Building ServicesII
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB2714 – Building Services II
Case Study: The Summit
April Semester 2014
Building Services II Case Study Report
Submission Date: 26th June 2013
Name Student ID
Yam Yih Hwan 0305861
Low Rong Tzuoo 0304924
Ng Jun Keat 0314368
Dixon Cheong 0310356
Adrian Ng Kar Chun 0314516
Wong Ha Shiong 0309640
Building ServicesII
Table of Content Page
Cover Page 1
Table of Content 2
Introduction 3
Mechanical & Air-Conditioning Systems 4 - 9
Fire Protection in the Buildings 10 - 14
Problems on Fire Protection 15 - 17
Vertical Transportation System 18 - 19
Problems on Vertical Transportation System 20
Electricity Supply Systems 21 - 22
Recommendations regarding on the Problems 23
Conclusion 24
Appendix 25
Building ServicesII
Introduction
Building service is one of a crucial role in a building because it helps a
building to function well. Building service is responsible for the design, installation,
and operation and monitoring of the mechanical, electrical and public health systems
required for the safe, comfortable and environmentally friendly operation of modern
buildings. Modern technology of building service can make a building to become
more safety or more comfortable for visitors of the building. While building
developers are increasingly being asked to analyze and improve building security,
developing technologies assisting engineers in the pursuit of safe working
environments couldn't have better timing. Hence, innovation of new building service
is important so that the level of safety and comfortable can be increases. Building
services influence the architecture of a building and play a significant role on the
sustainability and energy demand of a building.
Recently, we had chosen The Summit located at Subang Jaya, USJ as our
case study, a study to locate all the services within the building. The purpose of us
choosing The Summit as our case study is because The Summit used to be popular
place for youngster & families back in old days, but nowadays it became less and
less popular due to the poor management of the building.
Building ServicesII
Mechanical & Air-conditioning Systems
First of all, ventilation is the process of replacing the air in an enclosed space
with new and fresh air. It includes extraction and supply of air through mechanical or
natural ventilation. The purpose of ventilation is to control temperature and moisture
and maintain the freshness of the air. Natural ventilation means ventilation without
the mechanical help. It can be achieved by the design of the building layout and
openings with stack effect. Mechanical ventilation uses fans or air conditioning units
to achieve ventilation.
During our visit to The Summit, we found out that both natural and mechanical
systems of ventilation are implemented. In the washrooms, there are 3 openings of
windows to provide ventilation. There is also a fan blower inside, which is of the
mechanical system.
Building ServicesII
In Malaysia where the climate is hot, air conditioning is very important
especially in a shopping complex such as The Summit. So air doors are installed at
every automatic sliding door at The Summit to prevent loss of cool air and prevent
hot air from coming in. Condensers are normally located around the basement level
or the rooftop.
Building ServicesII
In the main area or lobby of the building, centralized system and air-
conditioning is installed. With this system, fresh or cold air is transfer through ducting
to various part of the building.
Building ServicesII
The cooling tower is located at the top of the building, along with other
services, for examples; piping, split units & electrical distributor.
Building ServicesII
Diffusers are where the air comes out and is discharged into the rooms. In
The Summit, we found out 3 types of diffusers that are installed.
The first one is linear diffuser. It is used in open plan rooms and it will hardly
interfere with the pattern of the ceiling. Its direction of air discharge can be changed
to suit the room conditions. It is suitable with high air velocity and it has high
induction slot can have rapid decay of air velocity and temperature.
The second one is the cone diffuser. Its shape can sometimes be square to
match pattern of the ceiling and its inner cone can be lowered or raised to result in
different flow pattern.
Building ServicesII
The third type of diffuser is the side wall inlet diffuser. It is used when there is
no false ceiling. For every inlet there will be a grill. The air discharge can be
controlled by sets of louvers in vertical or horizontal plane. The flow pattern can be
varied according to room size, velocity and aspect ratio.
Building ServicesII
Fire Protections in Building
There are two different methods of fire protection, which are passive fire
protection and active fire protection. Active fire protection method requires
mechanical, electric or electronic activation. It is the manual or automatic fire
protection systems such as fire alarms, detectors, wet and dry risers, hose reels,
carbon dioxide fixed installation.
One of the active fire protection systems that we have stumble upon in this
building is fire extinguisher. There are four different types of fire extinguishers, which
are water type, foam type, dry powder type and carbon dioxide. One way to indicate
what type of fire extinguisher is by looking at the colour the fire extinguisher. For
instance, the water type fire extinguisher is red in colour, the foam type fire
extinguisher is yellow in colour, the dry powder fire extinguisher is blue in colour, and
the carbon dioxide fire extinguisher is black in colour.
The types of fire extinguisher that we have found during our survey of the
building are ABC powder fire extinguisher and carbon dioxide fire extinguisher. In
this building, the carbon dioxide fire extinguisher is used more often compared to the
ABC fire extinguisher. There are 18 carbon dioxide fire extinguishers and 9 ABC
powder fire extinguishers on every floor. One of the reasons why there are more
carbon dioxide fire extinguishers is because there are a lot of small restaurants or
hawker stalls. Besides that, the carbon dioxide fire extinguishers are located near the
escape routes, staircase, elevators and cinemas, and the ABC powder fire
extinguishers are located at the center of the building and near the escalators.
Building ServicesII
The other active fire protection system is hose reel. In this building, there are
nine hose reel located at every escape routes (staircase) on every floor. The hose
reel is made of rubber; it is 19mm diameter and 25m in length. Other than that, the
sprinkler system is also another active fire system that is used in this building. The
sprinklers are fixed at 1m away from each other. Based on what we have learned,
we assumed that they used wet system. This is so, because Malaysia is a tropical
country and there are no risks of freezing. It is also equipped with control valve to
deliver the pressure of the sprinkler water.
Building ServicesII
In this building, 2 types of fire alarm systems were installed, which are
automatic and manual fire alarms. For the automatic alarm system, it automatically
initiates and activates the alarm when it detects fire. Whereas the manual alarm
system only provides an alarm to be activated only when it is switch on by someone.
An example of an automatic fire alarm system is the fire detection system. There are
many different types of detectors that can be used to automatically activate the alarm
when there is an occurrence of fire. Such as, smoke detectors, heat detectors,
radiation fire detectors, and laser beam detectors, however the detector that the
Building ServicesII
building is using is smoke detector. Since Summit is a building with large premise,
there are voice communication systems installed in different parts of the building in
event of fire.
Passive fire protection method is an integral component of the structural fire
protection and fire safety in a building. This method attempts to contain fires or
preventing the fire from spreading all over the building. Examples of passive fire
protection methods are fire-resistant walls, floors, and doors and so on. These
passive systems must comply with the associated listing and approval of use in order
to provide effectiveness expected by building codes.
One of the passive fire protection systems that we found after surveying the
building is fire-resistant door. These fire-resistant doors are used mainly for fire
escape doors, which lead to the staircase and protected corridor. The staircase were
properly designed, this being said because there are 13 risers per flight. Besides
that, the dimension of the threads and risers were constructed consistently, there are
no winders built and the length of the landing is not less than the width. There are
Building ServicesII
fire-rated doors used in this building too. They are mostly located at the fire escape
exits. This is done, so that the people in the building have some time to exit the
building before it collapse in event of fire. In addition, the other passive fire protection
system is fireman lift. The fireman lift is indicated so that in case of fire, the people
will not use it, letting the fire brigade to operate it.
Building ServicesII
Problems on Fire Protections
The problem that we have found during our survey of this building was that the
