3. 1. Company Profile
1
Location
: Tangerang, Banten, Indonesia
2
Registered Name
: PT. Woo il Indonesia
3
Office Address
: JL.RAYA PASAR KEMIS No. 25, KEC.PASAR KEMIS, DESA
SINDANGSARI, TANGERANG 15560, BANTEN, INDONESIA
4
Authorized Capital : US$ 4,200,000
5
Total Asset
: US$ 14,250,000
6
Tel No.
: + 62 -21- 5935-0101 / Fax No. + 62 -21-5935-0123
7
Work Shop
: Shop (8,023m2) / Yard (44,560m2)
8
Established
: JUNE 30, 1989
9
CEO & Major Share Holder : Jung, Sung-Koo
Education & Experience : Gim Hae, South Korea
Korea University, Seoul
Worked for S-Oil Refinery Co., Ltd. Seoul
3
4. 2. Business fields
<Business fields>
1. Steel Structure Fabricator, Machining & Erection
2. Industrial Machinery Manufacturing & Erection for the
Factory, Refinery and other processing plant.
3. Fabrication of Conveyor, Vessel, Storage tank and Silo.
4. Various Steel Structural Products.
5. Fabrication of Production line for Plywood, Tyre making
Machinery
6. Ducting, Piping, Hydraulic ,Pneumatic and Electrical Work
Head Office
Jl.Raya Pasar kemis-Rajeg No.25, Kel.Sindangsari, Pasar Kemis
Kab.Tangerang – Banten, Tlp : 021-59350101, Fax : 021-59350123
Email : ptwooil@hotmail.com
4
5. 2. 1 Business fields
7. Plastic Extrusion Machinery – Screw Barrel,
Extrusion Mould and Electric Panel
8. Transfer Car, Ware house Drive in Rack.
5
6. IPCR – Indonesia Posco Chosun Refractories
Cilegon - Banten
Fabrication of whole refractory making facility
Structure S/Bin for Mud, D/C & H/S Mixer
Mud Mixer, D/C Mixer & H/S Mixer
Skip Hoist for Mud Mixer, D/C Mixer & H/S Mixer
Mixer Deck Mud,D/C & H/S
Transfer Car
Tar Tank
6
7. KRAKATAU POSCO PROJECT
Cilegon, Banten – Indonesia
BLAST FURNACE
FURNACE TOP
Steel Structure, Platform & Stair
Bleeder Valve Inspection Deck
CASTHOUSE
Mould for Main Iron Runner
Mould for Tilting Runner
Main Iron Trough Cover
7
8. DONG SUH Chemical Project
Cikande – Banten
PROCESS AREA
Steel Construction
Mazzanine Floor
Stair and Deck
Handrail
BOILER HOUSE
Steel Construction
COMPRESSOR HOUSE
Steel Construction
PIPE RACK
Steel Construction
DRYER STRUCTURE
Steel Construction
WARE HOUSE
Steel Construction
PACKING HOUSE
Steel Construction
8
10. RACK SYSTEM
Drive Rack Raw Material
Pallet Rack
Second Floor Rack
10
11. STEEL STRUCTURE
DOOSAN HEAVY INDUSTRIES
Mong Duong II 2x560MW (NET)
Coal Fired Power Project Vietnam :
Internal Platform Silo # & Silo #2
Pipe Rack for Silo #1 & Silo #2
Pre – Heating hanging Platform
Pipe Bridges for Silo #1 & Silo #2
Maintenance Hoist
Roof Hoist
11
12. 3. Location View
PT.WOOIL INDONESIA
Jl.Raya Pasar Kemis-Rajeg No.25
Kel.Sindangsari, Pasar Kemis
Tangerang – Banten
Tlp.021-59350101, Fax.021-59350123
TOL JAKARTA – MERAK
Guard Tol Kebon Jeruk
TOL JAKARTA – MERAK
Guard Tol Cikupa-Kedaton
Our Location, see below further
http://goo.gl/maps/u7Nqf
http://www.panoramio.com/photo/94820277
12
13. 3.1 Organization OF Company
CEO
Engineering
Manager
Project Team
Fabrication
Team
Quality Control
Quality Assura
nce
Administration
Division
<Status of Local Manpower>
• Staff
• Full time
• Part time
: 9 Person
: 25 Person
: 183 Person
13
14. 3.2 Project Organization
SINGLE CONTACT POINT
WITH FULL RESPONSIBILITY
CLIENT
Project Manager
FABRICATION
MANAGER
PROJECT CONTROL
MANAGER
SCHEDULE
COST CONTROL
DOCUMENT CONTROL
MATERIAL CONTROL
PROJECT
ENGINEER
ENGINEERING
MANAGER
OPTIMIZATION STUDY
PROCESS SIMULATION
BASIC ENGINEERING
DETAILED ENGINEERING
OPERATION SERVICES
PROCUREMENT
MANAGER
PURCHASING
EXPEDITING
INSPECTION
TRAFFIC CONTROL
QA / QC
MANAGER
ADM
MANAGER
CONSTRUCTION
MANAGER
COMMISSIONING
MANAGER
CONST.MANAGEMENT
FIELD ENGINEERING
PROCUREMENT
SAFETY
FIELD QA/AC
COMMISSIONING
START-UP
PERFORMANCE TEST
14
15. 3.3 Company Organization
KOREAN
INDONESIAN
Managerial Staff
Administration
Engineers (Graduated)
