SlideShare uma empresa Scribd logo
1 de 63
Baixar para ler offline
This is a uk trade and investment document




     HELPING YOUR BUSINESS GROW INTERNATIONALLY



                                                  RAILWAY SECTOR
                                             FACT-FINDING MISSION TO TURKEY
                                                                   MAY 2011
Produced by:	
Bob Docherty,
International Business Adviser,
Railway Sector, UKTI,
No 1 Victoria Street
London, SW1H 0ET




© Crown Copyright 2011
You may re-use this information (not including logos, images and case studies) free of charge in
any format or medium, under the terms of the Open Government Licence. To view this licence visit
www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, 
The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk
Where we have identified any third party copyright information you will need to obtain permission from
the copyright holders concerned.
Any enquiries regarding this document should be sent to us at: enquiries@ukti.gsi.gov.uk 
or telephone: +44 (0)20 7215 8000 (Monday – Friday 09.00-17.00)
This document is also available from our website at www.ukti.gov.uk
CONTENTS
1	     Purpose and Methodology				                            2
2	     Executive Summary				                                 3-5
3	     Brief History and Milestones	                         5-7
4	     Ministry of Transport and Communications	            8-13
	      Rail Structure and Organisation
5	     TCDD – the State-owned Mainline Rail Company	       14-24
6	     Urban Railways	                                     24-33
7	     The Turkish Contracting Sector	                     34-35
8	     Rail Associations and Academia in Turkey		          35-37
9	     Privatisation and Inward Investment into Turkey		   37-38
10	    Eurasia Rail Exhibition	                              39
11	    Doing Business in Turkey 	                          40-41
	      Appendices	
I	     Case Study – The Marmary Crossing	                  42-45
II	    Case Study – High-Speed Rail Project		                46
III	   TCDD Subsidiaries 		                                47-51
IV	    UK and Turkish Business Sectors in Detail		         51-52
V	     Overview of Turkey 		                               52-57
	      ISPAT – the Turkish Inward Investment Agency		
VI	    Organisations Visited		                             58-59
1                             PURPOSE AND METHODOLOGY
                              This report has been created to provide UK companies with an introduction to the rail sector in
                              Turkey. It explores the expansion of both urban and high-speed rail, and recognises the desire
                              to improve freight distribution, both across the country and cross-border as a land-bridge. Prior
                              to the fact-finding mission, preparation included desk studies and research. This was followed
                              by a series of meetings in the market to examine the sector at first hand, interviewing officials
                              and reviewing and assessing opportunities. This report has been prepared by Bob Docherty at
                              UK Trade  Investment (UKTI), with the assistance of Mr Tim Gray from the Railway Industry
                              Association and UKTI colleagues in Turkey.


                              1.1 Acknowledgements and Delegation
                               Name                          Company                 Position
                               Bob Docherty                  UKTI                    International Business Adviser
                               Tim Gray                      RIA*                    International Business Development
                                                                                     Director


                              1.2 UKTI Turkey Support
                              Recognition must be given to the UKTI colleagues in Turkey, for their assistance in building the
                              programme and developing contacts in the rail sector.


                               Name                                               Location
                               Asiye Yaman                                        UKTI Ankara
                               Özge Dursun                                        UKTI Istanbul


                              1.3 Organisations Visited
                              The full list of companies and organisations visited in the course of the research are listed in the
                              Appendix to this report.


                              1.4 UKTI Railway Sector Contacts
                              Mr Derek Griffiths                                  Mr Bob Docherty
                              Head of Rail Sector Railways Sector, UKTI           International Business Adviser
                              Tel: +44 20 7215 4773                               Rail Sector, UKTI
                              Email: derek.griffiths@ukti.gsi.gov.uk              Tel: +44 7879 661 598
                                                                                  bobdocherty@btinternet.com
                              Mr Mike Carroll
                              Head of Mass Transport, UKTI                        UKTI
                              Tel: +44 20 7215 4569                               No 1 Victoria Street
                                                                                  London SW1H OET
                                                                                  www.ukti.gov.uk




2   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
EXECUTIVE SUMMARY
Railways are enjoying a period of significant and sustained investment in Turkey, with
major investment in high-speed lines, rail-led solutions to freight and distribution, and urban
transportation in major cities across the country. A commitment to invest US$45 bn has been
made (US$23.5 bn before 2023), in a programme of expansion up until 2035. The detail of this
expansion programme is:

„„   2,622 km of high-speed track by 2013
                                                                                                                         2
„„   A further 6,792 km of high-speed track by 2023
„„   4,707 km of new conventional track by 2023
„„   A
      n additional 2,960 km of high-speed track and 956 km of conventional track in the period
     from 2023 to 2035

The national economy has been growing and strengthening. Turkey is currently the 16th largest
economy in the world and the sixth largest economy relative to the EU, according to GDP figures
(at Purchasing Parity Power) in 2009. Growth is forecast at 6.7 per cent in the period 2011 to
2018; GDP is around US$618 bn, with inflation at around 6.5 per cent.

Turkey is being increasingly recognised as a country that is modernizing rapidly, growing a
competitive economy that is moving up the skills chain, and with increasing capability. Market
sectors that are expanding include electronics, white goods, automotive sectors, and defence
and aerospace. Privatization has been underway since 2002. Indeed, there is a suggestion in the
market that private capital will have a role to play in railways, certainly in the provision of a
high-speed station in Ankara on a public private partnership (PPP) basis for which the tender
has been published, on a build operate transfer (BOT) basis for high-speed lines, and possibly
also in freight.

Regarding the rail infrastructure, the new high-speed lines will be double-track and electrified, and
with line speeds of 250 kph. Rolling stock will be partially constructed or assembled within Turkey.

A number of major cities have urban rail systems, Light Rapid Transit systems (LRT), tram or
metro of some kind. Extensions or new lines are much in demand and being planned. In Istanbul
alone, there are plans to provide 118 km of new lines by 2018 and a further 276 km by 2023.

Rail is seen as the preferred solution for freight, with new freight hubs planned around the
country that will use the high-speed lines and the Marmary Crossing to carry freight overnight.
The environmental issues associated with freight are well recognised in Turkey. Road congestion
is an issue, especially at border crossings, with as much as 95 per cent of freight currently on the
roads. There is an interest in growing railway freight in the market for domestic and international
routes. Turkey is keen to capitalise on its strategic geographical location.




                                                                              RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   3
2
                              Turkey is developing rapidly and has become a manufacturing force in Europe. This will further
                              drive the demand for rail freight between Asia and Europe. (Turkey has borders with eight
                              countries). The future may, therefore, see an end to the monopoly of Turkish State Railways’
                              (TCDD) railway operations, with cross-border freight and passenger ‘open access’ operators
                              being allowed access to track. To facilitate change and to comply with EU directorates, TCDD
                              is undergoing reform, separating infrastructure, passenger and freight operations in a far-reaching
                              programme of modernisation. TCDD is currently a vertically-integrated railway, also owning
                              in-house manufacturing facilities for rolling stock and track materials, as well as maintenance units.
                              Ports and a rail ferry have been part of the portfolio but the former are now being privatised, and the
                              latter upgraded to include a ferry terminal with Russian gauge to accommodate cross-border traffic.

                              Historically, TCDD has owned a great deal of the maintenance and supply chain market. Many
                              of these facilities have been acquired in partnership, with technology transferred in-house, for
                              example, for track components, locomotives, wagons and passenger cars and their components.
                              UK companies may see this as an opportunity.

                              In a meeting with Academia regarding the rail sector, UKTI formed the impression that a step
                              change is happening in the Turkish market and that this should be accompanied by a step change
                              in technology, particularly with the demand for high-speed rail, and the drive to grow the freight
                              market. There is an opportunity for companies to introduce services and technology into the market.

                              The market is ready to work with international partners and there is desire to diversify these links.
                              In the wider (political) picture, Turkey is a member of NATO and wishes to join the European
                              Union (EU). Currently, both France and Germany appear to be resistant to Turkish accession (to
                              the EU), but despite this, both have traditionally strong positions in the Turkish rail market, with
                              more recent involvement from the Chinese, Japanese and Koreans.


                              2.1 Opportunities for UK Companies
                              With the growing rail market and high levels of investment, there are likely to be opportunities
                              for UK companies in Turkey. The Government is investing in the rail sector. There is investment
                              in high-speed and urban rail which may make these areas a particular focus for UK companies,
                              but freight and distribution are expanding too, and the drive for cross-border traffic may attract
                              companies with skills in inter-operability and logistics. UK skills in PPP and (real estate)
                              development may also contribute, as the market is changing and privatisation is progressing,
                              creating a growing desire to maximise use of assets, and return on investments. Professional
                              Services are likely to find opportunities in most of the previous areas. All new lines will be
                              electrified, so capacity for electrification may be an opportunity dependent on project phasing.

                              In supply chain rail areas, there has been extensive collaboration with overseas companies, so the
                              sector has a great deal of experience in technology transfer. The desire for local content, if not
                              production, remains strong. Performance will be admired, particularly for products or services
                              that can facilitate reductions in costs and energy consumption. European standards are widely-
                              recognised. Technology areas of interest include signalling and control, and rolling stock systems.




4   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
2
It is vital for UK companies to take care and pay close attention when approaching the market.
Sensitivity to the progress already made by local participants in advancing the rail sector is
considered essential, as is local partnership or a local market presence. A long-term approach is
also required.

Turkey is also recognised as having a very strong construction sector, capable of working in third
markets, and there may well be opportunities for UK companies here in support of the major
Turkish players.

Generally, major project work is advertised and is open to international competition. International
funders and Development Banks may also be a source of opportunity for feasibility work for
new-build projects and upgrades.

The UKTI team locally has good contacts and a strong market presence, and remains an
important resource to support UK industry in entering and developing the market.




BRIEF HISTORY AND
MILESTONES
3.1 Mainline 8Railway
The first rail system in Turkey was constructed in 1856 by a UK company, connecting the port
of Izmir with the Aydin. Railways were developed elsewhere around the country by other private
                                                                                                                      3
companies, before being nationalised in 1927.

The evolution of the railway system in Turkey is shown in table in 3.2 (Milestones) shows.

The first urban rail service in Turkey dates back to 1875, when the “Tünel” opened. The Tünel is
an underground funicular line of only 573 m that connects the Bosphorus. It rises 60 metres up
to the busy Taksim square area, with trains operating every 3.5 minutes and the journey lasting
about 1.5 minutes.

From Steam Trains to High Speed Service



                         1856                           2010




                                                                           RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   5
3
                              3.2 Milestones
                               Year       Milestone                                     Comment
                               1856       The first railway from Izmir to Aydin         Developed by a UK company
                               1924       4,000 km of track in operation                Nationalisation began
                               1927       Ports added to rail portfolio                 5,500 route km of track in operation
                               1950       Route km reaches 9,204 km
                               1953       Railway becomes a State Enterprise and        9,441 route km in operation
                                          TCDD is formed
                               1984       TCDD becomes a State Economic                 10,263 route km in operation
                                          Institution
                               2003       Rail transport is opened to include private
                                          sector participation
                               2004       Six ports are offered for privatization       10,991 km of track in operation
                               2008       First high-speed line is constructed
                               2009       High-speed operations begin
                               2010       2.85 million passengers carried on high-
                                          speed lines
                                          Projected Milestones
                               2023       Network of 26,251 route km                    Adding 14,336 route km, of which 10,000
                                                                                        will be high-speed lines
                               2035       Further 1200 km of high speed lines

                              Turkey has grown its rail network to around 11,000 route km (as at March 2011), and has a
                              programme of expansion currently underway and with more planned.

                              The intention is to extend the network by about 14,000 km by 2023, including 10,000 km of
                              high-speed lines by 2023 and further track by 2035.

                              There is a strong suggestion that some of the future expansion may draw in private capital in the
                              form of BOT (Build Operate Transfer) developments. Concession times of 30 to 35 years were
                              mentioned, and this approach could also be adopted for high-speed lines.




6   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
3
Section 5 of this report covers mainline railways in detail.




3.4 Urban Transportation
Turkey is creating or extending urban transport in most, if not all, of its major cities to meet growing
demand, using a mix of modes, including road and rail. (It may properly be described as guided
systems, as all forms of rail including monorail are under consideration). Buses and mini-bus services
are usually private sector, whilst the metropolitan authorities are responsible for rail.

Section 6 of this report examines urban transport in detail.




                                                                               RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   7
4                             4 MINISTRY OF TRANSPORT
                              AND COMMUNICATION
                              Rail Structure and Organisation

                              www.ubak.gov.tr/

                              This Ministry is responsible for all transport, air, roads, railways and ports in the structure
                              shown below. Key elements of note in the rail sector are TCDD, the state rail organisation, and
                              DLH, a turnkey contractor. TCDD is a vertically-integrated system, which also has extensive
                              manufacturing and maintenance facilities. DLH can be considered a turnkey contractor that has
                              evolved to include design, construction and project management capability, able to take on major
                              projects such as the Marmary Crossing, a multi-billion dollar, complex project.

                              Priorities and Projects
                              The Ministry has defined three main targets for the rail sector which are to:
                              1.	 provide an attractive, substantial and affordable high-speed rail service
                              2.	 enhance existing track to allow increased speed of operation
                              3.	 streamline TCDD through restructuring and privatisation

                              Organisation
                              The current structure of the Ministry is shown Opposite.




8   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
4




RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   9
4
                              4.1 DLH General Directorate of Ports Railways and Airports
                              www.dlh.gov.tr

                              DLH was established in 1934, initially as a public works body. A series of re-organisations
                              followed, with activity extending to include ports, airports civil defence and railways, it became a
                              General Directorate for the Ministry of Transportation and Communications in 1986.

                              DLH is the state-owned entity whose role is to deliver major infrastructure projects, from
                              planning and design through to project management and construction. It is involved in some
                              of the biggest projects in Turkey. DLH is the responsible directorate for the implementation of
                              projects and reports to the Ministry of Transportation.


                              4.2 Safety and Regulation
                              Currently, the railway is self-regulating in terms of safety. However, the proposed structure to
                              be adopted soon will include “DEKAK” which will be a separate railway accident investigation
                              board, reporting directly to the Ministry of Transport and Communication, rather than TCDD.
                              The proposed structure, which will probably be adopted following the next general elections in
                              Turkey (at time of writing, June 2011), is shown in Section 5.


                              4.2.1 Statistics and Safety Data
                              TCDD publishes an annual statistical report, including data relating to accidents, numbers of
                              casualties and much more (see link below). A snapshot of the number of accidents, followed by
                              passenger-km and freight tonnes-km is shown below for interest.

                              www.tcdd.gov.tr/Upload/Files/ContentFiles/2010/istatistik/2004_2008.pdf




                              4.3 Projects
                              A number of rail projects are in planning, but have not yet been released for construction. (Refer
                              to the TCDD website for current information).

                              The aim is to extend the network to over 26,550 km of track by adding more than 14,000 route
                              km, by 2023, the centenary of the Republic. Included in this is 10,000 km of high-speed track.
                              New track will be double-track electrified and it will use modern signalling.




10   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
4




RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   11
4
                              4.4 Enhancing Logistics and Distribution Capability
                              The Ministry is aware of the need to improve the logistics capability of Turkey to maintain
                              competiveness and support economic growth. There is a desire to exploit Turkey’s strategic
                              location as a bridge between Europe and Asia. Rail freight currently has a very modest share
                              of all freight carried, at around five per cent. The country is keen to increase this as the sheer
                              volume of trucks on the road is causing significant delays at Turkey’s border crossings on a daily
                              basis, with queues that regularly reach 15 km long.

                              Rail is seen as the desired solution for freight that wins on a number of fronts. It offers significant
                              capacity, with a low carbon footprint. The potential to run freight services at night over the high-
                              speed network and through the Marmary tunnel crossing are also desirable ways of adding capacity.

                              To support the growth in rail freight and assist in attracting international traffic to the rail sector,
                              Turkey’s logistical capability is in need of improvement. As such, a range of 16 hubs and
                              logistics centres are being developed, four of which are already complete. The map below shows
                              the detail. These, too, may offer opportunities for UK Industry.

