SlideShare uma empresa Scribd logo
1 de 43
CEE320
Winter2006
Pavement Design
CEE 320
Steve Muench
CEE320
Winter2006
Outline
1. Pavement Purpose
2. Pavement Significance
3. Pavement Condition
4. Pavement Types
a. Flexible
b. Rigid
5. Pavement Design
6. Example
CEE320
Winter2006
Pavement Purpose
• Load support
• Smoothness
• Drainage
DC to Richmond Road in 1919 – from the Asphalt Institute
CEE320
Winter2006
Pavement Significance
• How much pavement?
– 3.97 million centerline miles in U.S.
– 2.5 million miles (63%) are paved
– 8.30 million lane-miles total
– Largest single use of HMA and PCC
• Costs
– $20 to $30 billion spent annually on pavements
– Over $100 million spent annually in WA
CEE320
Winter2006
Pavement Condition
CEE320
Winter2006
Pavement Condition
CEE320
Winter2006
Pavement Condition
CEE320
Winter2006
Pavement Condition
FromWSDOT
I–90“fatdriver”syndrome
CEE320
Winter2006
Pavement Condition
• Defined by users (drivers)
• Develop methods to relate physical
attributes to driver ratings
• Result is usually a numerical scale
From the AASHO Road Test
(1956 – 1961)
CEE320
Winter2006
Present Serviceability Rating (PSR)
Picture from: Highway Research Board Special Report 61A-G
CEE320
Winter2006
Present Serviceability Index (PSI)
• Values from 0 through 5
• Calculated value to match PSR
( ) PCSVPSI +−+−= 9.01log80.141.5
SV = mean of the slope variance in the two wheelpaths
(measured with the CHLOE profilometer or BPR Roughometer)
C, P = measures of cracking and patching in the pavement surface
C = total linear feet of Class 3 and Class 4 cracks per 1000 ft2
of pavement area.
A Class 3 crack is defined as opened or spalled (at the surface) to a width of
0.25 in. or more over a distance equal to at least one-half the crack length.
A Class 4 is defined as any crack which has been sealed.
P = expressed in terms of ft2
per 1000 ft2
of pavement surfacing.
FYI – NOT TESTABLE
CEE320
Winter2006
Typical PSI vs. Time
Time
Serviceability(PSI)
p0
pt
p0 - pt
CEE320
Winter2006
Design Parameters
• Subgrade
• Loads
• Environment
CEE320
Winter2006
Subgrade
• Characterized by strength
and/or stiffness
– California Bearing Ratio (CBR)
• Measures shearing resistance
• Units: percent
• Typical values: 0 to 20
– Resilient Modulus (MR)
• Measures stress-strain relationship
• Units: psi or MPa
• Typical values: 3,000 to 40,000 psi
Picture from University of Tokyo Geotechnical Engineering Lab
CEE320
Winter2006
Subgrade
Some Typical Values
Classification CBR MR (psi) Typical Description
Good ≥ 10 20,000
Gravels, crushed stone and sandy
soils. GW, GP, GM, SW, SP, SM
soils are often in this category.
Fair 5 – 9 10,000
Clayey gravel and clayey sand, fine
silt soils. GM, GC, SM, SC soils are
often in this category.
Poor 3 – 5 5,000
Fine silty sands, clays, silts, organic
soils. CL, CH, ML, MH, CM, OL, OH
soils are often in this category.
CEE320
Winter2006
Loads
• Load characterization
– Tire loads
– Axle and tire configurations
– Load repetition
– Traffic distribution
– Vehicle speed
CEE320
Winter2006
Load Quantification
• Equivalent Single Axle Load (ESAL)
– Converts wheel loads of various magnitudes and repetitions
("mixed traffic") to an equivalent number of "standard" or
"equivalent" loads
– Based on the amount of damage they do to the pavement
– Commonly used standard load is the 18,000 lb. equivalent
single axle load
• Load Equivalency
– Generalized fourth power approximation
factordamagerelative
lb.000,18
load
4
=