fire extinguishers were not send for maintenance. Maintenance has to be done to ensure
that the extinguisher is still functional.
The other problem that we have come across was that the manual fire alarm is ‘not in
use’.
Building ServicesII
Besides that, the fire doors are not in good condition. For example, the quality is
degraded, the doorknob is missing, and the doors should always be closed and should
not be obstructed by any object.
Building ServicesII
Lastly, their voice communication systems are not in suitable conditions and not
maintenance were carried out.
Building ServicesII
Vertical Transportation Systems
The differences between hydraulic and electric lifts are electrical lift driven by AC
or DC electric motors. Electrical lift use worm gears to control mechanical movement of
elevator cars by "rolling" steel hoist ropes over a drive sheave which is attached to a
gearbox driven by a high-speed motor. These machines are generally the best option for
basement or overhead traction use for speeds up to 500 feet per minute (3 m/s). The
hydraulic lift in comparison to electrical lift makes them ideal for low rise, low traffic
installations.
They are less energy efficient as the pump works against gravity to push the car
and its passengers upwards; this energy is lost when the car descends on its own
weight. The high current draw of the pump when starting up also places higher demands
on a building’s electrical system. There are also environmental concerns should either
the lifting cylinder leak fluid into the ground. The modern generation of low cost, machine
room-less electrical life made possible by advances in miniaturization of the traction
motor and control systems challenges the supremacy of the hydraulic lift in their
traditional market niche.
These days there are few advantages to hydraulic lifts other than price. Hydraulic
lifts are inherently dangerous because if there is a catastrophic oil line failure the
elevator will drop uncontrolled. Hydraulic lifts are limited to about 6 or 7 floors max.
Changing the rated speed would require a complete replacement or re-engineering of
the pump unit. The hydraulic lifts are nature more eco-friendly.
The population of Summit mall is around 5000. Area of The Summit mall is about
1.2 million square feet; it is a commercial building consists of 9 floors included
basements. There is only one bus stop in front of The Summit; The Summit is poor in
position of building in relation to public transport services, which means it has low
passenger peaks during arrival hours.
Building ServicesII
Escalator is a conveyor transport designed for moving people quickly and
efficiently between floors of a building. There are two types of escalator in The Summit
which are one way traffic of single bank with interrupted traffic in one direction on every
floor and two-way traffic parallel located in the cinema.
Building ServicesII
Problems on Vertical Transportation Systems
In The Summit, the lift car capacity is 20 passengers, life entrances is 1160mm
wide with 2 pieces of doors, door closing time is 50 seconds for 1160mm width doors
and passenger transfer time is 50 seconds in and out. It’s ridiculously slow compared to
other places. The lift arrangement consists of only one lift for 9 floors including basement
levels and the quality of the service is below average.
Moreover, we found that there are few problems of the vertical transportation in
The Summit. There are 5 passenger and 6 fire’s man lifts on every floor, but we realized
that there is only one passenger lift working among all. Most likely, the shoppers use the
fire’s man lift to travel from 1 floor to the other. The Summit used hydraulic lifts, it
supposed to be low vibration and noise, but we found that it causes a lot of vibration and
noise; we assumed that it has less maintenance on the vertical transportation.
Building ServicesII
Electricity Supply Systems
Building ServicesII
The main switch boards are located around the building examples are at the
rooftop, at the ground floor and the basement parking. The pictures above show the
different location of the main switch board. The function of the main switch board act as
an assembly of switches and circuit protection devices from which power is distributed. It
is totally enclosed, sheet steel fabricated. It also distributes large incoming supply into
smaller, easily controlled parcel. One of the more mutual configurations for an electric
switchboard is a series of interconnected electrical panels. Each of the panels in turn
features a series of switches that make it possible to control the flow of electricity.
Making use of the switches, it is possible to adjust the voltage that is transmitted to
connected devices, ensuring that the flow is not sufficient to cause damage to the
circuitry. From this perspective, we can see that the electric switchboard can be viewed
as a way of enhancing the safety of using electricity in the operation of various
appliances, machinery, and other devices.
Building ServicesII
Recommendations regarding on the Problems
We would like to recommend an external fire hydrant for The Summit because the
nearest fire hydrant we could found was located at The Giant. Every building must have
at least 1 fire hydrant located not more than 91.5 meters from the nearest point of fire
breakage access. The closest fire hydrant is located at giant which is 51 meters away, a
good one should be 6 meter away. For commercial buildings, the 19mm hose reel
diameter is not good enough as it pump out lesser water; we would recommend a 25mm
diameter hose reel. As for the hose reel length, The Summit uses the 25 meter in total
length; but we would the recommended the 30 meters length as it could cover a larger
area compared to 25 meters. The fire detection system found in The Summit is smoke
detector and I would like to recommend heat detector, because heat detector respond
when the converted thermal energy of a fire increases the temperature of a heat
sensitive element. The number of detectors fitted should not be less than 1 in 50 meter
square. For flat horizontal ceiling, every point should not exceed 5.3 meter. The
fireman’s lift passenger transfer time is too long; normally it should be 1.6 – 2.0 s in and
out.
We highly recommend an electrical elevator for The Summit. There are two types
of driving systems for rope-type elevators include drum method and traction method.
The drum method uses a variable speed motor that winds the cable onto a drum and
then on descent allows the car to use its weight to help with lowering. Traction method is
when the elevator cars are pulled up by means of rolling steel ropes over a deeply
grooved pulley, the weight of the car is balanced by a counterweight. The traction
method includes two types which is geared and gearless. Geared means the motor
rotation is reduced using a speed reducer equipped with worm and transmitted to the
traction sheave of the traction machine. Gearless means the traction sheaves is
connected directly to the shaft of the traction motor, and motor rotation is transmitted
directly to the traction sheave without any intermediate gearing. The main advantages of
traction elevators are speed and availability for high-rise use, consume less energy than
hydraulic elevators.
Building ServicesII
Conclusion
In conclusion, there is no doubt that building services is vital in a building.
Building services is ‘what makes a building alive’ so everything inside of a building which
make it safe and comfortable comes under the title of ‘building services’. Without
building services, we won’t have lighting, heat, escalator, lift, acoustics, plumbing, power
supply, the security and safety system in a building so without all this it will only be a
cold, dark and uninhabitable building.
Since we are on the subject of building services, Summit’s building services is not
what we expected because many of the safety system are spoiled and are poorly
maintained. Examples are the emergency phone and the fire escape door which is
allocated near the stairs. Not only that, many of the lifts in The Summit are not
functioning causing the peoples to use both the stairs and escalator only. The population
in summit is lesser compared to other shopping complex like mid valley Megamall,
Subang Parade or 1 Utama. So after the research, we hope the owner of summit will
take the responsibilities to improve and maintain the services in the building to secure a
safe and comfortable environment for the shoppers and the workers which work in the
building for several hours. Our first impression of the building is that It is dull and dark
so by improving its lighting to be more brighter and also by adding some decoration it
can attract more shoppers to shop in this building.
So lastly, my group and I had learned a lot stuff through this project, many new
experience and most importantly we’ve learn to work as a team because by working as
a team, we can accomplish goals.
Building ServicesII
Appendix
Work Schedule
Name Work Scope for Report
Yam Yih Hwan Introduction, Appendix & Pictures, Compilation
Low Rong Tzuoo Vertical Transportation Systems & Problems
Ng Jun Keat Recommendations
Dixon Cheong Conclusion, Electricity Supply Systems
Adrian Ng Kar Chun Fire Protection in Buildings & Problems
Wong Ha Shiong Mechanical & Air-Conditioning Systems

