SlideShare uma empresa Scribd logo
1 de 27
Zero Wait-State Company Confidential
Zero Wait-State Company Confidential Do not
distribute
Introduction
Tuesday – am Define Approach and Technology Review
Business Model drivers with existing customer examples
pm Cad Structure
Agile BoM Structure
Wednesday – am Non Cad modelled parts in the Agile BoM
pm Demo and Scenario/Outcome building
pm Agile BoM transfer to ERP with mfg changes
discussion
Thursday - am – Flow Chart Presentation AS IS – TO BE
am – Scenario/outcome Presentation
Agenda – High Level
Zero Wait-State Company Confidential Do not
distribute
Agenda – Wednesday pm
Attendees:
 Review of Wed am discussions
 Overview
 CAD reference assembly method
 Handle publish and non-published items to Agile BoM
 Agile Demo adding bulk items to Agile BoM after CAD
published BoM exists.
Discussion on the process with Scenario building
 Defining scenarios
 Relating outcomes to pain points discussed earlier
 Relating scenarios to Resources, and Business Model drivers
while identifying technical limitations
 Tech limitations – Related to the application’s road map
Example Detailed Agenda for each session
Zero Wait-State Company Confidential Do not
distribute
Approach
 Resources
 Technology limitations
 Business Model
3 Agile PLM clients with different
end solutions based on above criteria
Approach - Contraints
 Resources – Engineering/Mfg/Doc Control
 Limited manpower
 Technology –
 Agile Single BoM Structure
 EC functions
 CAD functions
 XA functions
 Business Model
 Modular Design – lends it self to CAD design
automation
 Manufacturing – in-house
 Relative Long shelf life
Zero Wait-State Company Confidential Do not
distribute
Approach – 3 Agile Clients
 Apple - Nx,Team CenterPDM,Agile,SAP
 “ The BoM is structured in SAP ( ERP) based on
their Apple Care program.”
○ Modular – yes
○ Lower shelf life
○ Outsourced manufacturing
Zero Wait-State Company Confidential Do not
distribute
Approach – 3 Agile Clients
 Sun - Pro/E, Agile with EC,EBS
 “ The BoM is structured for Manufacturing in
CAD. Design for Mfg (DFM) They model
everything – fasteners,etc.
○ Modular – yes
○ Mechanical Engineering resources – high
○ Pro/E – Very large assembly functions (
performance)
○ Medium Shelf life
○ Combo of in house and outsourced mfg
Zero Wait-State Company Confidential Do not
distribute
Approach – 3 Agile Clients
 ESCO - Nx, Agile with EC, EBS
 HYBRID - “ The BoM takes a partial CAD
structure and components are added in
Agile.
○ Modular – medium
○ Some long, some short
○ In house manufacturing
○ Engineering resources - limited
Zero Wait-State Company Confidential Do not
distribute
Day 3 Summary Presentation
Zero Wait-State Company Confidential Do not
distribute
Zero Wait-State Company Confidential Do not
distribute
New Assembly
Models Created in
CAD with Structure
Flat BOM Manually
Derived and
Entered into Excel
Flat BOM Created
in Agile PLM with
Sequence Codes
Items and BOMs
Released in Agile
and Sent to XA
Manufacturing
Uses BOM plus
Sequence Codes
CAD Sometimes
Updated to Reflect
BOM Changes
BOMs and
Sequence Codes
Updated in Agile
Items and BOMs
Released in Agile
and Sent to XA
As-Is Process
Engineering
Initiates Changes
via ‘Text’ Methods
Zero Wait-State Company Confidential Do not
distribute
New Assembly
Models Created in
CAD with Structure
Flat BOM Manually
Derived and
Entered into Excel
Flat BOM Created
in Agile PLM with
Sequence Codes
Items and BOMs
Released in Agile
and Sent to XA
Manufacturing
Uses BOM plus
Sequence Codes
CAD Sometimes
Updated to Reflect
BOM Changes
BOMs and
Sequence Codes
Updated in Agile
Items and BOMs
Released in Agile
and Sent to XA
Pain Points
Engineering
Initiates Changes
via ‘Text’ Methods
Pain Points
missing
parts from
solid models
complexity
of sequence
codes
flat BOMs,
without
structure
changing
part
numbers
where used
visibility
too many
“common”
parts
Multiple
manufacturing
sites
out of date
assemblies
BOM
generation
is tedious
assembly
maintenance
in SolidWorks
sorting of flat
BOMs in XA
Zero Wait-State Company Confidential Do not
distribute
New Assembly
Models Created in
CAD with Structure
Structured BOM
Created in Agile
PLM via EC
Items and BOMs
Released in Agile