- Mechanical / Piping
- Electrical
-I&C
Surveyor
Drafter
Field Supervisor
1
9
10
1
1
7
3
4
1
3
2
Summary
4
39
1
15
21. No.
Descriptions
Qty.
Unit
No.
Descriptions
Qty.
Unit
1.
Overhead Crane 5 Ton
2
Set
12.
Scraf Machine
2
Set
2.
Forklift 5 Ton
1
Set
13.
CNC Plasma Cutting Machine, Hypertherm
1
Unit
3.
Forkllift 3 Ton
2
Set
14.
Portable Flame Cutting Machine
6
Set
4.
Milling Machine # 10.
1
Set
15.
Automatic Flame Cutting Machine
3
Set
5.
Milling Machine # 5.
2
Set
16.
Bench Grinder
3
Set
6.
Gun Drill Machine dia 19 mm – 50 mm
1
Set
17.
Air Compressor, 100 HP, 50 HP, 15 HP
3
Set
7.
Radial Drilling Machine
3
Set
18.
Cutting Wheel Machne
2
Set
8.
Plate Roll Bending Machine 15 T
2
Unit
19.
Balancing Machine
1
Unit
9.
Bending Machine
1
Unit
20.
Lathe Machine Max 6 meter, Swing 1.5 meter
5
Set
10.
Magnetic Drill
13
Unit
21.
Planer Miller, wiidth 1,8 mter, length 15 mtr
1
Unit
11.
Shearing Machine
2
Unit
22.
Band Sawing Machine, H650, Amada
1
Unit
21
22. No.
Descriptions
Qty.
Unit
Capacity
1.
DIESEL ENGINE , ENGINE DEUTZ F3L-912
TAHUN 1997
45
Set
MILLER BIG BLUE TYPE : 500DX - 500A / Weld output range : 45 - 500Amp / Rated
welding output : 500A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase,
3 KVA/KW / 25A, 120V AC, 60 Hz
2.
DIESEL ENGINE, ENGINE DEUTZ F3L-912
TAHUN 2002
12
Set
MILLER BIG BLUE TYPE : 602DX - 600A / Weld output range : 45 - 600Amp / Rated
welding output : 600A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase,
3 KVA/KW / 25A, 120V AC, 60 Hz
3.
DIESEL ENGINE, ENGINE DEUTZ F3L-912
TAHUN 2002
1
Set
MILLER BIG BLUE TYPE : 401DX - 400A / Weld output range : 45 - 400Amp / Rated
welding output : 400A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase,
3 KVA/KW / 25A, 120V AC, 60 Hz
4.
DIESEL ENGINE, ENGINE DEUTZ F3L-912
2
Set
MILLER BIG BLUE TYPE : 300A / Weld output range : 45 - 300Amp / Rated welding
output : 300A, 40 Volt DC / 60 - 100% duty cycle / Power rating : single phase, 3
KVA/KW / 25A, 120V AC, 60 Hz
5.
DIESEL ENGINE, THERMAL ARC TA
20/500PS, TAHUN 2000
12
Set
PERKINS 3.1524-500A / Welding current max : 500Amp / Duty cycle : 60 - 100% /
Power : 36 HP (26KW) – 1500 RPM / Voltage : 230V/50Hz, 1 Phase, 12 KVA
6.
WELDING RECTIFIER , TAHUN 2001
60
Set
DC Rectifier SRH 444 - 500A / Merk MILLER / 3 Phase, 220V/380V - 50Hz / Duty
cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding
7.