Mais conteúdo relacionado

Mais procurados

Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Lovie Tey
 
CASE STUDY OF BUILDING SERVICES IN PUBLIC BUILDINGS
CASE STUDY OF BUILDING SERVICES IN PUBLIC BUILDINGSCASE STUDY OF BUILDING SERVICES IN PUBLIC BUILDINGS
CASE STUDY OF BUILDING SERVICES IN PUBLIC BUILDINGSHafizMasri
 
Building services final report
Building services final reportBuilding services final report
Building services final reportAfiq Knick
 
Building service
Building serviceBuilding service
Building serviceHuey Chyi
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1Nur Zaas
 
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the interventionAngeline KH
 
Building Services II - Summit USJ
Building Services II - Summit USJBuilding Services II - Summit USJ
Building Services II - Summit USJDarrenTofu
 
Building services report
Building services report Building services report
Building services report Soh Shing
 
Building Services
Building Services Building Services
Building Services Joshua Lee
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides마 이환
 
Building services group report
Building services group report Building services group report
Building services group report XingYue0907
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 
Building service
Building serviceBuilding service
Building serviceOng Shi Hui
 
Building services (Project 1: Case Study)
Building services (Project 1: Case Study)Building services (Project 1: Case Study)
Building services (Project 1: Case Study)AlexSiv03
 
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Nekumi Kida
 
Fire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFerit Fazliu
 
PAM centre (building services)
PAM centre (building services)PAM centre (building services)
PAM centre (building services)Cryslyn Tan
 
Elevators and its types
Elevators and its typesElevators and its types
Elevators and its typesRajat Nainwal
 

Mais procurados (20)

Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus // Building Service, Taylor's University Lakeside Campus //
Building Service, Taylor's University Lakeside Campus //
 
CASE STUDY OF BUILDING SERVICES IN PUBLIC BUILDINGS
CASE STUDY OF BUILDING SERVICES IN PUBLIC BUILDINGSCASE STUDY OF BUILDING SERVICES IN PUBLIC BUILDINGS
CASE STUDY OF BUILDING SERVICES IN PUBLIC BUILDINGS
 
Building services final report
Building services final reportBuilding services final report
Building services final report
 
Building service
Building serviceBuilding service
Building service
 
Building Services Assignment 1
Building Services Assignment 1Building Services Assignment 1
Building Services Assignment 1
 
Bservice
BserviceBservice
Bservice
 
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention[ARC2423] Building Services- Project 2 : The inspiration and the intervention
[ARC2423] Building Services- Project 2 : The inspiration and the intervention
 
Building Services II - Summit USJ
Building Services II - Summit USJBuilding Services II - Summit USJ
Building Services II - Summit USJ
 
Building services report
Building services report Building services report
Building services report
 
Building Services
Building Services Building Services
Building Services
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides
 
Building services group report
Building services group report Building services group report
Building services group report
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
Building service
Building serviceBuilding service
Building service
 
Building services (Project 1: Case Study)
Building services (Project 1: Case Study)Building services (Project 1: Case Study)
Building services (Project 1: Case Study)
 
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
Building Service Case Study Report - Pantai Hospital, Kuala Lumpur (Bangsar)
 
Fire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildings
 
PAM centre (building services)
PAM centre (building services)PAM centre (building services)
PAM centre (building services)
 