CEE320
Winter2006
Typical LEFs
Notice that cars are insignificant and thus usually
ignored in pavement design.
CEE320
Winter2006
LEF Example
The standard axle weights for a standing-room-only loaded Metro
articulated bus (60 ft. Flyer) are:
Axle Empty Full
Steering 13,000 lb. 17,000 lb.
Middle 15,000 lb. 20,000 lb.
Rear 9,000 lb. 14,000 lb.
Using the 4th
power approximation, determine the total equivalent
damage caused by this bus in terms of ESALs when it is empty. How
about when it is full?
CEE320
Winter2006
Environment
• Temperature extremes
• Frost action
– Frost heave
– Thaw weakening
CEE320
Winter2006
Pavement Types
• Flexible Pavement
– Hot mix asphalt (HMA) pavements
– Called "flexible" since the total pavement structure
bends (or flexes) to accommodate traffic loads
– About 82.2% of paved U.S. roads use flexible pavement
– About 95.7% of paved U.S. roads are surfaced with HMA
• Rigid Pavement
– Portland cement concrete (PCC) pavements
– Called “rigid” since PCC’s high modulus of elasticity
does not allow them to flex appreciably
– About 6.5% of paved U.S. roads use rigid pavement
CEE320
Winter2006
Flexible Pavement
• Structure
– Surface course
– Base course
– Subbase course
– Subgrade
CEE320
Winter2006
Types of Flexible Pavement
Dense-graded
Open-graded Gap-graded
CEE320
Winter2006
Flexible Pavement – Construction
FYI – NOT TESTABLE
CEE320
Winter2006
Rigid Pavement
• Structure
– Surface course
– Base course
– Subbase course
– Subgrade
CEE320
Winter2006
Types of Rigid Pavement
• Jointed Plain Concrete Pavement (JPCP)
CEE320
Winter2006
Types of Rigid Pavement
• Continuously Reinforced Concrete
Pavement (CRCP)
Photo from the Concrete Reinforcing Steel Institute
CEE320
Winter2006
Rigid Pavement – Construction
Slipform
Fixed form
FYI – NOT TESTABLE
CEE320
Winter2006
Pavement Design
• Several typical methods
– Design catalog
– Empirical
• 1993 AASHTO method
– Mechanistic-empirical
• New AASHTO method (as yet unreleased)
CEE320
Winter2006
Design Catalog
Example design catalog from the Washington Asphalt
Pavement Association (WAPA) for residential streets
CEE320
Winter2006
Empirical
• 1993 AASHTO Flexible Equation
• 1993 AASHTO Rigid Equation
( ) ( )
( )
( ) 07.8log32.2
1
1094
40.0
5.15.4
log
20.01log36.9log 10
19.5
10
101810 −×+
+
+






−
∆
+−+×+×= RoR M
SN
PSI
SNSZW
( ) ( )
( )
( ) ( )( )( )
( )










































−
−′
×−+
+
×
+






−
∆
+−+×+×=
25.0
75.0
75.0
10
46.8
7
10
101810
42.18
63.215
132.1
log32.022.4
1
10624.1
1
5.15.4
log
06.01log35.7log
k
E
DJ
DCS
p
D
PSI
DSZW
c
dc
toR
CEE320
Winter2006
Terms – Flexible
• W18 (loading)
– Predicted number of ESALs over the pavement’s life.
• SN (structural number)
– Abstract number expressing structural strength
– SN = a1D1 + a2D2m2 + a3D3m3 + …
• ΔPSI (change in present serviceability index)
– Change in serviceability index over the useful pavement life
– Typically from 1.5 to 3.0
• MR (subgrade resilient modulus)
– Typically from 3,000 to 30,000 psi (10,000 psi is pretty good)
CEE320
Winter2006
Terms – Rigid
• D (slab depth)
– Abstract number expressing structural strength
– SN = a1D1 + a2D2m2 + a3D3m3 + …
• S’c (PCC modulus of rupture)
– A measure of PCC flexural strength
– Usually between 600 and 850 psi
• Cd (drainage coefficient)
– Relative loss of strength due to drainage characteristics
and the total time it is exposed to near-saturated conditions
– Usually taken as 1.0
CEE320
Winter2006
Terms – Rigid
• J (load transfer coefficient)
– Accounts for load transfer efficiency
– Lower J-factors = better load transfer
– Between 3.8 (undoweled JPCP) and 2.3 (CRCP with tied
shoulders)
• Ec (PCC elastic modulus)
– 4,000,000 psi is a good estimate
• k (modulus of subgrade reaction)
– Estimates the support of the PCC slab by the underlying
layers
– Usually between 50 and 1000 psi/inch
CEE320
Winter2006
Reliability
X = Probability distribution of stress
(e.g., from loading, environment, etc.)
Y = Probability distribution of strength
(variations in construction, material, etc.)
Probability
Stress/Strength
Reliability = P [Y > X] [ ] ( ) ( ) dxdyyfxfXYP
x
yx 