                              4.5 Privatisation and Private Capital in Railways




                              www.oib.gov.tr




12   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
4
Both mainline and urban railways remain in public ownership for now, despite a programme
of privatisation that is underway in Turkey. This privatisation process is managed by OIB, the
Turkish Government agency, and is covered in this report in Section 9. Currently, the impact of
privatisation in the rail sector is limited to the privatisation of some ports under TCDD control.

In future, there is a possibility of opening up the market to private capital and private operators in
several ways:

1.	  he new high-speed station planned for Ankara will be delivered on a PPP basis. After several
    T
    delays, a tender was issued, before being later withdrawn. At the time of writing, the timetable
    for the process has still not been finalised. If the PPP model is successful, the same approach
    may be used for further stations on new high-speed routes, so careful planning of this tender
    will bring benefits in future.
2.	  he plan to enhance international freight may provide opportunities for UK companies in
    T
    operations.
3.	  uild Operate Transfer (BOT) appears to be the favoured option for attracting private capital
    B
    into rail. Selected lines may be tendered on a BOT basis, with a proposed concession period
    of up to 30 or even 35 years. No process or policy has yet been adopted for such private sector
    engagement, but at the time of preparation of this report, BOT looks likely to be the preferred
    solution for the future.

.




                                                                            RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   13
5                             TCDD - THE STATE-OWNED
                              MAINLINE RAILWAY COMPANY
                              www.tcdd.gov.tr

                              TCDD is the Turkish state-owned, vertically-integrated railway company. Headquartered in
                              Ankara, it has seven regional directorates around the country and, in addition to the rail and
                              maintenance operations, TCDD also has an extensive manufacturing capability in both rolling
                              stock and track components. It is a part of the Ministry of Transport and Communications. In
                              order to comply with European Legislation, a reorganisation of TCDD is imminent, most likely
                              following the elections that are planned for June 2011. (chart as pubished including acronyms)




14   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
5
5.1 TCDD Activities
TCDD’s current activities are extensive and diverse, going beyond rail operations and
maintenance to include:

„„   train operations
„„   rail infrastructure
„„   ownership and management of all stations
„„   track construction
„„   track maintenance
„„   rolling stock maintenance
„„   manufacturing units for rolling stock
     -- locomotives
     -- passenger cars
     -- freight wagons
„„   factories
     -- ADF ve Ray
     -- Kaynak
     -- Afyon ve Siva Beton Travers
     -- Çamaf
„„   four ports – (a further three have already been privatised)
„„   shared ownership of manufacturing units
     -- Eurotem
     -- Izban
     -- Vademsa

Detail on most of these facilities can be found on the TCDD website. TCDD has or has had in the
past joint ventures or collaboration with Austrian, French, German and Korean partners.


5.2 Physical Data
A detailed report on physical conditions, including bridges, track curvature, tunnels, wagon
resource, plant and equipment, as well as statistics covering TCDD operations can be found at:
http://www.tcdd.gov.tr/Upload/Files/ContentFiles/2010/istatistik/2004_2008.pdf




                                                                        RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   15
5
                              5.2.1 Route Km and Detail
                               Route km (2011)                Volume / units
                               Conventional                   11,048 km
                               Electrified                    2,305 km
                               Signalled                      2,665 km
                               Dual Track                     403 km
                               Triple Track                   28 km
                               Quadruple Track                9 km
                               High-Speed Lines               867 km
                               Total                          11,915 km


                              5.2.2 Existing and Planned Route Map




16   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
5
5.2.3 Rolling Stock
 Type                                           Active units
 High-Speed Train Sets                          12
 Diesel Locos                                   470
 Electric Locos                                 52
 DMUs                                           46
 EMUs                                           91
 Passenger Car                                  46
 Freight Wagon (TCDD)                           16,189
 Freight Wagon (3rd party)                      2,486


5.2.4 Employment

 Category                                    Personnel                Interpretation
 Civil Servants Including Contracted Staff   16,089                   White Collar
 Permanent and Temporary Staff               15,590                   Blue Collar
 Total                                       31,679


5.2.5 Market Share
At the peak of its powers in the 1950’s, TCDD had significant market share, which has fallen
considerably in modern times, following decades of relative under-investment compared to the
road sector.




                                                                      RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   17
5
                              5.2.6 Proposed Organisation
                              The new organisation, expected to come into force later this year, will look as follows:




                              This new structure will comply with European legislation regarding rail operations.


                              5.2.7 Lake Van – Rail Ferry Operations
                              Ports Van Gölü Feribot Isletmeciligi Establishment is the part of TCDD that operates the
                              train ferry service at Lake Van. Plans include investment in modern ferries to support freight
                              distribution across and through Turkey.




18   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
5
Lake Van Operations




5.3 Budget Allocation and Priority Projects
Railway in general and TCDD in particular, are enjoying an upturn in investment, following
decades of under investment, certainly in comparison to roads. The investment is aimed at
recovering market share by providing much-improved services. In the passenger sector, growth is
planned in the high-speed and urban sector, whilst in freight Turkey is keen to support economic
growth by improving rail and multi-modal freight services, logistics and distribution capability.
This will extend to include the creation of an international, trans continental land-bridge for
freight, linking Europe to the Middle East and Asia to Europe.


5.3.1 TCDD Annual Budget Evolution




                                                                        RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   19
5
                              5.3.2 Key Projects
                              Railways are expanding in Turkey. The following projects are underway, with the extensions of
                              the high-speed network constituting a key area:

                              „„   expansion of high-speed rail
                              „„   Marmaray project
                              „„   rehabilitation of existing railway lines
                              „„   modernisation of rolling stock and infrastructure
                              „„   improved logistics and distribution, including multi-modal options
                              „„   improvement of block train management
                              „„   establishment of rail RD facilities.


                              5.4 High-Speed Operations
                              The high-speed (HS) lines between Ankara and Eskeşhir commenced revenue operations on
                              13 March 2009. Around 2.85 million passengers used the service from its launch until end of
                              December 2010.

                              Since July 2010, the lines have operated 22 trips per day, carrying around 6,000 passengers every
                              weekday and 8,000 at weekends.

                              The tender for a new high-speed station required for Ankara has been issued on a PPP basis and
                              this may well be a model for future high-speed stations, encouraging private capital into the
                              sector. The tender process experienced some delays and had been re-issued without a specific
                              time frame for closure at the time of preparing this report. This process may be a useful case
                              study to determine how the market adopts the PPP process for future use.

                              Siemens has stated that it would consider producing a “Velaro” type train in Turkey, adapted
                              for local use, and capable of running at 400 kph. During the Eurasia Rail exhibition, there were
                              reports that the technology transfer could open with 20 per cent local content, rising to 50 per
                              cent or more in future. There may be other suitors seeking an investment in Turkey in this area.




20   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
5
5.5 TCDD Port Operations
TCDD has responsibility for four ports, with three (Mersin, Samsun and Bandirma) already
having been privatised. The privatisation process will continue, so the number of ports under
TCDD control will diminish.

The volumes passing through the TCDD ports are shown below for information.




                                                                         RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   21
5
                              5.5.1 Freight Transportation Potential
                              TCDD is confident that the traditional and historic trade route between Asia and Europe can be
                              revived and expanded using rail to exploit Turkey’s strategic location.

                              It has analysed the market and believes there is a potential US$75 bn trade flow pa. The
                              organisation wishes to offer a route to market for companies wishing to obtain a share of this.




                              Existing Rail Border Crossings

                               Location                                          Borders / Connects to
                               Kapikule                                          Bulgaria and onward to Europe
                               Uzunköprü                                         Greece and beyond
                               Kapıköy                                           Iran and central Asian Markets
                               Islahiye                                          Syria and Iraq
                               Nusaybin                                          Syria and Iraq


                               The intention is to improve the network and entice operators to use rail to deliver into the heart
                              of markets in Europe. A great deal of work is needed to deliver such a service, including access
                              and interoperability agreements with neighbouring countries.

                              Access to CIS / Russian gauge (1,520 mm) is catered for by means of a Black Sea rail ferry, and
                              gauge conversion facilities, where bogies can be changed. Investment to modernise and improve
                              train ferry services is proposed.



22   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
5
Existing International Freight
The charts below show the freight between Turkey and Europe, and Turkey and Asia. The
proportion of international freight is modest, whilst imports into Turkey from the Middle East
have largest share of cross-border freight. These charts suggest the extent of activity required to
grow international freight.




International Freight Traffic Classification*




                                                                           RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   23
5
                              A press announcement during April 2010 reflected the desire of TCDD to extend Turkey’s reach
                              as an international freight destination:

                              “Turkey’s Independent Industrialists and Businessmen’s Association (MUSIAD) signed a
                              co-operation agreement with the Lithuanian railways at the beginning of April 2010.

                              MUSIAD conducts initiatives for the realisation of the Viking Project to connect Turkey and
                              Middle Eastern countries with the Baltic countries. The agreement was signed by the Foreign
                              Relations Commission of MUSIAD and the General Manager of the Lithuania Railroad.

                              The Viking Project also involves the commercial connection between Lithuania-Belarus-Ukraine
                              (Odessa) and Turkey (Samsun, Istanbul)-Syria-Iraq-Iran.”




6
                              URBAN RAILWAYS
                              Demand for urban transport is growing in Turkey, with its increasingly-congested cities. Rail-
                              based solutions are recognised as delivering solutions in an environmentally-friendly manner,
                              and there is a belief that investment in rail (in its many forms, including light and heavy rail
                              commuter systems), will continue, certainly in the major cities that have sufficient traffic density
                              to meet the economic criteria for rail.




                              6.1 Urban Transportation – Metropolitan Authority
                              Urban transportation is generally the responsibility of the metropolitan authorities, which own
                              and manage rail operations. However, bus services are generally privately-owned and run,
                              including the ubiquitous mini bus services which are found in most cities.




24   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
6
6.2 UITP
www.uitp.org/regions/europe/turkey.cfm

UITP, the International Association for Public Transport, has opened a liaison office in Turkey
to better serve its members there and maintain current awareness of industry trends in important
areas, such as finance.

Contacts are listed on the UITP website:
Enis Hemedoglu, UITP Turkey Office Manager, enis.hemedoglu@uitp.org
Sibel Bahtiyar, UITP Turkey Office Assistant, sibel.bahtiyar@uitp.org

UITP Turkey Liaison Office
Tel: +90 212 569 5786
Fax: +90 212 568 9956

Ferhatpasa Metro Facilities Esenler
TR 34200 Istanbul
TURKEY


6.3 Metro Systems in Detail
When researching this report, there was insufficient time to visit all of the metropolitan
authorities with planned or existing rail systems, though we did have very positive exchanges in
both Ankara and Istanbul. Detailed information is included in this report. Additional information
was kindly provided by Ms Sibel Gursoy at Ulasim, the Istanbul metropolitan authority, and a
list of cities with transportation authorities is included below, which may be useful for companies
addressing the market.


 City                                             System
 Adana                                            Heavy Rail
 Ankara                                           Heavy Rail Metro
                                                  Light Rail
 Antalya                                          Tramway
 Bursa                                            Light Rail
 Eskişehir                                        2 x Lines Light Rail
 Istanbul                                         Heavy Rail
                                                  Light Rail
                                                  Tramway
                                                  Funicular
 Izmir                                            Heavy Rail
 Konya                                            Tramway
 Kayseri                                          Tramway
 Samsun                                           Light Rail




                                                                          RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   25
6
                              6.4 Adana
                              http://www.adana.bel.tr

                              Situated in southern Turkey, Adana has a light metro line. Construction began in 1992, with
                              the first, mostly surface section finally opened in March 2009. The second phase, around 6 km
                              (Akincilar Station-Cukurova University), is currently under construction and due to be ope
                              rational during 2011. This will raise the daily passenger carrying capacity to 660,000.
                              The website has more detail, including the strategic plan for 2010 – 2014 (in Turkish).

                              www.adana.bel.tr/adanabeltr/data/pagetopic/63/stratejikplan-20102014.pdf

                              6.5 Ankara
                              www.ankara.bel.tr/TasarimOgeleri/defaultEn.aspx

                              The Turkish capital has some 3.5 million inhabitants in the metropolitan area, who are served by
                              a mixture of rail systems: the commuter rail system delivered by TCDD, Ankaray a light railway
                              system and the “Metro. Ankara is developing new projects and has a detailed masterplan called
                              Urban Transportation Plan of Ankara for 2015.

                              The first “Metro”, the M1 (Kizilay-Batikent) metro line (14.6 km) started operation in December
                              1997 with 108 cars. Ankaray, became operational in 1996 serving Dikimevi-Asti (8.5 km).

                              Currently under construction, M2 Kizilay-Cayyolu will add 16.5 km to the metro system. M3
                              Batikent-Sincan to Torekent will be 15.3 km and M4 Tandogan-Kecioren will be 10.5 km.

                              6.5.1 Ankaray
                              www.ankaray.com

                              Built in 1996, this system runs mostly underground on an east to west axis and provides an
                              interchange with bus services and the heavy metro in the city centre. An extension of around 12
                              km is planned. Full detail can be found on the website:

                              http://www.ankaray.com.tr/component/content/article/6-genel-tanitim.html


                              6.5.2 Ankara Metro
                              www.ankarametrosu.com.tr

                              Ankara metro system covers 14.6 route km. It is a double-track, heavy rail system serving 12
                              stations, supported by a depot. It travels from southeast to northwest through the city centre.

                              Ankara metro system operates with a 90 second headway, with maximum operating speeds of
                              80 kph. It has 108 cars (in 36 train sets), capable of carrying 70,000 passengers. This heavy rail
                              system had significant UK input during construction. A link to an interactive map, with system
                              detail and plans can be found here: www.ankarametrosu.com.tr/guzergahmap




26   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
6
6.5.3 Ankara Suburban Railways – TCDD
TCDD operate a network of around 37 km, covering 28 stations across Ankara;

 Category                         Detail
 Name                             TCDD                             www.tcdd.gov.tr
 Description                      Suburban Heavy Rail
 Route km and Stations            37 km with 28 Stations           25 kV Hz
 Passengers                       380 Million Passenger - km
 Rolling Stock                    96 Cars Emu Rotem / Mitsui       26 Train Sets


6.6 Antaly
www.antray.com (website under construction)

The Antray Light Rapid Transit (LRT) in Antaly opened in December 2009, with 11.1 km and 16
stations (between Kepez and Meydan).


6.7 Bursa
www.burulas.com.tr

Bursa, with a population of around 1.3 million, is situated in north-western Turkey, about 150
km south of Istanbul and 400 km west of Ankara. Burulas is the Public Transport Authority and
Operator. Bursa became famous as the first capital of the Ottoman Empire and the departure point
for the Silk Road trading route.

Bursaray is the light metro system for the city and will be extended, in time, to 50 route km in
total. The initial 17 km Y-shaped line opened in 2002, built by a Siemens-led consortium. It
carries some 190,000 passengers daily. Burulas is the municipal company in charge of operation
and maintenance of the system. Both branch lines are being extended


6.7.1 Bursa Light Rail Receives International Funding
In March 2011, The European Bank for Reconstruction  Development approved a 15-year
loan worth €50m towards construction of the second phase of the light rail network in Bursa.
The loan is part of a financing package that also includes €100m from the European Investment
Bank. The funding will allow the operator to purchase 30 Flexity Swift cars from Bombardier to
boost capacity on the expanding network.


6.8 Denizli
www.denizli.gov.tr

The municipality of Denizli is currently planning a railway system project to relieve congestion
in the city. A rail transportation master plan has been produced, including some revisions to the
route and further feasibility work. Approval to proceed is anticipated soon.




                                                                          RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   27
6
                              6.9 Eskişehir
                              www.estram.com.tr/eng/iletisim.php

                              There is an operational Light Rapid Transit (LRT) system in the industrial city of Eskişehir,
                              which the regional authority plans to extend. An urban development plan has been written to
                              create a modern transportation infrastructure that will harmonize the city’s development needs
                              with quality of life and environmental concerns.

                              The LRT was built within 20 months by a Bombardier–Yapı Merkezi consortium in December
                              2004. It won the 2004 UITP Light Rail Award. Estram is the operator of the system, with a
                              concession for 10 years. The current network covers 13.5 km, with two lines across the city, has
                              a daily patronage of around 87,000 passengers. Feasibility studies have been completed to extend
                              the system.