Refuse Chute
Refuse ChuteRefuse Chute
Refuse Chute
 
Elevators and its types
Elevators and its typesElevators and its types
Elevators and its types
 

Destaque

BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTXinYee Khoo
 
Building Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportBuilding Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportJoyeeLee0131
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)Chee Lee
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services ReportJoanne Yunn Tze
 
Lift.escalator & moving walk
Lift.escalator & moving walkLift.escalator & moving walk
Lift.escalator & moving walkshamal das
 
Building Service Chapter 6
Building Service Chapter 6Building Service Chapter 6
Building Service Chapter 6Izam Lukman
 
Building Service Chapter 1
Building Service Chapter 1Building Service Chapter 1
Building Service Chapter 1Izam Lukman
 
Finance Jones Case Study Final
Finance Jones Case Study FinalFinance Jones Case Study Final
Finance Jones Case Study FinalEdwin Abel
 
building services project 1
building services project 1building services project 1
building services project 1Baddy Peigun
 
Museum case study by Sarthak
Museum case study by SarthakMuseum case study by Sarthak
Museum case study by SarthakSarthak Kaura
 
Shopping mall case study
Shopping mall case studyShopping mall case study
Shopping mall case studyankita20111994
 
Forum mall bangalore case study
Forum mall bangalore case studyForum mall bangalore case study
Forum mall bangalore case studySyed Imdad
 
The Etsy Shard Architecture: Starts With S and Ends With Hard
The Etsy Shard Architecture: Starts With S and Ends With HardThe Etsy Shard Architecture: Starts With S and Ends With Hard
The Etsy Shard Architecture: Starts With S and Ends With Hardjgoulah
 
Fire fighting presentation
Fire  fighting presentationFire  fighting presentation
Fire fighting presentationRaghunath Patil
 

Destaque (20)

BUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENTBUILDING SERVICE GROUP ASSIGNMENT
BUILDING SERVICE GROUP ASSIGNMENT
 
Building Service Project 2 Case Study Report
Building Service Project 2 Case Study ReportBuilding Service Project 2 Case Study Report
Building Service Project 2 Case Study Report
 
Final building service (assignment)
Final   building service (assignment)Final   building service (assignment)
Final building service (assignment)
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services Report
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
Lift.escalator & moving walk
Lift.escalator & moving walkLift.escalator & moving walk
Lift.escalator & moving walk
 
Building Service Chapter 6
Building Service Chapter 6Building Service Chapter 6
Building Service Chapter 6
 
Building Service Chapter 1
Building Service Chapter 1Building Service Chapter 1
Building Service Chapter 1
 
Finance Jones Case Study Final
Finance Jones Case Study FinalFinance Jones Case Study Final
Finance Jones Case Study Final
 
building services project 1
building services project 1building services project 1
building services project 1
 
SELECT CITYWALK MALL JAMIA MILLIA ISLAMIA DELHI
SELECT CITYWALK MALL JAMIA MILLIA ISLAMIA DELHISELECT CITYWALK MALL JAMIA MILLIA ISLAMIA DELHI
SELECT CITYWALK MALL JAMIA MILLIA ISLAMIA DELHI
 
Museum case study by Sarthak
Museum case study by SarthakMuseum case study by Sarthak
Museum case study by Sarthak
 
Technical Report Writing
Technical Report WritingTechnical Report Writing
Technical Report Writing
 
Shopping mall case study
Shopping mall case studyShopping mall case study
Shopping mall case study
 
Lift
LiftLift
Lift
 
Forum mall bangalore case study
Forum mall bangalore case studyForum mall bangalore case study
Forum mall bangalore case study
 
Basics of Fire fighting
Basics of Fire fightingBasics of Fire fighting
Basics of Fire fighting
 
The Etsy Shard Architecture: Starts With S and Ends With Hard
The Etsy Shard Architecture: Starts With S and Ends With HardThe Etsy Shard Architecture: Starts With S and Ends With Hard
The Etsy Shard Architecture: Starts With S and Ends With Hard
 
Museum Case Studies
Museum Case StudiesMuseum Case Studies
Museum Case Studies
 
Fire fighting presentation
Fire  fighting presentationFire  fighting presentation
Fire fighting presentation
 

Semelhante a Case Study Report: The Summit

Case Study of Building Service in Public buildings
Case Study of Building Service in Public buildingsCase Study of Building Service in Public buildings
Case Study of Building Service in Public buildingsChong Chin Pin
 
Data collection
Data collectionData collection
Data collectionTeh Yang
 
Bserviceproject2
Bserviceproject2Bserviceproject2
Bserviceproject2Nge Chen
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services ReportAmos Tan
 
Bs2assignment 150628160250-lva1-app6892
Bs2assignment 150628160250-lva1-app6892Bs2assignment 150628160250-lva1-app6892
Bs2assignment 150628160250-lva1-app6892Arthur Wilson
 
Building services 2 final (final)
Building services 2 final (final)Building services 2 final (final)
Building services 2 final (final)fareezsham
 
Mechanical Component(MEP)
Mechanical Component(MEP) Mechanical Component(MEP)
Mechanical Component(MEP) Umesh Yadav
 
Building Services Project 2
Building Services Project 2Building Services Project 2
Building Services Project 2Ryan Kerry Jy
 
Bs 2 group assignment
Bs 2 group assignmentBs 2 group assignment
Bs 2 group assignmentShze Hwa Lee
 
Buildingservices2 bld60503
Buildingservices2 bld60503Buildingservices2 bld60503
Buildingservices2 bld60503Kailyn Lee
 
Building services
Building services Building services
Building services Enoch Wong
 
Building Services
Building ServicesBuilding Services
Building ServicesEn Huey
 
B.serv project 2 (final report)
B.serv   project 2 (final report)B.serv   project 2 (final report)
B.serv project 2 (final report)Yen Min Khor
 
Building services report
Building services reportBuilding services report
Building services reportCanisius Bong
 
Building service paper
Building service paperBuilding service paper
Building service paperAaronMing93
 
Building services report [final]
Building services report [final]Building services report [final]
Building services report [final]Jannah Jailani
 

Semelhante a Case Study Report: The Summit (20)