=> ∫∫
∞∞
∞−
CEE320
Winter2006
WSDOT Flexible Table
CEE320
Winter2006
WSDOT Rigid Table
CEE320
Winter2006
Design Utilities
From the WSDOT Pavement Guide Interactive
http://guides.ce.washington.edu/uw/wsdot
CEE320
Winter2006
New AASHTO Method
• Mechanistic-empirical
• Can use load spectra (instead of ESALs)
• Computationally intensive
– Rigid design takes about 10 to 20 minutes
– Flexible design can take several hours
CEE320
Winter2006
Design Example – Part 1
A WSDOT traffic count on Interstate 82 in Yakima gives the following
numbers:
Parameter Data WSDOT Assumptions
AADT 18,674 vehicles
Singles 971 vehicles 0.40 ESALs/truck
Doubles 1,176 vehicles 1.00 ESALs/truck
Trains 280 vehicles 1.75 ESALs/truck
Assume a 40-year pavement design life with a 1% growth rate
compounded annually. How many ESALs do you predict this pavement
will by subjected to over its lifetime if its lifetime were to start in the same
year as the traffic count?
( )( )
i
iP
Total
n
11 −+
=
CEE320
Winter2006
Design Example – Part 2
Design a flexible pavement for this number of ESALs using (1) the
WSDOT table, and (2) the design equation utility in the WSDOT
Pavement Guide Interactive. Assume the following:
•Reliability = 95% (ZR = -1.645 , S0 = 0.50)
•ΔPSI = 1.5 (p0 = 4.5, pt = 3.0)
•2 layers (HMA surface and crushed stone base)
HMA coefficient = 0.44, minimum depth = 4 inches
Base coefficient = 0.13, minimum depth = 6 inches
Base MR = 28,000 psi
•Subgrade MR = 9,000 psi
CEE320
Winter2006
Design Example – Part 3
Design a doweled JPCP rigid pavement for this number of ESALs
using (1) the WSDOT table, and (2) the design equation utility in the
WSDOT Pavement Guide Interactive. Assume the following:
•Reliability = 95% (ZR = -1.645 , S0 = 0.40)
•ΔPSI = 1.5 (p0 = 4.5, pt = 3.0)
•EPCC = 4,000,000 psi
•S’C = 700 psi
•Drainage factor (Cd) = 1.0
•Load transfer coefficient (J) = 2.7
•Modulus of subgrade reaction (k) = 400 psi/in
HMA base material
CEE320
Winter2006
Primary References
• Mannering, F.L.; Kilareski, W.P. and Washburn, S.S. (2005).
Principles of Highway Engineering and Traffic Analysis, Third
Edition. Chapter 4
• Muench, S.T.; Mahoney, J.P. and Pierce, L.M. (2003) The
WSDOT Pavement Guide Interactive. WSDOT, Olympia, WA.
http://guides.ce.washington.edu/uw/wsdot
• Muench, S.T. (2002) WAPA Asphalt Pavement Guide. WAPA,
Seattle, WA. http://www.asphaltwa.com

Mais conteúdo relacionado

Mais procurados

Pavement design
Pavement designPavement design
Pavement designhusna004
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentationPawan Kumar
 
Pavement Analysis and Design.pptx
Pavement Analysis and Design.pptxPavement Analysis and Design.pptx
Pavement Analysis and Design.pptxEmaan Sharma
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of pilesLatif Hyder Wadho
 
Pavement materials in Road Construction
Pavement materials in Road ConstructionPavement materials in Road Construction
Pavement materials in Road Constructionsrinivas2036
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. IGauri kadam
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumensrinivas2036
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1GARRE RAVI KUMAR
 
California bearing ratio test (CBR TEST)
California bearing ratio test (CBR TEST)California bearing ratio test (CBR TEST)
California bearing ratio test (CBR TEST)Ujas Patel
 
Pavement skid resistance
Pavement skid resistancePavement skid resistance
Pavement skid resistanceHai Vo
 
Lect 6 pavement design
Lect 6 pavement designLect 6 pavement design
Lect 6 pavement designM Firdaus
 
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...Make Mannan
 
Group index method
Group index methodGroup index method
Group index methodUsama Aslam
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavementBhavik A Shah
 
Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)Safiullah Khan
 

Mais procurados (20)

Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Pavement design
Pavement designPavement design
Pavement design
 
Design flexible and rigid pavements
Design flexible and rigid pavementsDesign flexible and rigid pavements
Design flexible and rigid pavements
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
Pavement Analysis and Design.pptx
Pavement Analysis and Design.pptxPavement Analysis and Design.pptx
Pavement Analysis and Design.pptx
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Pavement materials in Road Construction
Pavement materials in Road ConstructionPavement materials in Road Construction
Pavement materials in Road Construction
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. I
 