                              6.10 Gaziantep
                              www.gazi-antep.com/index.php?option=com_contenttask=viewid=15Itemid=

                              There is 9 km of Light Rapid Transit (LRT) in Gaziantep, with 13 stations under construction and
                              plans for further extension by 2025.


                              6.11 Istanbul
                              In Istanbul, public transport extends to include: bus and minibus; rail; a funicular railway; a
                              modern tram and a heritage tram. New capacity is currently being added, with one high profile
                              project being the Marmary Crossing. New and extended rail lines will be added to extend the
                              systems when the (Marmary Crossing) tunnels are completed. Even with these new systems,
                              demand will continue to grow in this bustling metropolis of at least 12 million people.

                              Passenger Demand and Share in Istanbul
                              Rail carries about 9.5 per cent of passenger traffic in Istanbul, though road is the dominant mode.
                              Demand has risen substantially in the past five years, and the forecast is for continued growth.




28   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
6
6.11.1 Metropolitan Transport Authority
IETT - İstanbul Elektrik Tramvay ve Tünel İşletmeleri Genel Müdürlüğü

http://www.iett.gov.tr

IETT is the General Directorate for the Electric Tramway and Tunnel for Istanbul. Whilst its key
responsibility is for the bus services in Istanbul, it also operates the funicular Tünel systems and a
tram, which runs over 1.6 km and carries around 1,500 passengers per day.

Transport and Affiliated Organisations
The following table shows the transport structure within Istanbul:




                                                                            RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   29
6
                              Systems in Use
                              The following systems are in use in Istanbul, many of which will be extended:

                               Name                 System                Vehicles    Stations      Route km      Passengers
                                                                                                                  ‘000
                               M1                   Aksaray - Airport     84          18            20            200
                               T1                   Şişhane - AOS         124         10            14.5          170
                               M2                   Zeytinburnu - Kabataş 61          23            14            260
                               T2                   Güngören - Bağcılar   16          9             5.2           50
                               T3                   Kadıköy - Moda        4           10            2.6           2
                               T4                   Habibler - Topkapı    62          22            15.4          100
                               F1                   Taksim - Kabataş      4           2             0.59          28
                                                    Funicular
                               Cable                Eyüp -Maçka           8           4             0.71          5



                              6.11.2 Istanbul Metro - Ulasim
                              www.istanbul-ulasim.com.tr

                              Ulasim is the operator of the Istanbul metro. It is a fully vertically-integrated rail system
                              and covers all disciplines, from planning design and consultancy through to operations and
                              maintenance. Indeed, Ulasim is also manufacturing passenger cars in-house.

                              Operations
                              Ulasim was founded in 1988 to maintain and develop suburban rail systems under the
                              metropolitan authority of Istanbul. Its activities include:

                              „„    operations
                                    -- metro
                                    -- light rail
                                    -- tram
                                    -- cable car
                              „„    maintenance  construction
                              „„    measurement and training
                              „„    engineering and consulting
                              „„    research and development

                              Ulasim is building an in-house passenger tram car and has developed its own control systems,
                              demonstrating the reach and capability of the organisation.




30   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
6
Planned Extensions:
System Evolution / Future Development
Plans to develop the metro are shown in the map below. The city is seeking to complete these
ahead of the centenary celebration of the republic in 2023:

 Lines                                                                       Length (km)
 Existing Lines
                   Municipality-owned lines                                  72.8
                   Suburban lines (TCDD-owned lines)                         72
 Short–term Projects (under construction)
 -                 Urban rail lines (to be finished in 2012)                 54.5
 -                 Marmaray Tunnel (to be finished in 2012)                  89.5
 Mid–term Projects
 -                 (To be finished in 2018)                                  118.6
 Long-term Projects
 -                 (To be finished in 2023)                                  276.6
 TOTAL                                                                       612




The System at a Glance
„„ Founded: 1988
„„   Seven lines
„„   73 km length
„„   98 stations
„„   815.000 passengers per day
„„   363 trains




                                                                       RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   31
6
                              Manufacturing / RD Capability
                              The extent of the capability at Ulasim can be measured by the Domestic Tram Project, which was
                              designed and produced by İstanbul Ulaşım in–house. The first prototype was produced in 1999,
                              and to date, the vehicles produced have carried more than five million passengers. An updated
                              version was produced in 2009.

                              New Rolling Stock Demand

                               Types of Cars                                            Number of Cars
                               Through to 2018
                                               Metro                                    1,105
                                               Light Rail                               186
                                               Tram                                     30
                                               Monorail                                 26
                                               Suburban                                 440
                               Between 2018 and 2023
                                               Metro                                    943
                                               Monorail                                 46
                                               Suburban                                 148
                               TOTAL                                                    2,924


                              6.11.3 Marmaray Crossing
                              The Marmaray Crossing project a long-planned underwater Bosphorus rail crossing, begun
                              in 1994. The project includes a 13.3 km Istanbul Strait crossing and the upgrade of 63 km
                              of suburban lines to create a 76.3 km high-capacity line between Gebze and Halkali. The
                              crossing is being constructed using a 1.8 km earthquake-proof immersed tube, assembled in 18
                              sections. This tube will be accessed by bored tunnels from Yenikapi on the European side and
                              Sogutlucesme on the Asian side of Istanbul.

                              The project has been delayed by the discovery of important heritage sites and around US$60
                              million of additional cost has been incurred investigating these and recovering a huge the
                              important relics and antiquities discovered on the site.

                              A case study is included in Appendix I at the end of this report

                              Plans for the Marmaray Crossing include interchange stations with Istanbul metro and light rail,
                              whilst the upgrade of the suburban lines requires a third track to be laid along most of the route to
                              increase the line capacity up to 75,000 passengers per hour in each direction. Signalling is being
                              upgraded to provide a service with two minutes’ headway.

                              The 41 stations along the line will be refurbished and the platforms lengthened to 180 m. The rail
                              tunnel will be used by both suburban and long-distance services, as well as freight. A decision on
                              whether the line will be operated by TCDD or Ulasim is yet to be taken.




32   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
6
6.12 Izmir
www.izmirmetro.com.tr

Izmir is served by around 80 km of suburban rail, with 31 stations and operated by TCDD. There
is also a metro, Izmir Metro AS, with 11.5 km of lines currently operational and further phases
under construction:

„„   Phase 2 	   5.4 km
„„   Phase 3 	   7.5 km
„„   Phase 4 	   3 km
„„   Phase 5	    11 km

The metropolitan authority has a transportation master plan from 2010 that includes a further 50
route km of metro. The website contains detail information, a brochure and presentation with full
technical detail and system description.


6.13 Kayseri
www.kayseri.bel.tr

The 17.5 km tramway Kayseray, became operational in August 2009, serving 28 stations with a
further three phases now at the planning stage.

The General Manager of Kayseray is listed on the website above.


6.14 Konya
www.konya.bel.tr

Operated by the municipality, the first tramline in this ancient city of the Central Anatolian
Region opened in 1992, following lengthy delays in both planning and construction. A second
line was added in 1995, with a third extension of 3.3 km completed in 2007. The system carries
more than 30 million passengers each year.


6.15 Samsun
www.samsun.bel.tr/proje-detay.asp?SayfaId=15

Detailed information can be found on the website, covering the 17.2 km of the Light Rapid
Transit (LRT) system which serves 21 stations.




                                                                        RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   33
7                             THE TURKISH
                              CONTRACTING SECTOR
                              Turkey has a very strong reputation and capability in the international construction and contracting
                              sectors. Consequently, it may present opportunities to UK companies for co-operation and supply
                              chain, both in Turkey and third markets. The chart below shows the evolution of the values accrued
                              by Turkish contractors in overseas markets and the geographic spread.




34   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
7
Turkish Contractors Association

www.tmb.org.tr

There is a Turkish Contractors Association, which recently completed an inward mission to the
UK arranged by UKTI. The website is a good source of information.

Secretary General		                Mr Haluk Bϋykϋbas
Deputy Secretary General	          Ms Çiğdem Çinar


7.1 Yapiray
Insight into the rail market in Turkey was provided for this report by Yapiray, the Turkish rail
contractor. Yapiray has considerable experience both in Turkey and in international markets. It can
list projects such as the high-speed rail line in Turkey and the Dubai Metro amongst its references.




                                                                                                                        8
RAIL ASSOCIATIONS AND
ACADEMIA IN TURKEY
Turkey has several rail organisations.


8.1 RAYDER (Association of Rail Transport Systems)
http://www.rayder.org.tr

Rayder is the organisation founded for the development of the railway sector in Turkey. Its board
is drawn from academia and industry.

The organisation’s aims include improving skills and knowledge locally, as well as monitoring the
latest developments from around the world, with the intention of adopting these for use within Turkey.

The development of the railways has been adopted as the most significant transport policy of the
new Turkish Government. Its intention is to grow the share of rail freight to 15 per cent by 2023.
Plans are being laid to invest US$50 billion in high- speed lines, the Marmaray Crossing project,
and metro and tramway projects across Turkey’s metropolitan cities. As such, Rayder sees itself
as having an increasing important role.




                                                                            RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   35
8
                              Key Points
                              „„  ayder is an industry body.
                                 R
                              „„   I
                                    t is preparing a railway industrial catalogue to promote the indigenous railway sector and
                                   industry.
                              „„   R
                                    ayder has been participating in INNOTRANS, Berlin, drawing in other Turkish companies
                                   and raising the international profile of the sector.
                              „„   T
                                    he organisation works in collaboration with international organisations, such as UITP
                                   (International Association of Public Transport) and UNIFE (The Association of the European
                                   Rail Industry).
                              „„   R
                                    ayder is seeking to create a General Directorate of Urban Rail Systems within the Ministry
                                   of Transportation and support research and development for the production of metro and
                                   tramway vehicles locally.
                              „„   W
                                    ork to establish a research and development centre for rail systems, and a test line in
                                   Eskişehir, is underway.
                              „„   T
                                    he creation of a Department of Rail Systems in Turkey’s universities is also underway.
                              „„   R
                                    ayder supports rail system departments in some recently-opened Industrial Vocational High
                                   Schools across Turkey.
                              „„   I
                                    t aims to encourage further investment and participation in the sector from local and
                                   international players from the private sector, and is working to develop a new law that will
                                   extend the use of the private sector in rail.

                              Rayder recognises the need to develop railway infrastructure, the supply chain sector and rolling
                              stock. The upturn in the market has already attracted the attention of a number of local and
                              European companies in this field.

                              Rayder Contact Information
                              Email: rayder@rayder.org.tr
                              www.rayder.org.tr


                              8.2 Railway Transport Association (DTD)
                              www.dtd.org.tr/

                              DTD is the Railway Operators Association, established in June 2006. Its members carry over 3.5
                              million tonne of freight pa and are seeking to grow rail’s share of freight in Turkey.

                              DTD lobbies for improved railway transportation, railway infrastructure and the restructuring
                              of the industry and law to align Turkey with European legislation. Therefore, the organisation is
                              building international links to ensure that rail can take advantage of the growing freight market
                              and potential for international traffic on rail.




36   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
8
8.3 Academia
There a number of universities and distinguished academics with links to the rail sector in
Turkey, some of whom also hold positions in the rail associations and lend their expertise to
bodies such as Tüvasas, the rolling stock constructor. Among the universities with links to the rail
sector are:

„„   Işik University
„„   Istanbul University (Faculty of Engineering)
„„   Istanbul Technical University.

While researching this report, we had the opportunity to take soundings from several of these
institutions who kindly offered their insights into the rail market.

The impression we formed was that a step change is happening in the market and, consequently,
this needs to be accompanied by a step change in technology, particularly with the demand
for high-speed rail, and the drive to grow the freight market. There is an opportunity for UK
companies to introduce services and technology into the Turkish market.




                                                                                                                       9
PRIVATISATION AND INWARD
INVESTMENT INTO TURKEY
www.oib.gov.tr

The Ministry responsible for privatisation, OIB, and the Ministry for Inward Investment into
Turkey report to the office of the Turkish Prime Minister. It is widely anticipated that private
capital will have a place in Turkish railways in the future. The most likely scenario is that Turkey
will adopt public-private partnership (PPP) opportunities on a Build Operate Transfer (BOT)
basis. PPP operations are probable, particularly on high-speed lines. PPP is already established
and in use in Turkey, but not yet in the rail sector.

The diverse nature of rail operator TCDD, with its ports and production units for rolling stock
and components, means that these two Ministries are worth including in this report.


9.1 Republic of Turkey Privatisation Administration 2011
Further privatisation is underway in Turkey and may impact the railways in future, though no
plans beyond privatisation of ports were discussed during this visit. Further privatisation of ports
currently owned and operated by TCDD is possible.

The role for private capital is likely to be on BOT (Build Operate Transfer) projects, with 30-year
concessions. These will probably include high-speed lines.




                                                                           RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   37
9
                              9.2 Republic of Turkey Prime Ministry Investment Support and
                              Promotion Agency of Turkey (ISPAT)
                              http://www.invest.gov.tr

                              Ispat provides a one–stop shop for inward investment into Turkey. It has a presence around the
                              world, including offices in the UK. It also serves as a reference point for international investors
                              and as a point of contact for all institutions engaged in promoting and attracting investments at
                              national, regional and local levels.

                              Ispat operates like a private company. It works with its clients on a confidential basis and has the
                              backing of all Turkish Governmental bodies. Its services, which are provided free-of-charge include:

                              „„   market information and analyses
                              „„   industry overviews and comprehensive sector reports
                              „„   assessing conditions for investment
                              „„   site selection
                              „„   finding companies for potential partnerships and joint ventures
                              „„   negotiating with relevant Government institutions
                              „„   facilitating legal procedures and legislation issues, such as:
                                   -- establishing business operations
                                   -- incentive applications
                                   -- getting licenses
                                   -- work/residence permits.

                              Ispat’s UK representative is:
                              Ahmet Iplikci
                              Republic of Turkey Prime Ministry
                              Investment Support and Promotion Agency of Turkey
                              2nd Floor Berkeley Square House
                              Berkeley Square London W1J 6BD

                              Tel: 0 20 7887 1987
                              Fax: 0 20 7887 6001
                              Mob: 07540 359 215
                              Email: aiplikci@invest.gov.tr




38   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
10 EURASIA RAIL EXHIBITION
www.eurasiarail.com

The first ever exhibition focussing exclusively on rail was held in Ankara in March 2011. The
next Eurasia Rail exhibition will be held on 8 – 12 March 2012, this time in Istanbul and Eurasia
Rail is confident that it will be bigger and better than the launch event. Eurasia Rail reported that
the 2011 show was a great success. It said:
                                                                                                            10
„„   A
      pproximately 117 companies participated, 60 per cent of which were international.
„„   I
      ts aim is for 250 companies in 2012 - 78 are already confirmed.
„„   T
      urkey is enjoying US$25 bn of investment in rail, so there is already significant interest in
     the show and the rail market.
„„   T
      he freight sector will benefit from being able to run through the Marmary tunnel at night.
     Consequently, the next event will include a focus on infrastructure and logistics in order to
     develop this sector and international traffic.


10.1 Show Review UKTI East Midlands
UKTI East Midlands and UKTI West Midlands had joint stand space at the Eurasia Rail
exhibition in 2011, taking 11 participating UK companies. UKTI delegates commented the
exhibition was well-organised, and while the number of visitors was modest, their quality was
encouraging, with key decision-makers in attendance and accessible to delegates. For example,
there were senior officials from a variety of divisions of TCDD, contractors, and specialist
suppliers to the industry. As well as gaining market intelligence, UK delegates identified a
number of potential partners at the event and all of them achieved their objectives.

UKTI East Midlands and a significant proportion of the UK delegates are planning to return to
Turkey for the next show in Istanbul in 2012.

UKTI East Midlands Contact is Mr Richard Burchell richard.burchell@uktiem.co.uk




                                                                             RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   39
11
                              11 Doing Business in Turkey
                              The UK has stated publically that Turkey is a market with significant potential for growth and is
                              keen to develop mutual trading links. UKTI has a strong team in Turkey to support UK business,
                              and can assist in areas such as market research and identifying key stakeholders, including
                              partners, agents or distributors. UKTI has a number of reports available off-the-shelf, or you may
                              be able to commission the Overseas Market Introduction Service (OMIS) to prepare a bespoke
                              report specific for your needs. OMIS is a cost-effective means of obtaining credible information
                              specific to your company.