Case Study of Building Service in Public buildings
Case Study of Building Service in Public buildingsCase Study of Building Service in Public buildings
Case Study of Building Service in Public buildings
 
Data collection
Data collectionData collection
Data collection
 
Bserviceproject2
Bserviceproject2Bserviceproject2
Bserviceproject2
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services Report
 
Bs2assignment 150628160250-lva1-app6892
Bs2assignment 150628160250-lva1-app6892Bs2assignment 150628160250-lva1-app6892
Bs2assignment 150628160250-lva1-app6892
 
Building services 2 final (final)
Building services 2 final (final)Building services 2 final (final)
Building services 2 final (final)
 
sujit & karan
sujit & karansujit & karan
sujit & karan
 
BS2 REPORT
BS2 REPORTBS2 REPORT
BS2 REPORT
 
Redrum
RedrumRedrum
Redrum
 
Mechanical Component(MEP)
Mechanical Component(MEP) Mechanical Component(MEP)
Mechanical Component(MEP)
 
Building Services Project 2
Building Services Project 2Building Services Project 2
Building Services Project 2
 
Bs 2 group assignment
Bs 2 group assignmentBs 2 group assignment
Bs 2 group assignment
 
Buildingservices2 bld60503
Buildingservices2 bld60503Buildingservices2 bld60503
Buildingservices2 bld60503
 
Building services
Building services Building services
Building services
 
Building Services
Building ServicesBuilding Services
Building Services
 
B.serv project 2 (final report)
B.serv   project 2 (final report)B.serv   project 2 (final report)
B.serv project 2 (final report)
 
Building services report
Building services reportBuilding services report
Building services report
 
Building service paper
Building service paperBuilding service paper
Building service paper
 
Building service paper
Building service paperBuilding service paper
Building service paper
 
Building services report [final]
Building services report [final]Building services report [final]
Building services report [final]
 

Mais de 마 이환

Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)마 이환
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)마 이환
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development마 이환
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)마 이환
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer마 이환
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides마 이환
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations마 이환
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet마 이환
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report마 이환
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment마 이환
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines마 이환
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)마 이환
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)마 이환
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd마 이환
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices마 이환
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment마 이환
 

Mais de 마 이환 (20)

Measurement V
Measurement VMeasurement V
Measurement V
 
Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
 
Internal memo
Internal memoInternal memo
Internal memo
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 

Último

Call Girls In {Connaught Place Delhi} 9667938988 IndianRussian High Profile E...
Call Girls In {Connaught Place Delhi} 9667938988 IndianRussian High Profile E...Call Girls In {Connaught Place Delhi} 9667938988 IndianRussian High Profile E...
Call Girls In {Connaught Place Delhi} 9667938988 IndianRussian High Profile E...aakahthapa70
 
Call Girls in Saket (delhi) call me [8264348440 ] escort service 24X7
Call Girls in Saket (delhi) call me [8264348440 ] escort service 24X7Call Girls in Saket (delhi) call me [8264348440 ] escort service 24X7
Call Girls in Saket (delhi) call me [8264348440 ] escort service 24X7soniya singh
 
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579diyaspanoida
 
Call Girls In {{Laxmi Nagar Delhi}} 9667938988 Indian Russian High Profile Es...
Call Girls In {{Laxmi Nagar Delhi}} 9667938988 Indian Russian High Profile Es...Call Girls In {{Laxmi Nagar Delhi}} 9667938988 Indian Russian High Profile Es...
Call Girls In {{Laxmi Nagar Delhi}} 9667938988 Indian Russian High Profile Es...aakahthapa70
 
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Availablenitugupta1209
 
CALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
CALL GIRLS 9999288940 women seeking men Locanto No Advance North GoaCALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
CALL GIRLS 9999288940 women seeking men Locanto No Advance North Goadelhincr993
 
JABALPUR CALL GIRL 92628/71154 JABALPUR K
JABALPUR CALL GIRL 92628/71154 JABALPUR KJABALPUR CALL GIRL 92628/71154 JABALPUR K
JABALPUR CALL GIRL 92628/71154 JABALPUR KNiteshKumar82226
 
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...
Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...Goa Call Girls Service Goa escort agency
 
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...aakahthapa70
 
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...Pooja Nehwal
 
KAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA CKAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA CNiteshKumar82226
 
RAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CALRAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CALNiteshKumar82226
 
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...riyasharma00119
 
Call Now ☎9870417354|| Call Girls in Noida Sector 12 Escort Service Noida N.C.R.
Call Now ☎9870417354|| Call Girls in Noida Sector 12 Escort Service Noida N.C.R.Call Now ☎9870417354|| Call Girls in Noida Sector 12 Escort Service Noida N.C.R.
Call Now ☎9870417354|| Call Girls in Noida Sector 12 Escort Service Noida N.C.R.riyadelhic riyadelhic
 
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋Sheetaleventcompany
 
DIGHA CALL GIRL 92628/1154 DIGHA CALL GI
DIGHA CALL GIRL 92628/1154 DIGHA CALL GIDIGHA CALL GIRL 92628/1154 DIGHA CALL GI
DIGHA CALL GIRL 92628/1154 DIGHA CALL GINiteshKumar82226
 
MYSORE CALL GIRLS ESCORT SER 92628/71154
MYSORE CALL GIRLS ESCORT SER 92628/71154MYSORE CALL GIRLS ESCORT SER 92628/71154
MYSORE CALL GIRLS ESCORT SER 92628/71154NiteshKumar82226
 

Último (20)

Call Girls In {Connaught Place Delhi} 9667938988 IndianRussian High Profile E...
Call Girls In {Connaught Place Delhi} 9667938988 IndianRussian High Profile E...Call Girls In {Connaught Place Delhi} 9667938988 IndianRussian High Profile E...
Call Girls In {Connaught Place Delhi} 9667938988 IndianRussian High Profile E...
 
