FINAL PROJECT
TYPES OF BUILDING
DEVELOPEMENT
FNBE FEBRUARY 2014
ANG WEI YI
0317885
TANG JU YI
0317735
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
1
CONTENT :
TITTLE PAGE
1.LOCATION OF THE SITE 2 - 3
2.SUGGESTION 4
3.LAYOUT OF THE REST AREA 5 - 6
4.ZONING OF THE REST AREA 7 - 8
5.RATIONALE 9
6.BENEFITS 10
7.SITE ANALYSIS 11
8.NEEDS OF THE PROJECT TO 12
THE CLIENT AND
COMMUNITY
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
2
Location
The site is located at Block E lower ground floor in Taylor’s University
Lakeside Campus. The site is about 10 x 10m large. The land functions as a small
garden without any specific purposes.
There are two ways to approach the site. The first way is using the pathway,
located between Block C, D and E and the lake. The second way is from the
parking zone F. Because of the smaller size of the campus which is about 27 acres,
the site is quite accessible from every corner of the campus. It only takes two
minutes the most to reach the site from the furthest lecture theatre.
SITE PLAN
The
proposed
rest area
site
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
3
1st – The pathway between the lake and Block C,D and E
2nd – Directly from paring zone F
FRONT VIEW OF THE SITE SIDE VIEW OF THE SITE
2nd
1st
ACCESS TO THE SITE
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
4
SUGGESTIONS
Although Taylor’s University has a large 5-storey library and some rest area
outside the library which is an open space, it is still insufficient to allow more
students to have a proper rest area. Some students have to keep looking for other
rest area before class starts.
Hence, we decided to propose a new rest area in Taylor’s University. The
new rest area shall be near to the lecture halls to ease the students to each the
rest area after a tiring lecture. The rest area should also located near the parking
zone so that students can sit and wait for someone to come and fetch them in a
more comfortable zone, instead of standing under the hot sun.
The rest area is divided into two parts. The first part is the ground floor
which is a cozy café. There will be plenty of comfortable seats and some tables for
those who wants to study or do work. It is air-conditioned and soothing music will
be played. The ground floor is surrounded by glass windows so that students can
view the beautiful lake. Students can also rest while waiting for their parents,
siblings or friends to come and fetch them after the lecture at the rest area. They
can easily see if they are coming from the inside of the glass windows.
The second part will be the roof part. This café is not like any other café. It
has a roof garden with seats and tables too. It’s a more private space because
they are surrounded by green shrubs. Students can really calm their mind and
forget about their worries for a while. Students have the opportunity to enjoy the
beautiful scenery of the lake too.
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
5
THE LAYOUT OF THE REST AREA
Roof garden : Full of plants and shrubs. Tables and chairs
are provided for students to sit down and relax. They can
also enjoy the beautiful scenery of the lake
Glass Window to allow students from the
inside of the café to view the lake
Glass balcony so that students can view
the lake easily
The round floor is a café for students to chat and chill
while having a short break. They can drink coffee and
rest for a while before the next lecture starts.
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
6
THE SIDE VIEW OF THE REST AREA
THE OVERALL LAYOUT OF THE REST AREA
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
7
ZONING OF THE REST AREA
GROUND FLOOR
A A
Book Shelf with books
Coffee Lounge
Sofas
Sofas
Metal table and chairs
A large book shelf full of books is attached to the
wall for students to read
All the chairs will be made of metal
and attached to cushions
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
8
ROOF GARDEN
Public Rest
AreaSmall Garden
Public
Rest Area
Plants and shrubsMetal table and chairs
The public rest area will include sofas for students to chat
and chill
The roof garden is full of shrubs and
plants
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
9
RATIONALE
The main reason we propose this new rest area is simply because of the