and Sent to XA
Manufacturing Uses
Structured BOM
(Sequence Codes?)
CAD Models
Updated to Reflect
BOM Changes
BOMs Updated in
Agile PLM via EC
& Manual Updates
Items and BOMs
Released in Agile
and Sent to XA
To-Be Process
missing
parts from
solid models
complexity
of sequence
codes
flat BOMs,
without
structure
changing
part
numbers
where used
visibility
too many
“common”
parts
Multiple
manufacturing
sites
out of date
assemblies
BOM
generation
is tedious
assembly
maintenance
in SolidWorks
sorting of flat
BOMs in XA
Scenario Description
Zero Wait-State Company Confidential Do not
distribute
Approach - Contraints
 Resources
 Limited manpower
 Technology
 Agile Single BoM Structure
 EC functions
 SolidWorks functions
 XA functions
 Business Model
 Modular Design – lends it self to CAD design
automation
 Manufacturing – in-house
 Relative Long shelf life
Zero Wait-State Company Confidential Do not
distribute
Zero Wait-State Company Confidential Do not
distribute
Scenario – CAD Assembly to BoM
Assembly
Model
Agile
Save
BoM in
Agile
Resource Eng ↓
Resource Mfg ↓
Tech Limitations ↔
BoM not
Updating with
CAD Design
Manual
Editing of
XLS
Zero Wait-State Company Confidential Do not
distribute
Scenario – NonModeled Item into BoM
Baseline
BoM
BoM
Redline
Complete
BoM
Resource Eng ↔
Resource Mfg ↔
Tech Limitations ↔
BoM Count
Incorrect
Manual
Editing of
XLS
Zero Wait-State Company Confidential Do not
distribute
Scenario – Design Reference Assy
Ref Assy
Model
Agile
Save
BoM Qty
Correct
Resource Eng ↑
Resource Mfg ↓
Tech Limitations ↔
Lost Design
Effort
Manual
Editing of
XLS
Zero Wait-State Company Confidential Do not
distribute
Scenario – Design Reference Assy
Ref Assy
Model
Agile
Save
Design
Only
Resource Eng ↑
Resource Mfg ↓
Tech Limitations ↔
Lost Design
Effort
Manual
Editing of
XLS
Zero Wait-State Company Confidential Do not
distribute
Scenario – CAD HelperPart Not Published
CAD
Model
Agile
Save
Design
Only
Resource Eng ↑
Resource Mfg ↔
Tech Limitations ↔
Unneeded Item
Published
Manual
Editing of
XLS
Zero Wait-State Company Confidential Do not
distribute
Scenario – Fasteners in CAD Assy
Fasteners
in Assy
Agile
Save
BoM Qty
Correct
XLS Requires
Extra Editing
Missing
Hardware
Resource Eng ↑
Resource Mfg ↔
Tech Limitations ↑
Zero Wait-State Company Confidential Do not
distribute
Scenario – CAD Assy Maintained Current
Assy Chg
in CAD
Agile
Save
BoM
Updated
Resource Eng ↑
Resource Mfg ↓
Tech Limitations ↔
CAD Design
Out of Date
Manual
Editing of
XLS
Zero Wait-State Company Confidential Do not
distribute
Scenario – Granular Control of Configured Part
Assembly
Model
Agile
Save
BoM Qty
Correct
Resource Eng ↔
Resource Mfg ↔
Tech Limitations ↔
Incorrect BoM
Quantity
Manual
Editing of
XLS
Zero Wait-State Company Confidential Do not
distribute
Recommendations
Review from Day 2
New ones
Zero Wait-State Company Confidential Do not
distribute
Recommendations: CAD Structure driving the BoM
 Establish a high level assembly structure for each
product line
• Allow flexibility to re-arrange structure due to mfg
changes
 We should establish a fast track ECO process ( CMII
best practice
 Existing Common parts – driven to much smaller number
 spares/installation kits
 Manufacturing to determine component assembly order
 To Be: can use 3D models for work instructions
( 3D via composer)
Other Recommendations
Zero Wait-State Company Confidential Do not
distribute
CAD Models and Assembly Review/Super user training
 ZWS consultants: Dan B. or Len M.
CAD models should be used at design reviews/change mtgs
 Bring up the assembly/model and let’s look at it
 composer used for this – easier to manipulate
Have someone get CMII certified or equivalent
 Configuration management is at the heart of PLM
Great Brands are built from Great
Products – Where are you on the
spectrum?
Zero Wait-State Company Confidential Do not
distribute
As is Location To Be Location
Operational Excellence
Zero Wait-State Company Confidential Do not
distribute
Business Model
You can buy any premier
kitchen brand and bring
their organization into
yours and drive operational
excellence BECAUSE
You have outstanding people,
processes and technology
Keep Building Digital Infrastructure

