2. IND-3 – Moving up the PVC
Maturity Curve in Industrial
Manufacturing
Steve Porter – CEO, Zero Wait State
Scott Evans – Corporate IT Manager, Sub Zero
Miah Finley – Business Systems Analyst, Sub Zero
Michael Ger – Director, Oracle
#ovcs
9. Engineering Collaboration
•
•
•
Zero Wait-State is Oracle’s
Go-To Partner for
Engineering Collaboration
ZWS is staffed with
Engineering Resources that
have experience with both
CAD data Management and
Enterprise PLM
ZWS has an extensive track
record implement Edge and
Pro/Engineer/CREO
10. Compliance
• Assembled a team of
industry experts who
specialize in PG&C
• Leverage automation tools
to streamline importing
information
• LoadState Compliance
Accelerator
• Ensure a quick and
successful implementation
experience
11. PDXState Stand-Alone PDX Viewer
• Works with all PLM solutions
• Handles large PDX files
• Based on new technology and
provides a simple user interface and
is easy to use
• Platform for future supply chain
management capabilities including
change management and cost
analysis
• Saves time, and reduces the risk of
costly errors, omissions and version
mismatch in your product data
• Enhances PDX functionality with
intuitive product structure browsing
and item BoM comparison
Import, view, and export PDX files from
one PLM System to another to increase
your Supply Chain Efficiency.
15. Sub-Zero Group is the leading manufacturer of luxury appliances
Sub-Zero - Refrigeration, freezers and wine storage products
Wolf - Ranges, ovens, cooktops and grills
Founded in 1945
Corporate Headquarters
– Madison, WI
Manufacturing/Distribution
– Madison, WI
– Fitchburg, WI
– Goodyear, AZ
16. • Sub-Zero/Wolf needs to decrease time to market and increase
accuracy to stay competitive
• Continues strive for better product quality
• Reduction in prototyping costs
• Provide better tools to allow for significant process change
opportunities
• Reduce custom applications
Summary
Application Based
Database
MS Excel Based
Delta
~2
~14
~3
22. • Sub-Zero exports to 24 countries
• Annual volume
o 300 Ocean Containers
o 200 Air Freight
o 300 Parcel
o Import/Export Regulations
o Foreign Trade Zone in Arizona
o ROHS, REACH & Conflict Minerals
• Source material from 250 suppliers across 25 countries
24. • Answer the question… ‘Can we ship to that country?’
• Confidence to welcome an audit
• Track & report all export compliance in one place
• Stable, secure & easy to use application
• Minimum of staff support
26. o No enhancements
o Converted all legacy data
o Minimum dedicated staff requirements
o 2 internal staff, 2 sourced specialists
o Flexible configuration
o Add additional compliance independently
o LoadState upload tool
o Supplier Entry spreadsheet tool
o Upload substance info and documents to PG&C
28. • Compliance management evolved from a response to a
strategy
• Full audit preparedness
• Consolidated staff & decreased effort
– Less chatter on regulations
• Swiftly answer… ‘YES! We can ship to that country.’
31. • Sub-Zero Group, Inc can better incorporate
International trade into design projects
o Helps remove hidden/surprise costs
• New product timelines become more accurate
o Existing system for tracking compliance removes the ‘how’
o As more and more info is collected, we have a larger base of
transferrable information
Red objects are applications or islands of data that can be removed
Existing Environment
ERP = Infor XA (Mapics)
SolidWorksAutoCAD
80 seats
Projected total users
~600 Users
Apple R&D Spend:
Fiscal 2011 R&D is 2.2 percent of revenue
Fiscal 2010 R&D spend: 2.7 percent of revenue
Fiscal 2009 R&D spend: 3.1 percent of revenue
Fiscal 2008 R&D spend: 3.4 percent of revenue
Fiscal 2007 R&D spend: 3.3 percent of revenue
Fiscal 2006 R&D spend: 3.7 percent of revenue
Fiscal 2005 R&D spend: 4 percent of revenue (restated)
Fiscal 2004 R&D spend: 4 percent of revenue (restated)
Fiscal 2003, 2002, 2001 R&D spend: 8 percent of revenue
Fiscal 2000 R&D spend: 5 percent of revenue
Slide 12 – Should build this slide. Too much content without building
Hitachi Tag line: Innovation is translation of ideas and inventions into profitable offerings for customers.
Optimized multi-tier program scheduling minimizes activity and resource bottlenecks
“What-if” analysis minimizes impact to schedule time, cost and risk
Complete visibility to project dependencies highlights work impacted
Enterprise visibility to program status and progress at a glance
Project duration reduced by 5% by choosing the right project and resources with PPM
Effective management of resources and forecasting can save an estimated 15% of development costs
Optimized multi-tier program scheduling minimizes activity and resource bottlenecks
“What-if” analysis minimizes impact to schedule time, cost and risk
Complete visibility to project dependencies highlights work impacted
Enterprise visibility to program status and progress at a glance
Project duration reduced by 5% by choosing the right project and resources with PPM
Effective management of resources and forecasting can save an estimated 15% of development costs
Optimized multi-tier program scheduling minimizes activity and resource bottlenecks
“What-if” analysis minimizes impact to schedule time, cost and risk
Complete visibility to project dependencies highlights work impacted
Enterprise visibility to program status and progress at a glance
Project duration reduced by 5% by choosing the right project and resources with PPM
Effective management of resources and forecasting can save an estimated 15% of development costs