insufficient rest area for students in Taylor’s University. Taylor’s University is not a
huge campus but there are quite a number of students (nearly 20,000), all
studying under one roof.
The most visited places for a short break in Taylor’s University is the 5-storey
library, the open space outside the library, which is hot and quite uncomfortable
and the restaurants. Early birds get to claim a place to rest, but those who are a
bit late will have to keep on searching for another rest area until the next lecture
starts. Additionally, the above rest area becomes crowded and noisy; students will
not feel comfortable to rest.
Without a proper rest place, students cannot relax themselves after a tiring
lecture and might not concentrate well in the next lecture. Hence, it is necessary
to allocate a proper rest are for the students in the campus.
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
10
BENEFITS
When there is a proper rest area in Taylor’s University, Those who gain the
most benefits will be the students. They can finally have a break alone by
themselves without anyone disturbing them. Sometimes they need to be alone
because they will feel tired to keep on entertaining the others.
Besides that, students can also gain some rest before the next lecture starts.
If they do not have enough rest, they will never get to concentrate well during the
lectures. Slowly, they will start to lose interest in their academic performances.
Hence, it is necessary to gain enough rest in the journey of learning.
In addition, some students choose to spend their time with their friends
after the lecture ends. Most of them prefer to have a private spot where they can
discuss about private stuffs. The new rest area will be an ideal place for them to
chat and chill.
Next, Taylor’s University is not green enough; we can even count the
number of plants using our hand. However, with this new rest area where the top
part is a roof garden, the greenery in the campus will definitely increase. The roof
garden features a variety of beautiful plants. They are not only nice to look at,
they also lower the surrounding temperature and provide fresh air in the campus.
The rest area is located right beside parking zone F, so when their parents
arrive, they can straightly now by viewing from the rest area. It doesn’t matter if
the student is at the ground floor or the roof garden. This is because the ground
floor is surrounded by glass windows while the roof garden is an open space.
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
11
SITE ANALYSIS
The site is a good spot to build a rest area for the students. This is
because it is located right beside two tall blocks. During afternoon,
where the sun shines the brightest, the site remains cool because the
sunlight is blocked by the tall blocks. In addition to the cooling effect,
the wind also blows from the lake to the block most of the time. The
site also enhances walkability as it is easily accessible from the lecture
halls and the paring lots.
ICI | Final Project | Building Development Report | The Construction Project
ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University
12
NEEDS OF THE PROJECT TO THE CLIENT AND TO THE
COMMUNITY
Taylor’s University really needs more space for students to rest properly,
because the current rest area is seriously insufficient to allow such a huge number
of students to do so. Besides, the students need a proper rest area where is it
cooling and comfortable, not some random open space which makes them feel
hot and sweaty. The new rest area which is a café suits the students well because
it is air-conditioned and makes them feel more comfortable in a hot sunny day.
Some students feel tired of the technologies in the modern era; they need a
place where they can get closer to nature. Although it is impossible to build a
forest in the campus, they can still enjoy the greenery at the top part of the new
rest area which is a roof garden. They can breathe some fresh air and escape from
the concrete jungle for a short while.
Not only that, students also need some private time where not even their
friends can come and disturb them. The rest area will be their first choice because
students are not allowed to talk loudly so their friends would not want to come
and chat with them.

