Definition
A semi-submersible (semi submerged ship) is a specialized
marine vessel with legs/pontoons for buoyancy to float,
and weight to keep the structure upright, which used in
a number of specific offshore roles as,
• offshore drilling rigs,
• heavy lift cranes,
• oil production platforms,
• safety vessels.
They are designed with good stability and sea keeping
characteristics.
Semi-Submersible
• Exploratory and production purposes;
• floating structure;
• towed to the site,
• ballasted and moored;
• large vertical columns connected to large
pontoons/legs,
• columns support deck structure and equipment.
Semi-Submersible
• Water depth 200m to 3000m,
• Offers large deck space,
• Exceptional stability and sea keeping,
• Withstand rough waters,
• Highly flexible and efficient,
• Can be moved from place to place.
Applications
• Mobile offshore drilling units (MODU) or
Semi–Submersible Drilling Units (SSDU)
• Semi-Submersible crane vessels (SSCV)
• Offshore support vessels (OSV)
• Offshore production platforms
Semi-Submersible Drilling Units
(SSDU)
Based on the way the rig is submerged in the
water, there are two main types
• Bottle-type semi-subs and
• Column-stabilized semi-subs
Bottle-type semi-subs
• Hull below the drilling deck is Bottle-shaped.
• Hull can be submerged by ballasting.
• Originally bottles below the rig were completely
submerged, resting on ocean floor.
• As time progressed bottles were only partially
submerged.
• Offers exceptional stability for drilling operations.
Column-Stabilized semi-subs
• More popular design
• Two horizontal hulls are connected via cylindrical
or rectangular columns to the drilling deck above
the water
• Smaller diagonal columns are used to support the
structure
• Mooring lines and dynamic positioning help to
keep the semi-sub on location
Mobile offshore drilling units (MODU)
Semi–Submersible Drilling Units SSDU classified
by IMO
Semi-Submersible crane vessels (SSCV)
• De-ballasted during transit; only part of the
lower hull is submerged.
• The vessel Ballasted during lifting operations.
• High stability allows them to lift extreme high
loads
Semi-Submersible crane vessels (SSCV)
Offshore support vessels (OSV)
Semi-submersibles are used as number of offshore
support vessels because of their good stability, large
deck areas, and variable deck load (VDL).
 Construction support vessel,
 Diving Support Vessel (DSV),
 Offshore Safety support vessel,
 Offshore accommodation platform,
 Offshore Multiservice Vessel (MSV),
E.g.- Ocean Odyssey – Converted semi-submersible
drilling rig used as a rocket launch pad.
Offshore production platforms
• When oil fields were first developed in offshore
locations, drilling semi-submersibles were converted
for use as combined drilling and production platforms.
• As progressed to deeper water and harsh
environments, purpose-built production semi-
submersible platforms were designed.
• Offers very stable and cost effective platforms.
• Mostly converted semi-submersible vessels.
Mooring patterns and Dynamic
positioning
• Spread Mooring patterns and Dynamic positioning
used to keep the floating rig in place
• Mooring is similar to multiple anchors
• Chosen depending on shape of unit and sea conditions
• Dynamic positioning uses different motors or
propulsion units to counteract motions of water
• Dynamic positioning system is guided by telemetry
signals from beacons, satellite information and the
angular movements of a cable.
Semi–Submersible Drilling Units – SSDU
Advantages Disadvantages
1. Semi-submersibles can achieve good
(small) motion response and, therefore,
can be more easily positioned over a well
template for drilling.
2. Most stable of any floating rig.
3. Semi-submersibles allow for a large
number of flexible risers.
4. Provides large deck area.
5. Transportation from location to location
is easy.
6. Can be reused and converted to other
support vessels.
1. High initial and operating costs.
2. Pipeline infrastructure or other means is
required to export produced oil.
3. Building schedules for semi-submersibles
are usually longer than jack-up rigs.
4. Limited deck load (low reserve
buoyancy).
5. Structural fatigue.
6. Expensive to move large distances.
7. Limited dry-docking facilities available.
8. Difficult to handle mooring systems and
riser in rough seas.
Thank You
Questions?

