023Silver One Corporate Presentation - March 2023
Silver One Corporate Presentation - March 2023
 
Q4 2022 Conference Call Presentation FINAL (updated).pdf
Q4 2022 Conference Call Presentation FINAL (updated).pdfQ4 2022 Conference Call Presentation FINAL (updated).pdf
Q4 2022 Conference Call Presentation FINAL (updated).pdf
 
Clean Air Metals - Corporate Presentation - feb2023.pdf
Clean Air Metals - Corporate Presentation - feb2023.pdfClean Air Metals - Corporate Presentation - feb2023.pdf
Clean Air Metals - Corporate Presentation - feb2023.pdf
 
January PP 2023 short_V2.FINAL.pdf
January PP 2023 short_V2.FINAL.pdfJanuary PP 2023 short_V2.FINAL.pdf
January PP 2023 short_V2.FINAL.pdf
 
Lundin Gold_Corporate Presentation (new) Renmark August.pdf
Lundin Gold_Corporate Presentation (new) Renmark August.pdfLundin Gold_Corporate Presentation (new) Renmark August.pdf
Lundin Gold_Corporate Presentation (new) Renmark August.pdf
 
Calibre Investor Presentation July 2022 FINAL.pdf
Calibre Investor Presentation July 2022 FINAL.pdfCalibre Investor Presentation July 2022 FINAL.pdf
Calibre Investor Presentation July 2022 FINAL.pdf
 
Calibre Investor Presentation May 2022 Final.pdf
Calibre Investor Presentation May 2022 Final.pdfCalibre Investor Presentation May 2022 Final.pdf
Calibre Investor Presentation May 2022 Final.pdf
 
COPR_IR_17May2022_FINAL3.pdf
COPR_IR_17May2022_FINAL3.pdfCOPR_IR_17May2022_FINAL3.pdf
COPR_IR_17May2022_FINAL3.pdf
 
Ero Copper - GS HY Conference vF2.pdf
Ero Copper - GS HY Conference vF2.pdfEro Copper - GS HY Conference vF2.pdf
Ero Copper - GS HY Conference vF2.pdf
 
LUG Q1 2022 Conf Call v5.pdf
LUG Q1 2022 Conf Call v5.pdfLUG Q1 2022 Conf Call v5.pdf
LUG Q1 2022 Conf Call v5.pdf
 
Bmo presentation final-feb28-2022
Bmo presentation   final-feb28-2022Bmo presentation   final-feb28-2022
Bmo presentation final-feb28-2022
 
20220223 calibre fy 2021 earnings and outlook deck (fin v2
20220223 calibre fy 2021 earnings and outlook deck (fin v220220223 calibre fy 2021 earnings and outlook deck (fin v2
20220223 calibre fy 2021 earnings and outlook deck (fin v2
 
20220223 calibre fy 2021 earnings and outlook deck (fin
20220223 calibre fy 2021 earnings and outlook deck (fin20220223 calibre fy 2021 earnings and outlook deck (fin
20220223 calibre fy 2021 earnings and outlook deck (fin
 
Lug q4 2021 conf call final
Lug q4 2021 conf call finalLug q4 2021 conf call final
Lug q4 2021 conf call final
 
Clean air metals corporate presentation - full versio-jan27
Clean air metals   corporate presentation - full versio-jan27Clean air metals   corporate presentation - full versio-jan27
Clean air metals corporate presentation - full versio-jan27
 
Clean air metals corporate presentation - jan262022
Clean air metals   corporate presentation - jan262022Clean air metals   corporate presentation - jan262022
Clean air metals corporate presentation - jan262022
 
Clean air metals corporate presentation - full versio
Clean air metals   corporate presentation - full versioClean air metals   corporate presentation - full versio
Clean air metals corporate presentation - full versio
 
Clean air metals corporate presentation - full versio-dec-23-2021
Clean air metals   corporate presentation - full versio-dec-23-2021Clean air metals   corporate presentation - full versio-dec-23-2021
Clean air metals corporate presentation - full versio-dec-23-2021
 
Coyote sinter slides_final_2021-11-30
Coyote sinter slides_final_2021-11-30Coyote sinter slides_final_2021-11-30
Coyote sinter slides_final_2021-11-30
 