Flexible Pavement Design
Flexible Pavement DesignFlexible Pavement Design
Flexible Pavement Design
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumen
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1
 
California bearing ratio test (CBR TEST)
California bearing ratio test (CBR TEST)California bearing ratio test (CBR TEST)
California bearing ratio test (CBR TEST)
 
Pavement skid resistance
Pavement skid resistancePavement skid resistance
Pavement skid resistance
 
Dense bituminous macadam
Dense bituminous macadamDense bituminous macadam
Dense bituminous macadam
 
Lect 6 pavement design
Lect 6 pavement designLect 6 pavement design
Lect 6 pavement design
 
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
 
Group index method
Group index methodGroup index method
Group index method
 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
 
Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)
 

Destaque

Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavementswhutton1
 
Impacts of energy development on low volume roads paul wilke, pe
Impacts of energy development on low volume roads paul wilke, peImpacts of energy development on low volume roads paul wilke, pe
Impacts of energy development on low volume roads paul wilke, pemecocca5
 
ROADS/PAVEMENT & TYPES OF ROAD BY ENGR SAAD ULLAH WEC
ROADS/PAVEMENT  &  TYPES OF ROAD BY ENGR SAAD ULLAH WECROADS/PAVEMENT  &  TYPES OF ROAD BY ENGR SAAD ULLAH WEC
ROADS/PAVEMENT & TYPES OF ROAD BY ENGR SAAD ULLAH WECSAAD ULLAH
 
PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)eddie fonte
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress Ankit Sarkar
 
9-HMA Mix Design ( Highway Engineering Dr. Sherif El-Badawy )
9-HMA Mix Design ( Highway Engineering Dr. Sherif El-Badawy )9-HMA Mix Design ( Highway Engineering Dr. Sherif El-Badawy )
9-HMA Mix Design ( Highway Engineering Dr. Sherif El-Badawy )Hossam Shafiq I
 
Laboratorium Uji Tanah - CBR Lapangan
Laboratorium Uji Tanah - CBR LapanganLaboratorium Uji Tanah - CBR Lapangan
Laboratorium Uji Tanah - CBR LapanganReski Aprilia
 
Proper Concrete Design Methodology
Proper Concrete Design MethodologyProper Concrete Design Methodology
Proper Concrete Design Methodologycrazedbuckeye
 
India 2010 Vehicle Present Scenario
India 2010 Vehicle Present ScenarioIndia 2010 Vehicle Present Scenario
India 2010 Vehicle Present Scenarioguest5365163
 
Lecture soil compaction
Lecture  soil compactionLecture  soil compaction
Lecture soil compactionPookodu
 

Destaque (20)

Pavement design
Pavement designPavement design
Pavement design
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavements
 
28 pavement design
28 pavement design28 pavement design
28 pavement design
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
CBR Mektan
CBR MektanCBR Mektan
CBR Mektan
 
Impacts of energy development on low volume roads paul wilke, pe
Impacts of energy development on low volume roads paul wilke, peImpacts of energy development on low volume roads paul wilke, pe
Impacts of energy development on low volume roads paul wilke, pe
 
ROADS/PAVEMENT & TYPES OF ROAD BY ENGR SAAD ULLAH WEC
ROADS/PAVEMENT  &  TYPES OF ROAD BY ENGR SAAD ULLAH WECROADS/PAVEMENT  &  TYPES OF ROAD BY ENGR SAAD ULLAH WEC
ROADS/PAVEMENT & TYPES OF ROAD BY ENGR SAAD ULLAH WEC
 
PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)PAVEMENT DESIGN (Group 9)
PAVEMENT DESIGN (Group 9)
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress
 
Pavement ppt
Pavement pptPavement ppt
Pavement ppt
 
RIEMA HMA Presentation
RIEMA HMA PresentationRIEMA HMA Presentation
RIEMA HMA Presentation
 
9-HMA Mix Design ( Highway Engineering Dr. Sherif El-Badawy )
9-HMA Mix Design ( Highway Engineering Dr. Sherif El-Badawy )9-HMA Mix Design ( Highway Engineering Dr. Sherif El-Badawy )
9-HMA Mix Design ( Highway Engineering Dr. Sherif El-Badawy )
 
Session 37 Bo Olofsson
Session 37 Bo OlofssonSession 37 Bo Olofsson
Session 37 Bo Olofsson
 