Mais conteúdo relacionado

Mais procurados

Thinking about bringing CAFM into your design or construction offering?
Thinking about bringing CAFM into your design or construction offering?Thinking about bringing CAFM into your design or construction offering?
Thinking about bringing CAFM into your design or construction offering?Steve Owen MBA CBIFM
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDFSandy .
 
Introduction to Adaptive and 3DEXPERIENCE
Introduction to Adaptive and 3DEXPERIENCE Introduction to Adaptive and 3DEXPERIENCE
Introduction to Adaptive and 3DEXPERIENCE Adaptive Corporation
 
CamundaCon 2018: How to combine Camunda with RPA (Camunda)
CamundaCon 2018: How to combine Camunda with RPA (Camunda)CamundaCon 2018: How to combine Camunda with RPA (Camunda)
CamundaCon 2018: How to combine Camunda with RPA (Camunda)camunda services GmbH
 
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...Victor Mitov
 
IBM - Paul Pilotto
IBM - Paul PilottoIBM - Paul Pilotto
IBM - Paul PilottoIDGnederland
 
IBM - Craig Bender
IBM - Craig BenderIBM - Craig Bender
IBM - Craig BenderIDGnederland
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesShze Hwa Lee
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)Hasif Alias
 
Software Application
Software ApplicationSoftware Application
Software Applicationkohwenqi
 
Mandated BIM! Are you ready?
Mandated BIM! Are you ready?Mandated BIM! Are you ready?
Mandated BIM! Are you ready?CCT International
 
Richard Tarling, Managing Director and Randall Graebner, Senior Engineer from...
Richard Tarling, Managing Director and Randall Graebner, Senior Engineer from...Richard Tarling, Managing Director and Randall Graebner, Senior Engineer from...
Richard Tarling, Managing Director and Randall Graebner, Senior Engineer from...camunda services GmbH
 
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial DesignerDesigning with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial DesignerDesign World
 
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire  20th JanContractor Lead BIM: Baxall Construction: CE Lancashire  20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th JanMartin Brown
 
How VMware is using VisibleThread to Increase Quality & Drive Efficiency
How VMware is using VisibleThread to Increase Quality & Drive EfficiencyHow VMware is using VisibleThread to Increase Quality & Drive Efficiency
How VMware is using VisibleThread to Increase Quality & Drive EfficiencyVisibleThread
 
Streamlining the Design of Industrial Machinery and Heavy Equipment
Streamlining the Design of Industrial Machinery and Heavy EquipmentStreamlining the Design of Industrial Machinery and Heavy Equipment
Streamlining the Design of Industrial Machinery and Heavy EquipmentEngineering Technique
 

Mais procurados (20)

Thinking about bringing CAFM into your design or construction offering?
Thinking about bringing CAFM into your design or construction offering?Thinking about bringing CAFM into your design or construction offering?
Thinking about bringing CAFM into your design or construction offering?
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
 
Introduction to Adaptive and 3DEXPERIENCE
Introduction to Adaptive and 3DEXPERIENCE Introduction to Adaptive and 3DEXPERIENCE
Introduction to Adaptive and 3DEXPERIENCE
 
CamundaCon 2018: How to combine Camunda with RPA (Camunda)
CamundaCon 2018: How to combine Camunda with RPA (Camunda)CamundaCon 2018: How to combine Camunda with RPA (Camunda)
CamundaCon 2018: How to combine Camunda with RPA (Camunda)
 
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
 
IBM - Paul Pilotto
IBM - Paul PilottoIBM - Paul Pilotto
IBM - Paul Pilotto
 
What's New - OrCAD 17.2 QIR 6
What's New - OrCAD 17.2 QIR 6What's New - OrCAD 17.2 QIR 6
What's New - OrCAD 17.2 QIR 6
 
FSI Global - CAFM systems
FSI Global - CAFM systemsFSI Global - CAFM systems
FSI Global - CAFM systems
 
IBM - Craig Bender
IBM - Craig BenderIBM - Craig Bender
IBM - Craig Bender
 
Contractors: Get BIM Ready!
Contractors: Get BIM Ready!Contractors: Get BIM Ready!
Contractors: Get BIM Ready!
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
 
Software Application
Software ApplicationSoftware Application
Software Application
 
Mandated BIM! Are you ready?
Mandated BIM! Are you ready?Mandated BIM! Are you ready?
Mandated BIM! Are you ready?
 