                              The UKTI Trade team in Turkey presented the following summary of the market. An overview of
                              Turkey presented by Ispat (The Turkish Inward Investment Agency) is also included in this report.


                              11.1 UKTI, Ankara – Market Overview, March 2011
                              „„   T
                                    urkey is world’s 15th, and Europe’s sixth largest economy. It is forecast to be in world’s
                                   top 10 by 2050
                              „„   T
                                    he FDI Global Rankings in 2008 (UNCTAD) placed Turkey 20th and the UK fourth in
                                   the world
                              „„   U
                                    K is Turkey’s second largest export market in Europe, after Germany. Turkey is UK’s eighth
                                   largest export market in Europe. Turkey’s major import markets are Russia and Germany. The
                                   UK ranks 19th

                              Turkey Exports to UK
                              2008		         2009		               Change		          2010 Jan-Nov
                              £5.32bn		      £3.86bn		            -27%		            +18%			

                              UK Exports to Turkey
                              2008		         2009		               Change
                              £3.47bn		      £2.26bn		            -35%		            +35%

                              In the first 11 months of 2010, bilateral trade was £7.4bn, exceeding the total for the whole of
                              2009 by £1.25b

                              Main Exports
                              (a)  K to Turkey - machinery and mechanical appliances; pharmaceuticals; vehicles; iron and
                                  U
                                  steel; plastic.

                              (b)  urkey to UK - clothing and textiles; electrical machinery and equipment; vehicles; footwear;
                                  T
                                  machinery and mechanical appliances.

                              Turkey: A High-Growth Emerging Market (HGEM)
                              Turkey is designated by HMG as one of the world’s High Growth Emerging Market of significant
                              potential and strategic importance to the UK economy. It places Turkey alongside the BRIC
                              countries (Brazil, Russia, India, China




40   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
11
Investment
UK investors in Turkey include: Tesco; Vodafone; British Foods; BP; Shell; Lloyds List; HSBC;
International Power; and Mott MacDonald.

Inward Investment into the UK from Turkey
The number of Turkish investors supported by UKTI increased from five in 2008/9 to 13 in
2009/10 (a 160 per cent increase). There are 70 Turkish-owned businesses in the UK registered at
Companies House, with an annual turnover of £1.1 billion.

Turkey: Killer Facts

„„   T
      urkey has the youngest and fastest growing population in Europe (with 450,000
     graduates a year).
„„   T
      he Istanbul economy alone is larger than 12 EU countries.
„„   T
      urkey will be second fastest-growing country in the world by 2018 (according to the OECD).
„„   T
      he Turkish economy will outstrip Canada, Spain and Italy by 2025.
„„   T
      urkey has the world’s second largest construction and contracting sector.
„„   I
      t is Europe’s number one TV manufacturer.
„„   I
      t is Europe’s leading passenger coach manufacturer.
„„   T
      urkey is the world’s third largest mega-yacht producer.


11.2 ECGD – Market Summary
www.ecgd.gov.uk

The Export Credits Guarantee Department (ECGD), the UK’s official export credit agency
undertook a market review of Turkey in 2010. It offers a very positive view of the current market
conditions (although, as market conditions are subject to change, please refer to ECGD for
updates or any conditions that may apply to transactions).

ECGD can provide cover in Turkey (for political risk, insurance and finance guarantees) subject
to its terms and conditions. The organisation can look at projects of around £50 million quite
easily, but would be prepared to consider cases of a considerably higher value, subject to content.
It will consider sovereign or corporate borrowers.




                                                                           RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   41
I                             APPENDIX I
                              Case Study – The Marmaray Crossing
                              The demand for travel across Istanbul, including the Bosphorus, is huge, with a population of at
                              least 12 million to cater for and in excess of two million visitors at any one time. Whilst Istanbul
                              has existing metro and rail systems, a new commuter rail system is being developed which
                              will travel, via two immersed tunnels, under the Bosphorus Strait. It will connect the European
                              side of the Strait to the Asian side, adding capacity of 75,000 people per hour in each direction.
                              Much of the project has already been awarded, although a re-tender is underway for the railway
                              systems segment following the late withdrawal of the party originally contracted. Five groups are
                              contesting the re-run, with Bechtel representing the UK interest.

                              The broad details of the project are:

                               Category                                                               Volume
                               Commuter Rail System                                                   77 km
                               At Grade European Side                                                 19.6 km
                               At Grade Asian Side                                                    43.4 km
                               Bored Tunnel                                                           12.2 km
                               Immersed Tube Tunnel                                                   1.4 km
                               Maximum Depth of Immersed Tunnel                                       56 m
                               New Stations                                                           4
                               Total Stations                                                         40
                               Capacity
                               Existing Rail                                                          10,000/hr
                               New Rail                                                               75,000/hr
                               Design Speed                                                           100 kph
                               Operational Speed                                                      45 kph
                               Headway (Peak)                                                         2 to 3 minutes
                               Reduction in Travel Time                                               81 minutes
                               (Gebze to Halkali)

                              The contract provides for:
                              „„  pgrade of existing track and stations to cater for enhanced passenger numbers
                                 u
                                 and freight services
                              „„   N
                                    ew signalling and telecoms, including a new control centre
                              „„   A
                                    utomatic Fare Collection system upgrade that will allow integrated ticketing with all modes,
                                   and provide an electronic wallet operation for modest value purchases
                              „„   4
                                    4 train sets with five and 10-car configurations
                              „„   s
                                    even transfer stations for intercity trains to enhance passenger service and mobility.




42   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
I
Project Map




Benefits
The project will help to relieve some of the pressure on Istanbul’s bridges and reduce car
congestion in the city, with a reduction in carbon emissions as a result. However, there is some
concern that, even with the rail system working at capacity, road traffic levels will not actually
decline, as demand for transport remains high in and around Istanbul and new drivers will replace
those who switch to trains. Istanbul has about 73 per cent employment on the European side and
around 35 per cent of the population on the Asian side.

One key benefit is the considerable reduction in journey times for the estimated one million
commuters who will use the lines.

The scheme is running behind schedule due to significant archaeological finds made during
construction, including seven whole shipwrecks and numerous artefacts around the construction
sites. Turkish heritage is protected in law by the Ministry for Culture. Further issues have been
caused by a contractor dropping out of a contract for systems, necessitating a re-tender, which is
now under evaluation (see below).

Funding
The contract was originally split into three areas, with Japanese International Cooperation
Agency (JICA) funding for the tunnel construction and European Investment Bank funding for
the other two packages:



 Ref    Element                       Detail                                                  Funds
 BC1    Bosphorus Crossing            Immersed tube tunnels.                                  JICA
                                      Bored tunnels on both sides.
                                      Construction of four new stations.

 CR1*   Upgrade of Commuter Rail      Improvement of existing track.                          EIB
                                      Addition of a third track – for commuter and
                                      freight.                                                CEB
                                      Signalling and telecoms
                                      control centre.
                                      Fare collection systems.

 CR2    New Rolling Stock             44 train sets (10-car and five-car)                     EIB



                                                                            RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   43
I
                              *Due to the withdrawal of the contracted party, CR1 has been re-tendered and is now referred
                              to as CR3. It is now funded by CEB, the Council of Europe Development Bank. The tender is
                              due to be awarded mid-2011 and contenders include, Bechtel UK, two Italian consortia, one
                              Chinese and one Spanish consortia. CR1 is now in litigation, the original winning bidder is being
                              challenged on its withdrawal from the contract.

                              BC1 (the Bosphorus Crossing) is being undertaken by a Turkish / Japanese consortium, whilst Hyundai /
                              Rotem of Korea have won CR2, with some technology transfer that will allow local content.

                              The Treasury of Turkey, under the Ministry of Finance, is responsible for arranging the financing
                              of the Marmaray Crossing project. It also has responsibility for deciding the fare prices and the
                              fare principles.

                              Construction Team
                              Avrasaya has been the consultant engineer to DLH since the beginning of the project. Avrasya
                              consult is an international team of three partners from Turkey and Japan. The team is also assisted
                              by local consultants from Turkey:

                              „„   Oriental Consultants is the lead partner from Japan
                              „„   Yüksel Proje Uluslarası A.Ş. is the local partner from Turkey
                              „„   JARTS is the specialist partner from Japan.

                              These three partners form the joint venture, which is in association with the following two
                              Turkish companies:

                              „„   Terzibaşıoğlu Müşavir Mühendislik Ltd. Şti. (TMM)
                              „„   Yerbilimleri Etüd ve Müşavirlik Ltd. Şti (SIAL)

                              Crossing Construction
                              An immersed tunnel was chosen to avoid the excessive gradient that a bored tunnel would
                              require. One hundred and eleven segments, each weighing 20,000 tonnes, were constructed
                              nearby and floated into position. Tight control was required for sinking them into position, given
                              the water flows and traffic in the Bosphorus area.

                              Historical Discoveries and Impact on the Project
                              The first underwater link across the Marmary was proposed in 1860. Since then, a series of schemes
                              have been put forward until the current project was finally agreed and executed. Indeed, a tunnel
                              excavation was found during the construction works believed to be about 1,700 years old.

                              In addition, the artefacts found during excavation include important ancient ruins, burial grounds,
                              an ancient harbour and seven ships that are virtually intact, including some laden with cargo, gold
                              coins and numerous household items.

                              The consequences to the project of the historical findings are that:
                              „„ one high-speed rail link and one intercity station have been cancelled
                              „„   the cost of the archaeological excavations is US$35 million
                              „„   the cost of prolonging the contract is US$60 million
                              „„   the total time lost is around 4.5 years.




44   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
I
Future Connections
New rail systems are planned to facilitate movement across the city on both European and Asian
sides, with daily demand growing from around 1.1 m crossings in 2009 to 1.6 million.

Seismic Concerns
Istanbul is in an earthquake zone, and measures have been taken to mitigate the impact of a
major earthquake (we understand that the tunnel has been designed to withstand an earthquake of
around 7.5 on the richter scale.

There is a major fault line 16 km from the project. The seismic history was profiled and a solution
provided during the preparation phase:

Environmental Mitigation
A major effort was made to ensure that the project was delivered with minimal impact on the
environment. This included provision for major fish migrations from the Black Sea to the
Marmary and vice versa.




                                                                         RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   45
II                            APPENDIX II
                              Case Study – High-Speed Rail Project
                              The Ministry of Transport and Communications has pledged to construct a high-speed network
                              around Turkey with the intention of reducing journey times, and creating an affordable and
                              sustainable means of transport. The aim is to extend the network to 14,336 km of track, of which
                              around 10,000 km will be high-speed, by 2023, the centenary of the Republic. All new high-
                              speed lines will be double-track and electrified, and capable of running at 250 kph. Rolling stock
                              will be part-supplied within Turkey.

                              One example is the Ankara to Istanbul line. At 533 km long, the line, which is a double-track,
                              electrified, and signalled rail system, will be available for operation at 250 kph. This will reduce the
                              journey time from the current 6 and a half hours to three hours between Ankara and Istanbul.

                              Growth in Market Share (Passenger)
                              The busiest route in the country is the Ankara to Istanbul corridor. Rail’s share of passenger
                              transport on this route is projected to increase from 10 per cent to 78 per cent on completion of
                              the high-speed railway.

                              The journey time will be significantly reduced when the line from Esenkent to Eskişehir is fully-
                              opened, with the benefits of travelling at high speed from city centre to city centre. The journey time
                              will fall from over 6.5 hours to 4 / 4.5 hours, and as such, it will be equivalent to the air route.

                              When the project is connected to the Marmary Crossing, seamless passenger transportation will
                              be provided between Europe and Asia, taking Turkey firmly into the modern age of the train,
                              and enhancing the case for Turkey‘s accession to the EU. There will be social benefits, too, with
                              positive impacts on economic, social and cultural life. Turkey will become the sixth country in
                              Europe and eighth in the world to be operating high-speed trains.

                              High-Speed Routes




46   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
APPENDIX III
TCDD Subsidiaries
TCDD, the state-owned mainline rail company is not only fully vertically-integrated, it also has
a diversified range of activities that include: manufacturing rolling stock and track components,
track and rolling stock maintenance, port operations, and more.

Wholly-owned Manufacturing Units
                                                                                                            III

Map Showing TCDD Subsidiary Operations




                                                                          RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011   47
III
                              III.1 Tülom sas – Locomotives

                              www.tulomsas.com.tr

                              Tülomsas, a wholly-owned subsidiary of TCDD, is the only locomotive supplier in Turkey. It has
                              a long history in manufacturing and maintenance, reaching back to 1894. To date, the company
                              has produced over 700 locomotives and 7,500 freight cars. The facility has a history of working
                              in joint venture partnerships with leading international companies. It has a wide range
                              of capabilities, including engines for defence equipment, such as tanks and vessels.

                              In 2003, Tülomsaş made an agreement with USA-company General Motors (GM) for technology
                              transfer. GM manufactured the first six of 89 units of DE 33,000 diesel electric mainline
                              locomotives for TCDD. Forty-two of the remaining 89 locomotives were built by 2006, whilst
                              the remaining 47 locomotives will be manufactured with 51 per cent local content.

                              More recently, a joint venture with General Electric (GE Transportation) has allowed the local
                              production and introduction of GE’s most technically-advanced engine, Powerhaul, a series of
                              locomotives that are also aimed at export from Turkey to markets in Northern Africa and the
                              Middle East. The new engine claims to save up to 9 per cent of fuel compared to other models.

                              Locomotive Factory
                              The locomotive factory is the largest plant in Tülomsas. It has extensive manufacturing
                              capabilities for a number of types of rolling stock, ranging from 360 to 4,300 HP, with all the
                              workshops and facilities required for loco manufacture.

                              Capacity

                               Category                                         Capacity Units pa
                               Locomotives                                      60
                               Railway Maintenance Cars                         100
                               Bogie Freight Cars                               500
                               Diesel Engines                                   100
                               Alternators                                      100
                               Traction Motors                                  400
                               Steel and Iron Castings                          2,500 mt




48   RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)
UKTI - Railway sector in Turkey, 2011 (ENG)

Mais conteúdo relacionado

Semelhante a UKTI - Railway sector in Turkey, 2011 (ENG)

The_UK_Rail_Sector.pdf
The_UK_Rail_Sector.pdfThe_UK_Rail_Sector.pdf
The_UK_Rail_Sector.pdfJigishaVasa1
 
ERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
ERRAC and how proposals for Horizon 2020 have been developed - Andy DohertyERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
ERRAC and how proposals for Horizon 2020 have been developed - Andy DohertyKTN
 
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, TurkeyTurkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, TurkeyOECD Governance
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1Hasan Gunes
 
Turkey’s View of China as an Economic Partner
Turkey’s View of China as an Economic PartnerTurkey’s View of China as an Economic Partner
Turkey’s View of China as an Economic PartnerAltay Atli
 
SkyWay Investment Project - Pitch Deck Online
SkyWay Investment Project - Pitch Deck OnlineSkyWay Investment Project - Pitch Deck Online
SkyWay Investment Project - Pitch Deck OnlineMila Serdjukova
 
Unleashing infrastructure synergies across sectors
Unleashing infrastructure synergies across sectorsUnleashing infrastructure synergies across sectors
Unleashing infrastructure synergies across sectorsAbu Saeed Khan
 
Innovation through understanding of transferred technology in China
Innovation through understanding of transferred technology in ChinaInnovation through understanding of transferred technology in China
Innovation through understanding of transferred technology in ChinaKenneth Lim
 
Horizon 2020 overview - Dennis Schut
Horizon 2020 overview - Dennis SchutHorizon 2020 overview - Dennis Schut
Horizon 2020 overview - Dennis SchutKTN
 
A Mayoral Manifesto for the Digital Economy
A Mayoral Manifesto for the Digital EconomyA Mayoral Manifesto for the Digital Economy
A Mayoral Manifesto for the Digital EconomyLondon Assembly
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.docSuryadev Maity
 
6th Annual Modern Railways (Railway Pro)
6th Annual Modern Railways (Railway Pro)6th Annual Modern Railways (Railway Pro)
6th Annual Modern Railways (Railway Pro)marcus evans
 