More Related Content

What's hot (20)

Overview of subsea production systems
Overview of subsea production systemsOverview of subsea production systems
Overview of subsea production systems
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentation
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Reservoir simulation study
Reservoir simulation study Reservoir simulation study
Reservoir simulation study
 
Casing Seat depth and Basic casing design lecture 4.pdf
Casing Seat depth and Basic casing design  lecture 4.pdfCasing Seat depth and Basic casing design  lecture 4.pdf
Casing Seat depth and Basic casing design lecture 4.pdf
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
How to build a platform
How to build a platformHow to build a platform
How to build a platform
 
Well Stimulation
Well StimulationWell Stimulation
Well Stimulation
 
Type of rig
Type of rigType of rig
Type of rig
 
Q921 de1 lec 4 v1
Q921 de1 lec 4 v1Q921 de1 lec 4 v1
Q921 de1 lec 4 v1
 
Mudline Suspension (MLS)
Mudline Suspension (MLS)Mudline Suspension (MLS)
Mudline Suspension (MLS)
 
Sand control
Sand controlSand control
Sand control
 
Drillships
DrillshipsDrillships
Drillships
 
Wellhead
WellheadWellhead
Wellhead
 
Offshore oil platform ppt
Offshore oil platform  pptOffshore oil platform  ppt
Offshore oil platform ppt
 
Cementation
CementationCementation
Cementation
 
Introduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface FacilitiesIntroduction to Offshore Oil and Gas Surface Facilities
Introduction to Offshore Oil and Gas Surface Facilities
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technology
 
Spar Platforms
Spar PlatformsSpar Platforms
Spar Platforms
 

Viewers also liked

Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and componentsChoong KW
 
State Of The Art Staal Versterkingen Bij Bestaande Bruggen 01120211
State Of The Art   Staal Versterkingen Bij Bestaande Bruggen 01120211State Of The Art   Staal Versterkingen Bij Bestaande Bruggen 01120211
State Of The Art Staal Versterkingen Bij Bestaande Bruggen 01120211Sander den Blanken
 
[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructions[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructionsSyaifullah Hamim
 
C2VSim Workshop 6 - Closing
C2VSim Workshop 6 - ClosingC2VSim Workshop 6 - Closing
C2VSim Workshop 6 - ClosingCharlie Brush
 
LOTO Case Study - Offshore Rig - Project Sales Corp, India
LOTO Case Study - Offshore Rig - Project Sales Corp, IndiaLOTO Case Study - Offshore Rig - Project Sales Corp, India
LOTO Case Study - Offshore Rig - Project Sales Corp, IndiaProject Sales Corp
 
Explore new corrosion control technologies
Explore new corrosion control technologiesExplore new corrosion control technologies
Explore new corrosion control technologiesRobin Wright
 
Offshore Oil Drilling
Offshore Oil DrillingOffshore Oil Drilling
Offshore Oil DrillingGrace Henry
 
Offshore oil rigs
Offshore oil rigsOffshore oil rigs
Offshore oil rigsBoun Yadyok
 

Viewers also liked (18)

Slammimng & Dek Wetness
Slammimng & Dek WetnessSlammimng & Dek Wetness
Slammimng & Dek Wetness
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
 
State Of The Art Staal Versterkingen Bij Bestaande Bruggen 01120211
State Of The Art   Staal Versterkingen Bij Bestaande Bruggen 01120211State Of The Art   Staal Versterkingen Bij Bestaande Bruggen 01120211
State Of The Art Staal Versterkingen Bij Bestaande Bruggen 01120211
 
[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructions[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructions
 