Recently uploaded

AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...yordanosyohannes2
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfHenry Tapper
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxuzma244191
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...Amil baba
 
The Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng PilipinasThe Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng PilipinasCherylouCamus
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithAdamYassin2
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》rnrncn29
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 
PMFBY , Pradhan Mantri Fasal bima yojna
PMFBY , Pradhan Mantri  Fasal bima yojnaPMFBY , Pradhan Mantri  Fasal bima yojna
PMFBY , Pradhan Mantri Fasal bima yojnaDharmendra Kumar
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...First NO1 World Amil baba in Faisalabad
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarHarsh Kumar
 
government_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdfgovernment_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdfshaunmashale756
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companiesprashantbhati354
 
The AES Investment Code - the go-to counsel for the most well-informed, wise...
The AES Investment Code -  the go-to counsel for the most well-informed, wise...The AES Investment Code -  the go-to counsel for the most well-informed, wise...
The AES Investment Code - the go-to counsel for the most well-informed, wise...AES International
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHenry Tapper
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Commonwealth
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 

Recently uploaded (20)

AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptx
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
 
The Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng PilipinasThe Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng Pilipinas
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam Smith
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 
PMFBY , Pradhan Mantri Fasal bima yojna
PMFBY , Pradhan Mantri  Fasal bima yojnaPMFBY , Pradhan Mantri  Fasal bima yojna
PMFBY , Pradhan Mantri Fasal bima yojna
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh Kumar
 
government_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdfgovernment_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdf
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companies
 
The AES Investment Code - the go-to counsel for the most well-informed, wise...
The AES Investment Code -  the go-to counsel for the most well-informed, wise...The AES Investment Code -  the go-to counsel for the most well-informed, wise...
The AES Investment Code - the go-to counsel for the most well-informed, wise...
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview document
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 