Railway Stations&Nbrhd Development
Railway Stations&Nbrhd DevelopmentRailway Stations&Nbrhd Development
Railway Stations&Nbrhd DevelopmentAzher Malik
 
Middle East Rail 2016 Prospectus
Middle East Rail 2016 ProspectusMiddle East Rail 2016 Prospectus
Middle East Rail 2016 ProspectusAlex Augusti
 
BTS Brochure
BTS BrochureBTS Brochure
BTS BrochureOrhan Bag
 

Semelhante a UKTI - Railway sector in Turkey, 2011 (ENG) (20)

The_UK_Rail_Sector.pdf
The_UK_Rail_Sector.pdfThe_UK_Rail_Sector.pdf
The_UK_Rail_Sector.pdf
 
ERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
ERRAC and how proposals for Horizon 2020 have been developed - Andy DohertyERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
ERRAC and how proposals for Horizon 2020 have been developed - Andy Doherty
 
PTS Worldwide Express
PTS Worldwide ExpressPTS Worldwide Express
PTS Worldwide Express
 
PTS Worldwide Express
PTS Worldwide ExpressPTS Worldwide Express
PTS Worldwide Express
 
UK Trade & Investment Australia Rail Industry Webinar
UK Trade & Investment Australia Rail Industry WebinarUK Trade & Investment Australia Rail Industry Webinar
UK Trade & Investment Australia Rail Industry Webinar
 
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, TurkeyTurkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
Turkish Experience in Public-Private Partnerships - Özlem AYDIN SAKRAK, Turkey
 
Railway transportation 2.1
Railway transportation 2.1Railway transportation 2.1
Railway transportation 2.1
 
Turkey’s View of China as an Economic Partner
Turkey’s View of China as an Economic PartnerTurkey’s View of China as an Economic Partner
Turkey’s View of China as an Economic Partner
 
SkyWay Investment Project - Pitch Deck Online
SkyWay Investment Project - Pitch Deck OnlineSkyWay Investment Project - Pitch Deck Online
SkyWay Investment Project - Pitch Deck Online
 
Unleashing infrastructure synergies across sectors
Unleashing infrastructure synergies across sectorsUnleashing infrastructure synergies across sectors
Unleashing infrastructure synergies across sectors
 
Innovation through understanding of transferred technology in China
Innovation through understanding of transferred technology in ChinaInnovation through understanding of transferred technology in China
Innovation through understanding of transferred technology in China
 
Railway
RailwayRailway
Railway
 
Horizon 2020 overview - Dennis Schut
Horizon 2020 overview - Dennis SchutHorizon 2020 overview - Dennis Schut
Horizon 2020 overview - Dennis Schut
 
Test
TestTest
Test
 
A Mayoral Manifesto for the Digital Economy
A Mayoral Manifesto for the Digital EconomyA Mayoral Manifesto for the Digital Economy
A Mayoral Manifesto for the Digital Economy
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.doc
 
6th Annual Modern Railways (Railway Pro)
6th Annual Modern Railways (Railway Pro)6th Annual Modern Railways (Railway Pro)
6th Annual Modern Railways (Railway Pro)
 
Railway Stations&Nbrhd Development
Railway Stations&Nbrhd DevelopmentRailway Stations&Nbrhd Development
Railway Stations&Nbrhd Development
 
Middle East Rail 2016 Prospectus
Middle East Rail 2016 ProspectusMiddle East Rail 2016 Prospectus
Middle East Rail 2016 Prospectus
 
BTS Brochure
BTS BrochureBTS Brochure
BTS Brochure
 

Mais de Unialta

Icex - Costes establecimiento en Turquía 2011
Icex  - Costes establecimiento en Turquía 2011Icex  - Costes establecimiento en Turquía 2011
Icex - Costes establecimiento en Turquía 2011Unialta
 
ICEX - Estudio de mercado materiales de construcción Turquía 2010 (ESP)
ICEX - Estudio de mercado materiales de construcción Turquía 2010 (ESP)ICEX - Estudio de mercado materiales de construcción Turquía 2010 (ESP)
ICEX - Estudio de mercado materiales de construcción Turquía 2010 (ESP)Unialta
 
EMRA - Turkish energy market. An investors' guide, 2012 (ENG)
EMRA - Turkish energy market. An investors' guide, 2012 (ENG)EMRA - Turkish energy market. An investors' guide, 2012 (ENG)
EMRA - Turkish energy market. An investors' guide, 2012 (ENG)Unialta
 
Tcp - Automotive and spare parts 2012 (ENG)
Tcp - Automotive and spare parts 2012 (ENG)Tcp - Automotive and spare parts 2012 (ENG)
Tcp - Automotive and spare parts 2012 (ENG)Unialta
 
Tuik - Turkish Economic Indicators, may 2012 (TR-ENG)
Tuik - Turkish Economic Indicators, may 2012 (TR-ENG)Tuik - Turkish Economic Indicators, may 2012 (TR-ENG)
Tuik - Turkish Economic Indicators, may 2012 (TR-ENG)Unialta
 
Turkey economic report oct2012 (TheCityUK)
Turkey economic report oct2012 (TheCityUK)Turkey economic report oct2012 (TheCityUK)
Turkey economic report oct2012 (TheCityUK)Unialta
 
Icex Elcano (libro) El entorno económico y las posibilidades de inversión en...
Icex Elcano (libro)  El entorno económico y las posibilidades de inversión en...Icex Elcano (libro)  El entorno económico y las posibilidades de inversión en...
Icex Elcano (libro) El entorno económico y las posibilidades de inversión en...Unialta
 
Pwc+hsbc doing business in_turkey 2011
Pwc+hsbc doing business in_turkey 2011Pwc+hsbc doing business in_turkey 2011
Pwc+hsbc doing business in_turkey 2011Unialta
 
Deloitte - How to do business in turkey 2011
Deloitte - How to do business in turkey 2011Deloitte - How to do business in turkey 2011
Deloitte - How to do business in turkey 2011Unialta
 
World bank - Doing business turkey 2012 (Tax, Turkey, VAT, company, business...
World bank  - Doing business turkey 2012 (Tax, Turkey, VAT, company, business...World bank  - Doing business turkey 2012 (Tax, Turkey, VAT, company, business...
World bank - Doing business turkey 2012 (Tax, Turkey, VAT, company, business...Unialta
 
Turkey inside business'13
Turkey inside business'13Turkey inside business'13
Turkey inside business'13Unialta
 

Mais de Unialta (11)

Icex - Costes establecimiento en Turquía 2011
Icex  - Costes establecimiento en Turquía 2011Icex  - Costes establecimiento en Turquía 2011
Icex - Costes establecimiento en Turquía 2011
 
ICEX - Estudio de mercado materiales de construcción Turquía 2010 (ESP)
ICEX - Estudio de mercado materiales de construcción Turquía 2010 (ESP)ICEX - Estudio de mercado materiales de construcción Turquía 2010 (ESP)
ICEX - Estudio de mercado materiales de construcción Turquía 2010 (ESP)
 
EMRA - Turkish energy market. An investors' guide, 2012 (ENG)
EMRA - Turkish energy market. An investors' guide, 2012 (ENG)EMRA - Turkish energy market. An investors' guide, 2012 (ENG)
EMRA - Turkish energy market. An investors' guide, 2012 (ENG)
 
Tcp - Automotive and spare parts 2012 (ENG)
Tcp - Automotive and spare parts 2012 (ENG)Tcp - Automotive and spare parts 2012 (ENG)
Tcp - Automotive and spare parts 2012 (ENG)
 
Tuik - Turkish Economic Indicators, may 2012 (TR-ENG)
Tuik - Turkish Economic Indicators, may 2012 (TR-ENG)Tuik - Turkish Economic Indicators, may 2012 (TR-ENG)
Tuik - Turkish Economic Indicators, may 2012 (TR-ENG)
 
Turkey economic report oct2012 (TheCityUK)
Turkey economic report oct2012 (TheCityUK)Turkey economic report oct2012 (TheCityUK)
Turkey economic report oct2012 (TheCityUK)
 
Icex Elcano (libro) El entorno económico y las posibilidades de inversión en...
Icex Elcano (libro)  El entorno económico y las posibilidades de inversión en...Icex Elcano (libro)  El entorno económico y las posibilidades de inversión en...
Icex Elcano (libro) El entorno económico y las posibilidades de inversión en...
 
Pwc+hsbc doing business in_turkey 2011
Pwc+hsbc doing business in_turkey 2011Pwc+hsbc doing business in_turkey 2011
Pwc+hsbc doing business in_turkey 2011
 
Deloitte - How to do business in turkey 2011
Deloitte - How to do business in turkey 2011Deloitte - How to do business in turkey 2011
Deloitte - How to do business in turkey 2011
 
World bank - Doing business turkey 2012 (Tax, Turkey, VAT, company, business...
World bank  - Doing business turkey 2012 (Tax, Turkey, VAT, company, business...World bank  - Doing business turkey 2012 (Tax, Turkey, VAT, company, business...
World bank - Doing business turkey 2012 (Tax, Turkey, VAT, company, business...
 
Turkey inside business'13
Turkey inside business'13Turkey inside business'13
Turkey inside business'13
 

Último

FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 

Último (20)

FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 

UKTI - Railway sector in Turkey, 2011 (ENG)