Call Girls in Saket (delhi) call me [8264348440 ] escort service 24X7
Call Girls in Saket (delhi) call me [8264348440 ] escort service 24X7Call Girls in Saket (delhi) call me [8264348440 ] escort service 24X7
Call Girls in Saket (delhi) call me [8264348440 ] escort service 24X7
 
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
Best VIP Call Girl Noida Sector 48 Call Me: 8700611579
 
Call Girls In {{Laxmi Nagar Delhi}} 9667938988 Indian Russian High Profile Es...
Call Girls In {{Laxmi Nagar Delhi}} 9667938988 Indian Russian High Profile Es...Call Girls In {{Laxmi Nagar Delhi}} 9667938988 Indian Russian High Profile Es...
Call Girls In {{Laxmi Nagar Delhi}} 9667938988 Indian Russian High Profile Es...
 
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
 
CALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
CALL GIRLS 9999288940 women seeking men Locanto No Advance North GoaCALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
CALL GIRLS 9999288940 women seeking men Locanto No Advance North Goa
 
JABALPUR CALL GIRL 92628/71154 JABALPUR K
JABALPUR CALL GIRL 92628/71154 JABALPUR KJABALPUR CALL GIRL 92628/71154 JABALPUR K
JABALPUR CALL GIRL 92628/71154 JABALPUR K
 
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...
Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...
 
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
 
9953056974 Call Girls In Ashok Nagar, Escorts (Delhi) NCR.
9953056974 Call Girls In Ashok Nagar, Escorts (Delhi) NCR.9953056974 Call Girls In Ashok Nagar, Escorts (Delhi) NCR.
9953056974 Call Girls In Ashok Nagar, Escorts (Delhi) NCR.
 
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
 
Goa Call Girls 🥰 +91 9540619990 📍Service Girls In Goa
Goa Call Girls 🥰 +91 9540619990 📍Service Girls In GoaGoa Call Girls 🥰 +91 9540619990 📍Service Girls In Goa
Goa Call Girls 🥰 +91 9540619990 📍Service Girls In Goa
 
➥🔝9953056974 🔝▻ Anand Vihar Call-girl in Women Seeking Men 🔝Delhi🔝 NCR
➥🔝9953056974 🔝▻ Anand Vihar Call-girl in Women Seeking Men 🔝Delhi🔝 NCR➥🔝9953056974 🔝▻ Anand Vihar Call-girl in Women Seeking Men 🔝Delhi🔝 NCR
➥🔝9953056974 🔝▻ Anand Vihar Call-girl in Women Seeking Men 🔝Delhi🔝 NCR
 
KAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA CKAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA C
 
RAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CALRAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
RAJKOT CALL GIRLS 92628/71154 RAJKOT CAL
 
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
Low Rate Russian Call Girls In Lajpat Nagar ➡️ 7836950116 Call Girls Service ...
 
Call Now ☎9870417354|| Call Girls in Noida Sector 12 Escort Service Noida N.C.R.
Call Now ☎9870417354|| Call Girls in Noida Sector 12 Escort Service Noida N.C.R.Call Now ☎9870417354|| Call Girls in Noida Sector 12 Escort Service Noida N.C.R.
Call Now ☎9870417354|| Call Girls in Noida Sector 12 Escort Service Noida N.C.R.
 
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
💚😋Bangalore Escort Service Call Girls, ₹5000 To 25K With AC💚😋
 
DIGHA CALL GIRL 92628/1154 DIGHA CALL GI
DIGHA CALL GIRL 92628/1154 DIGHA CALL GIDIGHA CALL GIRL 92628/1154 DIGHA CALL GI
DIGHA CALL GIRL 92628/1154 DIGHA CALL GI
 
MYSORE CALL GIRLS ESCORT SER 92628/71154
MYSORE CALL GIRLS ESCORT SER 92628/71154MYSORE CALL GIRLS ESCORT SER 92628/71154
MYSORE CALL GIRLS ESCORT SER 92628/71154
 