Richard Tarling, Managing Director and Randall Graebner, Senior Engineer from...
Richard Tarling, Managing Director and Randall Graebner, Senior Engineer from...Richard Tarling, Managing Director and Randall Graebner, Senior Engineer from...
Richard Tarling, Managing Director and Randall Graebner, Senior Engineer from...
 
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial DesignerDesigning with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
Designing with the 3DExperience – First Look at SOLIDWORKS Industrial Designer
 
Technical debt
Technical debtTechnical debt
Technical debt
 
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire  20th JanContractor Lead BIM: Baxall Construction: CE Lancashire  20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
 
How VMware is using VisibleThread to Increase Quality & Drive Efficiency
How VMware is using VisibleThread to Increase Quality & Drive EfficiencyHow VMware is using VisibleThread to Increase Quality & Drive Efficiency
How VMware is using VisibleThread to Increase Quality & Drive Efficiency
 
Streamlining the Design of Industrial Machinery and Heavy Equipment
Streamlining the Design of Industrial Machinery and Heavy EquipmentStreamlining the Design of Industrial Machinery and Heavy Equipment
Streamlining the Design of Industrial Machinery and Heavy Equipment
 

Destaque

Plm as a platform for smb companies
Plm as a platform for smb companiesPlm as a platform for smb companies
Plm as a platform for smb companiesZero Wait-State
 
Oracle value chain summit 14
Oracle value chain summit 14Oracle value chain summit 14
Oracle value chain summit 14Zero Wait-State
 
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLMDesignState Intralink to AgilePLM
DesignState Intralink to AgilePLMZero Wait-State
 
Learn More About PDXState Stand Alone Viewer
Learn More About PDXState Stand Alone ViewerLearn More About PDXState Stand Alone Viewer
Learn More About PDXState Stand Alone ViewerZero Wait-State
 
Zero Wait-State Agile EC MCAD Implementation Quick Start Presentation
Zero Wait-State Agile EC MCAD Implementation Quick Start PresentationZero Wait-State Agile EC MCAD Implementation Quick Start Presentation
Zero Wait-State Agile EC MCAD Implementation Quick Start PresentationZero Wait-State
 
Epdm Agile Webinar 3 2010 F
Epdm Agile Webinar 3 2010 FEpdm Agile Webinar 3 2010 F
Epdm Agile Webinar 3 2010 FZero Wait-State
 
Moving Up the PVC Maturity Curve in Industrial Manufacturing
Moving Up the PVC Maturity Curve in Industrial ManufacturingMoving Up the PVC Maturity Curve in Industrial Manufacturing
Moving Up the PVC Maturity Curve in Industrial ManufacturingZero Wait-State
 
Data migration Presentation
Data migration PresentationData migration Presentation
Data migration PresentationZero Wait-State
 
Medical Device Agile Quality Demo
Medical Device Agile Quality DemoMedical Device Agile Quality Demo
Medical Device Agile Quality DemoZero Wait-State
 
ECAD 231 Functional Overview
ECAD 231 Functional OverviewECAD 231 Functional Overview
ECAD 231 Functional OverviewZero Wait-State
 
New Engineering Client for Agile PLM
New Engineering Client for Agile PLMNew Engineering Client for Agile PLM
New Engineering Client for Agile PLMZero Wait-State
 
Zws Corporate Presentation Agile Implementation Approach
Zws Corporate Presentation  Agile Implementation ApproachZws Corporate Presentation  Agile Implementation Approach
Zws Corporate Presentation Agile Implementation ApproachZero Wait-State
 

Destaque (17)

Migration madness
Migration madnessMigration madness
Migration madness
 
Plm as a platform for smb companies
Plm as a platform for smb companiesPlm as a platform for smb companies
Plm as a platform for smb companies
 
Integration Solutions
Integration Solutions  Integration Solutions
Integration Solutions
 
