1. Standard Renewable Energy
photovoltaic installs 1
Basis Architecture
multi-use downtown
revitalization
Park Lane Development 2
Whyard remodel/addition 3
commercial
Craft & Design Center 4
Xanterra Employee Dining 5
senior housing
Fox Run Good Samaritan Village 6
multi-family housing
The Timbers at Estes Park 7
single family residential
Cheley-Klebe, Hill, Greer, McMillon 8
collaborative projects 9
Whitney Brooks Overstreet
3344 South Holly Street
Denver, CO 80222
(303) 915-5987
whitney.brooks@yahoo.com
2. Denver, Jefferson County, Aurora, Greenwood Village, Boulder County,
City of Boulder, Broomfield, Louisville, Westminster, Conifer, Colorado Springs
Standard Renewable Energy
photovoltaic installs 1
Basis Architecture
multi-use downtown
revitalization
Park Lane Development 2
Whyard remodel/addition 3
commercial
Craft & Design Center 4
Xanterra Employee Dining 5
senior housing
Fox Run Good Samaritan Village 6
multi-family housing
The Timbers at Estes Park 7
single family residential
Cheley-Klebe, Hill, Greer, McMillon 8
collaborative projects 9
Whitney Brooks Overstreet
3344 South Holly Street
Denver, CO 80222
(303) 915-5987
whitney.brooks@yahoo.com
1
4. 1692 Big Thompson Avenue, Suite 100
GENERAL NOTES
B A S I S
Estes Park, Colorado 80517
1.) All construction shall conform to the following applicable codes; as amended by Town of Estes Park
International Building Code 2003
Whyard Remodel/Addition
International Plumbing Code 2003
International Mechanical Code 2003
National Electrical Code 2008 ed.
All other applicable codes.
Paul & Sally Whyard
The Contractor and its sub-contractors shall obtain all licences and permits required by the
authorities having jurisdiction.
Estes Park, CO
2.) The Contractor and sub-contractors are to become familiar with the site and the drawings, and
shall report, to the Architect, any discrepancies within or between the Contract Documents and
the Work, discovered during the course of their review of the drawings and/or examination of the Work.
3.) The Contractor shall be solely responsible for safety on the jobsite and shall take all necessary
Tiki Bar & Deck (proposed)
4.)
precautions to protect the public and adjacent properties from damage during construction.
Construction debris shall be legally removed on a continuing basis. The site shall be maintained
2 story residence (addition)
5.)
in a 'neat' appearance.
Gallery of Glass (addition)
Dimensions are to face of stud, concrete or masonry unless other wise noted. Column dimensions
are to centerline. Vertical dimensions are to concrete slab, wood subfloor or top of wall or beam.
vox: 970.586.9140
Mountain Munchies (remodel)
Dimensional discrepancies discovered shall be reported to the Architect prior to installation of Work
potentially affected. fax: 970.586.9149
1 story residence (existing)
Scaling drawings to determine exact dimensions for construction is not permitted. If dimensions are
required but not indicated, request necessary information from the Architect.
basisarchitecture.com
c BASIS
6.) Provide fire-blocking per IBC Section 717. Fire blocking is required in concealed spaces, including
Architecture, P.C.
but not limited to, in stud walls at the floor-ceiling level and at 10-foot intervals, in openings around
5940 sf total
vents, ducts, etc and at all interconnections between concealed horizontal and vertical spaces.
Provide draft-stopping as indicated on drawings.
7.) Provide adequate blocking in walls and ceilings for all installations occurring later in construction,
including, but not limited to, equipment, accessories, cabinets, door tracks, finish carpentry, etc.
Standard Renewable Energy
8.) All construction shall be adequately braced to resist construction loads and to prevent distortion
or damage due to construction activities, wind, weather, etc.
9.) All fire-resistive assemblies are to comply with the complete listings indicated, as described in the
10.)
I.B.C., Underwriters Laboratories and Gypsum Association references, most current addition.
All penetrations of fire-resistive assemblies shall be protected by listed materials which conform to
approved Underwriters Laboratories listings for 'Through penetration fire-stop assemblies' and/or
photovoltaic installs 1
as otherwise permitted by the Building code.
Issue:
Each subcontractor shall be responsible for fire-stops required by penetrations by their portion of
the Work, unless otherwise directed by the General Contractor.
Basis Architecture
Final Review
multi-use downtown
11.) All components, equipment and other installations shall comply with the manufacturer's written Date:
instructions and recommendations.
