SAFETY PRESENTATION




ISOLATION AND TAGGING
ISOLATION AND TAGGING


You isolate to stop :

• A motor from switching on (or off)

• A substance such as liquid, gas or powder getting in or
  out

• Two hazardous substances mixing


                                                       2
ISOLATION AND TAGGING
You isolate to :

• Allow maintenance or inspection

• Take a piece of plant out of service for a certain time

• Change a process

• Make sure that even isolated plant cannot be started by
  mistake somewhere else

• Stop the chance of human error or mechanical failure
                                                        3
ISOLATION AND TAGGING

  Isolation of equipment will make sure:


• That it will not start while you are working on it


• All persons working on the machine are protected


• Damage to the equipment is prevented.

                                                       4
ISOLATION AND TAGGING
   Isolation points can be :
• battery isolator switches
• air or water system
  gate/shut off valves
• electrical switches or any
  other physical means of
  ensuring personnel can
  not turn on the energy
  source.


                                5
ISOLATION AND TAGGING
                  A tag is put on an
                  isolation point to warn
                  other people not to
                  change the state of the
                  isolation point




                                      6
ISOLATION AND TAGGING

AUMS uses four basic types of tags

• Out of Service

• Personal Danger

• Commissioning and Testing

• Information

                                     7
ISOLATION AND TAGGING
       ISOLATION AND TAGGING

      OUT OF SERVICE
These tags are used to prevent
defective equipment being started,
operated or used which may result in
injury to personnel or further
equipment damage.




                                       8
ISOLATION AND TAGGING


          PERSONAL DANGER
A Personal Danger tag provides protection
for personnel working on equipment.
No person shall de-isolate, operate any
switch or valve whilst a personal danger
tag is in place.
The only person who can place or remove
this tag is the person whose name
appears on the tag.
                                            9
ISOLATION AND TAGGING


  COMMISSIONING AND TESTING
This tag gives an employee exclusive
control over the plant operation.

It is used during commissioning,
calibration, testing, inspection and
maintenance when equipment is
required to be in operating mode.


                                       10
ISOLATION AND TAGGING
       ISOLATION AND TAGGING

INFORMATION TAGS

These tags are used to pass on
information which may reduce
inefficiencies, doubling up or constant
reporting.




                                          11
ISOLATION AND TAGGING
                    Equipment must be
                    isolated and tagged
                    with an OUT OF
                    SERVICE tag at each
                    isolation point




                                     12
ISOLATION AND TAGGING




Switches and valves
must be switched to
the isolated position
and tagged by an
authorised person

                               13
ISOLATION AND TAGGING




Each person working
on the equipment
must have a PERSONAL
DANGER tag at each
isolation point
                              14
ISOLATION AND TAGGING
ISOLATION AND TAGGING

Before starting work, test the isolation. Discharge any
energy that MIGHT be stored in the system.
Each person must remove his or her own Personal
Danger Tag at the completion of the job or prior to
leaving the work site.
If the task is incomplete, the Out of Service tag remains
on the isolation point.
Always communicate isolation conditions with your
supervisor and the supervisor of the next crew coming
on shift.

                                                          15
SAFETY PRESENTATION




       THANK YOU

Mais conteúdo relacionado

Mais procurados

Machine Guarding Ppt
Machine Guarding PptMachine Guarding Ppt
Machine Guarding Ppt
Colleen True
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
Jost2012
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
sankarnagar
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
jasonmorgan
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
vtsiri
 

Mais procurados (20)

Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Machine Guarding Ppt
Machine Guarding PptMachine Guarding Ppt
Machine Guarding Ppt
 
An OSHA - LOTO Presentation
An OSHA - LOTO PresentationAn OSHA - LOTO Presentation
An OSHA - LOTO Presentation
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
 
Welding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh RajputWelding and Cutting | Gaurav Singh Rajput
Welding and Cutting | Gaurav Singh Rajput
 
Electrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards swElectrical safety training based on osha 1910 standards sw
Electrical safety training based on osha 1910 standards sw
 
Working at-height
Working at-height Working at-height
Working at-height
 
working at height
working at heightworking at height
working at height
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
safety training
safety training   safety training
safety training
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Presentation working at height
Presentation working at heightPresentation working at height
Presentation working at height
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
Ladder Safety- Safety First!
Ladder Safety- Safety First!Ladder Safety- Safety First!
Ladder Safety- Safety First!
 