Oracle value chain summit 14
Oracle value chain summit 14Oracle value chain summit 14
Oracle value chain summit 14
 
The power of pdx state
The power of pdx stateThe power of pdx state
The power of pdx state
 
DesignState Intralink to AgilePLM
DesignState Intralink to AgilePLMDesignState Intralink to AgilePLM
DesignState Intralink to AgilePLM
 
Learn More About PDXState Stand Alone Viewer
Learn More About PDXState Stand Alone ViewerLearn More About PDXState Stand Alone Viewer
Learn More About PDXState Stand Alone Viewer
 
PLM Implementation
PLM ImplementationPLM Implementation
PLM Implementation
 
Zero Wait-State Agile EC MCAD Implementation Quick Start Presentation
Zero Wait-State Agile EC MCAD Implementation Quick Start PresentationZero Wait-State Agile EC MCAD Implementation Quick Start Presentation
Zero Wait-State Agile EC MCAD Implementation Quick Start Presentation
 
Epdm Agile Webinar 3 2010 F
Epdm Agile Webinar 3 2010 FEpdm Agile Webinar 3 2010 F
Epdm Agile Webinar 3 2010 F
 
Moving Up the PVC Maturity Curve in Industrial Manufacturing
Moving Up the PVC Maturity Curve in Industrial ManufacturingMoving Up the PVC Maturity Curve in Industrial Manufacturing
Moving Up the PVC Maturity Curve in Industrial Manufacturing
 
Data migration Presentation
Data migration PresentationData migration Presentation
Data migration Presentation
 
Medical Device Agile Quality Demo
Medical Device Agile Quality DemoMedical Device Agile Quality Demo
Medical Device Agile Quality Demo
 
Zws Seminar 20 Minutes
Zws Seminar 20 MinutesZws Seminar 20 Minutes
Zws Seminar 20 Minutes
 
ECAD 231 Functional Overview
ECAD 231 Functional OverviewECAD 231 Functional Overview
ECAD 231 Functional Overview
 
New Engineering Client for Agile PLM
New Engineering Client for Agile PLMNew Engineering Client for Agile PLM
New Engineering Client for Agile PLM
 
Zws Corporate Presentation Agile Implementation Approach
Zws Corporate Presentation  Agile Implementation ApproachZws Corporate Presentation  Agile Implementation Approach
Zws Corporate Presentation Agile Implementation Approach
 

Semelhante a Zws e bom2mbom discovery and recommendation process_agileec_v1 0 (2)

Ptc creo afx overview and customer examples
Ptc creo afx overview and customer examplesPtc creo afx overview and customer examples
Ptc creo afx overview and customer examplesVictor Mitov
 
Building Sustainable Design Systems
Building Sustainable Design SystemsBuilding Sustainable Design Systems
Building Sustainable Design SystemsUXDXConf
 
India GRUC Agility Presentation 2015-6-30
India GRUC Agility Presentation 2015-6-30India GRUC Agility Presentation 2015-6-30
India GRUC Agility Presentation 2015-6-30Roger Snook
 
Specialized Industry Solutions - Presentation
Specialized Industry Solutions - PresentationSpecialized Industry Solutions - Presentation
Specialized Industry Solutions - PresentationDavid Bohannon
 
DMC Siemens Automation Summit 2014 Presentation: Siemens Best Practices When ...
DMC Siemens Automation Summit 2014 Presentation: Siemens Best Practices When ...DMC Siemens Automation Summit 2014 Presentation: Siemens Best Practices When ...
DMC Siemens Automation Summit 2014 Presentation: Siemens Best Practices When ...DMC, Inc.
 
Implementing and Extending Oracle PLM Cloud for Gibson Overseas
Implementing and Extending Oracle PLM Cloud for Gibson OverseasImplementing and Extending Oracle PLM Cloud for Gibson Overseas
Implementing and Extending Oracle PLM Cloud for Gibson OverseasJade Global
 
Software Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesSoftware Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesPang Khai Shuen
 
Advenser CAD services
Advenser CAD servicesAdvenser CAD services
Advenser CAD servicesSarita Shibu
 
DesignTech Systems - DCS presentation Oct 2017
DesignTech Systems - DCS presentation Oct 2017DesignTech Systems - DCS presentation Oct 2017
DesignTech Systems - DCS presentation Oct 2017DesignTech Systems Ltd.
 
