SlideShare a Scribd company logo
1 of 45
GOLLIS UNIVERSITY, BURAO CAMPUS
“Gollis University Empowers its Students as Professional Leaders Committed to Make a Positive
Difference
Faculty Of
Engineering
Department Of
Civil Engineering
PROJECT TITLE:- CENTRAL PRISON BUILDING
SUPERVISOR:- Eng Ibrahim A/rahman Dahir
GROUP MEMBERS
S. No.: Student Names: Reg. No.:
Mustafe Jama Baruud GUB/B07/CIV/002
Warda Ali Faacuul GUB/B07/CIV/007
Abdiqani Mohamed
Saeed
GUB/B07/CIV/001
Abdale Kamaal Osman GUB/B07/CIV/000
This is to certify that the following students:
ACKNOWLEDGMENT
 All praise is due to Allah the lord of the world, the beneficent the
merciful, and the most compassionate, the master of the Day of
Judgment who provided us this precious opportunity of the
university studies which in our homeland and facilitated for us to
write this as second project.
 Secondly, we appreciate our supervisors, Eng. Ibrahim
Abdirahman Daahir he has been great project supervisors.
1. CHAPTER (1) : INTRODUCTION
2. CHAPTER (2) : Architectural Drawing and Plans
3. CHAPTER (3) : STRUCTURAL DESIGN
4. CHAPTER (4) : COST ESTIMATION
5. CHAPTER (5): CONCRETE MIX DESING
6. Chapter (6) : SPECIFICATION OF THIS BUILDING
7. CHAPTER (7) : SCHEDULE OF THE PROJECT WORK
8. CHAPTER(8) : CONTRACT AND CONTRACT AGREEMENT
 TABLE CONTENT
The word prison traces its origin to the Old French word "prisoun,"
which means to captivity or imprisonment. The Old French was a mix
of Celtics and Greco-Romans. Therefore, a prison is a facility where
captured criminals are held as punishment or where suspects are held
while awaiting their trial. The earliest records of prisons date back to
1000BC, in the early historical civilizations of Mesopotamia and Egypt.
These early prisons were mostly detention centers built as
underground dungeons.
Ch 1:INTRODUCTION
OBJECTIVES OF THE PROJEC
1.3.1 General Objective
The main objective of the project is to develop an
architectural design of Central prison in Burao City.
1.3.2 Specific Objectives
The following are the Specific Objectives of the study:
To collect and analyze data that will help in determining the
user and the building requirement of the prison facility.
To design a model of the prison building.
To assess the cause of poor prisons structure in Burao.
To evaluate the cost required for the building of prison.
. SIGNIFICANCE OF THE PROJECT
• Due to the fact that there are laws breakers in Burao City and Somaliland at
large, there is need of having better and high quality prison buildings.
These buildings need to have all the modern facilities that will make them a
better correction environment, something which many of the current
prison buildings are still lacking. Because of the above stated factors and
other reasons, it thus provided the project developers with the motive to
go ahead to develop this prison facility architectural design.
.
 Main project is central prison building.
Area of the project is 100m*60m.
 Floors of project is G+1
Location of the project is center of Burao Togdher Somaliland.
Overview
 project contains
a) Main building G+1
b) Mosque
c) Weapon store
