Albania has substantial potential to developed its renewable energy sources, particularly in small hydropower
and solar power. Almost 90 percent of installed electricity capacity is based on hydropower, while one-third
of its potential is utilized (ECS, 2013). The development of power plants from wind and biomass also has sub-
stantial potential (Lalic et al., 2011). Currently, only small hydropower plants are eligible to receive feed-in
tariffs in combination with power purchase obligations over 15 years by the grid operator, ERE (NANR, 2013).
In May 2013, the Albanian parliament adopted a new Law on Renewable Energy Sources, making electricity
produced from wind, solar, geothermal and biomass eligible for a feed-in tariff. The new tariff is currently
being developed by the country’s energy regulator in line with the law’s requirements and methodology. It
will allow a reasonable internal rate of return as well as investor security by power purchase obligations up
Albania
General Country
Information
Population: 3,162,083
Surface Area: 28,745 km²
Capital City: Tirana
GDP (2012): $ 13.119 billion
GDP Per Capita (2012): $ 4,149
WB Ease of Doing Business: 90
Source: Karaj et al. (2010); AEA (2012);WBC-INFO (2012); AEA (2013); Republic of Albania, GEF and UNDP (2012);World Bank (2014);
EIA (2010); Renewable Facts (2013); EIA (2013); SRS NET & EEE (2008); Hoogwijk and Graus (2008); Hoogwijk (2004); JRC (2011);
and UNDP calculations.
R E N E W A B L E E N E R G Y S N A P S H O T :
Key information about renewable energy in Albania
Empowered lives.
Resilient nations.
2.7%
RE Share
1,631 MW
Total Installed Capacity
Biomass Solar PV Wind Small Hydro
0 0 0 44
400 26,000 2,000 4,500
44 MW
Installed RE Capacity
Electricity Generating
Capacity 2012
Installed Renewable Electricity
Capacity 2012 in MW
Technical Potential for Installed
Renewable Electricity Capacity in MW
to 15 years (Law on Renewable Energy Sources, Article 15). The previous support scheme, which was appli-
cable only to small hydropower plants and used a concession-based competitive tender process, affected
the investment climate in recent years. 90 MW of installed capacity was commissioned in 2010 and 2011
(Republic of Albania et al., 2012). IFC (2012) estimates that by the end of 2012, $256 million has been invested
in small hydropower plants. The absence of a tender system and the expansion from eligible renewable en-
ergy sources in the new law will make investment in those technologies even more attractive. In recent years,
Albania has become more investor friendly (World Bank, 2011).
Albania’s energy policy is defined in the National Strategy of Energy and Plan of Action. The country’s energy
market will be integrated into the EU energy market by meeting the requirements of the Energy Charter
Treaty and the EU’s Directive 96/92/EC on Electricity. Together with UNDP and the Global Environment Facility,
the country developed a Draft Albanian Renewable Energy Plan. This draft estimates the maximum final tar-
get share of renewable energy sources in gross final energy consumption until 2020 at 38 percent (Republic
of Albania et al., 2012). With the EC Ministerial Council’s decision to adopt Directive 96/92/EC, Albania ac-
cepted this target share as a national binding target (EC, 2012). The National Strategy of Energy and Plan of
Action aims to maximize renewable energy sources and to increase investment in the energy market by in-
ternational financial institutions. The Power Sector Law requires energy producers with an installed capacity
higher than 50 MW to produce a quota of at least 3 percent of their annual electricity output from renewable
sources. But since the law was adopted, no thermal power plant has yet been commissioned and the law is
yet to be practically implemented. As well as the feed-in tariffs, the new Law on Renewable Energy Sources
defines the national target for energy consumption from renewable sources, and aims to attract potential
investors in renewable energy through priority grid access. Other incentives schemes exist for all technologies
and all capacity sizes. Electricity from renewable sources is exempt from excise tax. Machinery and equipment
used for the construction of renewable energy power plants are exempt from customs duties.
Legislation and policy
R E N E W A B L E E N E R G Y S N A P S H O T :
Eligible Technology Feed-in tariff in €/MW-h
Existing hydropower plants up to 10 MW 54
New hydropower plants up to 15 MW 49
Source: ERE (2013). ALL/€ as on 28 February 2014.
Albania
Institutions
Organization Responsibility Website
Ministry
of Energy
and Industry
- Prepares and revises the National Energy Strategy
- Promotes energy efficiency and renewable energy,
including small hydropower plants
- Approves the National Energy Efficiency Action Plan
and National Renewable Energy Action Plan
- Promotes domestic and foreign private investment
www.mete.gov.al/
National Agency
of Natural Resources
- Advisory body on energy issues for the government
- Develops the National Energy Strategy and policy for
renewable energy
www.akbn.gov.al/
Electricity Regulatory
Commission (ERE)
- Approves tariffs and develops as well as implements
feed-in tariffs for small hydropower plants
- Is responsible for establishing the feed-in tariffs
under the new law on renewable energy sources for
all other eligible renewable sources
- Grants licencing for companies in the electrical en-
ergy sector including guarantees of origin for pro-
ducers of renewable energy