AUTOMATIC WELDING, TAHUN 2005
1
Set
Merk ESAB / Double Side Horizontal
8.
WELDING RECTIFIER
Year 2013
50
Unit
DC Rectifier SRH 444 - 500A / MILLER / 3 Phase, 220V/380V - 50Hz / Duty cycle :
35% - 100% / Stick (SMAW) - Tig (GTAW) Welding
9.
WELDING MACHINE Co2
20
Unit
INVERTER, MIG Welding Riland 350 A
10.
WELDING RECTIFIER
4
Unit
MILLER Delta Weld 402
11.
WELDING RECTIFIER, TAHUN 1998
7
Unit
DC Rectifier 300 - 400A / AECO/DAIHEN/ESAB LHF 400 / 3 Phase, 220V/380V - 50Hz
Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) Welding
22
23. No.
Descriptions
Qty.
Unit
Capacity
12.
WELDING RECTIFIER
TAHUN 1998
1
Unit
DC Rectifier 400A / THERMAL ARC 400 GTS / 3 Phase, 220V/380V - 50Hz
Duty cycle : 35% - 100% / Stick (SMAW) - Tig (GTAW) / Titanium Welding
13.
WIRE FEEDER (CO)
TAHUN 2000
2
Unit
DC ARC VOLTAGE 15 - 40V - 400A / LINCOLN - LN 25 / 3 Phase, 220V/380V - 50Hz
MIG Welding
14.
WIRE FEEDER (CO)
TAHUN 2000
2
Unit
DC ARC VOLTAGE 15 – 40V - 400A / MILLER / 3 Phase, 220V/380V - 50Hz
MIG Welding
15.
PLASMA CUTTING MACHINE
1
Unit
ESAB - PCM 875 / Max. Carbon Steel : 25mm / SUS Max. : 15mm
16.
GENERATOR SET
SOUND PROOF
1
1
Unit
Unit
DENYO - 180 SPK
Mitsubishi – 100 KVA
17.
GENERATOR SET , SOUND PROOF
2
Unit
HOKUETSU / Cap. : PDG - 35KVA
18.
SANDPOT
4
Set
GRACO – USA / Cap. : 1M3
19.
PAINTING
2
Set
Cap. : 10 Liter
23
24. No.
Descriptions
Qty.
Unit
21.
FORKLIFT
3
Unit
KOMATSU/MITSUBISHI Cap. : 3 Ton
1
Unit
KATO, Cap. : 30T
22.
CRANE TELESCOPIC, TAHUN 1982
Capacity
23.
CRANE TELESCOPIC, TAHUN 1997
1
Unit
P & H, Cap. : 35T
24.
CARGO CRANE, TAHUN 1997
1
Unit
TADANO, Cap. : 3T
25.
KOBELCO, TAHUN 1998
1
Unit
YUTANI, Cap. : 0.8 M3
26.
STONE WALES
1
Unit
Tahun 1992
27.
VEHICLE’S
TRUCK ISUZU ELF 135 PS
TRUCK MITSUBISHI
PICK UP PANTHER
PICK UP KIJANG
DAIHATSU ROCKY 4WD
HINO TRONTON (Blue)
4
Unit
Unit
Unit
Unit
Unit
Unit
Tahun 1997
Tahun 1997
Tahun 1997
Tahun 2003
Tahun 1995
Tahun 1998
2
2
1
1
1
24
25. 6. Experience Projects
CLIENT / LOCATION
PROJECT NAME
PROJECT PERIOD
PT. SK KERIS
1) Fabrication & Erection Quenching Stack
1992. 06 ~ 1993.07
TANGERANG
2) Mechanical & Piping Work For Utility Area
1993. 09 ~ 1994.02
-WEST JAVAINDONESIA
3) Fabrication & Erection Work For Steel Structure , Piping &
Equipment For ISBL Area
1994. 02 ~ 1995.11
4) Erection ISP- 4 Polyester Spinning M/C Piping Work
1995. 12 ~ 1997.04
5) Modification Cp-1 & Overhaul
1997. 09 ~ 1998.02
6) Sm#2 For ISP-7a Project
1998.10 ~ 1999.05
HYUNDAI DUTA GRAHA
1) Fabrication & Erection Steel Structure Work
1996.11 ~ 1997.05
PT. CHEIL JEDANG
1) Equipment Erection & Piping Installation
1997.07 ~ 2010.12
2) DISMANTLING & ERECTION OF PADDLE MIXER
2003.07 ~ 2009.12
PT. GARUDA TWIN JAYA