More Related Content

Similar to FNBE0214_ICI_Final Project_Report

FNBE 0414 ICI Project 3 Proposal Report
FNBE 0414 ICI Project 3 Proposal ReportFNBE 0414 ICI Project 3 Proposal Report
FNBE 0414 ICI Project 3 Proposal ReportTan Jaden
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industryHwei Ying Saw
 
Final Project - CL Report
Final Project - CL ReportFinal Project - CL Report
Final Project - CL ReportYen Min Khor
 
Ici proposal
Ici proposalIci proposal
Ici proposalj3frin30
 
Learning act# 3 the school as a learning environment (for private school)
Learning act# 3 the school as a learning environment (for private school)Learning act# 3 the school as a learning environment (for private school)
Learning act# 3 the school as a learning environment (for private school)shaian30
 
Ici building proposal
Ici building proposalIci building proposal
Ici building proposal마 이환
 
Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Lwj Welson
 
Foundation in natural and built environment final project for ici
Foundation in natural and built environment final project for iciFoundation in natural and built environment final project for ici
Foundation in natural and built environment final project for iciYong Sy
 
ICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefRyan Kerry Jy
 
Ici final project (final)
Ici final project (final)Ici final project (final)
Ici final project (final)Joe Onn Lim
 
Ici report revised (2)
Ici report revised (2)Ici report revised (2)
Ici report revised (2)Darren Loong
 

Similar to FNBE0214_ICI_Final Project_Report (20)

FNBE 0414 ICI Project 3 Proposal Report
FNBE 0414 ICI Project 3 Proposal ReportFNBE 0414 ICI Project 3 Proposal Report
FNBE 0414 ICI Project 3 Proposal Report
 
Ici
IciIci
Ici
 
Ici final
Ici finalIci final
Ici final
 
Introduction to construction industry
Introduction to construction industryIntroduction to construction industry
Introduction to construction industry
 
Final Project - CL Report
Final Project - CL ReportFinal Project - CL Report
Final Project - CL Report
 
ICI Report
ICI ReportICI Report
ICI Report
 
Ici proposal
Ici proposalIci proposal
Ici proposal
 
Learning act# 3 the school as a learning environment (for private school)
Learning act# 3 the school as a learning environment (for private school)Learning act# 3 the school as a learning environment (for private school)
Learning act# 3 the school as a learning environment (for private school)
 
ISCN 2019 - Breakouts
ISCN 2019 - BreakoutsISCN 2019 - Breakouts
ISCN 2019 - Breakouts
 
Ici building proposal
Ici building proposalIci building proposal
Ici building proposal
 
Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)Introduction to construction industry final project (project brief)
Introduction to construction industry final project (project brief)
 
Pm corridor m_masd
Pm corridor m_masdPm corridor m_masd
Pm corridor m_masd
 
Foundation in natural and built environment final project for ici
Foundation in natural and built environment final project for iciFoundation in natural and built environment final project for ici
Foundation in natural and built environment final project for ici
 
Cept Case study
Cept Case studyCept Case study
Cept Case study
 
Student perceptions of MALL from GloCALL 2019
Student perceptions of MALL from GloCALL 2019Student perceptions of MALL from GloCALL 2019
Student perceptions of MALL from GloCALL 2019
 
ICI Project 3 - The Project Brief
ICI Project 3 - The Project BriefICI Project 3 - The Project Brief
ICI Project 3 - The Project Brief
 
Ici final project report
Ici final project reportIci final project report
Ici final project report
 
Ici final project (final)
Ici final project (final)Ici final project (final)
Ici final project (final)
 
Ici report revised (2)
Ici report revised (2)Ici report revised (2)
Ici report revised (2)
 
TSU English 15 SBP
TSU English 15 SBPTSU English 15 SBP
TSU English 15 SBP
 

More from Winnie Ang

Building Science_02_Report_Integration Project
Building Science_02_Report_Integration ProjectBuilding Science_02_Report_Integration Project
Building Science_02_Report_Integration ProjectWinnie Ang
 
Representing Place_Project_02_Presentation Slides
Representing Place_Project_02_Presentation SlidesRepresenting Place_Project_02_Presentation Slides
Representing Place_Project_02_Presentation SlidesWinnie Ang
 
Representing Place_Project_01b_Proposal
Representing Place_Project_01b_ProposalRepresenting Place_Project_01b_Proposal
Representing Place_Project_01b_ProposalWinnie Ang
 
Building Structures_Project_01_Truss Analysis Calculation
Building Structures_Project_01_Truss Analysis CalculationBuilding Structures_Project_01_Truss Analysis Calculation
Building Structures_Project_01_Truss Analysis CalculationWinnie Ang
 
Asian Architecture_Project_PartB_Report
Asian Architecture_Project_PartB_ReportAsian Architecture_Project_PartB_Report
Asian Architecture_Project_PartB_ReportWinnie Ang
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02Winnie Ang
 
Building Services_Project_02
Building Services_Project_02Building Services_Project_02
Building Services_Project_02Winnie Ang
 
Architecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web bookArchitecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web bookWinnie Ang
 
FNBE0214_PSY_Final Project_Video Report
FNBE0214_PSY_Final Project_Video ReportFNBE0214_PSY_Final Project_Video Report
FNBE0214_PSY_Final Project_Video ReportWinnie Ang
 