Case Study Report: The Summit

  • 1. Building ServicesII SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB2714 – Building Services II Case Study: The Summit April Semester 2014 Building Services II Case Study Report Submission Date: 26th June 2013 Name Student ID Yam Yih Hwan 0305861 Low Rong Tzuoo 0304924 Ng Jun Keat 0314368 Dixon Cheong 0310356 Adrian Ng Kar Chun 0314516 Wong Ha Shiong 0309640
  • 2. Building ServicesII Table of Content Page Cover Page 1 Table of Content 2 Introduction 3 Mechanical & Air-Conditioning Systems 4 - 9 Fire Protection in the Buildings 10 - 14 Problems on Fire Protection 15 - 17 Vertical Transportation System 18 - 19 Problems on Vertical Transportation System 20 Electricity Supply Systems 21 - 22 Recommendations regarding on the Problems 23 Conclusion 24 Appendix 25
  • 3. Building ServicesII Introduction Building service is one of a crucial role in a building because it helps a building to function well. Building service is responsible for the design, installation, and operation and monitoring of the mechanical, electrical and public health systems required for the safe, comfortable and environmentally friendly operation of modern buildings. Modern technology of building service can make a building to become more safety or more comfortable for visitors of the building. While building developers are increasingly being asked to analyze and improve building security, developing technologies assisting engineers in the pursuit of safe working environments couldn't have better timing. Hence, innovation of new building service is important so that the level of safety and comfortable can be increases. Building services influence the architecture of a building and play a significant role on the sustainability and energy demand of a building. Recently, we had chosen The Summit located at Subang Jaya, USJ as our case study, a study to locate all the services within the building. The purpose of us choosing The Summit as our case study is because The Summit used to be popular place for youngster & families back in old days, but nowadays it became less and less popular due to the poor management of the building.
  • 4. Building ServicesII Mechanical & Air-conditioning Systems First of all, ventilation is the process of replacing the air in an enclosed space with new and fresh air. It includes extraction and supply of air through mechanical or natural ventilation. The purpose of ventilation is to control temperature and moisture and maintain the freshness of the air. Natural ventilation means ventilation without the mechanical help. It can be achieved by the design of the building layout and openings with stack effect. Mechanical ventilation uses fans or air conditioning units to achieve ventilation. During our visit to The Summit, we found out that both natural and mechanical systems of ventilation are implemented. In the washrooms, there are 3 openings of windows to provide ventilation. There is also a fan blower inside, which is of the mechanical system.
  • 5. Building ServicesII In Malaysia where the climate is hot, air conditioning is very important especially in a shopping complex such as The Summit. So air doors are installed at every automatic sliding door at The Summit to prevent loss of cool air and prevent hot air from coming in. Condensers are normally located around the basement level or the rooftop.
  • 6. Building ServicesII In the main area or lobby of the building, centralized system and air- conditioning is installed. With this system, fresh or cold air is transfer through ducting to various part of the building.
  • 7. Building ServicesII The cooling tower is located at the top of the building, along with other services, for examples; piping, split units & electrical distributor.
  • 8. Building ServicesII Diffusers are where the air comes out and is discharged into the rooms. In The Summit, we found out 3 types of diffusers that are installed. The first one is linear diffuser. It is used in open plan rooms and it will hardly interfere with the pattern of the ceiling. Its direction of air discharge can be changed to suit the room conditions. It is suitable with high air velocity and it has high induction slot can have rapid decay of air velocity and temperature. The second one is the cone diffuser. Its shape can sometimes be square to match pattern of the ceiling and its inner cone can be lowered or raised to result in different flow pattern.
  • 9. Building ServicesII The third type of diffuser is the side wall inlet diffuser. It is used when there is no false ceiling. For every inlet there will be a grill. The air discharge can be controlled by sets of louvers in vertical or horizontal plane. The flow pattern can be varied according to room size, velocity and aspect ratio.
  • 10. Building ServicesII Fire Protections in Building There are two different methods of fire protection, which are passive fire protection and active fire protection. Active fire protection method requires mechanical, electric or electronic activation. It is the manual or automatic fire protection systems such as fire alarms, detectors, wet and dry risers, hose reels, carbon dioxide fixed installation. One of the active fire protection systems that we have stumble upon in this building is fire extinguisher. There are four different types of fire extinguishers, which are water type, foam type, dry powder type and carbon dioxide. One way to indicate what type of fire extinguisher is by looking at the colour the fire extinguisher. For instance, the water type fire extinguisher is red in colour, the foam type fire extinguisher is yellow in colour, the dry powder fire extinguisher is blue in colour, and the carbon dioxide fire extinguisher is black in colour. The types of fire extinguisher that we have found during our survey of the building are ABC powder fire extinguisher and carbon dioxide fire extinguisher. In this building, the carbon dioxide fire extinguisher is used more often compared to the ABC fire extinguisher. There are 18 carbon dioxide fire extinguishers and 9 ABC powder fire extinguishers on every floor. One of the reasons why there are more carbon dioxide fire extinguishers is because there are a lot of small restaurants or hawker stalls. Besides that, the carbon dioxide fire extinguishers are located near the escape routes, staircase, elevators and cinemas, and the ABC powder fire extinguishers are located at the center of the building and near the escalators.
  • 11. Building ServicesII The other active fire protection system is hose reel. In this building, there are nine hose reel located at every escape routes (staircase) on every floor. The hose reel is made of rubber; it is 19mm diameter and 25m in length. Other than that, the sprinkler system is also another active fire system that is used in this building. The sprinklers are fixed at 1m away from each other. Based on what we have learned, we assumed that they used wet system. This is so, because Malaysia is a tropical country and there are no risks of freezing. It is also equipped with control valve to deliver the pressure of the sprinkler water.
  • 12. Building ServicesII In this building, 2 types of fire alarm systems were installed, which are automatic and manual fire alarms. For the automatic alarm system, it automatically initiates and activates the alarm when it detects fire. Whereas the manual alarm system only provides an alarm to be activated only when it is switch on by someone. An example of an automatic fire alarm system is the fire detection system. There are many different types of detectors that can be used to automatically activate the alarm when there is an occurrence of fire. Such as, smoke detectors, heat detectors, radiation fire detectors, and laser beam detectors, however the detector that the
  • 13. Building ServicesII building is using is smoke detector. Since Summit is a building with large premise, there are voice communication systems installed in different parts of the building in event of fire. Passive fire protection method is an integral component of the structural fire protection and fire safety in a building. This method attempts to contain fires or preventing the fire from spreading all over the building. Examples of passive fire protection methods are fire-resistant walls, floors, and doors and so on. These passive systems must comply with the associated listing and approval of use in order to provide effectiveness expected by building codes. One of the passive fire protection systems that we found after surveying the building is fire-resistant door. These fire-resistant doors are used mainly for fire escape doors, which lead to the staircase and protected corridor. The staircase were properly designed, this being said because there are 13 risers per flight. Besides that, the dimension of the threads and risers were constructed consistently, there are no winders built and the length of the landing is not less than the width. There are
  • 14. Building ServicesII fire-rated doors used in this building too. They are mostly located at the fire escape exits. This is done, so that the people in the building have some time to exit the building before it collapse in event of fire. In addition, the other passive fire protection system is fireman lift. The fireman lift is indicated so that in case of fire, the people will not use it, letting the fire brigade to operate it.