  • 1. This is a uk trade and investment document HELPING YOUR BUSINESS GROW INTERNATIONALLY RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 2. Produced by: Bob Docherty, International Business Adviser, Railway Sector, UKTI, No 1 Victoria Street London, SW1H 0ET © Crown Copyright 2011 You may re-use this information (not including logos, images and case studies) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. Any enquiries regarding this document should be sent to us at: enquiries@ukti.gsi.gov.uk or telephone: +44 (0)20 7215 8000 (Monday – Friday 09.00-17.00) This document is also available from our website at www.ukti.gov.uk
  • 3. CONTENTS 1 Purpose and Methodology 2 2 Executive Summary 3-5 3 Brief History and Milestones 5-7 4 Ministry of Transport and Communications 8-13 Rail Structure and Organisation 5 TCDD – the State-owned Mainline Rail Company 14-24 6 Urban Railways 24-33 7 The Turkish Contracting Sector 34-35 8 Rail Associations and Academia in Turkey 35-37 9 Privatisation and Inward Investment into Turkey 37-38 10 Eurasia Rail Exhibition 39 11 Doing Business in Turkey 40-41 Appendices I Case Study – The Marmary Crossing 42-45 II Case Study – High-Speed Rail Project 46 III TCDD Subsidiaries 47-51 IV UK and Turkish Business Sectors in Detail 51-52 V Overview of Turkey 52-57 ISPAT – the Turkish Inward Investment Agency VI Organisations Visited 58-59
  • 4. 1 PURPOSE AND METHODOLOGY This report has been created to provide UK companies with an introduction to the rail sector in Turkey. It explores the expansion of both urban and high-speed rail, and recognises the desire to improve freight distribution, both across the country and cross-border as a land-bridge. Prior to the fact-finding mission, preparation included desk studies and research. This was followed by a series of meetings in the market to examine the sector at first hand, interviewing officials and reviewing and assessing opportunities. This report has been prepared by Bob Docherty at UK Trade Investment (UKTI), with the assistance of Mr Tim Gray from the Railway Industry Association and UKTI colleagues in Turkey. 1.1 Acknowledgements and Delegation Name Company Position Bob Docherty UKTI International Business Adviser Tim Gray RIA* International Business Development Director 1.2 UKTI Turkey Support Recognition must be given to the UKTI colleagues in Turkey, for their assistance in building the programme and developing contacts in the rail sector. Name Location Asiye Yaman UKTI Ankara Özge Dursun UKTI Istanbul 1.3 Organisations Visited The full list of companies and organisations visited in the course of the research are listed in the Appendix to this report. 1.4 UKTI Railway Sector Contacts Mr Derek Griffiths Mr Bob Docherty Head of Rail Sector Railways Sector, UKTI International Business Adviser Tel: +44 20 7215 4773 Rail Sector, UKTI Email: derek.griffiths@ukti.gsi.gov.uk Tel: +44 7879 661 598 bobdocherty@btinternet.com Mr Mike Carroll Head of Mass Transport, UKTI UKTI Tel: +44 20 7215 4569 No 1 Victoria Street London SW1H OET www.ukti.gov.uk 2 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 5. EXECUTIVE SUMMARY Railways are enjoying a period of significant and sustained investment in Turkey, with major investment in high-speed lines, rail-led solutions to freight and distribution, and urban transportation in major cities across the country. A commitment to invest US$45 bn has been made (US$23.5 bn before 2023), in a programme of expansion up until 2035. The detail of this expansion programme is: „„ 2,622 km of high-speed track by 2013 2 „„ A further 6,792 km of high-speed track by 2023 „„ 4,707 km of new conventional track by 2023 „„ A n additional 2,960 km of high-speed track and 956 km of conventional track in the period from 2023 to 2035 The national economy has been growing and strengthening. Turkey is currently the 16th largest economy in the world and the sixth largest economy relative to the EU, according to GDP figures (at Purchasing Parity Power) in 2009. Growth is forecast at 6.7 per cent in the period 2011 to 2018; GDP is around US$618 bn, with inflation at around 6.5 per cent. Turkey is being increasingly recognised as a country that is modernizing rapidly, growing a competitive economy that is moving up the skills chain, and with increasing capability. Market sectors that are expanding include electronics, white goods, automotive sectors, and defence and aerospace. Privatization has been underway since 2002. Indeed, there is a suggestion in the market that private capital will have a role to play in railways, certainly in the provision of a high-speed station in Ankara on a public private partnership (PPP) basis for which the tender has been published, on a build operate transfer (BOT) basis for high-speed lines, and possibly also in freight. Regarding the rail infrastructure, the new high-speed lines will be double-track and electrified, and with line speeds of 250 kph. Rolling stock will be partially constructed or assembled within Turkey. A number of major cities have urban rail systems, Light Rapid Transit systems (LRT), tram or metro of some kind. Extensions or new lines are much in demand and being planned. In Istanbul alone, there are plans to provide 118 km of new lines by 2018 and a further 276 km by 2023. Rail is seen as the preferred solution for freight, with new freight hubs planned around the country that will use the high-speed lines and the Marmary Crossing to carry freight overnight. The environmental issues associated with freight are well recognised in Turkey. Road congestion is an issue, especially at border crossings, with as much as 95 per cent of freight currently on the roads. There is an interest in growing railway freight in the market for domestic and international routes. Turkey is keen to capitalise on its strategic geographical location. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 3
  • 6. 2 Turkey is developing rapidly and has become a manufacturing force in Europe. This will further drive the demand for rail freight between Asia and Europe. (Turkey has borders with eight countries). The future may, therefore, see an end to the monopoly of Turkish State Railways’ (TCDD) railway operations, with cross-border freight and passenger ‘open access’ operators being allowed access to track. To facilitate change and to comply with EU directorates, TCDD is undergoing reform, separating infrastructure, passenger and freight operations in a far-reaching programme of modernisation. TCDD is currently a vertically-integrated railway, also owning in-house manufacturing facilities for rolling stock and track materials, as well as maintenance units. Ports and a rail ferry have been part of the portfolio but the former are now being privatised, and the latter upgraded to include a ferry terminal with Russian gauge to accommodate cross-border traffic. Historically, TCDD has owned a great deal of the maintenance and supply chain market. Many of these facilities have been acquired in partnership, with technology transferred in-house, for example, for track components, locomotives, wagons and passenger cars and their components. UK companies may see this as an opportunity. In a meeting with Academia regarding the rail sector, UKTI formed the impression that a step change is happening in the Turkish market and that this should be accompanied by a step change in technology, particularly with the demand for high-speed rail, and the drive to grow the freight market. There is an opportunity for companies to introduce services and technology into the market. The market is ready to work with international partners and there is desire to diversify these links. In the wider (political) picture, Turkey is a member of NATO and wishes to join the European Union (EU). Currently, both France and Germany appear to be resistant to Turkish accession (to the EU), but despite this, both have traditionally strong positions in the Turkish rail market, with more recent involvement from the Chinese, Japanese and Koreans. 2.1 Opportunities for UK Companies With the growing rail market and high levels of investment, there are likely to be opportunities for UK companies in Turkey. The Government is investing in the rail sector. There is investment in high-speed and urban rail which may make these areas a particular focus for UK companies, but freight and distribution are expanding too, and the drive for cross-border traffic may attract companies with skills in inter-operability and logistics. UK skills in PPP and (real estate) development may also contribute, as the market is changing and privatisation is progressing, creating a growing desire to maximise use of assets, and return on investments. Professional Services are likely to find opportunities in most of the previous areas. All new lines will be electrified, so capacity for electrification may be an opportunity dependent on project phasing. In supply chain rail areas, there has been extensive collaboration with overseas companies, so the sector has a great deal of experience in technology transfer. The desire for local content, if not production, remains strong. Performance will be admired, particularly for products or services that can facilitate reductions in costs and energy consumption. European standards are widely- recognised. Technology areas of interest include signalling and control, and rolling stock systems. 4 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 7. 2 It is vital for UK companies to take care and pay close attention when approaching the market. Sensitivity to the progress already made by local participants in advancing the rail sector is considered essential, as is local partnership or a local market presence. A long-term approach is also required. Turkey is also recognised as having a very strong construction sector, capable of working in third markets, and there may well be opportunities for UK companies here in support of the major Turkish players. Generally, major project work is advertised and is open to international competition. International funders and Development Banks may also be a source of opportunity for feasibility work for new-build projects and upgrades. The UKTI team locally has good contacts and a strong market presence, and remains an important resource to support UK industry in entering and developing the market. BRIEF HISTORY AND MILESTONES 3.1 Mainline 8Railway The first rail system in Turkey was constructed in 1856 by a UK company, connecting the port of Izmir with the Aydin. Railways were developed elsewhere around the country by other private 3 companies, before being nationalised in 1927. The evolution of the railway system in Turkey is shown in table in 3.2 (Milestones) shows. The first urban rail service in Turkey dates back to 1875, when the “Tünel” opened. The Tünel is an underground funicular line of only 573 m that connects the Bosphorus. It rises 60 metres up to the busy Taksim square area, with trains operating every 3.5 minutes and the journey lasting about 1.5 minutes. From Steam Trains to High Speed Service 1856 2010 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 5
  • 8. 3 3.2 Milestones Year Milestone Comment 1856 The first railway from Izmir to Aydin Developed by a UK company 1924 4,000 km of track in operation Nationalisation began 1927 Ports added to rail portfolio 5,500 route km of track in operation 1950 Route km reaches 9,204 km 1953 Railway becomes a State Enterprise and 9,441 route km in operation TCDD is formed 1984 TCDD becomes a State Economic 10,263 route km in operation Institution 2003 Rail transport is opened to include private sector participation 2004 Six ports are offered for privatization 10,991 km of track in operation 2008 First high-speed line is constructed 2009 High-speed operations begin 2010 2.85 million passengers carried on high- speed lines Projected Milestones 2023 Network of 26,251 route km Adding 14,336 route km, of which 10,000 will be high-speed lines 2035 Further 1200 km of high speed lines Turkey has grown its rail network to around 11,000 route km (as at March 2011), and has a programme of expansion currently underway and with more planned. The intention is to extend the network by about 14,000 km by 2023, including 10,000 km of high-speed lines by 2023 and further track by 2035. There is a strong suggestion that some of the future expansion may draw in private capital in the form of BOT (Build Operate Transfer) developments. Concession times of 30 to 35 years were mentioned, and this approach could also be adopted for high-speed lines. 6 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 9. 3 Section 5 of this report covers mainline railways in detail. 3.4 Urban Transportation Turkey is creating or extending urban transport in most, if not all, of its major cities to meet growing demand, using a mix of modes, including road and rail. (It may properly be described as guided systems, as all forms of rail including monorail are under consideration). Buses and mini-bus services are usually private sector, whilst the metropolitan authorities are responsible for rail. Section 6 of this report examines urban transport in detail. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 7
  • 10. 4 4 MINISTRY OF TRANSPORT AND COMMUNICATION Rail Structure and Organisation www.ubak.gov.tr/ This Ministry is responsible for all transport, air, roads, railways and ports in the structure shown below. Key elements of note in the rail sector are TCDD, the state rail organisation, and DLH, a turnkey contractor. TCDD is a vertically-integrated system, which also has extensive manufacturing and maintenance facilities. DLH can be considered a turnkey contractor that has evolved to include design, construction and project management capability, able to take on major projects such as the Marmary Crossing, a multi-billion dollar, complex project. Priorities and Projects The Ministry has defined three main targets for the rail sector which are to: 1. provide an attractive, substantial and affordable high-speed rail service 2. enhance existing track to allow increased speed of operation 3. streamline TCDD through restructuring and privatisation Organisation The current structure of the Ministry is shown Opposite. 8 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 11. 4 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 9
  • 12. 4 4.1 DLH General Directorate of Ports Railways and Airports www.dlh.gov.tr DLH was established in 1934, initially as a public works body. A series of re-organisations followed, with activity extending to include ports, airports civil defence and railways, it became a General Directorate for the Ministry of Transportation and Communications in 1986. DLH is the state-owned entity whose role is to deliver major infrastructure projects, from planning and design through to project management and construction. It is involved in some of the biggest projects in Turkey. DLH is the responsible directorate for the implementation of projects and reports to the Ministry of Transportation. 4.2 Safety and Regulation Currently, the railway is self-regulating in terms of safety. However, the proposed structure to be adopted soon will include “DEKAK” which will be a separate railway accident investigation board, reporting directly to the Ministry of Transport and Communication, rather than TCDD. The proposed structure, which will probably be adopted following the next general elections in Turkey (at time of writing, June 2011), is shown in Section 5. 4.2.1 Statistics and Safety Data TCDD publishes an annual statistical report, including data relating to accidents, numbers of casualties and much more (see link below). A snapshot of the number of accidents, followed by passenger-km and freight tonnes-km is shown below for interest. www.tcdd.gov.tr/Upload/Files/ContentFiles/2010/istatistik/2004_2008.pdf 4.3 Projects A number of rail projects are in planning, but have not yet been released for construction. (Refer to the TCDD website for current information). The aim is to extend the network to over 26,550 km of track by adding more than 14,000 route km, by 2023, the centenary of the Republic. Included in this is 10,000 km of high-speed track. New track will be double-track electrified and it will use modern signalling. 10 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 13. 4 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 11
  • 14. 4 4.4 Enhancing Logistics and Distribution Capability The Ministry is aware of the need to improve the logistics capability of Turkey to maintain competiveness and support economic growth. There is a desire to exploit Turkey’s strategic location as a bridge between Europe and Asia. Rail freight currently has a very modest share of all freight carried, at around five per cent. The country is keen to increase this as the sheer volume of trucks on the road is causing significant delays at Turkey’s border crossings on a daily basis, with queues that regularly reach 15 km long. Rail is seen as the desired solution for freight that wins on a number of fronts. It offers significant capacity, with a low carbon footprint. The potential to run freight services at night over the high- speed network and through the Marmary tunnel crossing are also desirable ways of adding capacity. To support the growth in rail freight and assist in attracting international traffic to the rail sector, Turkey’s logistical capability is in need of improvement. As such, a range of 16 hubs and logistics centres are being developed, four of which are already complete. The map below shows the detail. These, too, may offer opportunities for UK Industry. 4.5 Privatisation and Private Capital in Railways www.oib.gov.tr 12 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 15. 4 Both mainline and urban railways remain in public ownership for now, despite a programme of privatisation that is underway in Turkey. This privatisation process is managed by OIB, the Turkish Government agency, and is covered in this report in Section 9. Currently, the impact of privatisation in the rail sector is limited to the privatisation of some ports under TCDD control. In future, there is a possibility of opening up the market to private capital and private operators in several ways: 1. he new high-speed station planned for Ankara will be delivered on a PPP basis. After several T delays, a tender was issued, before being later withdrawn. At the time of writing, the timetable for the process has still not been finalised. If the PPP model is successful, the same approach may be used for further stations on new high-speed routes, so careful planning of this tender will bring benefits in future. 2. he plan to enhance international freight may provide opportunities for UK companies in T operations. 3. uild Operate Transfer (BOT) appears to be the favoured option for attracting private capital B into rail. Selected lines may be tendered on a BOT basis, with a proposed concession period of up to 30 or even 35 years. No process or policy has yet been adopted for such private sector engagement, but at the time of preparation of this report, BOT looks likely to be the preferred solution for the future. . RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 13
  • 16. 5 TCDD - THE STATE-OWNED MAINLINE RAILWAY COMPANY www.tcdd.gov.tr TCDD is the Turkish state-owned, vertically-integrated railway company. Headquartered in Ankara, it has seven regional directorates around the country and, in addition to the rail and maintenance operations, TCDD also has an extensive manufacturing capability in both rolling stock and track components. It is a part of the Ministry of Transport and Communications. In order to comply with European Legislation, a reorganisation of TCDD is imminent, most likely following the elections that are planned for June 2011. (chart as pubished including acronyms) 14 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 17. 5 5.1 TCDD Activities TCDD’s current activities are extensive and diverse, going beyond rail operations and maintenance to include: „„ train operations „„ rail infrastructure „„ ownership and management of all stations „„ track construction „„ track maintenance „„ rolling stock maintenance „„ manufacturing units for rolling stock -- locomotives -- passenger cars -- freight wagons „„ factories -- ADF ve Ray -- Kaynak -- Afyon ve Siva Beton Travers -- Çamaf „„ four ports – (a further three have already been privatised) „„ shared ownership of manufacturing units -- Eurotem -- Izban -- Vademsa Detail on most of these facilities can be found on the TCDD website. TCDD has or has had in the past joint ventures or collaboration with Austrian, French, German and Korean partners. 5.2 Physical Data A detailed report on physical conditions, including bridges, track curvature, tunnels, wagon resource, plant and equipment, as well as statistics covering TCDD operations can be found at: http://www.tcdd.gov.tr/Upload/Files/ContentFiles/2010/istatistik/2004_2008.pdf RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 15
  • 18. 5 5.2.1 Route Km and Detail Route km (2011) Volume / units Conventional 11,048 km Electrified 2,305 km Signalled 2,665 km Dual Track 403 km Triple Track 28 km Quadruple Track 9 km High-Speed Lines 867 km Total 11,915 km 5.2.2 Existing and Planned Route Map 16 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 19. 5 5.2.3 Rolling Stock Type Active units High-Speed Train Sets 12 Diesel Locos 470 Electric Locos 52 DMUs 46 EMUs 91 Passenger Car 46 Freight Wagon (TCDD) 16,189 Freight Wagon (3rd party) 2,486 5.2.4 Employment Category Personnel Interpretation Civil Servants Including Contracted Staff 16,089 White Collar Permanent and Temporary Staff 15,590 Blue Collar Total 31,679 5.2.5 Market Share At the peak of its powers in the 1950’s, TCDD had significant market share, which has fallen considerably in modern times, following decades of relative under-investment compared to the road sector. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 17