Confined space entry natt7029
Confined space entry   natt7029Confined space entry   natt7029
Confined space entry natt7029
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
 
PPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie EPPT ON PERMIT TO WORK, by Ekemezie E
PPT ON PERMIT TO WORK, by Ekemezie E
 

Destaque

DM water conservation
DM water conservationDM water conservation
DM water conservation
Dilip Kumar
 
Ro system animation
Ro system animationRo system animation
Ro system animation
Indiana Agak
 
Ro Operation And Maintenance Manual
Ro Operation And Maintenance ManualRo Operation And Maintenance Manual
Ro Operation And Maintenance Manual
Deivanayagam Pillai
 

Destaque (20)

Process Safety Management in Design, Construction & Commissioning | Lalit K...
Process Safety Management in Design, Construction &  Commissioning | Lalit  K...Process Safety Management in Design, Construction &  Commissioning | Lalit  K...
Process Safety Management in Design, Construction & Commissioning | Lalit K...
 
Electrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentationElectrical Commissioning and Arc-Flash Safety presentation
Electrical Commissioning and Arc-Flash Safety presentation
 
Commissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating ConsiderationsCommissioning of Industrial Projects - Cost Estimating Considerations
Commissioning of Industrial Projects - Cost Estimating Considerations
 
Shell CSR
Shell CSRShell CSR
Shell CSR
 
Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma
 
Sewerage Treatment Plant (stp) 2016
Sewerage Treatment Plant (stp) 2016Sewerage Treatment Plant (stp) 2016
Sewerage Treatment Plant (stp) 2016
 
DM water conservation
DM water conservationDM water conservation
DM water conservation
 
HV Circuit Breaker Testing
HV Circuit Breaker TestingHV Circuit Breaker Testing
HV Circuit Breaker Testing
 
Reverse Osmosis System Basics
Reverse Osmosis System BasicsReverse Osmosis System Basics
Reverse Osmosis System Basics
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
BASIC CIVIL ENGINEERING
BASIC CIVIL ENGINEERINGBASIC CIVIL ENGINEERING
BASIC CIVIL ENGINEERING
 
ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)ABCB(air blast circuit breaker)
ABCB(air blast circuit breaker)
 
Reverse osmosis (ro) plant an overview-saeed
Reverse osmosis (ro) plant  an overview-saeedReverse osmosis (ro) plant  an overview-saeed
Reverse osmosis (ro) plant an overview-saeed
 
A Relationship Between Calcium Phosphate And Silica Fouling In Wastewater Ro ...
A Relationship Between Calcium Phosphate And Silica Fouling In Wastewater Ro ...A Relationship Between Calcium Phosphate And Silica Fouling In Wastewater Ro ...
A Relationship Between Calcium Phosphate And Silica Fouling In Wastewater Ro ...
 
Ro system animation
Ro system animationRo system animation
Ro system animation
 
Water treatment process by RO UF
Water treatment process by RO UFWater treatment process by RO UF
Water treatment process by RO UF
 
Ro Operation And Maintenance Manual
Ro Operation And Maintenance ManualRo Operation And Maintenance Manual
Ro Operation And Maintenance Manual
 
De-mineralization of Water
De-mineralization of WaterDe-mineralization of Water
De-mineralization of Water
 
progress in civil engg by aatif sadiq
progress in  civil engg by aatif sadiqprogress in  civil engg by aatif sadiq
progress in civil engg by aatif sadiq
 
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...
Basic Civil and Environmental Engineering, Unit I [Based on First year Engine...
 

Semelhante a Safety presentation isolation and tagging

New holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manualNew holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manual
fjskksmem
 
New holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manualNew holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manual
fjsekksmemm
 
New holland e175 c crawler excavator service repair manual instant download
New holland e175 c crawler excavator service repair manual instant downloadNew holland e175 c crawler excavator service repair manual instant download
New holland e175 c crawler excavator service repair manual instant download
ufjjsjdkkskem
 

Semelhante a Safety presentation isolation and tagging (11)

LOTO 2
LOTO 2LOTO 2
LOTO 2
 
Hazardous Energy Control by MSHA
Hazardous Energy Control by MSHAHazardous Energy Control by MSHA
Hazardous Energy Control by MSHA
 
8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout8 steps-to-ensure-proper-lockout-tagout
8 steps-to-ensure-proper-lockout-tagout
 