d) cafeteria
e) Officer department G+1
f) Health department
g) Security check up
In this chapter.
o We discuss the architectural aspect of the project, and it contains
several plans and designs that covers the whole parts of the project,
such as;
CH.2: ARCHITECTURAL DESIGN
 Architectural 2D part
 plans
 Sections
 Footing and foundation plan
Architectural 3D view
Site plan
PLANS
PLANS
Sections
Section A-A
Section B-B
Front view
Side view
Skeleton 1
Skeleton 2
foundation
 Excavation plan
 footing plan
Electricity plan
Doors schedule
Windows schedule
Architectural 3D view
Main front view
Right side view
perspective view
CH.3: STRUCTURAL DESIGN
ITEMS DESCRIPTIONS NO DIAMETER SPACING
1 Slab
2 Mid span
X . Direction
Y . direction
#12
#12
200 c/c
200 c/c
3 Extra bars at top near the
support
X . Direction
Y . Direction
#12
#12
300 c/c
300 c/c
4 BEAM
Main bars 7 #20
Hungers bars 2 #10
Stirrups bars #10 200 c/c
Cont……………..
5 COLUMN
Main bars
Ties
8 #20
#8 300 c/c
6 FOOTING
Main bars
X . Direction
Y . Direction
7
7
#18
#18
200 c/c
200 c/c
7 GROUND BEAM
8 Main bars
Hungers
5
2
#18
#10
9 Stirrups #8 150 c/c
Cont……………
10 STAIRCASE
11 Main bars 21 #14 150 c/c
12 Distribution
bars
#8 150 c/c
13 Extra bars 5 #18 200 c/c
DESIGN OF SLAB
DESIGN OF BEAM
design of footing
design of column
design of column, staircase and footing
CH.4 : COST ESTIMATION
NO DESCRIPTION FLOORS SECTIONS COST
1 Main building G+1 1 $ 1,023,121.72
2 Floor officers
G+1 1 $ 50,400
3 Weapon store … 1 $ 33,600
4 Mosque 1 $ 23,040
5 hospital 1 $ 20,800
6 Cafeteria …. 1 $ 11400
7 Total project $ 1,240,482.2
CH.5: CONCRETE MIX DESIGN
M20 concrete mix has a mix
proportion of 1:1.5:3
 Cement, [ 1]
 Sand , [1.5]
 Aggregate ,[ 3]
grade of concrete is M20
 M20 – M represents Mix and
[20N/mm2 ] is the
characteristic compressive
strength of concrete
 Grade of steel fy = 415mpa
CH.6: SPECIFICATIONS
specifications is clearly specify
Design and drawing
Labor employment
Materials to be used
Construction method
Equipment’s used
CHAPTER 7: SCHEDULE OF THE PROJECT WORK
• Construction of project shall be completed in 412 days.
CONCLUSION
• Our project name is G+1 of project Building. The total of the Main building
is 50m*36m All details that are needed in our building are clarified in our
drawings. Views both 2D and 3D are also mentioned. All analysis and
design in our project is done by hand calculation. Frames of our building
such as beam, column, slab, foundation and staircase are designed and
checked for their safety and finally our structure is safe. The bill of quantity
of our structure is done by using the Somaliland local unit price.
REFERENCES
• REFERANCED: https://www.britannica.com/topic/prison
• REFENACED:https://www.rasmussen.edu/degrees/justice-
studies/blog/different-types-of-prisons/
• REFENACED: https://elawtalk.com/types-of-prisoners/
• REFENACED: Design of Reinforced Concrete Structures
(P.DAYARATNAM) Third Edition
• Is: 456-2000
• Ramamrutham S. 2011 Design of REINFORCED CONCTETE STRUCTURS
(seventeenth Revision)
• C.Eng.P.E., G. Nawy, Dr. Edward 2000Concrete construction handbook
2nd edition.
•
13/09/2022
10:30-11:00