3/22/2009
12.) not used
13.) Use metal edge at all gypsum wallboard corners. Ensure factory edge or provide metal edge trim
where gypsum wallboard meets a different material. revitalization
Park Lane Development 2
Provide water-resistant (type 'X' where req'd) gypsum wallboard at all wet locations, u.o.n.
14.) Materials and finishes shall be as detailed on drawings or as described by clarification drawings
Whyard remodel/addition 3
issued by the Architect for items not described.
15.) Insulation shall be as detailed on drawings. Batt insulation is to be
1692 Big Thompson Avenue, Suite 100
Paul & Sally Whyard
MECHANICAL GUARD FOR EXHAUST FAN
installed where blown-in insulation is impractical, for fire-safing and fire-blocking and where
B A S I S
Estes Park, Colorado 80517
Estes Park, Colorado 80517
Max. Height
EL: 130' - 0" otherwise required. Minimum value for roof insulation is to be R-38.
16.) not used
commercial
CORRUGATED METAL ROOF
189 East Riverside Drive
17.) All openings into the building envelope, including, but not limited to exterior joints at windows
2X8 FASCIA, TYP
and doors, openings between wall and foundation, between wall and roof construction,
Whyard 'Tiki Bar'
PROPOSED SIGN LOCATION
Craft & Design Center 4
penetrations of utility services, etc shall be sealed, caulked, gasketed or weatherstripped to
CORRUGATED METAL SIDING, TYP
prevent air leakage.
Xanterra Employee Dining 5
18.) not used
19.) Fabrication of all manufactured installations dependent on finished dimensions of other aspects
vox: 970.586.9140
T.O. 2nd Floor
EL: 112' - 6 1/2" (+/-)
of the Work shall be field verified. fax: 970.586.9149
NEW basisarchitecture.com
20.) not used c BASIS
Architecture, P.C.
senior housing
21.) Do not split apart sets of construction documents. The general condition of the contract
EXISTING
for construction affirm that what is required by one part of the construction documents
shall be "as required by all."
Fox Run Good Samaritan Village 6
T.O. 1st Floor
EL: 100' - 0"
SHEET INDEX
2 North Elevation A1.0 SITE PLAN & 1ST Final Review
FLOOR PLAN
Issue:
Date:
A2.0 2ND FLOOR PLAN3/22/2009 STUDY
& CODE
multi-family housing
1/4" = 1'-0"
Sheet Title:
1 Site/Roof Plan
N A3.0 EAST & NORTH ELEVATIONS
A3.1 WEST & SOUTH ELEVATIONS Site Plan & 1st Floor
A4.0 SECTIONS & ASSEMBLIES Plan
1/8" = 1'-0" A4.1
S2.0
SECTIONS & DETAILS
FRAMING PLANS TheNo:
Sheet Timbers at Estes Park 7
Paul & Sally Whyard
A1.0
S2.1 STRUCTURAL DETAILS
Estes Park, Colorado 80517
189 East Riverside Drive
Whyard 'Tiki Bar'
single family residential
1 7
__ of __
I T E C T U R E P. C. Cheley-Klebe, Hill, Greer, McMillon 8
Sheet Title:
East & North Elevations
Sheet No:
collaborative projects 9
1 East Elevation A3.0
Whitney Brooks Overstreet
1/4" = 1'-0" 3 7
__ of __
A R C H I T E C T U R E P. C.
