SlideShare a Scribd company logo
1 of 29
Trail Bridge Capacity Development in Ethiopia Presenter: Markus Ischer Country Programme Director Helvetas Ethiopia October 11, 2010, Tunis, Tunisia HELVETAS
Outline of Presentation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1. Ethiopia at a glance (World Bank, UNDP) Surface Area 1,1 mio km 2 Population (2008)  85.2 Mio HDI-Rank (2008)  105 out of 109 Population below poverty line below 2$ per day (2007) 78% Literacy rate, adult (2009)  43% Access to potable water (2006)    42% GNI per capita (2008)  280 US$ Average distance to all weather road (2009) 11.8 km Average travel time of rural households (2005) 4 to 6 hrs/day
2 .  Crossing problems in rural Ethiopia
 
Sebara Dildey bridge – crossing blue Nil, ET
Timeline Activity 2003-2006 Pilot projects, 13 TB built, mainly in Oromia Region December 2007 Exposure visit by Helvetas Ethiopia & 3 ERA Officials to Nepal  March 2008 Fact finding mission by Helvetas Nepal & Helvetas Ethiopia in Oromia, Amhara & Tigray Regions May 2008 Signing of Cooperation Agreement between ERA & Helvetas Ethiopia December 2008 14 Ethiopian personnel trained in Nepal on trail bridge technology (management level) June 2009 Project implementation agreement signed  between HET and 3 RRAs for the construction of 9 bridges November 2009 – March 2010 Construction of 9 bridges, in three different regions April – September 2010 Preparation 6 TB in Tigray (D-type) and 4 TB in Gambella region (2 N-type, 2 D-type) Present  status 10 trail bridges ready for construction. 3.  Milestones in  trail bridge projects development
4. Helvetas Ethiopia Trail Bridge Project ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
5. Approaches ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
6. Partnership with ERA / RRA’s  ,[object Object],[object Object]
7. South – south collaboration - principles ,[object Object],[object Object],[object Object],[object Object]
8. Achievements ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
9. Bridges constructed Steel Truss Bridge Numbers: 2 Location: Yem Woreda, SNNPR Span: 24m / 28m
…… .. N-Type  Trail Bridges Numbers: 2 Location: Atsbi Womberta Woreda, Tigray Span: 96 m, 112 m
………… . Trail Bridges D-Type Numbers: 18 Location: various regions Span: average 90 m
10. Cost Summary (by bridge type) Cost type category D-Type, Span 85 mt US$ N-Type, Span 85 mt US$ 1. Preparatory work:  feasibility study, survey, design / cost estimate 4’000 5’000 2. Construction, materials:  cables, bulldog grips, steel parts, cement, tools, transportation 40’000 50’000 3. Construction, labors:  skilled, unskilled, foremen, driver, running cost 9’000 18’000 4. Capacity Building:  south – south collab-oration, social organization support, trainings etc 18’000 23’000 5. Management:  coordination, supervision, monitoring (main office Addis Ababa) 18’000 25’000 Cost/m D-Type:  1’047 N-Type:  1’424 Total 89’000 121’000
11. Challenges ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
12. Experiences gained
……… .
……… .
……… .
……… .
……… .
……… .
……… .
……… . Land dispute
13. Trail bridges – under preparation
…… . Gambella Region: 2 N-Type / 2 D-type Tigray Region: 6 D-Type Construction period: October 15. 2010 – end of February 2011
Thank you for your attention!

More Related Content

What's hot

Mass transit system
Mass transit systemMass transit system
Mass transit systemSagar Kaptan
 
Design of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimationDesign of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimationVijay Kumar
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESDavinderpal Singh
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 Sachin PatiL
 
Highway And traffic Engineering
Highway And traffic EngineeringHighway And traffic Engineering
Highway And traffic EngineeringLatif Hyder Wadho
 
Implementation of magnetized water to improve the properties of concrete
Implementation of magnetized water to improve the properties of concreteImplementation of magnetized water to improve the properties of concrete
Implementation of magnetized water to improve the properties of concreteIAEME Publication
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume StudiesMd Tanvir Alam
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement designRohit Ranjan
 
4.engineering surveys
4.engineering surveys4.engineering surveys
4.engineering surveysMani Vel
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signalBhavya Patel
 
BASICS OF CIVIL ENGINEERING
BASICS OF CIVIL ENGINEERINGBASICS OF CIVIL ENGINEERING
BASICS OF CIVIL ENGINEERINGajal jose
 
Environmental Engineering -II Unit I
Environmental Engineering -II Unit IEnvironmental Engineering -II Unit I
Environmental Engineering -II Unit IGAURAV. H .TANDON
 