FNBE0214_PSY_Final Project_Video Presentation
FNBE0214_PSY_Final Project_Video PresentationFNBE0214_PSY_Final Project_Video Presentation
FNBE0214_PSY_Final Project_Video PresentationWinnie Ang
 
FNBE0214_BIZ_Final Report
FNBE0214_BIZ_Final ReportFNBE0214_BIZ_Final Report
FNBE0214_BIZ_Final ReportWinnie Ang
 
FNBE0214_ENG_Tea Business Report
FNBE0214_ENG_Tea Business ReportFNBE0214_ENG_Tea Business Report
FNBE0214_ENG_Tea Business ReportWinnie Ang
 
FNBE0214_ENG_Compare and Contrast Essay
FNBE0214_ENG_Compare and Contrast EssayFNBE0214_ENG_Compare and Contrast Essay
FNBE0214_ENG_Compare and Contrast EssayWinnie Ang
 
FNBE0214_BIZ_Project_02_Business Plan
FNBE0214_BIZ_Project_02_Business PlanFNBE0214_BIZ_Project_02_Business Plan
FNBE0214_BIZ_Project_02_Business PlanWinnie Ang
 
FNBE0214_EPC_Tea Business
FNBE0214_EPC_Tea BusinessFNBE0214_EPC_Tea Business
FNBE0214_EPC_Tea BusinessWinnie Ang
 
FNBE0214_EPC_Analyses of Mural Paintings
FNBE0214_EPC_Analyses of Mural PaintingsFNBE0214_EPC_Analyses of Mural Paintings
FNBE0214_EPC_Analyses of Mural PaintingsWinnie Ang
 
FNBE0214_CNC_Project_02_Script
FNBE0214_CNC_Project_02_ScriptFNBE0214_CNC_Project_02_Script
FNBE0214_CNC_Project_02_ScriptWinnie Ang
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportWinnie Ang
 

More from Winnie Ang (18)

Building Science_02_Report_Integration Project
Building Science_02_Report_Integration ProjectBuilding Science_02_Report_Integration Project
Building Science_02_Report_Integration Project
 
Representing Place_Project_02_Presentation Slides
Representing Place_Project_02_Presentation SlidesRepresenting Place_Project_02_Presentation Slides
Representing Place_Project_02_Presentation Slides
 
Representing Place_Project_01b_Proposal
Representing Place_Project_01b_ProposalRepresenting Place_Project_01b_Proposal
Representing Place_Project_01b_Proposal
 
Building Structures_Project_01_Truss Analysis Calculation
Building Structures_Project_01_Truss Analysis CalculationBuilding Structures_Project_01_Truss Analysis Calculation
Building Structures_Project_01_Truss Analysis Calculation
 
Asian Architecture_Project_PartB_Report
Asian Architecture_Project_PartB_ReportAsian Architecture_Project_PartB_Report
Asian Architecture_Project_PartB_Report
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02
 
Building Services_Project_02
Building Services_Project_02Building Services_Project_02
Building Services_Project_02
 
Architecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web bookArchitecture Culture & History 2_Project_02_Web book
Architecture Culture & History 2_Project_02_Web book
 
FNBE0214_PSY_Final Project_Video Report
FNBE0214_PSY_Final Project_Video ReportFNBE0214_PSY_Final Project_Video Report
FNBE0214_PSY_Final Project_Video Report
 
FNBE0214_PSY_Final Project_Video Presentation
FNBE0214_PSY_Final Project_Video PresentationFNBE0214_PSY_Final Project_Video Presentation
FNBE0214_PSY_Final Project_Video Presentation
 
FNBE0214_BIZ_Final Report
FNBE0214_BIZ_Final ReportFNBE0214_BIZ_Final Report
FNBE0214_BIZ_Final Report
 
FNBE0214_ENG_Tea Business Report
FNBE0214_ENG_Tea Business ReportFNBE0214_ENG_Tea Business Report
FNBE0214_ENG_Tea Business Report
 