Session 30 Sigurdur Erlingsson
Session 30 Sigurdur ErlingssonSession 30 Sigurdur Erlingsson
Session 30 Sigurdur Erlingsson
 
Concrete pavement design
Concrete pavement designConcrete pavement design
Concrete pavement design
 
Laboratorium Uji Tanah - CBR Lapangan
Laboratorium Uji Tanah - CBR LapanganLaboratorium Uji Tanah - CBR Lapangan
Laboratorium Uji Tanah - CBR Lapangan
 
Proper Concrete Design Methodology
Proper Concrete Design MethodologyProper Concrete Design Methodology
Proper Concrete Design Methodology
 
India 2010 Vehicle Present Scenario
India 2010 Vehicle Present ScenarioIndia 2010 Vehicle Present Scenario
India 2010 Vehicle Present Scenario
 
Pavement
PavementPavement
Pavement
 
Lecture soil compaction
Lecture  soil compactionLecture  soil compaction
Lecture soil compaction
 

Semelhante a Pavement design

Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdfRecent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdfRANGOJUSRINIVASAKUMA1
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - ISachin Kulkarni
 
Subgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsSubgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsJill Reeves
 
The cost-effective upgrading, preservation and rehabilitation of roads - opti...
The cost-effective upgrading, preservation and rehabilitation of roads - opti...The cost-effective upgrading, preservation and rehabilitation of roads - opti...
The cost-effective upgrading, preservation and rehabilitation of roads - opti...Tristan Wiggill
 
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdfSandipPaul46
 
Modern Trends In Pavement Design
Modern Trends In Pavement DesignModern Trends In Pavement Design
Modern Trends In Pavement DesignLatif Hyder Wadho
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsPath Marketing Inc.
 
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisDesign Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisMichael Masi, Jr. Eng.
 
Pavement Design Methods 2 (Flexible and Rigid).pdf
Pavement Design Methods 2 (Flexible and Rigid).pdfPavement Design Methods 2 (Flexible and Rigid).pdf
Pavement Design Methods 2 (Flexible and Rigid).pdfMohammadKabirHossain4
 
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...R C Patil Patil
 
Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignRiaz Zalil
 
CV530_04_Pavement-Design.pdf
CV530_04_Pavement-Design.pdfCV530_04_Pavement-Design.pdf
CV530_04_Pavement-Design.pdfssuser3f175e
 

Semelhante a Pavement design (20)

4320071.ppt
4320071.ppt4320071.ppt
4320071.ppt
 
Pavement-Design.ppt
Pavement-Design.pptPavement-Design.ppt
Pavement-Design.ppt
 
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdfRecent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
Recent Advances in Pavement Deisgn of Flexoble Papenent by IRC:37.pdf
 
Soil .pdf
Soil .pdfSoil .pdf
Soil .pdf
 
Aashto design
Aashto designAashto design
Aashto design
 
Rigid Pavements Design Part - I
Rigid Pavements Design Part - IRigid Pavements Design Part - I
Rigid Pavements Design Part - I
 
Pavement
PavementPavement
Pavement
 
Subgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsSubgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & Methods
 
The cost-effective upgrading, preservation and rehabilitation of roads - opti...
The cost-effective upgrading, preservation and rehabilitation of roads - opti...The cost-effective upgrading, preservation and rehabilitation of roads - opti...
The cost-effective upgrading, preservation and rehabilitation of roads - opti...
 
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
09_VV_Pavement Design IRC37-2018_29Jan2020 - Admin KHRI.pdf
 
Modern Trends In Pavement Design
Modern Trends In Pavement DesignModern Trends In Pavement Design
Modern Trends In Pavement Design
 
Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & Applications
 
Ppt rcc road design
Ppt rcc road designPpt rcc road design
Ppt rcc road design
 
Vertical Alignment
Vertical Alignment Vertical Alignment
Vertical Alignment
 
Design Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost AnalysisDesign Proposal for a Single and Double Span Bridge using Cost Analysis
Design Proposal for a Single and Double Span Bridge using Cost Analysis
 
Pavement Design Methods 2 (Flexible and Rigid).pdf
Pavement Design Methods 2 (Flexible and Rigid).pdfPavement Design Methods 2 (Flexible and Rigid).pdf
Pavement Design Methods 2 (Flexible and Rigid).pdf
 
23a_IRC582015_RP_Design(1).pdf
23a_IRC582015_RP_Design(1).pdf23a_IRC582015_RP_Design(1).pdf
23a_IRC582015_RP_Design(1).pdf
 
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
S60 mb proper_20_pccp_20design_20details_20for_20performance_20__20road_20sch...
 