Santhosh resume
Santhosh resumeSanthosh resume
Santhosh resumesanthosh n
 
CURRICULUM VITAE_Balu
CURRICULUM VITAE_BaluCURRICULUM VITAE_Balu
CURRICULUM VITAE_Balubalakrishna H
 
Unit 5 design for manufacturing
Unit 5 design for manufacturing Unit 5 design for manufacturing
Unit 5 design for manufacturing arivumani ravanan
 
Highway to heaven - Microservices Meetup Berlin
Highway to heaven - Microservices Meetup BerlinHighway to heaven - Microservices Meetup Berlin
Highway to heaven - Microservices Meetup BerlinChristian Deger
 
What Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problemsWhat Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problemsDawn Collins
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsulfkoester
 
Serverless is a win for businesses, not just developers
Serverless is a win for businesses, not just developersServerless is a win for businesses, not just developers
Serverless is a win for businesses, not just developersYan Cui
 
Implementing Service Oriented Architecture
Implementing Service Oriented Architecture Implementing Service Oriented Architecture
Implementing Service Oriented Architecture Amazon Web Services
 
Implementing Service Oriented Architecture
Implementing Service Oriented ArchitectureImplementing Service Oriented Architecture
Implementing Service Oriented ArchitectureAmazon Web Services
 

Semelhante a Zws e bom2mbom discovery and recommendation process_agileec_v1 0 (2) (20)

Ptc creo afx overview and customer examples
Ptc creo afx overview and customer examplesPtc creo afx overview and customer examples
Ptc creo afx overview and customer examples
 
Building Sustainable Design Systems
Building Sustainable Design SystemsBuilding Sustainable Design Systems
Building Sustainable Design Systems
 
Afes
AfesAfes
Afes
 
India GRUC Agility Presentation 2015-6-30
India GRUC Agility Presentation 2015-6-30India GRUC Agility Presentation 2015-6-30
India GRUC Agility Presentation 2015-6-30
 
Specialized Industry Solutions - Presentation
Specialized Industry Solutions - PresentationSpecialized Industry Solutions - Presentation
Specialized Industry Solutions - Presentation
 
DMC Siemens Automation Summit 2014 Presentation: Siemens Best Practices When ...
DMC Siemens Automation Summit 2014 Presentation: Siemens Best Practices When ...DMC Siemens Automation Summit 2014 Presentation: Siemens Best Practices When ...
DMC Siemens Automation Summit 2014 Presentation: Siemens Best Practices When ...
 
Implementing and Extending Oracle PLM Cloud for Gibson Overseas
Implementing and Extending Oracle PLM Cloud for Gibson OverseasImplementing and Extending Oracle PLM Cloud for Gibson Overseas
Implementing and Extending Oracle PLM Cloud for Gibson Overseas
 
Software Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - SlidesSoftware Application in Quantity Surveying - Slides
Software Application in Quantity Surveying - Slides
 
Advenser CAD services
Advenser CAD servicesAdvenser CAD services
Advenser CAD services
 
DesignTech Systems - DCS presentation Oct 2017
DesignTech Systems - DCS presentation Oct 2017DesignTech Systems - DCS presentation Oct 2017
DesignTech Systems - DCS presentation Oct 2017
 
Manual testing notes
Manual testing notesManual testing notes
Manual testing notes
 
Santhosh resume
Santhosh resumeSanthosh resume
Santhosh resume
 
CURRICULUM VITAE_Balu
CURRICULUM VITAE_BaluCURRICULUM VITAE_Balu
CURRICULUM VITAE_Balu
 
Unit 5 design for manufacturing
Unit 5 design for manufacturing Unit 5 design for manufacturing
Unit 5 design for manufacturing
 
Highway to heaven - Microservices Meetup Berlin
Highway to heaven - Microservices Meetup BerlinHighway to heaven - Microservices Meetup Berlin
Highway to heaven - Microservices Meetup Berlin
 
What Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problemsWhat Is Your PLM Challenge - Decrease downtime and minimize production problems
What Is Your PLM Challenge - Decrease downtime and minimize production problems
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystems
 
Serverless is a win for businesses, not just developers
Serverless is a win for businesses, not just developersServerless is a win for businesses, not just developers
Serverless is a win for businesses, not just developers
 
Implementing Service Oriented Architecture
Implementing Service Oriented Architecture Implementing Service Oriented Architecture
Implementing Service Oriented Architecture
 
Implementing Service Oriented Architecture
Implementing Service Oriented ArchitectureImplementing Service Oriented Architecture
Implementing Service Oriented Architecture
 