13. Introaction of pielines
13. Introaction of pielines13. Introaction of pielines
13. Introaction of pielines
 
Introduction to dredging
Introduction to dredgingIntroduction to dredging
Introduction to dredging
 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
 
VARIOUS SHIP TYPES
VARIOUS SHIP TYPESVARIOUS SHIP TYPES
VARIOUS SHIP TYPES
 
SHIP TYPES INFORMATION
SHIP TYPES INFORMATIONSHIP TYPES INFORMATION
SHIP TYPES INFORMATION
 
Saipem 7000 ALLEGATO_E
Saipem 7000 ALLEGATO_ESaipem 7000 ALLEGATO_E
Saipem 7000 ALLEGATO_E
 
C2VSim Workshop 6 - Closing
C2VSim Workshop 6 - ClosingC2VSim Workshop 6 - Closing
C2VSim Workshop 6 - Closing
 
Davie Hill QHSE Manager Case Studies
Davie Hill QHSE Manager  Case StudiesDavie Hill QHSE Manager  Case Studies
Davie Hill QHSE Manager Case Studies
 
LOTO Case Study - Offshore Rig - Project Sales Corp, India
LOTO Case Study - Offshore Rig - Project Sales Corp, IndiaLOTO Case Study - Offshore Rig - Project Sales Corp, India
LOTO Case Study - Offshore Rig - Project Sales Corp, India
 
Explore new corrosion control technologies
Explore new corrosion control technologiesExplore new corrosion control technologies
Explore new corrosion control technologies
 
Offshore Oil Drilling
Offshore Oil DrillingOffshore Oil Drilling
Offshore Oil Drilling
 
Offshore oil rigs
Offshore oil rigsOffshore oil rigs
Offshore oil rigs
 
Ship resistance in confined water
Ship resistance in confined waterShip resistance in confined water
Ship resistance in confined water
 

Similar to Semi submersible

Offshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsOffshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsGaurav Singh Rajput
 
Presentation 1 drilling rigs
Presentation 1 drilling rigsPresentation 1 drilling rigs
Presentation 1 drilling rigsAli Trichelli
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Oil and gas industry 1.1
Oil and gas industry 1.1Oil and gas industry 1.1
Oil and gas industry 1.1Jorge De Brito
 
Types of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigsTypes of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigsNilotpal Nath
 
94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptx94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptxPraveenPrajapati29
 
OFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfOFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfAisyah Asyikin
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Aijaz Ali Mooro
 
4.2 Offshore platform.pptx
4.2 Offshore platform.pptx4.2 Offshore platform.pptx
4.2 Offshore platform.pptxVijayalakshmiR64
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxdevmarineacademy
 
OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONNardipta Pratama
 
Jsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghiJsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghiKabir Sadeghi
 

Similar to Semi submersible (20)

Offshore Oil & Gas Production Systems
Offshore Oil & Gas Production SystemsOffshore Oil & Gas Production Systems
Offshore Oil & Gas Production Systems
 
Coastal Research Vessel
Coastal Research VesselCoastal Research Vessel
Coastal Research Vessel
 
Presentation 1 drilling rigs
Presentation 1 drilling rigsPresentation 1 drilling rigs
Presentation 1 drilling rigs
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Oil and gas industry 1.1
Oil and gas industry 1.1Oil and gas industry 1.1
Oil and gas industry 1.1
 
Cac loai gian khoan
Cac loai gian khoanCac loai gian khoan
Cac loai gian khoan
 
Types of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigsTypes of Offshore Oil and Gas rigs
Types of Offshore Oil and Gas rigs
 
Offshore_Technology.pptx
Offshore_Technology.pptxOffshore_Technology.pptx
Offshore_Technology.pptx
 
94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptx94008456-Offshore-Storage.pptx
94008456-Offshore-Storage.pptx
 
OFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdfOFFSHORE PLATFORM_1.ppt (1).pdf
OFFSHORE PLATFORM_1.ppt (1).pdf
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4
 