Final year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement DesignFinal year project ppt - The Future of Pavement Design
Final year project ppt - The Future of Pavement Design
 
CV530_04_Pavement-Design.pdf
CV530_04_Pavement-Design.pdfCV530_04_Pavement-Design.pdf
CV530_04_Pavement-Design.pdf
 

Último

Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfNainaShrivastava14
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 

Último (20)

Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdfPaper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
Paper Tube : Shigeru Ban projects and Case Study of Cardboard Cathedral .pdf
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 

Pavement design

  • 2. CEE320 Winter2006 Outline 1. Pavement Purpose 2. Pavement Significance 3. Pavement Condition 4. Pavement Types a. Flexible b. Rigid 5. Pavement Design 6. Example
  • 3. CEE320 Winter2006 Pavement Purpose • Load support • Smoothness • Drainage DC to Richmond Road in 1919 – from the Asphalt Institute
  • 4. CEE320 Winter2006 Pavement Significance • How much pavement? – 3.97 million centerline miles in U.S. – 2.5 million miles (63%) are paved – 8.30 million lane-miles total – Largest single use of HMA and PCC • Costs – $20 to $30 billion spent annually on pavements – Over $100 million spent annually in WA
  • 9. CEE320 Winter2006 Pavement Condition • Defined by users (drivers) • Develop methods to relate physical attributes to driver ratings • Result is usually a numerical scale From the AASHO Road Test (1956 – 1961)
  • 10. CEE320 Winter2006 Present Serviceability Rating (PSR) Picture from: Highway Research Board Special Report 61A-G
  • 11. CEE320 Winter2006 Present Serviceability Index (PSI) • Values from 0 through 5 • Calculated value to match PSR ( ) PCSVPSI +−+−= 9.01log80.141.5 SV = mean of the slope variance in the two wheelpaths (measured with the CHLOE profilometer or BPR Roughometer) C, P = measures of cracking and patching in the pavement surface C = total linear feet of Class 3 and Class 4 cracks per 1000 ft2 of pavement area. A Class 3 crack is defined as opened or spalled (at the surface) to a width of 0.25 in. or more over a distance equal to at least one-half the crack length. A Class 4 is defined as any crack which has been sealed. P = expressed in terms of ft2 per 1000 ft2 of pavement surfacing. FYI – NOT TESTABLE
  • 12. CEE320 Winter2006 Typical PSI vs. Time Time Serviceability(PSI) p0 pt p0 - pt
  • 14. CEE320 Winter2006 Subgrade • Characterized by strength and/or stiffness – California Bearing Ratio (CBR) • Measures shearing resistance • Units: percent • Typical values: 0 to 20 – Resilient Modulus (MR) • Measures stress-strain relationship • Units: psi or MPa • Typical values: 3,000 to 40,000 psi Picture from University of Tokyo Geotechnical Engineering Lab
  • 15. CEE320 Winter2006 Subgrade Some Typical Values Classification CBR MR (psi) Typical Description Good ≥ 10 20,000 Gravels, crushed stone and sandy soils. GW, GP, GM, SW, SP, SM soils are often in this category. Fair 5 – 9 10,000 Clayey gravel and clayey sand, fine silt soils. GM, GC, SM, SC soils are often in this category. Poor 3 – 5 5,000 Fine silty sands, clays, silts, organic soils. CL, CH, ML, MH, CM, OL, OH soils are often in this category.
  • 16. CEE320 Winter2006 Loads • Load characterization – Tire loads – Axle and tire configurations – Load repetition – Traffic distribution – Vehicle speed
  • 17. CEE320 Winter2006 Load Quantification • Equivalent Single Axle Load (ESAL) – Converts wheel loads of various magnitudes and repetitions ("mixed traffic") to an equivalent number of "standard" or "equivalent" loads – Based on the amount of damage they do to the pavement – Commonly used standard load is the 18,000 lb. equivalent single axle load • Load Equivalency – Generalized fourth power approximation factordamagerelative lb.000,18 load 4 =     
  • 18. CEE320 Winter2006 Typical LEFs Notice that cars are insignificant and thus usually ignored in pavement design.
  • 19. CEE320 Winter2006 LEF Example The standard axle weights for a standing-room-only loaded Metro articulated bus (60 ft. Flyer) are: Axle Empty Full Steering 13,000 lb. 17,000 lb. Middle 15,000 lb. 20,000 lb. Rear 9,000 lb. 14,000 lb. Using the 4th power approximation, determine the total equivalent damage caused by this bus in terms of ESALs when it is empty. How about when it is full?
  • 20. CEE320 Winter2006 Environment • Temperature extremes • Frost action – Frost heave – Thaw weakening
  • 21. CEE320 Winter2006 Pavement Types • Flexible Pavement – Hot mix asphalt (HMA) pavements – Called "flexible" since the total pavement structure bends (or flexes) to accommodate traffic loads – About 82.2% of paved U.S. roads use flexible pavement – About 95.7% of paved U.S. roads are surfaced with HMA • Rigid Pavement – Portland cement concrete (PCC) pavements – Called “rigid” since PCC’s high modulus of elasticity does not allow them to flex appreciably – About 6.5% of paved U.S. roads use rigid pavement
  • 22. CEE320 Winter2006 Flexible Pavement • Structure – Surface course – Base course – Subbase course – Subgrade
  • 23. CEE320 Winter2006 Types of Flexible Pavement Dense-graded Open-graded Gap-graded