IMPACTSilver-CorpPres-Mar2022-Q4.pdf

  • 1. ` Purest Silver Publicly Listed Company +90% Revenues from Silver Corporate Presentation IPT:TSXV / ISVLF:US / IKL:FR 16 Years of Exploration & Production Success in Mexico MAR 2022
  • 2. Disclosure Forward-Looking Statements This presentation may contain certain “forward-looking” statements and information relating to IMPACT Silver Corp. (“IMPACT” or the “Company”) that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including but not limited to, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement. The factors that could cause actual results to differ materially include, but are not limited to, the following: general economic conditions; changes in financial markets; the impact of exchange rates; political conditions and developments in countries in which the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company mines or hopes to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and efficiently staff the Company’s operations; the sufficiency of current working capital and the estimated cost and availability of funding for the continued exploration and development of the Company’s exploration properties. This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue reliance on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such future results, levels of activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy and completeness of these forward-looking statements. Cautionary Statement The Company’s decision to place a mine into production, expand a mine, make other production related decisions or otherwise carry out mining and processing operations, is largely based on internal non-public Company data and reports based on exploration, development and mining work by the Company’s geologists and engineers. The results of this work are evident in the discovery and building of multiple mines for the Company, and in the track record of mineral production and financial returns of the Company since 2006. Under NI43-101 the Company is required to disclose that it has not based its production decisions on NI43-101- compliant mineral resource or reserve estimates, preliminary economic assessments or feasibility studies, and historically such projects have increased uncertainty and risk of failure. NI 43-101 Qualified Person George Gorzynski, P. Eng., Vice President, Exploration and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the technical information in this presentation with the exception of the Capire project mineral resource estimate. Steven Ristorcelli, C.P.G. (U.S.A.), Principal Geologist for Mine Development Associates and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the Capire mineral resource estimate and directly related information. www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 2
  • 3. ESG. Silver Capital of World. IPT. • Largest silver producer in the world. – Strong geological data and past production records. Proven 500+ years area of history silver production. – Focus on ESG (Environmental, Social, Governance) – Staff is 99% local, job ops, adhering to high environmental standards. • Proximity to North America & ports to global customers www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 3 0.00 20.00 40.00 60.00 80.00 100.00 POLICY & MINING POTENTIAL INDEX 2020 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 INVESTMENT ATTRACTIVENESS 2020 MEXICO continues to rank near top of South America mining rich potential and investment attractiveness Re-forestation efforts Agave carbon offsets
  • 4. Royal Mines of Zacualpan 500+ Years of Production Production summary so far 11 MILLION silver produced since 2006 One of the purest silver producers with 90% of revenues from silver in Q1 2021 www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 4 457 349 636 824 750 834 621 683 726 950 953 908 744 664 647 634 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Silver Production Since Acquiring the Project in 2006 (000 oz) Located NW-SE of large silver epithermal belt of Mexico. NW from Taxco district
  • 5. $0.00 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20 $1.40 2015 - 2021 IMPACT Share Price Highly Leveraged to Silver Prices Silver vs IPT Share Price • One of the best leveraged silver plays in rising silver market – In 2016, 2019, and 2020’s recent silver rally, IMPACT’s share price generated significantly higher returns than holding silver bullion – Every $1 increment in silver prices represents direct increases to profit and value of ounces in ground www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 5 Jan 4 – Aug 2, 2016: 854% return Jan 4 – Aug 2, 2016: 50% return Jun 4 – July 30, 2019: 90% return Jun 4 – July 30, 2019: 12% return Mar 2 – July 26, 2020 149% return Mar 2 – July 26, 2020 37% return $0.00 $5.00 $10.00 $15.00 $20.00 $25.00 $30.00 $35.00 Silver Prices
  • 6. Royal Mines of Zacualpan Property Overview • 100% ownership of two contiguous mining districts covering 211 km² in south-central Mexico • A 3.5-hour drive southwest from Mexico City – Paved road access • Connected to a modern power grid with ample water supply and a skilled, 99% Mexican workforce www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 6 • 535 tpd Guadalupe Plant processing mineral from three underground mines (Guadalupe, San Ramon and Cuchara) and the Veta Negra open pit mine (all within close proximity) • 200 tpd Capire Pilot Plant is on care and maintenance – Most recently used to bulk test the processing of gold and copper feed from the Carlos Pacheco Zone