Zws e bom2mbom discovery and recommendation process_agileec_v1 0 (2)

  • 1. Zero Wait-State Company Confidential
  • 2. Zero Wait-State Company Confidential Do not distribute Introduction Tuesday – am Define Approach and Technology Review Business Model drivers with existing customer examples pm Cad Structure Agile BoM Structure Wednesday – am Non Cad modelled parts in the Agile BoM pm Demo and Scenario/Outcome building pm Agile BoM transfer to ERP with mfg changes discussion Thursday - am – Flow Chart Presentation AS IS – TO BE am – Scenario/outcome Presentation Agenda – High Level
  • 3. Zero Wait-State Company Confidential Do not distribute Agenda – Wednesday pm Attendees:  Review of Wed am discussions  Overview  CAD reference assembly method  Handle publish and non-published items to Agile BoM  Agile Demo adding bulk items to Agile BoM after CAD published BoM exists. Discussion on the process with Scenario building  Defining scenarios  Relating outcomes to pain points discussed earlier  Relating scenarios to Resources, and Business Model drivers while identifying technical limitations  Tech limitations – Related to the application’s road map Example Detailed Agenda for each session
  • 4. Zero Wait-State Company Confidential Do not distribute Approach  Resources  Technology limitations  Business Model 3 Agile PLM clients with different end solutions based on above criteria
  • 5. Approach - Contraints  Resources – Engineering/Mfg/Doc Control  Limited manpower  Technology –  Agile Single BoM Structure  EC functions  CAD functions  XA functions  Business Model  Modular Design – lends it self to CAD design automation  Manufacturing – in-house  Relative Long shelf life Zero Wait-State Company Confidential Do not distribute
  • 6. Approach – 3 Agile Clients  Apple - Nx,Team CenterPDM,Agile,SAP  “ The BoM is structured in SAP ( ERP) based on their Apple Care program.” ○ Modular – yes ○ Lower shelf life ○ Outsourced manufacturing Zero Wait-State Company Confidential Do not distribute
  • 7. Approach – 3 Agile Clients  Sun - Pro/E, Agile with EC,EBS  “ The BoM is structured for Manufacturing in CAD. Design for Mfg (DFM) They model everything – fasteners,etc. ○ Modular – yes ○ Mechanical Engineering resources – high ○ Pro/E – Very large assembly functions ( performance) ○ Medium Shelf life ○ Combo of in house and outsourced mfg Zero Wait-State Company Confidential Do not distribute
  • 8. Approach – 3 Agile Clients  ESCO - Nx, Agile with EC, EBS  HYBRID - “ The BoM takes a partial CAD structure and components are added in Agile. ○ Modular – medium ○ Some long, some short ○ In house manufacturing ○ Engineering resources - limited Zero Wait-State Company Confidential Do not distribute
  • 9. Day 3 Summary Presentation Zero Wait-State Company Confidential Do not distribute
  • 10. Zero Wait-State Company Confidential Do not distribute New Assembly Models Created in CAD with Structure Flat BOM Manually Derived and Entered into Excel Flat BOM Created in Agile PLM with Sequence Codes Items and BOMs Released in Agile and Sent to XA Manufacturing Uses BOM plus Sequence Codes CAD Sometimes Updated to Reflect BOM Changes BOMs and Sequence Codes Updated in Agile Items and BOMs Released in Agile and Sent to XA As-Is Process Engineering Initiates Changes via ‘Text’ Methods
  • 11. Zero Wait-State Company Confidential Do not distribute New Assembly Models Created in CAD with Structure Flat BOM Manually Derived and Entered into Excel Flat BOM Created in Agile PLM with Sequence Codes Items and BOMs Released in Agile and Sent to XA Manufacturing Uses BOM plus Sequence Codes CAD Sometimes Updated to Reflect BOM Changes BOMs and Sequence Codes Updated in Agile Items and BOMs Released in Agile and Sent to XA Pain Points Engineering Initiates Changes via ‘Text’ Methods Pain Points missing parts from solid models complexity of sequence codes flat BOMs, without structure changing part numbers where used visibility too many “common” parts Multiple manufacturing sites out of date assemblies BOM generation is tedious assembly maintenance in SolidWorks sorting of flat BOMs in XA