  • 24. CEE320 Winter2006 Flexible Pavement – Construction FYI – NOT TESTABLE
  • 25. CEE320 Winter2006 Rigid Pavement • Structure – Surface course – Base course – Subbase course – Subgrade
  • 26. CEE320 Winter2006 Types of Rigid Pavement • Jointed Plain Concrete Pavement (JPCP)
  • 27. CEE320 Winter2006 Types of Rigid Pavement • Continuously Reinforced Concrete Pavement (CRCP) Photo from the Concrete Reinforcing Steel Institute
  • 28. CEE320 Winter2006 Rigid Pavement – Construction Slipform Fixed form FYI – NOT TESTABLE
  • 29. CEE320 Winter2006 Pavement Design • Several typical methods – Design catalog – Empirical • 1993 AASHTO method – Mechanistic-empirical • New AASHTO method (as yet unreleased)
  • 30. CEE320 Winter2006 Design Catalog Example design catalog from the Washington Asphalt Pavement Association (WAPA) for residential streets
  • 31. CEE320 Winter2006 Empirical • 1993 AASHTO Flexible Equation • 1993 AASHTO Rigid Equation ( ) ( ) ( ) ( ) 07.8log32.2 1 1094 40.0 5.15.4 log 20.01log36.9log 10 19.5 10 101810 −×+ + +       − ∆ +−+×+×= RoR M SN PSI SNSZW ( ) ( ) ( ) ( ) ( )( )( ) ( )                                           − −′ ×−+ + × +       − ∆ +−+×+×= 25.0 75.0 75.0 10 46.8 7 10 101810 42.18 63.215 132.1 log32.022.4 1 10624.1 1 5.15.4 log 06.01log35.7log k E DJ DCS p D PSI DSZW c dc toR
  • 32. CEE320 Winter2006 Terms – Flexible • W18 (loading) – Predicted number of ESALs over the pavement’s life. • SN (structural number) – Abstract number expressing structural strength – SN = a1D1 + a2D2m2 + a3D3m3 + … • ΔPSI (change in present serviceability index) – Change in serviceability index over the useful pavement life – Typically from 1.5 to 3.0 • MR (subgrade resilient modulus) – Typically from 3,000 to 30,000 psi (10,000 psi is pretty good)
  • 33. CEE320 Winter2006 Terms – Rigid • D (slab depth) – Abstract number expressing structural strength – SN = a1D1 + a2D2m2 + a3D3m3 + … • S’c (PCC modulus of rupture) – A measure of PCC flexural strength – Usually between 600 and 850 psi • Cd (drainage coefficient) – Relative loss of strength due to drainage characteristics and the total time it is exposed to near-saturated conditions – Usually taken as 1.0
  • 34. CEE320 Winter2006 Terms – Rigid • J (load transfer coefficient) – Accounts for load transfer efficiency – Lower J-factors = better load transfer – Between 3.8 (undoweled JPCP) and 2.3 (CRCP with tied shoulders) • Ec (PCC elastic modulus) – 4,000,000 psi is a good estimate • k (modulus of subgrade reaction) – Estimates the support of the PCC slab by the underlying layers – Usually between 50 and 1000 psi/inch
  • 35. CEE320 Winter2006 Reliability X = Probability distribution of stress (e.g., from loading, environment, etc.) Y = Probability distribution of strength (variations in construction, material, etc.) Probability Stress/Strength Reliability = P [Y > X] [ ] ( ) ( ) dxdyyfxfXYP x yx       => ∫∫ ∞∞ ∞−
  • 38. CEE320 Winter2006 Design Utilities From the WSDOT Pavement Guide Interactive http://guides.ce.washington.edu/uw/wsdot
  • 39. CEE320 Winter2006 New AASHTO Method • Mechanistic-empirical • Can use load spectra (instead of ESALs) • Computationally intensive – Rigid design takes about 10 to 20 minutes – Flexible design can take several hours
  • 40. CEE320 Winter2006 Design Example – Part 1 A WSDOT traffic count on Interstate 82 in Yakima gives the following numbers: Parameter Data WSDOT Assumptions AADT 18,674 vehicles Singles 971 vehicles 0.40 ESALs/truck Doubles 1,176 vehicles 1.00 ESALs/truck Trains 280 vehicles 1.75 ESALs/truck Assume a 40-year pavement design life with a 1% growth rate compounded annually. How many ESALs do you predict this pavement will by subjected to over its lifetime if its lifetime were to start in the same year as the traffic count? ( )( ) i iP Total n 11 −+ =
  • 41. CEE320 Winter2006 Design Example – Part 2 Design a flexible pavement for this number of ESALs using (1) the WSDOT table, and (2) the design equation utility in the WSDOT Pavement Guide Interactive. Assume the following: •Reliability = 95% (ZR = -1.645 , S0 = 0.50) •ΔPSI = 1.5 (p0 = 4.5, pt = 3.0) •2 layers (HMA surface and crushed stone base) HMA coefficient = 0.44, minimum depth = 4 inches Base coefficient = 0.13, minimum depth = 6 inches Base MR = 28,000 psi •Subgrade MR = 9,000 psi
  • 42. CEE320 Winter2006 Design Example – Part 3 Design a doweled JPCP rigid pavement for this number of ESALs using (1) the WSDOT table, and (2) the design equation utility in the WSDOT Pavement Guide Interactive. Assume the following: •Reliability = 95% (ZR = -1.645 , S0 = 0.40) •ΔPSI = 1.5 (p0 = 4.5, pt = 3.0) •EPCC = 4,000,000 psi •S’C = 700 psi •Drainage factor (Cd) = 1.0 •Load transfer coefficient (J) = 2.7 •Modulus of subgrade reaction (k) = 400 psi/in HMA base material
  • 43. CEE320 Winter2006 Primary References • Mannering, F.L.; Kilareski, W.P. and Washburn, S.S. (2005). Principles of Highway Engineering and Traffic Analysis, Third Edition. Chapter 4 • Muench, S.T.; Mahoney, J.P. and Pierce, L.M. (2003) The WSDOT Pavement Guide Interactive. WSDOT, Olympia, WA. http://guides.ce.washington.edu/uw/wsdot • Muench, S.T. (2002) WAPA Asphalt Pavement Guide. WAPA, Seattle, WA. http://www.asphaltwa.com