  • 15. Building ServicesII Problems on Fire Protections The problem that we have found during our survey of this building was that the fire extinguishers were not send for maintenance. Maintenance has to be done to ensure that the extinguisher is still functional. The other problem that we have come across was that the manual fire alarm is ‘not in use’.
  • 16. Building ServicesII Besides that, the fire doors are not in good condition. For example, the quality is degraded, the doorknob is missing, and the doors should always be closed and should not be obstructed by any object.
  • 17. Building ServicesII Lastly, their voice communication systems are not in suitable conditions and not maintenance were carried out.
  • 18. Building ServicesII Vertical Transportation Systems The differences between hydraulic and electric lifts are electrical lift driven by AC or DC electric motors. Electrical lift use worm gears to control mechanical movement of elevator cars by "rolling" steel hoist ropes over a drive sheave which is attached to a gearbox driven by a high-speed motor. These machines are generally the best option for basement or overhead traction use for speeds up to 500 feet per minute (3 m/s). The hydraulic lift in comparison to electrical lift makes them ideal for low rise, low traffic installations. They are less energy efficient as the pump works against gravity to push the car and its passengers upwards; this energy is lost when the car descends on its own weight. The high current draw of the pump when starting up also places higher demands on a building’s electrical system. There are also environmental concerns should either the lifting cylinder leak fluid into the ground. The modern generation of low cost, machine room-less electrical life made possible by advances in miniaturization of the traction motor and control systems challenges the supremacy of the hydraulic lift in their traditional market niche. These days there are few advantages to hydraulic lifts other than price. Hydraulic lifts are inherently dangerous because if there is a catastrophic oil line failure the elevator will drop uncontrolled. Hydraulic lifts are limited to about 6 or 7 floors max. Changing the rated speed would require a complete replacement or re-engineering of the pump unit. The hydraulic lifts are nature more eco-friendly. The population of Summit mall is around 5000. Area of The Summit mall is about 1.2 million square feet; it is a commercial building consists of 9 floors included basements. There is only one bus stop in front of The Summit; The Summit is poor in position of building in relation to public transport services, which means it has low passenger peaks during arrival hours.
  • 19. Building ServicesII Escalator is a conveyor transport designed for moving people quickly and efficiently between floors of a building. There are two types of escalator in The Summit which are one way traffic of single bank with interrupted traffic in one direction on every floor and two-way traffic parallel located in the cinema.
  • 20. Building ServicesII Problems on Vertical Transportation Systems In The Summit, the lift car capacity is 20 passengers, life entrances is 1160mm wide with 2 pieces of doors, door closing time is 50 seconds for 1160mm width doors and passenger transfer time is 50 seconds in and out. It’s ridiculously slow compared to other places. The lift arrangement consists of only one lift for 9 floors including basement levels and the quality of the service is below average. Moreover, we found that there are few problems of the vertical transportation in The Summit. There are 5 passenger and 6 fire’s man lifts on every floor, but we realized that there is only one passenger lift working among all. Most likely, the shoppers use the fire’s man lift to travel from 1 floor to the other. The Summit used hydraulic lifts, it supposed to be low vibration and noise, but we found that it causes a lot of vibration and noise; we assumed that it has less maintenance on the vertical transportation.
  • 22. Building ServicesII The main switch boards are located around the building examples are at the rooftop, at the ground floor and the basement parking. The pictures above show the different location of the main switch board. The function of the main switch board act as an assembly of switches and circuit protection devices from which power is distributed. It is totally enclosed, sheet steel fabricated. It also distributes large incoming supply into smaller, easily controlled parcel. One of the more mutual configurations for an electric switchboard is a series of interconnected electrical panels. Each of the panels in turn features a series of switches that make it possible to control the flow of electricity. Making use of the switches, it is possible to adjust the voltage that is transmitted to connected devices, ensuring that the flow is not sufficient to cause damage to the circuitry. From this perspective, we can see that the electric switchboard can be viewed as a way of enhancing the safety of using electricity in the operation of various appliances, machinery, and other devices.
  • 23. Building ServicesII Recommendations regarding on the Problems We would like to recommend an external fire hydrant for The Summit because the nearest fire hydrant we could found was located at The Giant. Every building must have at least 1 fire hydrant located not more than 91.5 meters from the nearest point of fire breakage access. The closest fire hydrant is located at giant which is 51 meters away, a good one should be 6 meter away. For commercial buildings, the 19mm hose reel diameter is not good enough as it pump out lesser water; we would recommend a 25mm diameter hose reel. As for the hose reel length, The Summit uses the 25 meter in total length; but we would the recommended the 30 meters length as it could cover a larger area compared to 25 meters. The fire detection system found in The Summit is smoke detector and I would like to recommend heat detector, because heat detector respond when the converted thermal energy of a fire increases the temperature of a heat sensitive element. The number of detectors fitted should not be less than 1 in 50 meter square. For flat horizontal ceiling, every point should not exceed 5.3 meter. The fireman’s lift passenger transfer time is too long; normally it should be 1.6 – 2.0 s in and out. We highly recommend an electrical elevator for The Summit. There are two types of driving systems for rope-type elevators include drum method and traction method. The drum method uses a variable speed motor that winds the cable onto a drum and then on descent allows the car to use its weight to help with lowering. Traction method is when the elevator cars are pulled up by means of rolling steel ropes over a deeply grooved pulley, the weight of the car is balanced by a counterweight. The traction method includes two types which is geared and gearless. Geared means the motor rotation is reduced using a speed reducer equipped with worm and transmitted to the traction sheave of the traction machine. Gearless means the traction sheaves is connected directly to the shaft of the traction motor, and motor rotation is transmitted directly to the traction sheave without any intermediate gearing. The main advantages of traction elevators are speed and availability for high-rise use, consume less energy than hydraulic elevators.
  • 24. Building ServicesII Conclusion In conclusion, there is no doubt that building services is vital in a building. Building services is ‘what makes a building alive’ so everything inside of a building which make it safe and comfortable comes under the title of ‘building services’. Without building services, we won’t have lighting, heat, escalator, lift, acoustics, plumbing, power supply, the security and safety system in a building so without all this it will only be a cold, dark and uninhabitable building. Since we are on the subject of building services, Summit’s building services is not what we expected because many of the safety system are spoiled and are poorly maintained. Examples are the emergency phone and the fire escape door which is allocated near the stairs. Not only that, many of the lifts in The Summit are not functioning causing the peoples to use both the stairs and escalator only. The population in summit is lesser compared to other shopping complex like mid valley Megamall, Subang Parade or 1 Utama. So after the research, we hope the owner of summit will take the responsibilities to improve and maintain the services in the building to secure a safe and comfortable environment for the shoppers and the workers which work in the building for several hours. Our first impression of the building is that It is dull and dark so by improving its lighting to be more brighter and also by adding some decoration it can attract more shoppers to shop in this building. So lastly, my group and I had learned a lot stuff through this project, many new experience and most importantly we’ve learn to work as a team because by working as a team, we can accomplish goals.
  • 25. Building ServicesII Appendix Work Schedule Name Work Scope for Report Yam Yih Hwan Introduction, Appendix & Pictures, Compilation Low Rong Tzuoo Vertical Transportation Systems & Problems Ng Jun Keat Recommendations Dixon Cheong Conclusion, Electricity Supply Systems Adrian Ng Kar Chun Fire Protection in Buildings & Problems Wong Ha Shiong Mechanical & Air-Conditioning Systems