1) Fabrication & Erection Tape Coating Machine
1997.09, 2004.07
BOSOWA CEMENT PROJECT
1) Fabrication & Erection Work For Steel Structure
1997.09 ~ 2010.04
PT. SAMICK INDONESIA
1) Fabrication & Erection Water Painting System
1996.04 ~ 2003.02
2) Fabrication & Erection Duct Line
2003.02 ~ 2010.05
PT. ASPEX KUMBONG
1) Fabrication & Erection Auto Welding System for Container
Line
1998.06 ~ 2011.01
PT. SEPARINDO INDUSTRY
1) Fabrication & Erection Equipment & Piping Work
2001.08 ~ 2008.03
PT. DOOSAN HEAVY INDUSTY
1) SIPAT AIR DUCT PROJECT
2005.07 ~ 2006.02
2) PSA - RTGC PROJECT
2006.3 ~ 2006.11
1) Installation Press System
2006.09 ~ 2007.12
REMARK
PT. GOLD STAR PAPERTECH
25
26. 6. Experience Projects
CLIENT / LOCATION
PROJECT NAME
PT. Hankook Tyre
1) Tyre Making machinery
Cikarang, West Java
PROJECT PERIOD
REMARK
2) Hydraulic Trans machine
2011 ~ 2012
3) Fabrication & Erection Work
4) Transfer Car
5) Catridge Roller
POCSO E&C
Cilegon, Banten
IPCR (Refractory making
Factory)
1)
2)
3)
4)
5)
6)
7)
Steel Structure Fabrication for Krakatau Steel
COG, Gas Holder Tank
Inspection Deck, Handrail for Blast Furnace
Iron Runner Mould Fabrication
Iron Runner Trough Fabrication
Mould Cover Fabriation
Duct, Flange, etc.
2012 .11~ 2013.12
1)
2)
3)
4)
Storage Tank 72 Set
Steel Structure
Mud Making machinery
Hoist Crane
2013 .02~ 2013.09
1)
2)
3)
4)
5)
6)
7)
Steel Structure for Chemical Plant
Process Are Building
Boiler House Constrution
Compressor House Construction
Ware House Constructoin
Packing House Construction
Pipe Rack Construction
Cilegon, Banten
Dong Suh Chemical
Cikande, Banten
2013 .06~ 2013.09
26
28. 7. List of Clients
List of CLIENT
PT. KRAKATAU STEEL
PT. ASPEX KUMBONG
PT. CHEIL JEDANG
PT. HANKOOK CERAMIC
PT. DOOSAN HEAVY INDUSTRY
PT. SAMICK INDONESIA
PT. HYUNDAI HEAVY INDUSTRY
PT. INNE DONGHWA
PT. KALIMAS PLYWOOD
PT. INDAH KIAT
PT. INTI INDORAYON UTAMA
PT. KAYU LAPIS
PT. RIMBUNAN HIJAU
PT. DONG INNE
PT. WAENIBE
PT. WIJAYA GROUP
PT. SUMBER GRAHA SEJAHTERA
PT. KOSTRAMAS JAYA
PT. BASIRIH INDUSTRI
PT. PUTRA SUMBER UTAMA
List of CLIENT
PT.SK KERIS
PT. POSCO E&C
PT. HANJUNG Heavy Industry
PT. HASKO JAYA
PT. TIRTA MAHAKAM
PT. HANKOOK TYRE
PT. PANCA USAHA PALOPO
PT. SEPARINDO
PT. LEEWON
PT. BOSUNG INDONESIA
PT. FEDERAL TIRE
PT. GARUDA TWINJAYA
PT. DONGSUNG CHEMICAL
PT. DAESHIN
PT. EURASIA WOOD
PT. ABHIRAMA KRESNA
PT. OMEGA PRIMAWOOD
PT. BALIKPAPAN FOREST
PT. BADE MAKMUR ORISSA
PT. PRATAMA ABADI
28
29. JL.RAYA PASAR KEMIS NO.25, KEC.PASAR KEMIS,
DESA SINDANGSARI, TANGERANG 15560, BANTEN, INDONESIA
Tel : + 62 – 21 – 5935 – 0101, Fax: + 62 – 21 – 5935-0123, Mobile : + 62 -812-100-7151
Email: wooilskj@hotmail.com
jesijames9@gmail.com
29