More Related Content

Similar to final presentation-1 - Copy.pptx

Project brief
Project brief Project brief
Project brief PK146
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptSOUMITRAMUDI
 
Project brief
Project brief Project brief
Project brief Haziq1511
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoSite Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoChin Kian Hon
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUPKeshav Seewraz
 
Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)TeohPeiNi
 
Constructionmethodologyandprojectmanagementreport
ConstructionmethodologyandprojectmanagementreportConstructionmethodologyandprojectmanagementreport
ConstructionmethodologyandprojectmanagementreportDivyesh Mungara
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...Angeline KH
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1DavidJPCChai
 
Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Macy Khor
 
ICI Project Brief
ICI Project BriefICI Project Brief
ICI Project BriefJ-Sern Phua
 
Ici j sern unit employer brief v2
Ici j sern unit employer brief v2Ici j sern unit employer brief v2
Ici j sern unit employer brief v2Arthur Wilson
 
M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1Jing Chuang
 
project Mangement
project Mangementproject Mangement
project MangementAlex Jensen
 

Similar to final presentation-1 - Copy.pptx (20)

Project brief
Project brief Project brief
Project brief
 
Estimation_and_Costing.ppt
Estimation_and_Costing.pptEstimation_and_Costing.ppt
Estimation_and_Costing.ppt
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
01ADNAN Mtech
01ADNAN Mtech01ADNAN Mtech
01ADNAN Mtech
 
Project background
Project backgroundProject background
Project background
 
Project brief
Project brief Project brief
Project brief
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Site Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia XaoSite Visit Report - Chin Kian Hon & Chong Gia Xao
Site Visit Report - Chin Kian Hon & Chong Gia Xao
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUP
 
Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)Site visit report (Soo Bee Chien & Teoh Pei Ni)
Site visit report (Soo Bee Chien & Teoh Pei Ni)
 
DETAILED CV - Aug 16 v3
DETAILED CV - Aug 16 v3DETAILED CV - Aug 16 v3
DETAILED CV - Aug 16 v3
 
Constructionmethodologyandprojectmanagementreport
ConstructionmethodologyandprojectmanagementreportConstructionmethodologyandprojectmanagementreport
Constructionmethodologyandprojectmanagementreport
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)
 
ICI Project Brief
ICI Project BriefICI Project Brief
ICI Project Brief
 
Ici j sern unit employer brief v2
Ici j sern unit employer brief v2Ici j sern unit employer brief v2
Ici j sern unit employer brief v2
 
M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1M1 CTec1 BMat Rep1
M1 CTec1 BMat Rep1
 
project Mangement
project Mangementproject Mangement
project Mangement
 
madhu
madhumadhu
madhu
 

Recently uploaded

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 

Recently uploaded (20)