3344 South Holly Street
Denver, CO 80222
(303) 915-5987
whitney.brooks@yahoo.com
3
5. Craft & Design Center
YMCA of the Rockies
Estes Park, CO
adult/family crafts
3 classrooms/future classroom
leather room/kiln room
office/cashier area
6180 sf total
Standard Renewable Energy
photovoltaic installs 1
Basis Architecture
multi-use downtown
revitalization
Park Lane Development 2
Whyard remodel/addition 3
commercial
Craft & Design Center 4
Xanterra Employee Dining 5
senior housing
Fox Run Good Samaritan Village 6
multi-family housing
The Timbers at Estes Park 7
single family residential
Cheley-Klebe, Hill, Greer, McMillon 8
collaborative projects 9
Whitney Brooks Overstreet
3344 South Holly Street
Denver, CO 80222
(303) 915-5987
whitney.brooks@yahoo.com
4
6. Xanterra Employee Dining Facility
Xanterra Parks & Resorts
Estes Park, CO
dining/lounge/kitchen/office/staging/storage
2000 sf
completed 2007
Standard Renewable Energy
photovoltaic installs 1
Basis Architecture
multi-use downtown
revitalization
Park Lane Development 2
Whyard remodel/addition 3
commercial
Craft & Design Center 4
Xanterra Employee Dining 5
senior housing
Fox Run Good Samaritan Village 6
multi-family housing
The Timbers at Estes Park 7
single family residential
Cheley-Klebe, Hill, Greer, McMillon 8
collaborative projects 9
Whitney Brooks Overstreet
3344 South Holly Street
Denver, CO 80222
(303) 915-5987
whitney.brooks@yahoo.com
5
7. Fox Run Good Samaritan Village
Good Samaritan Society
Greeley, CO
chapel/public & private dining
commercial kitchen/breakroom
main lobby/sitting areas/2 lounges
spa/exercise room/locker rooms
bank/hair care/store/offices
50 residential units
96,000 sf
Standard Renewable Energy
year completed phase 1 of 5: 2005
photovoltaic installs 1
Basis Architecture
multi-use downtown
revitalization
Park Lane Development 2
Whyard remodel/addition 3
commercial
Craft & Design Center 4
Xanterra Employee Dining 5
senior housing
Fox Run Good Samaritan Village 6
multi-family housing
The Timbers at Estes Park 7
single family residential
Cheley-Klebe, Hill, Greer, McMillon 8
collaborative projects 9
Whitney Brooks Overstreet
3344 South Holly Street
Denver, CO 80222
(303) 915-5987
whitney.brooks@yahoo.com
6
8. The Timbers Condominiums
The Sanctuary, LLC
Estes Park, CO
3 units @ 2500 sf each
year completed phase 1 of 5: 2008
Standard Renewable Energy
photovoltaic installs 1
Basis Architecture
multi-use downtown
revitalization
Park Lane Development 2
Whyard remodel/addition 3
commercial
Craft & Design Center 4
Xanterra Employee Dining 5
senior housing
Fox Run Good Samaritan Village 6
multi-family housing
The Timbers at Estes Park 7
single family residential
Cheley-Klebe, Hill, Greer, McMillon 8
collaborative projects 9
Whitney Brooks Overstreet
3344 South Holly Street
Denver, CO 80222
(303) 915-5987
whitney.brooks@yahoo.com
7
9. 552 WEST ELKHORN AVE
ESTES PARK, COLORADO
B A S I
ARCHITECTUR
P. O. BOX 2421
McMillon Residence: Steve Lane, AIA
vox: 970.586.9140
3200 sf; completed 2005
fax: 970.586.9149
basis_arch@airbits.com
c BASIS
Architecture, P.C.
Issue:
Date:
11/16/2004
McMillion Residence
Lot 15, Eagle Rock Ranches
Estes Park, Colorado 80517
Greer Residence: 2400 sf; completed 2006
Sheet Title:
Perspectives
Sheet No:
__ of __
Standard Renewable Energy
photovoltaic installs 1
Basis Architecture
multi-use downtown
Hill Spec House: 2700 sf; completed 2007
revitalization
Park Lane Development 2
Whyard remodel/addition 3
commercial
Craft & Design Center 4
Xanterra Employee Dining 5
senior housing
Fox Run Good Samaritan Village 6
Cheley-Klebe Residence: 2500 sf; May 2009 estimated completion
multi-family housing
The Timbers at Estes Park 7
single family residential
Cheley-Klebe, Hill, Greer, McMillon 8
collaborative projects 9
Whitney Brooks Overstreet
3344 South Holly Street
Denver, CO 80222
(303) 915-5987
whitney.brooks@yahoo.com
8
10. Our Lady of the Mountains Shepherd of the Mountains
Catholic Church Addition/Remodel Lutheran Church
Standard Renewable Energy
photovoltaic installs 1
Basis Architecture
multi-use downtown
revitalization
Basis Architecture Office Building Kirk’s Fly Shop Park Lane Development 2
Whyard remodel/addition 3
commercial
Craft & Design Center 4
Xanterra Employee Dining 5
senior housing
Ravencrest Dining Hall Riverspointe Downtown Fox Run Good Samaritan Village 6
multi-family housing
The Timbers at Estes Park 7
single family residential
Cheley-Klebe, Hill, Greer, McMillon 8
Rocky Mountain
Evangelical Free Church Estes Park Visitors Center collaborative projects 9
Whitney Brooks Overstreet
3344 South Holly Street
Denver, CO 80222
(303) 915-5987
whitney.brooks@yahoo.com
9