  • 20. 5 5.2.6 Proposed Organisation The new organisation, expected to come into force later this year, will look as follows: This new structure will comply with European legislation regarding rail operations. 5.2.7 Lake Van – Rail Ferry Operations Ports Van Gölü Feribot Isletmeciligi Establishment is the part of TCDD that operates the train ferry service at Lake Van. Plans include investment in modern ferries to support freight distribution across and through Turkey. 18 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 21. 5 Lake Van Operations 5.3 Budget Allocation and Priority Projects Railway in general and TCDD in particular, are enjoying an upturn in investment, following decades of under investment, certainly in comparison to roads. The investment is aimed at recovering market share by providing much-improved services. In the passenger sector, growth is planned in the high-speed and urban sector, whilst in freight Turkey is keen to support economic growth by improving rail and multi-modal freight services, logistics and distribution capability. This will extend to include the creation of an international, trans continental land-bridge for freight, linking Europe to the Middle East and Asia to Europe. 5.3.1 TCDD Annual Budget Evolution RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 19
  • 22. 5 5.3.2 Key Projects Railways are expanding in Turkey. The following projects are underway, with the extensions of the high-speed network constituting a key area: „„ expansion of high-speed rail „„ Marmaray project „„ rehabilitation of existing railway lines „„ modernisation of rolling stock and infrastructure „„ improved logistics and distribution, including multi-modal options „„ improvement of block train management „„ establishment of rail RD facilities. 5.4 High-Speed Operations The high-speed (HS) lines between Ankara and Eskeşhir commenced revenue operations on 13 March 2009. Around 2.85 million passengers used the service from its launch until end of December 2010. Since July 2010, the lines have operated 22 trips per day, carrying around 6,000 passengers every weekday and 8,000 at weekends. The tender for a new high-speed station required for Ankara has been issued on a PPP basis and this may well be a model for future high-speed stations, encouraging private capital into the sector. The tender process experienced some delays and had been re-issued without a specific time frame for closure at the time of preparing this report. This process may be a useful case study to determine how the market adopts the PPP process for future use. Siemens has stated that it would consider producing a “Velaro” type train in Turkey, adapted for local use, and capable of running at 400 kph. During the Eurasia Rail exhibition, there were reports that the technology transfer could open with 20 per cent local content, rising to 50 per cent or more in future. There may be other suitors seeking an investment in Turkey in this area. 20 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 23. 5 5.5 TCDD Port Operations TCDD has responsibility for four ports, with three (Mersin, Samsun and Bandirma) already having been privatised. The privatisation process will continue, so the number of ports under TCDD control will diminish. The volumes passing through the TCDD ports are shown below for information. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 21
  • 24. 5 5.5.1 Freight Transportation Potential TCDD is confident that the traditional and historic trade route between Asia and Europe can be revived and expanded using rail to exploit Turkey’s strategic location. It has analysed the market and believes there is a potential US$75 bn trade flow pa. The organisation wishes to offer a route to market for companies wishing to obtain a share of this. Existing Rail Border Crossings Location Borders / Connects to Kapikule Bulgaria and onward to Europe Uzunköprü Greece and beyond Kapıköy Iran and central Asian Markets Islahiye Syria and Iraq Nusaybin Syria and Iraq The intention is to improve the network and entice operators to use rail to deliver into the heart of markets in Europe. A great deal of work is needed to deliver such a service, including access and interoperability agreements with neighbouring countries. Access to CIS / Russian gauge (1,520 mm) is catered for by means of a Black Sea rail ferry, and gauge conversion facilities, where bogies can be changed. Investment to modernise and improve train ferry services is proposed. 22 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 25. 5 Existing International Freight The charts below show the freight between Turkey and Europe, and Turkey and Asia. The proportion of international freight is modest, whilst imports into Turkey from the Middle East have largest share of cross-border freight. These charts suggest the extent of activity required to grow international freight. International Freight Traffic Classification* RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 23
  • 26. 5 A press announcement during April 2010 reflected the desire of TCDD to extend Turkey’s reach as an international freight destination: “Turkey’s Independent Industrialists and Businessmen’s Association (MUSIAD) signed a co-operation agreement with the Lithuanian railways at the beginning of April 2010. MUSIAD conducts initiatives for the realisation of the Viking Project to connect Turkey and Middle Eastern countries with the Baltic countries. The agreement was signed by the Foreign Relations Commission of MUSIAD and the General Manager of the Lithuania Railroad. The Viking Project also involves the commercial connection between Lithuania-Belarus-Ukraine (Odessa) and Turkey (Samsun, Istanbul)-Syria-Iraq-Iran.” 6 URBAN RAILWAYS Demand for urban transport is growing in Turkey, with its increasingly-congested cities. Rail- based solutions are recognised as delivering solutions in an environmentally-friendly manner, and there is a belief that investment in rail (in its many forms, including light and heavy rail commuter systems), will continue, certainly in the major cities that have sufficient traffic density to meet the economic criteria for rail. 6.1 Urban Transportation – Metropolitan Authority Urban transportation is generally the responsibility of the metropolitan authorities, which own and manage rail operations. However, bus services are generally privately-owned and run, including the ubiquitous mini bus services which are found in most cities. 24 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 27. 6 6.2 UITP www.uitp.org/regions/europe/turkey.cfm UITP, the International Association for Public Transport, has opened a liaison office in Turkey to better serve its members there and maintain current awareness of industry trends in important areas, such as finance. Contacts are listed on the UITP website: Enis Hemedoglu, UITP Turkey Office Manager, enis.hemedoglu@uitp.org Sibel Bahtiyar, UITP Turkey Office Assistant, sibel.bahtiyar@uitp.org UITP Turkey Liaison Office Tel: +90 212 569 5786 Fax: +90 212 568 9956 Ferhatpasa Metro Facilities Esenler TR 34200 Istanbul TURKEY 6.3 Metro Systems in Detail When researching this report, there was insufficient time to visit all of the metropolitan authorities with planned or existing rail systems, though we did have very positive exchanges in both Ankara and Istanbul. Detailed information is included in this report. Additional information was kindly provided by Ms Sibel Gursoy at Ulasim, the Istanbul metropolitan authority, and a list of cities with transportation authorities is included below, which may be useful for companies addressing the market. City System Adana Heavy Rail Ankara Heavy Rail Metro Light Rail Antalya Tramway Bursa Light Rail Eskişehir 2 x Lines Light Rail Istanbul Heavy Rail Light Rail Tramway Funicular Izmir Heavy Rail Konya Tramway Kayseri Tramway Samsun Light Rail RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 25
  • 28. 6 6.4 Adana http://www.adana.bel.tr Situated in southern Turkey, Adana has a light metro line. Construction began in 1992, with the first, mostly surface section finally opened in March 2009. The second phase, around 6 km (Akincilar Station-Cukurova University), is currently under construction and due to be ope rational during 2011. This will raise the daily passenger carrying capacity to 660,000. The website has more detail, including the strategic plan for 2010 – 2014 (in Turkish). www.adana.bel.tr/adanabeltr/data/pagetopic/63/stratejikplan-20102014.pdf 6.5 Ankara www.ankara.bel.tr/TasarimOgeleri/defaultEn.aspx The Turkish capital has some 3.5 million inhabitants in the metropolitan area, who are served by a mixture of rail systems: the commuter rail system delivered by TCDD, Ankaray a light railway system and the “Metro. Ankara is developing new projects and has a detailed masterplan called Urban Transportation Plan of Ankara for 2015. The first “Metro”, the M1 (Kizilay-Batikent) metro line (14.6 km) started operation in December 1997 with 108 cars. Ankaray, became operational in 1996 serving Dikimevi-Asti (8.5 km). Currently under construction, M2 Kizilay-Cayyolu will add 16.5 km to the metro system. M3 Batikent-Sincan to Torekent will be 15.3 km and M4 Tandogan-Kecioren will be 10.5 km. 6.5.1 Ankaray www.ankaray.com Built in 1996, this system runs mostly underground on an east to west axis and provides an interchange with bus services and the heavy metro in the city centre. An extension of around 12 km is planned. Full detail can be found on the website: http://www.ankaray.com.tr/component/content/article/6-genel-tanitim.html 6.5.2 Ankara Metro www.ankarametrosu.com.tr Ankara metro system covers 14.6 route km. It is a double-track, heavy rail system serving 12 stations, supported by a depot. It travels from southeast to northwest through the city centre. Ankara metro system operates with a 90 second headway, with maximum operating speeds of 80 kph. It has 108 cars (in 36 train sets), capable of carrying 70,000 passengers. This heavy rail system had significant UK input during construction. A link to an interactive map, with system detail and plans can be found here: www.ankarametrosu.com.tr/guzergahmap 26 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 29. 6 6.5.3 Ankara Suburban Railways – TCDD TCDD operate a network of around 37 km, covering 28 stations across Ankara; Category Detail Name TCDD www.tcdd.gov.tr Description Suburban Heavy Rail Route km and Stations 37 km with 28 Stations 25 kV Hz Passengers 380 Million Passenger - km Rolling Stock 96 Cars Emu Rotem / Mitsui 26 Train Sets 6.6 Antaly www.antray.com (website under construction) The Antray Light Rapid Transit (LRT) in Antaly opened in December 2009, with 11.1 km and 16 stations (between Kepez and Meydan). 6.7 Bursa www.burulas.com.tr Bursa, with a population of around 1.3 million, is situated in north-western Turkey, about 150 km south of Istanbul and 400 km west of Ankara. Burulas is the Public Transport Authority and Operator. Bursa became famous as the first capital of the Ottoman Empire and the departure point for the Silk Road trading route. Bursaray is the light metro system for the city and will be extended, in time, to 50 route km in total. The initial 17 km Y-shaped line opened in 2002, built by a Siemens-led consortium. It carries some 190,000 passengers daily. Burulas is the municipal company in charge of operation and maintenance of the system. Both branch lines are being extended 6.7.1 Bursa Light Rail Receives International Funding In March 2011, The European Bank for Reconstruction Development approved a 15-year loan worth €50m towards construction of the second phase of the light rail network in Bursa. The loan is part of a financing package that also includes €100m from the European Investment Bank. The funding will allow the operator to purchase 30 Flexity Swift cars from Bombardier to boost capacity on the expanding network. 6.8 Denizli www.denizli.gov.tr The municipality of Denizli is currently planning a railway system project to relieve congestion in the city. A rail transportation master plan has been produced, including some revisions to the route and further feasibility work. Approval to proceed is anticipated soon. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 27
  • 30. 6 6.9 Eskişehir www.estram.com.tr/eng/iletisim.php There is an operational Light Rapid Transit (LRT) system in the industrial city of Eskişehir, which the regional authority plans to extend. An urban development plan has been written to create a modern transportation infrastructure that will harmonize the city’s development needs with quality of life and environmental concerns. The LRT was built within 20 months by a Bombardier–Yapı Merkezi consortium in December 2004. It won the 2004 UITP Light Rail Award. Estram is the operator of the system, with a concession for 10 years. The current network covers 13.5 km, with two lines across the city, has a daily patronage of around 87,000 passengers. Feasibility studies have been completed to extend the system. 6.10 Gaziantep www.gazi-antep.com/index.php?option=com_contenttask=viewid=15Itemid= There is 9 km of Light Rapid Transit (LRT) in Gaziantep, with 13 stations under construction and plans for further extension by 2025. 6.11 Istanbul In Istanbul, public transport extends to include: bus and minibus; rail; a funicular railway; a modern tram and a heritage tram. New capacity is currently being added, with one high profile project being the Marmary Crossing. New and extended rail lines will be added to extend the systems when the (Marmary Crossing) tunnels are completed. Even with these new systems, demand will continue to grow in this bustling metropolis of at least 12 million people. Passenger Demand and Share in Istanbul Rail carries about 9.5 per cent of passenger traffic in Istanbul, though road is the dominant mode. Demand has risen substantially in the past five years, and the forecast is for continued growth. 28 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 31. 6 6.11.1 Metropolitan Transport Authority IETT - İstanbul Elektrik Tramvay ve Tünel İşletmeleri Genel Müdürlüğü http://www.iett.gov.tr IETT is the General Directorate for the Electric Tramway and Tunnel for Istanbul. Whilst its key responsibility is for the bus services in Istanbul, it also operates the funicular Tünel systems and a tram, which runs over 1.6 km and carries around 1,500 passengers per day. Transport and Affiliated Organisations The following table shows the transport structure within Istanbul: RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 29
  • 32. 6 Systems in Use The following systems are in use in Istanbul, many of which will be extended: Name System Vehicles Stations Route km Passengers ‘000 M1 Aksaray - Airport 84 18 20 200 T1 Şişhane - AOS 124 10 14.5 170 M2 Zeytinburnu - Kabataş 61 23 14 260 T2 Güngören - Bağcılar 16 9 5.2 50 T3 Kadıköy - Moda 4 10 2.6 2 T4 Habibler - Topkapı 62 22 15.4 100 F1 Taksim - Kabataş 4 2 0.59 28 Funicular Cable Eyüp -Maçka 8 4 0.71 5 6.11.2 Istanbul Metro - Ulasim www.istanbul-ulasim.com.tr Ulasim is the operator of the Istanbul metro. It is a fully vertically-integrated rail system and covers all disciplines, from planning design and consultancy through to operations and maintenance. Indeed, Ulasim is also manufacturing passenger cars in-house. Operations Ulasim was founded in 1988 to maintain and develop suburban rail systems under the metropolitan authority of Istanbul. Its activities include: „„ operations -- metro -- light rail -- tram -- cable car „„ maintenance construction „„ measurement and training „„ engineering and consulting „„ research and development Ulasim is building an in-house passenger tram car and has developed its own control systems, demonstrating the reach and capability of the organisation. 30 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 33. 6 Planned Extensions: System Evolution / Future Development Plans to develop the metro are shown in the map below. The city is seeking to complete these ahead of the centenary celebration of the republic in 2023: Lines Length (km) Existing Lines Municipality-owned lines 72.8 Suburban lines (TCDD-owned lines) 72 Short–term Projects (under construction) - Urban rail lines (to be finished in 2012) 54.5 - Marmaray Tunnel (to be finished in 2012) 89.5 Mid–term Projects - (To be finished in 2018) 118.6 Long-term Projects - (To be finished in 2023) 276.6 TOTAL 612 The System at a Glance „„ Founded: 1988 „„ Seven lines „„ 73 km length „„ 98 stations „„ 815.000 passengers per day „„ 363 trains RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 31
  • 34. 6 Manufacturing / RD Capability The extent of the capability at Ulasim can be measured by the Domestic Tram Project, which was designed and produced by İstanbul Ulaşım in–house. The first prototype was produced in 1999, and to date, the vehicles produced have carried more than five million passengers. An updated version was produced in 2009. New Rolling Stock Demand Types of Cars Number of Cars Through to 2018 Metro 1,105 Light Rail 186 Tram 30 Monorail 26 Suburban 440 Between 2018 and 2023 Metro 943 Monorail 46 Suburban 148 TOTAL 2,924 6.11.3 Marmaray Crossing The Marmaray Crossing project a long-planned underwater Bosphorus rail crossing, begun in 1994. The project includes a 13.3 km Istanbul Strait crossing and the upgrade of 63 km of suburban lines to create a 76.3 km high-capacity line between Gebze and Halkali. The crossing is being constructed using a 1.8 km earthquake-proof immersed tube, assembled in 18 sections. This tube will be accessed by bored tunnels from Yenikapi on the European side and Sogutlucesme on the Asian side of Istanbul. The project has been delayed by the discovery of important heritage sites and around US$60 million of additional cost has been incurred investigating these and recovering a huge the important relics and antiquities discovered on the site. A case study is included in Appendix I at the end of this report Plans for the Marmaray Crossing include interchange stations with Istanbul metro and light rail, whilst the upgrade of the suburban lines requires a third track to be laid along most of the route to increase the line capacity up to 75,000 passengers per hour in each direction. Signalling is being upgraded to provide a service with two minutes’ headway. The 41 stations along the line will be refurbished and the platforms lengthened to 180 m. The rail tunnel will be used by both suburban and long-distance services, as well as freight. A decision on whether the line will be operated by TCDD or Ulasim is yet to be taken. 32 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 35. 6 6.12 Izmir www.izmirmetro.com.tr Izmir is served by around 80 km of suburban rail, with 31 stations and operated by TCDD. There is also a metro, Izmir Metro AS, with 11.5 km of lines currently operational and further phases under construction: „„ Phase 2 5.4 km „„ Phase 3 7.5 km „„ Phase 4 3 km „„ Phase 5 11 km The metropolitan authority has a transportation master plan from 2010 that includes a further 50 route km of metro. The website contains detail information, a brochure and presentation with full technical detail and system description. 6.13 Kayseri www.kayseri.bel.tr The 17.5 km tramway Kayseray, became operational in August 2009, serving 28 stations with a further three phases now at the planning stage. The General Manager of Kayseray is listed on the website above. 6.14 Konya www.konya.bel.tr Operated by the municipality, the first tramline in this ancient city of the Central Anatolian Region opened in 1992, following lengthy delays in both planning and construction. A second line was added in 1995, with a third extension of 3.3 km completed in 2007. The system carries more than 30 million passengers each year. 6.15 Samsun www.samsun.bel.tr/proje-detay.asp?SayfaId=15 Detailed information can be found on the website, covering the 17.2 km of the Light Rapid Transit (LRT) system which serves 21 stations. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 33
  • 36. 7 THE TURKISH CONTRACTING SECTOR Turkey has a very strong reputation and capability in the international construction and contracting sectors. Consequently, it may present opportunities to UK companies for co-operation and supply chain, both in Turkey and third markets. The chart below shows the evolution of the values accrued by Turkish contractors in overseas markets and the geographic spread. 34 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 37. 7 Turkish Contractors Association www.tmb.org.tr There is a Turkish Contractors Association, which recently completed an inward mission to the UK arranged by UKTI. The website is a good source of information. Secretary General Mr Haluk Bϋykϋbas Deputy Secretary General Ms Çiğdem Çinar 7.1 Yapiray Insight into the rail market in Turkey was provided for this report by Yapiray, the Turkish rail contractor. Yapiray has considerable experience both in Turkey and in international markets. It can list projects such as the high-speed rail line in Turkey and the Dubai Metro amongst its references. 8 RAIL ASSOCIATIONS AND ACADEMIA IN TURKEY Turkey has several rail organisations. 8.1 RAYDER (Association of Rail Transport Systems) http://www.rayder.org.tr Rayder is the organisation founded for the development of the railway sector in Turkey. Its board is drawn from academia and industry. The organisation’s aims include improving skills and knowledge locally, as well as monitoring the latest developments from around the world, with the intention of adopting these for use within Turkey. The development of the railways has been adopted as the most significant transport policy of the new Turkish Government. Its intention is to grow the share of rail freight to 15 per cent by 2023. Plans are being laid to invest US$50 billion in high- speed lines, the Marmaray Crossing project, and metro and tramway projects across Turkey’s metropolitan cities. As such, Rayder sees itself as having an increasing important role. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 35