FNBE0214_ENG_Compare and Contrast Essay
FNBE0214_ENG_Compare and Contrast EssayFNBE0214_ENG_Compare and Contrast Essay
FNBE0214_ENG_Compare and Contrast Essay
 
FNBE0214_BIZ_Project_02_Business Plan
FNBE0214_BIZ_Project_02_Business PlanFNBE0214_BIZ_Project_02_Business Plan
FNBE0214_BIZ_Project_02_Business Plan
 
FNBE0214_EPC_Tea Business
FNBE0214_EPC_Tea BusinessFNBE0214_EPC_Tea Business
FNBE0214_EPC_Tea Business
 
FNBE0214_EPC_Analyses of Mural Paintings
FNBE0214_EPC_Analyses of Mural PaintingsFNBE0214_EPC_Analyses of Mural Paintings
FNBE0214_EPC_Analyses of Mural Paintings
 
FNBE0214_CNC_Project_02_Script
FNBE0214_CNC_Project_02_ScriptFNBE0214_CNC_Project_02_Script
FNBE0214_CNC_Project_02_Script
 
FNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_ReportFNBE0214_CL_Final Project_Report
FNBE0214_CL_Final Project_Report
 

Recently uploaded

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 

Recently uploaded (20)

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

FNBE0214_ICI_Final Project_Report

  • 1. FINAL PROJECT TYPES OF BUILDING DEVELOPEMENT FNBE FEBRUARY 2014 ANG WEI YI 0317885 TANG JU YI 0317735
  • 2. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 1 CONTENT : TITTLE PAGE 1.LOCATION OF THE SITE 2 - 3 2.SUGGESTION 4 3.LAYOUT OF THE REST AREA 5 - 6 4.ZONING OF THE REST AREA 7 - 8 5.RATIONALE 9 6.BENEFITS 10 7.SITE ANALYSIS 11 8.NEEDS OF THE PROJECT TO 12 THE CLIENT AND COMMUNITY
  • 3. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 2 Location The site is located at Block E lower ground floor in Taylor’s University Lakeside Campus. The site is about 10 x 10m large. The land functions as a small garden without any specific purposes. There are two ways to approach the site. The first way is using the pathway, located between Block C, D and E and the lake. The second way is from the parking zone F. Because of the smaller size of the campus which is about 27 acres, the site is quite accessible from every corner of the campus. It only takes two minutes the most to reach the site from the furthest lecture theatre. SITE PLAN The proposed rest area site
  • 4. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 3 1st – The pathway between the lake and Block C,D and E 2nd – Directly from paring zone F FRONT VIEW OF THE SITE SIDE VIEW OF THE SITE 2nd 1st ACCESS TO THE SITE
  • 5. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 4 SUGGESTIONS Although Taylor’s University has a large 5-storey library and some rest area outside the library which is an open space, it is still insufficient to allow more students to have a proper rest area. Some students have to keep looking for other rest area before class starts. Hence, we decided to propose a new rest area in Taylor’s University. The new rest area shall be near to the lecture halls to ease the students to each the rest area after a tiring lecture. The rest area should also located near the parking zone so that students can sit and wait for someone to come and fetch them in a more comfortable zone, instead of standing under the hot sun. The rest area is divided into two parts. The first part is the ground floor which is a cozy café. There will be plenty of comfortable seats and some tables for those who wants to study or do work. It is air-conditioned and soothing music will be played. The ground floor is surrounded by glass windows so that students can view the beautiful lake. Students can also rest while waiting for their parents, siblings or friends to come and fetch them after the lecture at the rest area. They can easily see if they are coming from the inside of the glass windows. The second part will be the roof part. This café is not like any other café. It has a roof garden with seats and tables too. It’s a more private space because they are surrounded by green shrubs. Students can really calm their mind and forget about their worries for a while. Students have the opportunity to enjoy the beautiful scenery of the lake too.
  • 6. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 5 THE LAYOUT OF THE REST AREA Roof garden : Full of plants and shrubs. Tables and chairs are provided for students to sit down and relax. They can also enjoy the beautiful scenery of the lake Glass Window to allow students from the inside of the café to view the lake Glass balcony so that students can view the lake easily The round floor is a café for students to chat and chill while having a short break. They can drink coffee and rest for a while before the next lecture starts.
  • 7. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 6 THE SIDE VIEW OF THE REST AREA THE OVERALL LAYOUT OF THE REST AREA
  • 8. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 7 ZONING OF THE REST AREA GROUND FLOOR A A Book Shelf with books Coffee Lounge Sofas Sofas Metal table and chairs A large book shelf full of books is attached to the wall for students to read All the chairs will be made of metal and attached to cushions