  • 7. Capital Structure Tickers TSXV:IPT, US:ISVLF, FR:IKL Share Price (Mar 22, 2022) C$0.60 52-Week Range C$0.43 – C$1.25 Shares Outstanding (basic) 143.8M Shares Outstanding (FD)* 161.7M Market Capitalization (basic) C$85.8M Cash & Cash Equivalents (C$M) C $22.4 M Debt (C$M) None Capital Structure 12 Month Share Price Performance Share Ownership Retail 70% Institutional Funds (Sprott, GR Asset, BCV, Commodity Discovery, EOP, & Crescat) 20% Management & Insiders 10% *Includes 5,185,000 options outstanding with a weighted average exercise price of C$0.55 and 30,504,322 warrants outstanding with a weighted average exercise price of C$0.36 Source: Stockwatch / Yahoo Finance Mar 2022 www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 7
  • 8. Summary of Operating Results Production by Metal Value (Q3 2021) www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 8 Q3 2021 2020 Q4 2020 Q4 2019 2019 2018 2017 Tonnes processed 145,458 140,069 40,815 36,528 140,878 173,217 194,266 Throughput (tonnes/day) 399 383 444 397 386 475 532 Average grade (g/t Ag) 159 172 166 182 173 159 172 Silver production (oz) 617,688 646,534 184,303 180,670 664,056 743,950 907,848 Lead production (tonnes) 250 240 68 78 275 329 481 Gold production (oz) 295 321 92 113 376 469 540 Silver sales (oz) 633,952 633,357 156,885 182,670 667,628 733,267 907,848 Lead sales (tonnes) 213 225 53 76 287 344 481 Gold sales (oz) 283 293 69 112 367 489 540 Revenue per tonne of ore processed (US$) $119.04 $116.47 $131.87 $105.47 $92.82 $74.88 $79.62 Direct costs per tonne of ore processed (US$) $86.44 $80.82 $92.21 $82.60 $82.55 $83.63 $76.49 Mine-level EBITDA (C$M) $4.70 $2.70 $1.46 $0.87 $1.37 -$1.68 $0.47 Silver 90% Gold 5% Lead 5% • 2018 strategic change led to significant decline in operating costs per tonne and an improvement in average grade • Q3 2021 revenue per tonne continues to stay lofty as cost maintained around $90/tonne. Some delays due to exploration & developments at mine sites. Veta Negra • New small open pit operation which commenced production in September 2019 • 4 km northwest of the Guadalupe mill • 8% of Q4 2021 production San Ramon • Began production in 2004 • Current high- grade silver production from large vein at depth – San Ramon Deeps • 8% of Q4 2021 production Cuchara • Corridor of epithermal veins linking new and legacy mines • Production is from medium grade epithermal silver and lead-zinc veins • 27% of Q4 2021 production Guadalupe • Historic producer located beside Guadalupe mill • Epithermal silver-lead- zinc veins • 57% of Q4 2021 production Ore Feed Mine Sources (Q3 2021)
  • 9. Royal Mines of Zacualpan Prolific History of High-Grade Silver Mining • One of the oldest mining districts in the Americas – Almost 500 years of recorded mining history • IMPACT’s exploration work has catalogued over 5,000 old mine workings and 42 historic processing plants, indicating extensive historical mining, large exploration potential and forming an invaluable database for modern and effective exploration • Taxco has historical records of over 300 million ounces silver produced. (South of IMPACT projects) Nombre de Dios La Cadena La Zorra El Calvario La Fortuna Some of the 42 historic processing plants in the Zacualpan District www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 9 Guadalupe Processing Plant • 535 TPD • Currently processing all ore for IPT • Running below capacity 400TPD Q1 2021 Capire Processing Plant • 200TPD • On care and maintenance since 2014 • Currently checking XRT process to lower cost
  • 10. Experienced Management & Board Frederick W. Davidson, CA, CPA President, CEO, Director • +35 years of mining experience, including holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines. Former CEO of Energold Drilling Corp. and CFO of TOTAL Energold (a partially owned subsidiary of TOTAL Oil of France with oil, gas and gold production) • Former Director of Wheaten River Minerals (acquired by Goldcorp in 2014 for $2.4 billion) • MBA from TUBC and CA, CPA George Gorzynski, P. Eng. VP Exploration, Director • +37 years of exploration and mining experience • Director of Fireweed Zinc Ltd. Jerry Huang, MBA CFO • +12 years of venture capital markets experience raising over $120 million for various small cap companies. • Former advisor for HNW at CIBC, director of gold/copper and lithium projects on TSXV, banking advisory roles. • MBA from University of British Columbia and CPA PEP from CPABC. Armando Alexandri, P.Eng COO • +35 years of mining experience in underground and open-pit mines as well as flotation and cyanidation processing plants Victor Tanaka, P. Geo Director • +40 years of exploration experience • Current Director of Fjordland Exploration, Westhaven Ventures and Consolidated Woodjam Copper • Held senior positions at Asamera Inc., Freeport McMoRan Gold Corp., Cominco Ltd., and Aber Resources Richard Mazur, P. Geo, MBA Director • President and CEO of Forum Energy Metals Corp. and CEO of Alto Ventures Ltd. • Held senior positions at Canamax Resources and IMPACT Minerals Peter Tredger, P. Eng., MBA Director • Former Senior Officer of Thompson Creek Metals Company • Held senior positions at Glencairn Gold (now B2Gold) and Wheaton River Minerals (now Goldcorp) Robert W. Lishman Director • +40 years of investment industry and business experience with strong portfolio management and financing expertise • Currently Managing General Partner of investment fund Yellowjacket, LP www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 10