Kioti daedong dk801 tractor service repair manual
Kioti daedong dk801 tractor service repair manualKioti daedong dk801 tractor service repair manual
Kioti daedong dk801 tractor service repair manual
 
Kioti daedong dk751 tractor service repair manual
Kioti daedong dk751 tractor service repair manualKioti daedong dk751 tractor service repair manual
Kioti daedong dk751 tractor service repair manual
 
New holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manualNew holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manual
 
New holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manualNew holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manual
 
New holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manualNew holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manual
 
New holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manualNew holland e175 c crawler excavator service repair manual
New holland e175 c crawler excavator service repair manual
 
New holland e175 c crawler excavator service repair manual instant download
New holland e175 c crawler excavator service repair manual instant downloadNew holland e175 c crawler excavator service repair manual instant download
New holland e175 c crawler excavator service repair manual instant download
 
Safety on machines.pptx
Safety on machines.pptxSafety on machines.pptx
Safety on machines.pptx
 

Mais de Warwick Bursey (6)

Safety presentation manbasket
Safety presentation manbasketSafety presentation manbasket
Safety presentation manbasket
 
Induction warwick revision
Induction warwick revisionInduction warwick revision
Induction warwick revision
 
General mining and underground induction
General mining and underground inductionGeneral mining and underground induction
General mining and underground induction
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation1
Presentation1Presentation1
Presentation1
 

Safety presentation isolation and tagging

  • 2. ISOLATION AND TAGGING You isolate to stop : • A motor from switching on (or off) • A substance such as liquid, gas or powder getting in or out • Two hazardous substances mixing 2
  • 3. ISOLATION AND TAGGING You isolate to : • Allow maintenance or inspection • Take a piece of plant out of service for a certain time • Change a process • Make sure that even isolated plant cannot be started by mistake somewhere else • Stop the chance of human error or mechanical failure 3
  • 4. ISOLATION AND TAGGING Isolation of equipment will make sure: • That it will not start while you are working on it • All persons working on the machine are protected • Damage to the equipment is prevented. 4
  • 5. ISOLATION AND TAGGING Isolation points can be : • battery isolator switches • air or water system gate/shut off valves • electrical switches or any other physical means of ensuring personnel can not turn on the energy source. 5
  • 6. ISOLATION AND TAGGING A tag is put on an isolation point to warn other people not to change the state of the isolation point 6
  • 7. ISOLATION AND TAGGING AUMS uses four basic types of tags • Out of Service • Personal Danger • Commissioning and Testing • Information 7
  • 8. ISOLATION AND TAGGING ISOLATION AND TAGGING OUT OF SERVICE These tags are used to prevent defective equipment being started, operated or used which may result in injury to personnel or further equipment damage. 8
  • 9. ISOLATION AND TAGGING PERSONAL DANGER A Personal Danger tag provides protection for personnel working on equipment. No person shall de-isolate, operate any switch or valve whilst a personal danger tag is in place. The only person who can place or remove this tag is the person whose name appears on the tag. 9
  • 10. ISOLATION AND TAGGING COMMISSIONING AND TESTING This tag gives an employee exclusive control over the plant operation. It is used during commissioning, calibration, testing, inspection and maintenance when equipment is required to be in operating mode. 10
  • 11. ISOLATION AND TAGGING ISOLATION AND TAGGING INFORMATION TAGS These tags are used to pass on information which may reduce inefficiencies, doubling up or constant reporting. 11
  • 12. ISOLATION AND TAGGING Equipment must be isolated and tagged with an OUT OF SERVICE tag at each isolation point 12
  • 13. ISOLATION AND TAGGING Switches and valves must be switched to the isolated position and tagged by an authorised person 13
  • 14. ISOLATION AND TAGGING Each person working on the equipment must have a PERSONAL DANGER tag at each isolation point 14
  • 15. ISOLATION AND TAGGING ISOLATION AND TAGGING Before starting work, test the isolation. Discharge any energy that MIGHT be stored in the system. Each person must remove his or her own Personal Danger Tag at the completion of the job or prior to leaving the work site. If the task is incomplete, the Out of Service tag remains on the isolation point. Always communicate isolation conditions with your supervisor and the supervisor of the next crew coming on shift. 15
  • 16. SAFETY PRESENTATION THANK YOU