Location controls and highway classification
Location controls and highway classificationLocation controls and highway classification
Location controls and highway classificationRana Ibrahim
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planningPiter Biswas
 

What's hot (20)

Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Bombay road plan
Bombay road planBombay road plan
Bombay road plan
 
Low cost road
Low cost roadLow cost road
Low cost road
 
Design of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimationDesign of sewerage collection system and cost estimation
Design of sewerage collection system and cost estimation
 
Traffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIESTraffic studies ORIGIN AND DESTINATION STUDIES
Traffic studies ORIGIN AND DESTINATION STUDIES
 
Unit 3
Unit 3Unit 3
Unit 3
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Highway And traffic Engineering
Highway And traffic EngineeringHighway And traffic Engineering
Highway And traffic Engineering
 
Implementation of magnetized water to improve the properties of concrete
Implementation of magnetized water to improve the properties of concreteImplementation of magnetized water to improve the properties of concrete
Implementation of magnetized water to improve the properties of concrete
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
Design of sewers
Design of sewersDesign of sewers
Design of sewers
 
4.engineering surveys
4.engineering surveys4.engineering surveys
4.engineering surveys
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signal
 
BASICS OF CIVIL ENGINEERING
BASICS OF CIVIL ENGINEERINGBASICS OF CIVIL ENGINEERING
BASICS OF CIVIL ENGINEERING
 
Environmental Engineering -II Unit I
Environmental Engineering -II Unit IEnvironmental Engineering -II Unit I
Environmental Engineering -II Unit I
 
Location controls and highway classification
Location controls and highway classificationLocation controls and highway classification
Location controls and highway classification
 
Sewerage design
Sewerage designSewerage design
Sewerage design
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planning
 

Similar to Helvetas Ethiopia trail bridge experience

SCIE Forum - Interreg
 SCIE Forum - Interreg SCIE Forum - Interreg
SCIE Forum - InterregSCIE
 
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...tejcagampang
 
Why Labor Based Technology in Nepal
Why Labor Based Technology in NepalWhy Labor Based Technology in Nepal
Why Labor Based Technology in NepalManoj Neupane
 
Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...European Commission
 
EuroVelo and Ukraine
EuroVelo and UkraineEuroVelo and Ukraine
EuroVelo and Ukrainevelotransport
 
Présentation Christian Salletmaier - EMICT Forum 2011
Présentation Christian Salletmaier - EMICT Forum 2011Présentation Christian Salletmaier - EMICT Forum 2011
Présentation Christian Salletmaier - EMICT Forum 2011EMICTForum
 
Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010Morten Meyer
 
"Building a transport system for a sustainable society" Jesmond Library Talk ...
"Building a transport system for a sustainable society" Jesmond Library Talk ..."Building a transport system for a sustainable society" Jesmond Library Talk ...
"Building a transport system for a sustainable society" Jesmond Library Talk ...Northumbria University
 
Mahmoud Resume English
Mahmoud Resume EnglishMahmoud Resume English
Mahmoud Resume Englishmahmoudfem
 

Similar to Helvetas Ethiopia trail bridge experience (20)

SCIE Forum - Interreg
 SCIE Forum - Interreg SCIE Forum - Interreg
SCIE Forum - Interreg
 
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
29688-wd-document_en_20_december_2010_ie_contracts_signing_ceremony_for_the_i...
 
CV_Kelemenis
CV_KelemenisCV_Kelemenis
CV_Kelemenis
 
Summary of the strategic initiative logistics
Summary of the strategic initiative logisticsSummary of the strategic initiative logistics
Summary of the strategic initiative logistics
 
81-CS
81-CS81-CS
81-CS
 
NMT City Wide
NMT City Wide NMT City Wide
NMT City Wide
 
Why Labor Based Technology in Nepal
Why Labor Based Technology in NepalWhy Labor Based Technology in Nepal
Why Labor Based Technology in Nepal
 
EOSC-Pillar
EOSC-PillarEOSC-Pillar
EOSC-Pillar
 
Ws B 2 I.Tartaglia
Ws B 2 I.TartagliaWs B 2 I.Tartaglia
Ws B 2 I.Tartaglia
 
Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...Grand opening building transport infrastructure to fuel europe's economic eng...
Grand opening building transport infrastructure to fuel europe's economic eng...
 