  • 12. Zero Wait-State Company Confidential Do not distribute New Assembly Models Created in CAD with Structure Structured BOM Created in Agile PLM via EC Items and BOMs Released in Agile and Sent to XA Manufacturing Uses Structured BOM (Sequence Codes?) CAD Models Updated to Reflect BOM Changes BOMs Updated in Agile PLM via EC & Manual Updates Items and BOMs Released in Agile and Sent to XA To-Be Process missing parts from solid models complexity of sequence codes flat BOMs, without structure changing part numbers where used visibility too many “common” parts Multiple manufacturing sites out of date assemblies BOM generation is tedious assembly maintenance in SolidWorks sorting of flat BOMs in XA
  • 13. Scenario Description Zero Wait-State Company Confidential Do not distribute
  • 14. Approach - Contraints  Resources  Limited manpower  Technology  Agile Single BoM Structure  EC functions  SolidWorks functions  XA functions  Business Model  Modular Design – lends it self to CAD design automation  Manufacturing – in-house  Relative Long shelf life Zero Wait-State Company Confidential Do not distribute
  • 15. Zero Wait-State Company Confidential Do not distribute Scenario – CAD Assembly to BoM Assembly Model Agile Save BoM in Agile Resource Eng ↓ Resource Mfg ↓ Tech Limitations ↔ BoM not Updating with CAD Design Manual Editing of XLS
  • 16. Zero Wait-State Company Confidential Do not distribute Scenario – NonModeled Item into BoM Baseline BoM BoM Redline Complete BoM Resource Eng ↔ Resource Mfg ↔ Tech Limitations ↔ BoM Count Incorrect Manual Editing of XLS
  • 17. Zero Wait-State Company Confidential Do not distribute Scenario – Design Reference Assy Ref Assy Model Agile Save BoM Qty Correct Resource Eng ↑ Resource Mfg ↓ Tech Limitations ↔ Lost Design Effort Manual Editing of XLS
  • 18. Zero Wait-State Company Confidential Do not distribute Scenario – Design Reference Assy Ref Assy Model Agile Save Design Only Resource Eng ↑ Resource Mfg ↓ Tech Limitations ↔ Lost Design Effort Manual Editing of XLS
  • 19. Zero Wait-State Company Confidential Do not distribute Scenario – CAD HelperPart Not Published CAD Model Agile Save Design Only Resource Eng ↑ Resource Mfg ↔ Tech Limitations ↔ Unneeded Item Published Manual Editing of XLS
  • 20. Zero Wait-State Company Confidential Do not distribute Scenario – Fasteners in CAD Assy Fasteners in Assy Agile Save BoM Qty Correct XLS Requires Extra Editing Missing Hardware Resource Eng ↑ Resource Mfg ↔ Tech Limitations ↑
  • 21. Zero Wait-State Company Confidential Do not distribute Scenario – CAD Assy Maintained Current Assy Chg in CAD Agile Save BoM Updated Resource Eng ↑ Resource Mfg ↓ Tech Limitations ↔ CAD Design Out of Date Manual Editing of XLS
  • 22. Zero Wait-State Company Confidential Do not distribute Scenario – Granular Control of Configured Part Assembly Model Agile Save BoM Qty Correct Resource Eng ↔ Resource Mfg ↔ Tech Limitations ↔ Incorrect BoM Quantity Manual Editing of XLS
  • 23. Zero Wait-State Company Confidential Do not distribute Recommendations Review from Day 2 New ones
  • 24. Zero Wait-State Company Confidential Do not distribute Recommendations: CAD Structure driving the BoM  Establish a high level assembly structure for each product line • Allow flexibility to re-arrange structure due to mfg changes  We should establish a fast track ECO process ( CMII best practice  Existing Common parts – driven to much smaller number  spares/installation kits  Manufacturing to determine component assembly order  To Be: can use 3D models for work instructions ( 3D via composer)
  • 25. Other Recommendations Zero Wait-State Company Confidential Do not distribute CAD Models and Assembly Review/Super user training  ZWS consultants: Dan B. or Len M. CAD models should be used at design reviews/change mtgs  Bring up the assembly/model and let’s look at it  composer used for this – easier to manipulate Have someone get CMII certified or equivalent  Configuration management is at the heart of PLM
  • 26. Great Brands are built from Great Products – Where are you on the spectrum? Zero Wait-State Company Confidential Do not distribute As is Location To Be Location
  • 27. Operational Excellence Zero Wait-State Company Confidential Do not distribute Business Model You can buy any premier kitchen brand and bring their organization into yours and drive operational excellence BECAUSE You have outstanding people, processes and technology Keep Building Digital Infrastructure