Notas do Editor

  1. A look at what pavement condition is? Need to ask what is good, what is bad and how do we know?
  2. Empty (13,000/18,000)4 = 0.272 (15,000/18,000)4 = 0.482 (9,000/18,000)4 = 0.063 Total = 0.817 ESALs Full (17,000/18,000)4 = 0.795 (20,000/18,000)4 = 1.524 (14,000/18,000)4 = 0.366 Total = 2.685 ESALs Increase in total weight = 14,000 lb. (about 80 people) or 39% Increase in ESALs is 1.868 (229%)
  3. More in pavement guide interactive Stevens Way will be fixed form starting in May
  4. First year ESALs ESALs in traffic count year = 0.40(971) + 1.00(1176) + 1.75(280) = 2,054.4 ESALs/day Total ESALs = 2,054.4 × 365 = 749,856 In 40 years Total ESALs = 749,856((1+0.01)40-1)/0.01 = 36,657,740 ESALs
  5. By the Table Reliability = 95% Design period ESALs = 25 to 50 million Subgrade condition = Average HMA surface course = 0.35 ft. HMA base course = 0.75 ft. Crushed stone = 0.45 ft. Total depth of HMA = 1.1 ft = 13 inches Total depth of base = 0.45 ft. = 5.4 inches BUT this must be rounded up to the minimum of 6 inches SN = 0.44(13 inches) + 0.13(6 inches) = 6.50 With the utility: Initial answer is 10 inches HMA, 13 inches base SN = 0.44(10 inches) + 0.13(13 inches) = 6.09 Differences due to standard table assumptions But, if we change HMA to 13 inches we get the same answer
  6. Table method: Doweled joints, HMA base material 25 to 50 million ESALs Reliability = 95% 0.97 ft. = 12 inches Utility method 11.5 inches rounded up to 12 inches