  • 11. Significant Exploration Upside • Exploration continues to evaluate the 5,000+ historic mine workings located on hundreds of mapped veins (red lines on map) on an extensive mineralizing system • Area 1: Brownfields exploration for silver veins within close trucking distance to the Guadalupe plant; area includes the San Ramon, Cuchara and Veta Negra mines • Area 2: Early stage exploration for Zacualpan southeast extension silver veins • Area 3: Brownfields and greenfields exploration on silver-rich VMS and vein targets; includes the open pit Capire mine • Area 4: Brownfields and greenfields exploration on copper-gold and silver vein targets www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 11
  • 12. Area 1 Guadalupe to Alacran Exploration Area • Fertile exploration area between two large historic Mines • The Guadalupe Mine to the north produced over 10 million ounces silver between 1972-1991, and much more since first recorded production in 1529; Sept 2018 drill results: – 2.61 m of 1,263 g/t Ag & 8.82 m of 306 g/t Ag • The Alacran Mine to the south is marked by extensive underground workings with historic reports of very high-grade (1,000’s of g/t) silver and gold mining beginning before 1527 Guadalupe Mine +10M oz Ag historic production Drill Targets Guadalupe Deeps El Paso San Ignacio Remedios El Progresso Alacran Deeps Alacran Mine Large historic Ag/Au production 1,200 m zone Alacran Deeps Drill Target www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 12
  • 13. 13 Area 1: Alacran Gold-Silver Mine Two historic reports indicate super high grades Lewis (1920) “…At enriched places, lenses of silver sulphides are found, 30 to 70cm. wide, the ores carrying 20 to 60 kg. silver per metric tonne. The wall- rock for a short distance is also impregnated to the point of making good mill-ore. The unenriched spaces between the ore bodies usually assay 400 to 500 gm. Silver. All the high-grade ores carry gold, with a characteristic accompaniment of iron and copper sulphides……” Garcia (1921) reports “The Alacran Mine employed 500 workers who produced 8 to 10 tonnes <per day> of direct shipping ore assaying 35kg/tonne which was exported to Penoles in Toluca and 40 tonnes <per day> of less than 10kg/tonne which was sent to the <Cuchara> flotation plant. Do the math: 50 tpd operation producing about 7 million ounces silver per year 13
  • 14. Area 2 Tasco North & Pregones Exploration Areas • Area is synonymous with silver in Mexico – Taxco is the most famous silver mine in Mexico • To the north, IMPACT’s early exploration efforts have discovered numerous old mines and old processing plants • Taxco district still owned & explored by majors (Grupo Mexico.) Old Mines Old Processing Plants Epithermal silver veins www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 14
  • 15. Area 3 Capire: Potential Quick Expansion of Production • 43-101openpitresourceof4.5MozSilver@79g/t+lead-zincinopenpitwithexpansion/explorationupside • 200tpdpilotplantoncare&maintenance; turnkeytorestartwithrisingsilverprices • Infrastructurepre-builtfor1,000tpdplant • VMSsilver-lead-zinc(-gold-copper) deposit;otherVMSprospectswithupsidenearby • XRT sorting technology has potential to materially reduce operating costs and extend mine life • 30k tonnes produced, 12 million oz silver eq 43-101 resource. Ability to fast-track production 200 tpd pilot plant Open-pit 3D model of planned open-pit Mill Tailings Facility Capire open-pit 3D model Capire open-pit mine and pilot plant on VMS Ag-Pb-Zn deposit (currently on standby) www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 15
  • 16. Area 4 Chapanial Gold Discovery • Located 7 km west of the Guadalupe processing plant& southwest of Veta Negra Mine • Sampling results from 2020 exploration include: – 97.5 g/t Au and 97.9 g/t Ag over a true width of 0.8 m – 18.25 g/t Au and 75.4 g/t Ag over a true width of 0.2 m • Close to historic Chapanial mine which produced on three levels over 45 m depth and along strike for 100 m • Vein is associated with a major structure which hosts a sulphide bearing polymictic breccia up to 8m in width • Many other veins and anomalies are currently being explored Chapanial Highlighted Channel Sampling Results Chapanial Norte Chapania Sur www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 16