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 

final presentation-1 - Copy.pptx

  • 1.
  • 2. GOLLIS UNIVERSITY, BURAO CAMPUS “Gollis University Empowers its Students as Professional Leaders Committed to Make a Positive Difference Faculty Of Engineering Department Of Civil Engineering PROJECT TITLE:- CENTRAL PRISON BUILDING SUPERVISOR:- Eng Ibrahim A/rahman Dahir
  • 3. GROUP MEMBERS S. No.: Student Names: Reg. No.: Mustafe Jama Baruud GUB/B07/CIV/002 Warda Ali Faacuul GUB/B07/CIV/007 Abdiqani Mohamed Saeed GUB/B07/CIV/001 Abdale Kamaal Osman GUB/B07/CIV/000 This is to certify that the following students:
  • 4. ACKNOWLEDGMENT  All praise is due to Allah the lord of the world, the beneficent the merciful, and the most compassionate, the master of the Day of Judgment who provided us this precious opportunity of the university studies which in our homeland and facilitated for us to write this as second project.  Secondly, we appreciate our supervisors, Eng. Ibrahim Abdirahman Daahir he has been great project supervisors.
  • 5. 1. CHAPTER (1) : INTRODUCTION 2. CHAPTER (2) : Architectural Drawing and Plans 3. CHAPTER (3) : STRUCTURAL DESIGN 4. CHAPTER (4) : COST ESTIMATION 5. CHAPTER (5): CONCRETE MIX DESING 6. Chapter (6) : SPECIFICATION OF THIS BUILDING 7. CHAPTER (7) : SCHEDULE OF THE PROJECT WORK 8. CHAPTER(8) : CONTRACT AND CONTRACT AGREEMENT  TABLE CONTENT
  • 6. The word prison traces its origin to the Old French word "prisoun," which means to captivity or imprisonment. The Old French was a mix of Celtics and Greco-Romans. Therefore, a prison is a facility where captured criminals are held as punishment or where suspects are held while awaiting their trial. The earliest records of prisons date back to 1000BC, in the early historical civilizations of Mesopotamia and Egypt. These early prisons were mostly detention centers built as underground dungeons. Ch 1:INTRODUCTION
  • 7. OBJECTIVES OF THE PROJEC 1.3.1 General Objective The main objective of the project is to develop an architectural design of Central prison in Burao City. 1.3.2 Specific Objectives The following are the Specific Objectives of the study: To collect and analyze data that will help in determining the user and the building requirement of the prison facility. To design a model of the prison building. To assess the cause of poor prisons structure in Burao. To evaluate the cost required for the building of prison.
  • 8. . SIGNIFICANCE OF THE PROJECT • Due to the fact that there are laws breakers in Burao City and Somaliland at large, there is need of having better and high quality prison buildings. These buildings need to have all the modern facilities that will make them a better correction environment, something which many of the current prison buildings are still lacking. Because of the above stated factors and other reasons, it thus provided the project developers with the motive to go ahead to develop this prison facility architectural design.
  • 9. .  Main project is central prison building. Area of the project is 100m*60m.  Floors of project is G+1 Location of the project is center of Burao Togdher Somaliland. Overview  project contains a) Main building G+1 b) Mosque c) Weapon store d) cafeteria e) Officer department G+1 f) Health department g) Security check up
  • 10. In this chapter. o We discuss the architectural aspect of the project, and it contains several plans and designs that covers the whole parts of the project, such as; CH.2: ARCHITECTURAL DESIGN  Architectural 2D part  plans  Sections  Footing and foundation plan Architectural 3D view
  • 31. CH.3: STRUCTURAL DESIGN ITEMS DESCRIPTIONS NO DIAMETER SPACING 1 Slab 2 Mid span X . Direction Y . direction #12 #12 200 c/c 200 c/c 3 Extra bars at top near the support X . Direction Y . Direction #12 #12 300 c/c 300 c/c 4 BEAM Main bars 7 #20 Hungers bars 2 #10 Stirrups bars #10 200 c/c
  • 32. Cont…………….. 5 COLUMN Main bars Ties 8 #20 #8 300 c/c 6 FOOTING Main bars X . Direction Y . Direction 7 7 #18 #18 200 c/c 200 c/c 7 GROUND BEAM 8 Main bars Hungers 5 2 #18 #10 9 Stirrups #8 150 c/c
  • 33. Cont…………… 10 STAIRCASE 11 Main bars 21 #14 150 c/c 12 Distribution bars #8 150 c/c 13 Extra bars 5 #18 200 c/c
  • 38. design of column, staircase and footing
  • 39. CH.4 : COST ESTIMATION NO DESCRIPTION FLOORS SECTIONS COST 1 Main building G+1 1 $ 1,023,121.72 2 Floor officers G+1 1 $ 50,400 3 Weapon store … 1 $ 33,600 4 Mosque 1 $ 23,040 5 hospital 1 $ 20,800 6 Cafeteria …. 1 $ 11400 7 Total project $ 1,240,482.2
  • 40. CH.5: CONCRETE MIX DESIGN M20 concrete mix has a mix proportion of 1:1.5:3  Cement, [ 1]  Sand , [1.5]  Aggregate ,[ 3] grade of concrete is M20  M20 – M represents Mix and [20N/mm2 ] is the characteristic compressive strength of concrete  Grade of steel fy = 415mpa
  • 41. CH.6: SPECIFICATIONS specifications is clearly specify Design and drawing Labor employment Materials to be used Construction method Equipment’s used
  • 42. CHAPTER 7: SCHEDULE OF THE PROJECT WORK • Construction of project shall be completed in 412 days.
  • 43. CONCLUSION • Our project name is G+1 of project Building. The total of the Main building is 50m*36m All details that are needed in our building are clarified in our drawings. Views both 2D and 3D are also mentioned. All analysis and design in our project is done by hand calculation. Frames of our building such as beam, column, slab, foundation and staircase are designed and checked for their safety and finally our structure is safe. The bill of quantity of our structure is done by using the Somaliland local unit price.
  • 44. REFERENCES • REFERANCED: https://www.britannica.com/topic/prison • REFENACED:https://www.rasmussen.edu/degrees/justice- studies/blog/different-types-of-prisons/ • REFENACED: https://elawtalk.com/types-of-prisoners/ • REFENACED: Design of Reinforced Concrete Structures (P.DAYARATNAM) Third Edition • Is: 456-2000 • Ramamrutham S. 2011 Design of REINFORCED CONCTETE STRUCTURS (seventeenth Revision) • C.Eng.P.E., G. Nawy, Dr. Edward 2000Concrete construction handbook 2nd edition. •