4.2 Offshore platform.pptx
4.2 Offshore platform.pptx4.2 Offshore platform.pptx
4.2 Offshore platform.pptx
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptx
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
Chinmoy Pathak Choudhury_LTV Internship report
Chinmoy Pathak Choudhury_LTV Internship reportChinmoy Pathak Choudhury_LTV Internship report
Chinmoy Pathak Choudhury_LTV Internship report
 
OFFSHORE ACTIVITIES
OFFSHORE ACTIVITIESOFFSHORE ACTIVITIES
OFFSHORE ACTIVITIES
 
Offshore part 2
Offshore part 2Offshore part 2
Offshore part 2
 
Offshore
Offshore Offshore
Offshore
 
OFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTIONOFFSHORE GEOTECHNICAL INTRODUCTION
OFFSHORE GEOTECHNICAL INTRODUCTION
 
Jsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghiJsas 002 04_01_sadeghi
Jsas 002 04_01_sadeghi
 

More from Indian Maritime University, Visakhapatnam

More from Indian Maritime University, Visakhapatnam (19)

AUV
AUVAUV
AUV
 
CONTAINER SHIP DESIGN REPORT
CONTAINER SHIP DESIGN REPORTCONTAINER SHIP DESIGN REPORT
CONTAINER SHIP DESIGN REPORT
 
Preliminary ship-design
Preliminary ship-designPreliminary ship-design
Preliminary ship-design
 
HINDUSTHAN SHIPYARD INTERNSHIP REPORT
HINDUSTHAN SHIPYARD INTERNSHIP REPORTHINDUSTHAN SHIPYARD INTERNSHIP REPORT
HINDUSTHAN SHIPYARD INTERNSHIP REPORT
 
MARPOL ANNEXURES AND IMPACT
MARPOL ANNEXURES AND IMPACT MARPOL ANNEXURES AND IMPACT
MARPOL ANNEXURES AND IMPACT
 
Environmental presentation
Environmental presentationEnvironmental presentation
Environmental presentation
 
Ship resistance in confined water
Ship resistance in confined waterShip resistance in confined water
Ship resistance in confined water
 
Wave resistance
Wave resistanceWave resistance
Wave resistance
 
Wave resistance
Wave resistanceWave resistance
Wave resistance
 
St. lawrence seaway.
St. lawrence seaway.St. lawrence seaway.
St. lawrence seaway.
 
DEEP SEA DIVING
DEEP SEA DIVINGDEEP SEA DIVING
DEEP SEA DIVING
 
Ocean waves
Ocean wavesOcean waves
Ocean waves
 
Water surface
Water surfaceWater surface
Water surface
 
Ocean properties
Ocean propertiesOcean properties
Ocean properties
 
Buoyancy & Stability
Buoyancy & StabilityBuoyancy & Stability
Buoyancy & Stability
 
INTRODUCTION TO TERM USED IN NAVAL ARCHITECT
INTRODUCTION TO TERM USED IN NAVAL ARCHITECTINTRODUCTION TO TERM USED IN NAVAL ARCHITECT
INTRODUCTION TO TERM USED IN NAVAL ARCHITECT
 
Marine hydrodynamics
Marine hydrodynamicsMarine hydrodynamics
Marine hydrodynamics
 
Programming and problem solving with c++, 3rd edition
Programming and problem solving with c++, 3rd editionProgramming and problem solving with c++, 3rd edition
Programming and problem solving with c++, 3rd edition
 
INDUSTRIAL WATER POLLUTION
INDUSTRIAL WATER POLLUTIONINDUSTRIAL WATER POLLUTION
INDUSTRIAL WATER POLLUTION
 

Recently uploaded

Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 

Recently uploaded (20)

Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 

Semi submersible

  • 1.
  • 2. Definition A semi-submersible (semi submerged ship) is a specialized marine vessel with legs/pontoons for buoyancy to float, and weight to keep the structure upright, which used in a number of specific offshore roles as, • offshore drilling rigs, • heavy lift cranes, • oil production platforms, • safety vessels. They are designed with good stability and sea keeping characteristics.
  • 3.
  • 4.
  • 5. Semi-Submersible • Exploratory and production purposes; • floating structure; • towed to the site, • ballasted and moored; • large vertical columns connected to large pontoons/legs, • columns support deck structure and equipment.
  • 6. Semi-Submersible • Water depth 200m to 3000m, • Offers large deck space, • Exceptional stability and sea keeping, • Withstand rough waters, • Highly flexible and efficient, • Can be moved from place to place.
  • 7.
  • 8. Applications • Mobile offshore drilling units (MODU) or Semi–Submersible Drilling Units (SSDU) • Semi-Submersible crane vessels (SSCV) • Offshore support vessels (OSV) • Offshore production platforms
  • 9. Semi-Submersible Drilling Units (SSDU) Based on the way the rig is submerged in the water, there are two main types • Bottle-type semi-subs and • Column-stabilized semi-subs
  • 10. Bottle-type semi-subs • Hull below the drilling deck is Bottle-shaped. • Hull can be submerged by ballasting. • Originally bottles below the rig were completely submerged, resting on ocean floor. • As time progressed bottles were only partially submerged. • Offers exceptional stability for drilling operations.
  • 11. Column-Stabilized semi-subs • More popular design • Two horizontal hulls are connected via cylindrical or rectangular columns to the drilling deck above the water • Smaller diagonal columns are used to support the structure • Mooring lines and dynamic positioning help to keep the semi-sub on location
  • 12. Mobile offshore drilling units (MODU)
  • 13.
  • 14. Semi–Submersible Drilling Units SSDU classified by IMO
  • 15. Semi-Submersible crane vessels (SSCV) • De-ballasted during transit; only part of the lower hull is submerged. • The vessel Ballasted during lifting operations. • High stability allows them to lift extreme high loads
  • 17. Offshore support vessels (OSV) Semi-submersibles are used as number of offshore support vessels because of their good stability, large deck areas, and variable deck load (VDL).  Construction support vessel,  Diving Support Vessel (DSV),  Offshore Safety support vessel,  Offshore accommodation platform,  Offshore Multiservice Vessel (MSV), E.g.- Ocean Odyssey – Converted semi-submersible drilling rig used as a rocket launch pad.
  • 18.
  • 19. Offshore production platforms • When oil fields were first developed in offshore locations, drilling semi-submersibles were converted for use as combined drilling and production platforms. • As progressed to deeper water and harsh environments, purpose-built production semi- submersible platforms were designed. • Offers very stable and cost effective platforms. • Mostly converted semi-submersible vessels.
  • 20.
  • 21. Mooring patterns and Dynamic positioning • Spread Mooring patterns and Dynamic positioning used to keep the floating rig in place • Mooring is similar to multiple anchors • Chosen depending on shape of unit and sea conditions • Dynamic positioning uses different motors or propulsion units to counteract motions of water • Dynamic positioning system is guided by telemetry signals from beacons, satellite information and the angular movements of a cable.
  • 22. Semi–Submersible Drilling Units – SSDU Advantages Disadvantages 1. Semi-submersibles can achieve good (small) motion response and, therefore, can be more easily positioned over a well template for drilling. 2. Most stable of any floating rig. 3. Semi-submersibles allow for a large number of flexible risers. 4. Provides large deck area. 5. Transportation from location to location is easy. 6. Can be reused and converted to other support vessels. 1. High initial and operating costs. 2. Pipeline infrastructure or other means is required to export produced oil. 3. Building schedules for semi-submersibles are usually longer than jack-up rigs. 4. Limited deck load (low reserve buoyancy). 5. Structural fatigue. 6. Expensive to move large distances. 7. Limited dry-docking facilities available. 8. Difficult to handle mooring systems and riser in rough seas.