  • 9. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 8 ROOF GARDEN Public Rest AreaSmall Garden Public Rest Area Plants and shrubsMetal table and chairs The public rest area will include sofas for students to chat and chill The roof garden is full of shrubs and plants
  • 10. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 9 RATIONALE The main reason we propose this new rest area is simply because of the insufficient rest area for students in Taylor’s University. Taylor’s University is not a huge campus but there are quite a number of students (nearly 20,000), all studying under one roof. The most visited places for a short break in Taylor’s University is the 5-storey library, the open space outside the library, which is hot and quite uncomfortable and the restaurants. Early birds get to claim a place to rest, but those who are a bit late will have to keep on searching for another rest area until the next lecture starts. Additionally, the above rest area becomes crowded and noisy; students will not feel comfortable to rest. Without a proper rest place, students cannot relax themselves after a tiring lecture and might not concentrate well in the next lecture. Hence, it is necessary to allocate a proper rest are for the students in the campus.
  • 11. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 10 BENEFITS When there is a proper rest area in Taylor’s University, Those who gain the most benefits will be the students. They can finally have a break alone by themselves without anyone disturbing them. Sometimes they need to be alone because they will feel tired to keep on entertaining the others. Besides that, students can also gain some rest before the next lecture starts. If they do not have enough rest, they will never get to concentrate well during the lectures. Slowly, they will start to lose interest in their academic performances. Hence, it is necessary to gain enough rest in the journey of learning. In addition, some students choose to spend their time with their friends after the lecture ends. Most of them prefer to have a private spot where they can discuss about private stuffs. The new rest area will be an ideal place for them to chat and chill. Next, Taylor’s University is not green enough; we can even count the number of plants using our hand. However, with this new rest area where the top part is a roof garden, the greenery in the campus will definitely increase. The roof garden features a variety of beautiful plants. They are not only nice to look at, they also lower the surrounding temperature and provide fresh air in the campus. The rest area is located right beside parking zone F, so when their parents arrive, they can straightly now by viewing from the rest area. It doesn’t matter if the student is at the ground floor or the roof garden. This is because the ground floor is surrounded by glass windows while the roof garden is an open space.
  • 12. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 11 SITE ANALYSIS The site is a good spot to build a rest area for the students. This is because it is located right beside two tall blocks. During afternoon, where the sun shines the brightest, the site remains cool because the sunlight is blocked by the tall blocks. In addition to the cooling effect, the wind also blows from the lake to the block most of the time. The site also enhances walkability as it is easily accessible from the lecture halls and the paring lots.
  • 13. ICI | Final Project | Building Development Report | The Construction Project ANG WEI YI (0317885) | TANG JU YI (0317735) | FNBE Feb 2014 | Taylor’s University 12 NEEDS OF THE PROJECT TO THE CLIENT AND TO THE COMMUNITY Taylor’s University really needs more space for students to rest properly, because the current rest area is seriously insufficient to allow such a huge number of students to do so. Besides, the students need a proper rest area where is it cooling and comfortable, not some random open space which makes them feel hot and sweaty. The new rest area which is a café suits the students well because it is air-conditioned and makes them feel more comfortable in a hot sunny day. Some students feel tired of the technologies in the modern era; they need a place where they can get closer to nature. Although it is impossible to build a forest in the campus, they can still enjoy the greenery at the top part of the new rest area which is a roof garden. They can breathe some fresh air and escape from the concrete jungle for a short while. Not only that, students also need some private time where not even their friends can come and disturb them. The rest area will be their first choice because students are not allowed to talk loudly so their friends would not want to come and chat with them.