Fiona McLean
Fiona McLeanFiona McLean
Fiona McLean
 
Fiona McLean
Fiona McLeanFiona McLean
Fiona McLean
 
EuroVelo and Ukraine
EuroVelo and UkraineEuroVelo and Ukraine
EuroVelo and Ukraine
 
Ahmed's CV- May, 2015
Ahmed's CV- May, 2015Ahmed's CV- May, 2015
Ahmed's CV- May, 2015
 
ISMED PPD: Assessment Report
ISMED PPD: Assessment ReportISMED PPD: Assessment Report
ISMED PPD: Assessment Report
 
Présentation Christian Salletmaier - EMICT Forum 2011
Présentation Christian Salletmaier - EMICT Forum 2011Présentation Christian Salletmaier - EMICT Forum 2011
Présentation Christian Salletmaier - EMICT Forum 2011
 
Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010Kees | Bikeability Workshop December 2010
Kees | Bikeability Workshop December 2010
 
"Building a transport system for a sustainable society" Jesmond Library Talk ...
"Building a transport system for a sustainable society" Jesmond Library Talk ..."Building a transport system for a sustainable society" Jesmond Library Talk ...
"Building a transport system for a sustainable society" Jesmond Library Talk ...
 
Mahmoud Resume English
Mahmoud Resume EnglishMahmoud Resume English
Mahmoud Resume English
 
Curriculum Vitae_EU FORMAT_RAILWAY
Curriculum Vitae_EU FORMAT_RAILWAYCurriculum Vitae_EU FORMAT_RAILWAY
Curriculum Vitae_EU FORMAT_RAILWAY
 

Recently uploaded

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 

Recently uploaded (20)

GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 

Helvetas Ethiopia trail bridge experience

  • 1. Trail Bridge Capacity Development in Ethiopia Presenter: Markus Ischer Country Programme Director Helvetas Ethiopia October 11, 2010, Tunis, Tunisia HELVETAS
  • 2.
  • 3. 1. Ethiopia at a glance (World Bank, UNDP) Surface Area 1,1 mio km 2 Population (2008) 85.2 Mio HDI-Rank (2008) 105 out of 109 Population below poverty line below 2$ per day (2007) 78% Literacy rate, adult (2009) 43% Access to potable water (2006) 42% GNI per capita (2008) 280 US$ Average distance to all weather road (2009) 11.8 km Average travel time of rural households (2005) 4 to 6 hrs/day
  • 4. 2 . Crossing problems in rural Ethiopia
  • 5.  
  • 6. Sebara Dildey bridge – crossing blue Nil, ET
  • 7. Timeline Activity 2003-2006 Pilot projects, 13 TB built, mainly in Oromia Region December 2007 Exposure visit by Helvetas Ethiopia & 3 ERA Officials to Nepal March 2008 Fact finding mission by Helvetas Nepal & Helvetas Ethiopia in Oromia, Amhara & Tigray Regions May 2008 Signing of Cooperation Agreement between ERA & Helvetas Ethiopia December 2008 14 Ethiopian personnel trained in Nepal on trail bridge technology (management level) June 2009 Project implementation agreement signed between HET and 3 RRAs for the construction of 9 bridges November 2009 – March 2010 Construction of 9 bridges, in three different regions April – September 2010 Preparation 6 TB in Tigray (D-type) and 4 TB in Gambella region (2 N-type, 2 D-type) Present status 10 trail bridges ready for construction. 3. Milestones in trail bridge projects development
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. 9. Bridges constructed Steel Truss Bridge Numbers: 2 Location: Yem Woreda, SNNPR Span: 24m / 28m
  • 14. …… .. N-Type Trail Bridges Numbers: 2 Location: Atsbi Womberta Woreda, Tigray Span: 96 m, 112 m
  • 15. ………… . Trail Bridges D-Type Numbers: 18 Location: various regions Span: average 90 m
  • 16. 10. Cost Summary (by bridge type) Cost type category D-Type, Span 85 mt US$ N-Type, Span 85 mt US$ 1. Preparatory work: feasibility study, survey, design / cost estimate 4’000 5’000 2. Construction, materials: cables, bulldog grips, steel parts, cement, tools, transportation 40’000 50’000 3. Construction, labors: skilled, unskilled, foremen, driver, running cost 9’000 18’000 4. Capacity Building: south – south collab-oration, social organization support, trainings etc 18’000 23’000 5. Management: coordination, supervision, monitoring (main office Addis Ababa) 18’000 25’000 Cost/m D-Type: 1’047 N-Type: 1’424 Total 89’000 121’000
  • 17.
  • 26. ……… . Land dispute
  • 27. 13. Trail bridges – under preparation
  • 28. …… . Gambella Region: 2 N-Type / 2 D-type Tigray Region: 6 D-Type Construction period: October 15. 2010 – end of February 2011
  • 29. Thank you for your attention!