  • 38. 8 Key Points „„ ayder is an industry body. R „„ I t is preparing a railway industrial catalogue to promote the indigenous railway sector and industry. „„ R ayder has been participating in INNOTRANS, Berlin, drawing in other Turkish companies and raising the international profile of the sector. „„ T he organisation works in collaboration with international organisations, such as UITP (International Association of Public Transport) and UNIFE (The Association of the European Rail Industry). „„ R ayder is seeking to create a General Directorate of Urban Rail Systems within the Ministry of Transportation and support research and development for the production of metro and tramway vehicles locally. „„ W ork to establish a research and development centre for rail systems, and a test line in Eskişehir, is underway. „„ T he creation of a Department of Rail Systems in Turkey’s universities is also underway. „„ R ayder supports rail system departments in some recently-opened Industrial Vocational High Schools across Turkey. „„ I t aims to encourage further investment and participation in the sector from local and international players from the private sector, and is working to develop a new law that will extend the use of the private sector in rail. Rayder recognises the need to develop railway infrastructure, the supply chain sector and rolling stock. The upturn in the market has already attracted the attention of a number of local and European companies in this field. Rayder Contact Information Email: rayder@rayder.org.tr www.rayder.org.tr 8.2 Railway Transport Association (DTD) www.dtd.org.tr/ DTD is the Railway Operators Association, established in June 2006. Its members carry over 3.5 million tonne of freight pa and are seeking to grow rail’s share of freight in Turkey. DTD lobbies for improved railway transportation, railway infrastructure and the restructuring of the industry and law to align Turkey with European legislation. Therefore, the organisation is building international links to ensure that rail can take advantage of the growing freight market and potential for international traffic on rail. 36 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 39. 8 8.3 Academia There a number of universities and distinguished academics with links to the rail sector in Turkey, some of whom also hold positions in the rail associations and lend their expertise to bodies such as Tüvasas, the rolling stock constructor. Among the universities with links to the rail sector are: „„ Işik University „„ Istanbul University (Faculty of Engineering) „„ Istanbul Technical University. While researching this report, we had the opportunity to take soundings from several of these institutions who kindly offered their insights into the rail market. The impression we formed was that a step change is happening in the market and, consequently, this needs to be accompanied by a step change in technology, particularly with the demand for high-speed rail, and the drive to grow the freight market. There is an opportunity for UK companies to introduce services and technology into the Turkish market. 9 PRIVATISATION AND INWARD INVESTMENT INTO TURKEY www.oib.gov.tr The Ministry responsible for privatisation, OIB, and the Ministry for Inward Investment into Turkey report to the office of the Turkish Prime Minister. It is widely anticipated that private capital will have a place in Turkish railways in the future. The most likely scenario is that Turkey will adopt public-private partnership (PPP) opportunities on a Build Operate Transfer (BOT) basis. PPP operations are probable, particularly on high-speed lines. PPP is already established and in use in Turkey, but not yet in the rail sector. The diverse nature of rail operator TCDD, with its ports and production units for rolling stock and components, means that these two Ministries are worth including in this report. 9.1 Republic of Turkey Privatisation Administration 2011 Further privatisation is underway in Turkey and may impact the railways in future, though no plans beyond privatisation of ports were discussed during this visit. Further privatisation of ports currently owned and operated by TCDD is possible. The role for private capital is likely to be on BOT (Build Operate Transfer) projects, with 30-year concessions. These will probably include high-speed lines. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 37
  • 40. 9 9.2 Republic of Turkey Prime Ministry Investment Support and Promotion Agency of Turkey (ISPAT) http://www.invest.gov.tr Ispat provides a one–stop shop for inward investment into Turkey. It has a presence around the world, including offices in the UK. It also serves as a reference point for international investors and as a point of contact for all institutions engaged in promoting and attracting investments at national, regional and local levels. Ispat operates like a private company. It works with its clients on a confidential basis and has the backing of all Turkish Governmental bodies. Its services, which are provided free-of-charge include: „„ market information and analyses „„ industry overviews and comprehensive sector reports „„ assessing conditions for investment „„ site selection „„ finding companies for potential partnerships and joint ventures „„ negotiating with relevant Government institutions „„ facilitating legal procedures and legislation issues, such as: -- establishing business operations -- incentive applications -- getting licenses -- work/residence permits. Ispat’s UK representative is: Ahmet Iplikci Republic of Turkey Prime Ministry Investment Support and Promotion Agency of Turkey 2nd Floor Berkeley Square House Berkeley Square London W1J 6BD Tel: 0 20 7887 1987 Fax: 0 20 7887 6001 Mob: 07540 359 215 Email: aiplikci@invest.gov.tr 38 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 41. 10 EURASIA RAIL EXHIBITION www.eurasiarail.com The first ever exhibition focussing exclusively on rail was held in Ankara in March 2011. The next Eurasia Rail exhibition will be held on 8 – 12 March 2012, this time in Istanbul and Eurasia Rail is confident that it will be bigger and better than the launch event. Eurasia Rail reported that the 2011 show was a great success. It said: 10 „„ A pproximately 117 companies participated, 60 per cent of which were international. „„ I ts aim is for 250 companies in 2012 - 78 are already confirmed. „„ T urkey is enjoying US$25 bn of investment in rail, so there is already significant interest in the show and the rail market. „„ T he freight sector will benefit from being able to run through the Marmary tunnel at night. Consequently, the next event will include a focus on infrastructure and logistics in order to develop this sector and international traffic. 10.1 Show Review UKTI East Midlands UKTI East Midlands and UKTI West Midlands had joint stand space at the Eurasia Rail exhibition in 2011, taking 11 participating UK companies. UKTI delegates commented the exhibition was well-organised, and while the number of visitors was modest, their quality was encouraging, with key decision-makers in attendance and accessible to delegates. For example, there were senior officials from a variety of divisions of TCDD, contractors, and specialist suppliers to the industry. As well as gaining market intelligence, UK delegates identified a number of potential partners at the event and all of them achieved their objectives. UKTI East Midlands and a significant proportion of the UK delegates are planning to return to Turkey for the next show in Istanbul in 2012. UKTI East Midlands Contact is Mr Richard Burchell richard.burchell@uktiem.co.uk RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 39
  • 42. 11 11 Doing Business in Turkey The UK has stated publically that Turkey is a market with significant potential for growth and is keen to develop mutual trading links. UKTI has a strong team in Turkey to support UK business, and can assist in areas such as market research and identifying key stakeholders, including partners, agents or distributors. UKTI has a number of reports available off-the-shelf, or you may be able to commission the Overseas Market Introduction Service (OMIS) to prepare a bespoke report specific for your needs. OMIS is a cost-effective means of obtaining credible information specific to your company. The UKTI Trade team in Turkey presented the following summary of the market. An overview of Turkey presented by Ispat (The Turkish Inward Investment Agency) is also included in this report. 11.1 UKTI, Ankara – Market Overview, March 2011 „„ T urkey is world’s 15th, and Europe’s sixth largest economy. It is forecast to be in world’s top 10 by 2050 „„ T he FDI Global Rankings in 2008 (UNCTAD) placed Turkey 20th and the UK fourth in the world „„ U K is Turkey’s second largest export market in Europe, after Germany. Turkey is UK’s eighth largest export market in Europe. Turkey’s major import markets are Russia and Germany. The UK ranks 19th Turkey Exports to UK 2008 2009 Change 2010 Jan-Nov £5.32bn £3.86bn -27% +18% UK Exports to Turkey 2008 2009 Change £3.47bn £2.26bn -35% +35% In the first 11 months of 2010, bilateral trade was £7.4bn, exceeding the total for the whole of 2009 by £1.25b Main Exports (a) K to Turkey - machinery and mechanical appliances; pharmaceuticals; vehicles; iron and U steel; plastic. (b) urkey to UK - clothing and textiles; electrical machinery and equipment; vehicles; footwear; T machinery and mechanical appliances. Turkey: A High-Growth Emerging Market (HGEM) Turkey is designated by HMG as one of the world’s High Growth Emerging Market of significant potential and strategic importance to the UK economy. It places Turkey alongside the BRIC countries (Brazil, Russia, India, China 40 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 43. 11 Investment UK investors in Turkey include: Tesco; Vodafone; British Foods; BP; Shell; Lloyds List; HSBC; International Power; and Mott MacDonald. Inward Investment into the UK from Turkey The number of Turkish investors supported by UKTI increased from five in 2008/9 to 13 in 2009/10 (a 160 per cent increase). There are 70 Turkish-owned businesses in the UK registered at Companies House, with an annual turnover of £1.1 billion. Turkey: Killer Facts „„ T urkey has the youngest and fastest growing population in Europe (with 450,000 graduates a year). „„ T he Istanbul economy alone is larger than 12 EU countries. „„ T urkey will be second fastest-growing country in the world by 2018 (according to the OECD). „„ T he Turkish economy will outstrip Canada, Spain and Italy by 2025. „„ T urkey has the world’s second largest construction and contracting sector. „„ I t is Europe’s number one TV manufacturer. „„ I t is Europe’s leading passenger coach manufacturer. „„ T urkey is the world’s third largest mega-yacht producer. 11.2 ECGD – Market Summary www.ecgd.gov.uk The Export Credits Guarantee Department (ECGD), the UK’s official export credit agency undertook a market review of Turkey in 2010. It offers a very positive view of the current market conditions (although, as market conditions are subject to change, please refer to ECGD for updates or any conditions that may apply to transactions). ECGD can provide cover in Turkey (for political risk, insurance and finance guarantees) subject to its terms and conditions. The organisation can look at projects of around £50 million quite easily, but would be prepared to consider cases of a considerably higher value, subject to content. It will consider sovereign or corporate borrowers. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 41
  • 44. I APPENDIX I Case Study – The Marmaray Crossing The demand for travel across Istanbul, including the Bosphorus, is huge, with a population of at least 12 million to cater for and in excess of two million visitors at any one time. Whilst Istanbul has existing metro and rail systems, a new commuter rail system is being developed which will travel, via two immersed tunnels, under the Bosphorus Strait. It will connect the European side of the Strait to the Asian side, adding capacity of 75,000 people per hour in each direction. Much of the project has already been awarded, although a re-tender is underway for the railway systems segment following the late withdrawal of the party originally contracted. Five groups are contesting the re-run, with Bechtel representing the UK interest. The broad details of the project are: Category Volume Commuter Rail System 77 km At Grade European Side 19.6 km At Grade Asian Side 43.4 km Bored Tunnel 12.2 km Immersed Tube Tunnel 1.4 km Maximum Depth of Immersed Tunnel 56 m New Stations 4 Total Stations 40 Capacity Existing Rail 10,000/hr New Rail 75,000/hr Design Speed 100 kph Operational Speed 45 kph Headway (Peak) 2 to 3 minutes Reduction in Travel Time 81 minutes (Gebze to Halkali) The contract provides for: „„ pgrade of existing track and stations to cater for enhanced passenger numbers u and freight services „„ N ew signalling and telecoms, including a new control centre „„ A utomatic Fare Collection system upgrade that will allow integrated ticketing with all modes, and provide an electronic wallet operation for modest value purchases „„ 4 4 train sets with five and 10-car configurations „„ s even transfer stations for intercity trains to enhance passenger service and mobility. 42 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 45. I Project Map Benefits The project will help to relieve some of the pressure on Istanbul’s bridges and reduce car congestion in the city, with a reduction in carbon emissions as a result. However, there is some concern that, even with the rail system working at capacity, road traffic levels will not actually decline, as demand for transport remains high in and around Istanbul and new drivers will replace those who switch to trains. Istanbul has about 73 per cent employment on the European side and around 35 per cent of the population on the Asian side. One key benefit is the considerable reduction in journey times for the estimated one million commuters who will use the lines. The scheme is running behind schedule due to significant archaeological finds made during construction, including seven whole shipwrecks and numerous artefacts around the construction sites. Turkish heritage is protected in law by the Ministry for Culture. Further issues have been caused by a contractor dropping out of a contract for systems, necessitating a re-tender, which is now under evaluation (see below). Funding The contract was originally split into three areas, with Japanese International Cooperation Agency (JICA) funding for the tunnel construction and European Investment Bank funding for the other two packages: Ref Element Detail Funds BC1 Bosphorus Crossing Immersed tube tunnels. JICA Bored tunnels on both sides. Construction of four new stations. CR1* Upgrade of Commuter Rail Improvement of existing track. EIB Addition of a third track – for commuter and freight. CEB Signalling and telecoms control centre. Fare collection systems. CR2 New Rolling Stock 44 train sets (10-car and five-car) EIB RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 43
  • 46. I *Due to the withdrawal of the contracted party, CR1 has been re-tendered and is now referred to as CR3. It is now funded by CEB, the Council of Europe Development Bank. The tender is due to be awarded mid-2011 and contenders include, Bechtel UK, two Italian consortia, one Chinese and one Spanish consortia. CR1 is now in litigation, the original winning bidder is being challenged on its withdrawal from the contract. BC1 (the Bosphorus Crossing) is being undertaken by a Turkish / Japanese consortium, whilst Hyundai / Rotem of Korea have won CR2, with some technology transfer that will allow local content. The Treasury of Turkey, under the Ministry of Finance, is responsible for arranging the financing of the Marmaray Crossing project. It also has responsibility for deciding the fare prices and the fare principles. Construction Team Avrasaya has been the consultant engineer to DLH since the beginning of the project. Avrasya consult is an international team of three partners from Turkey and Japan. The team is also assisted by local consultants from Turkey: „„ Oriental Consultants is the lead partner from Japan „„ Yüksel Proje Uluslarası A.Ş. is the local partner from Turkey „„ JARTS is the specialist partner from Japan. These three partners form the joint venture, which is in association with the following two Turkish companies: „„ Terzibaşıoğlu Müşavir Mühendislik Ltd. Şti. (TMM) „„ Yerbilimleri Etüd ve Müşavirlik Ltd. Şti (SIAL) Crossing Construction An immersed tunnel was chosen to avoid the excessive gradient that a bored tunnel would require. One hundred and eleven segments, each weighing 20,000 tonnes, were constructed nearby and floated into position. Tight control was required for sinking them into position, given the water flows and traffic in the Bosphorus area. Historical Discoveries and Impact on the Project The first underwater link across the Marmary was proposed in 1860. Since then, a series of schemes have been put forward until the current project was finally agreed and executed. Indeed, a tunnel excavation was found during the construction works believed to be about 1,700 years old. In addition, the artefacts found during excavation include important ancient ruins, burial grounds, an ancient harbour and seven ships that are virtually intact, including some laden with cargo, gold coins and numerous household items. The consequences to the project of the historical findings are that: „„ one high-speed rail link and one intercity station have been cancelled „„ the cost of the archaeological excavations is US$35 million „„ the cost of prolonging the contract is US$60 million „„ the total time lost is around 4.5 years. 44 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 47. I Future Connections New rail systems are planned to facilitate movement across the city on both European and Asian sides, with daily demand growing from around 1.1 m crossings in 2009 to 1.6 million. Seismic Concerns Istanbul is in an earthquake zone, and measures have been taken to mitigate the impact of a major earthquake (we understand that the tunnel has been designed to withstand an earthquake of around 7.5 on the richter scale. There is a major fault line 16 km from the project. The seismic history was profiled and a solution provided during the preparation phase: Environmental Mitigation A major effort was made to ensure that the project was delivered with minimal impact on the environment. This included provision for major fish migrations from the Black Sea to the Marmary and vice versa. RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 45
  • 48. II APPENDIX II Case Study – High-Speed Rail Project The Ministry of Transport and Communications has pledged to construct a high-speed network around Turkey with the intention of reducing journey times, and creating an affordable and sustainable means of transport. The aim is to extend the network to 14,336 km of track, of which around 10,000 km will be high-speed, by 2023, the centenary of the Republic. All new high- speed lines will be double-track and electrified, and capable of running at 250 kph. Rolling stock will be part-supplied within Turkey. One example is the Ankara to Istanbul line. At 533 km long, the line, which is a double-track, electrified, and signalled rail system, will be available for operation at 250 kph. This will reduce the journey time from the current 6 and a half hours to three hours between Ankara and Istanbul. Growth in Market Share (Passenger) The busiest route in the country is the Ankara to Istanbul corridor. Rail’s share of passenger transport on this route is projected to increase from 10 per cent to 78 per cent on completion of the high-speed railway. The journey time will be significantly reduced when the line from Esenkent to Eskişehir is fully- opened, with the benefits of travelling at high speed from city centre to city centre. The journey time will fall from over 6.5 hours to 4 / 4.5 hours, and as such, it will be equivalent to the air route. When the project is connected to the Marmary Crossing, seamless passenger transportation will be provided between Europe and Asia, taking Turkey firmly into the modern age of the train, and enhancing the case for Turkey‘s accession to the EU. There will be social benefits, too, with positive impacts on economic, social and cultural life. Turkey will become the sixth country in Europe and eighth in the world to be operating high-speed trains. High-Speed Routes 46 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011
  • 49. APPENDIX III TCDD Subsidiaries TCDD, the state-owned mainline rail company is not only fully vertically-integrated, it also has a diversified range of activities that include: manufacturing rolling stock and track components, track and rolling stock maintenance, port operations, and more. Wholly-owned Manufacturing Units III Map Showing TCDD Subsidiary Operations RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011 47
  • 50. III III.1 Tülom sas – Locomotives www.tulomsas.com.tr Tülomsas, a wholly-owned subsidiary of TCDD, is the only locomotive supplier in Turkey. It has a long history in manufacturing and maintenance, reaching back to 1894. To date, the company has produced over 700 locomotives and 7,500 freight cars. The facility has a history of working in joint venture partnerships with leading international companies. It has a wide range of capabilities, including engines for defence equipment, such as tanks and vessels. In 2003, Tülomsaş made an agreement with USA-company General Motors (GM) for technology transfer. GM manufactured the first six of 89 units of DE 33,000 diesel electric mainline locomotives for TCDD. Forty-two of the remaining 89 locomotives were built by 2006, whilst the remaining 47 locomotives will be manufactured with 51 per cent local content. More recently, a joint venture with General Electric (GE Transportation) has allowed the local production and introduction of GE’s most technically-advanced engine, Powerhaul, a series of locomotives that are also aimed at export from Turkey to markets in Northern Africa and the Middle East. The new engine claims to save up to 9 per cent of fuel compared to other models. Locomotive Factory The locomotive factory is the largest plant in Tülomsas. It has extensive manufacturing capabilities for a number of types of rolling stock, ranging from 360 to 4,300 HP, with all the workshops and facilities required for loco manufacture. Capacity Category Capacity Units pa Locomotives 60 Railway Maintenance Cars 100 Bogie Freight Cars 500 Diesel Engines 100 Alternators 100 Traction Motors 400 Steel and Iron Castings 2,500 mt 48 RAILWAY SECTOR FACT-FINDING MISSION TO TURKEY MAY 2011