  • 17. -23 -22 -1.6 0.5 10 -18 23 0.2 18 65 120 Americas Gold Silver Santa Cruz Silver Elephant Silverbear Silver Dollar Excellon IMPACT Great Panther Sierra Metals GoGold Endeavour 1 7 Market Capitalization (C$M) Working Capital (C $M) www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 17 Source: S&P Capital IQ and company filings May 2021 IPT – Undervalued Silver Miner Market Cap low despite higher Working Capital & Leveraged to Silver 34 31 37 85 25 139 143 233 268 893 1050 Silver Dollar Silver Elephant Silverbear IMPACT Excellon Santa Cruz Great Panther Americas Gold Silver Sierra Metals GoGold Endeavour % Revenue to Silver 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0%100.0% Americas Gold Silver Santa Cruz Silver Elephant Silverbear Silver Dollar Excellon IMPACT Great Panther Sierra Metals GoGold `
  • 18. Rapid Exploration to Mine Development Exploration and mine development process flowchart RESEARCH Compile old mines/ prospects from historic maps DRILLING Drilling in phases based on success MINE DEVELOPMENT Mine Planning, Permitting and Construction FIELD WORK Surface & underground sampling, mapping MINE PRODUCTION & CASH FLOW www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 18 • Preliminary test from Haylard Engineering for pre- mining treatment was positive – 20-30% reduction in cost per ounces • well-known that the crushing and grinding of ore consumes around 60 per cent of a mine’s operating and energy costs in addition to creating most of the greenhouse gas emissions Ongoing Cost Reduction through technology - XRT
  • 19. Why IMPACT Silver? www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 19 Thank you. Questions? inquiries@impactsilver.com Twitter: @impact_silver One of the purest play silver producers ~90% of revenues from silver in Q4 2021 Long-term, stable production Over the last 12 months, sold ~635K oz Ag and generated C$4.7 million in mine-level EBITDA Near-term development opportunity at Capire Expandable 200 tpd mill and open pit resource with XRT technology to lower cost and potential to increase resource District exploration 20,000 meters Hundreds of epithermal vein targets and >5,000 historic workings – several to be explored in 2022 Exciting new Gold- Copper Chapanial discovery Sampled 97.5 g/t Au and 97.9 g/t Ag over true width of 0.8 m
  • 20. Refurbishing Historic Infrastructure at Guadalupe • Refurbishing old assets and equipment – in this case the mine shaft and underground railroad to lower cost and speed up tonnage being hauled out of mine 20
  • 21. 21 Area 1: Alacran Gold-Silver Mine 1918-1926 Mining Areas Long Section 1.2+ km zone 21
  • 22. Technical App: Guadalupe (Pachuqueno) Mine • Over 5,000 underground workings, digitized maps from Sept 1989 22
  • 23. Technical App: Guadalupe area • Vein system overhead view • Sampling and drilling then determines an internal tonnage model which then moves the project to near- term production stage. 23
  • 24. Technical App: Long Section • IMPACT team visits projects and catalogues the opportunity. • Sampling and drilling then determines an internal tonnage model which then moves the project to near-term production stage. 24
  • 26. Photos • Refurbishing old assets and equipments – in this case mine shaft and railroad underground to lower cost and speed up tonnage being hauled out 26
  • 27. Veta Negra • Open pit low cost expansion potential • High grade and past major’s project (Penoles) • Already contributing to feed in Q1 2020 27
  • 28. Veta Negra Plan view • Plan view Sample average grade and widths • Example of how fast IPT team can explore, develop, and produce from vast amount of geological data 28
  • 29. XRT Discussions • Preliminary test from Haylard Engineering for pre-mining treatment was positive – 20-30% reduction in cost per ounces • well-known that the crushing and grinding of ore consumes around 60 per cent of a mine’s operating and energy costs in addition to creating most of the greenhouse gas emissions • X-ray transmission may be a good solution if your rock has differences in density, which usually translate to atomic density differences. X-ray transmission measures how many x-rays come through a particle because when different minerals are x- rayed, a difference in the attenuation of the mineral is found. 29
  • 30. XRT Steiner Facilities Cont.. • Example at MINSUR Peru’s large Tin operation, Osisko’s Cariboo, Fireweed, Renison tin, Sokamo Silver, Rambler Metals XRT Discussions • Added value: XRT sensor-based ore sorting is converting uneconomic waste material into economic ore, as material below the cut-off for the main plant can be treated with lower operating costs and converted into reserves. • Increased capacity in the main plant, from 2,950 tpd before implementation to today’s 3,200 tpd, as a result of the crushing operation at the XRT-sorting plant. • Significant improvement in the overall recovery in the main plant, from 90.5% to 92.5%. This is because sensor-based ore sorting rejects particles with very fine mineralized Cassiterite that is too small for detection - resulting in higher grade and size of mineralization. • Extended life-of-mine: today, about 24% of the feed to the sensor-based ore sorting plant is contributed by low grade ore from underground, which in the past would have been excluded for being below cut-off. • Elimination of liabilities through the treatment and proper disposal of 100% of the stockpile. • Decreased tailings disposal, as the sensor-based ore sorting system reduces the amount of waste by increasing the grade in the feed to the plant. 30