www.erc.go.ke/erc/index.php
Transmission System and
Market Operator
- Operates, maintains and develops the transmission
system
- Provides grid access
www.ost.al/english/taxonomy/term/19
Opportunities to finance renewable energy projects in Albania
Financing organization Details Website
Green Growth Fund Provides direct and indirect (through financial inter-
mediaries) financing for small scale renewable energy
projects, usually not larger than €50 million.
www.ggf.lu/
Western Balkans
Sustainable Energy
Direct Financing
Facility
Local small and medium enterprises with a sound fi-
nancial and economic structure and sufficient means
of equity capital can apply for direct loans from the
European Bank for Reconstruction and Development’s
Western Balkan Sustainable Energy Direct Financing
Facility of between €2 million and €6 million.
www.websedff.com
International Finance
Corporation (IFC)
Banks’capitalization and providing specialized prod-
ucts for renewable energy projects and small and
medium enterprises.
www.ifc.org/
European Bank
for Reconstruction
and Development
(EBRD)
Provides renewable energy developers with equity,
loans and loan guarantees for projects with good
commercial prospects of up to 15 years’duration.
www.ebrd.com/pages/workingwithus/pro
jects.shtml
Albania
References
Albania Energy Association (AEA), 2013: AlbaniaWind
Energy. Available at:
http://aea-al.org/albania-wind-energy/
Albania Energy Association (AEA), 2012: Renewable
Energy Resources and Energy Efficiency in Albania,
Available at:
http://aea-al.org/wp-content/uploads/2012/04/
RENEWABLE-ENERGY-ALBANIA.pdf
Energy Charter Secretariat (ECS), 2013: In-Depth Review
of the Energy Efficiency Policy of ALBANIA. Available at:
www.encharter.org/fileadmin/user_upload/
Publications/Albania_EE_2013_ENG.pdf
Energy Community (EC), 2012: Energy Community
Ministerial Council adopts Renewable Energy 2020
targets. Available at:
www.energy-community.org/portal/page/portal/
ENC_HOME/NEWS/News_Details?p_new_id=6342
Enti Rregulatori I Energjise (ERE), 2013. Available at:
www.ere.gov.al/doc/Tarifat_e_miratuara_nga_ERE_
per_1_janar_-_31_dhjetor_2011.pdf
Hoogwijk, M., 2004: On the global and regional
potential of renewable energy sources. Utrecht:
Universiteit Utrecht, Faculteit Scheikunde. Dissertation.
Available at:
http://igitur-archive.library.uu.nl/dissertations/2004-
0309-123617/full.pdf
Hoogwiijk, M. andW. Graus, 2008: Global Potential of
Renewable Energy Sources: A Literature Assessment.
Available at: www.ecofys.com/files/files/report_global
_potential_of_renewable_energy_sources_a_literature
_ assessment.pdf
IFC Advisory Service, 2012 – Removing Market Barriers
to Support Clean Energy: Development in Albania.
Available at:
https://www1.ifc.org/wps/wcm/connect/
dccbff804ce042a7858fc5f81ee631cc/sba-proj-
albania.pdf?MOD=AJPERES
IFC, 2012: Albania Renewable Energy - Removing
market barriers to support clean energy development.
Available at:
www.ifc.org/wps/wcm/connect/dccbff804ce042a7858f
c5f81ee631cc/sba-proj-albania.pdf?MOD=AJPERES
Joint Research Centre of the European Commission
(JRC), 2011:Technical Assessment of the Renewable
Energy Action Plans. Available at:
http://ec.europa.eu/dgs/jrc/downloads/jrc_reference
_report_2011_reap.pdf
Karaj, S., Rehl,T., Leis, H. and J. Mueller, 2010: Analysis of
biomass residues potential for electrical energy
generation in Albania, in: Renewable and Sustainable
Energy Reviews, 14: 493-499
Lalic, D., Popovskib, K., Gecevskac,V.,Vasilevskad, S. and
Z.Tesica, 2011: Analysis of the opportunities and
challenges for renewable energy market in theWestern
Balkan countries, in: Renewable and Sustainable Energy
Reviews (15): 3187-3195
National Agency of Natural Resources (NANR), 2013.
Available at:
www.akbn.gov.al/images/pdf/hidroenergjetike/Hydrop
ower_Situation_and_Current_Situation.pdf
Renewable Facts, 2013: Albania. Available at:
www.renewablefacts.com/country/albania/
Republic of Albania, 2013: Law No. 138/2013 On
Renewable Energy Sources
Republic of Albania, GEF and UNDP, 2012: Draft
Albanian Renewable Energy Action Plan
Scientific Reference System on New Energy
Technologies, Energy End-use Efficiency and Energy
(SRS NET & EEE), 2008:WP3-Technology data - Executive
Summary on Small Hydro. Available at:
http://srs.epu.ntua.gr/Portals/SRS/material/
technologyreview/Small%20Hydro.pdf
U.S. Energy Information Administration (EIA), 2010:
Electricity Data -Total Electricity Installed Capacity.
Available at:
www.eia.gov/cfapps/ipdbproject/IEDIndex3.cfm?
tid=2&pid=2&aid=7
U.S. Energy Information Administration (EIA), 2013:
Levelized Cost of New Generation Resources in the
Annual Energy Outlook 2013. Available at:
www.eia.gov/forecasts/aeo/electricity_generation.cfm
WBC-INCO, 2012: National background report on
Energy for Albania. Available at:
http://wbc-inco.net/attach/WBC-INCO.net_
AL-Report_Energy_2012_v02.pdf
World Bank, 2011: Doing business 2011 - Making a
Difference for Entrepreneurs. Available at:
www.doingbusiness.org/~/media/fpdkm/doing%
20business/documents/annual-reports/english/db11-
fullreport.pdf
World Bank, 2014: Data Catalog. Available at:
http://datacatalog.worldbank.org/
Recent projects in Albania
Company Project Status
Marseglia Group
(Italy)
Construction of a biomass power plant (palm oil) with
140 MW installed capacity.
Under Development
Moncada Energy Group
(Italy)
Developing the 500 MW Vlore wind farm. Under Development

Mais conteúdo relacionado

Mais procurados

Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Gilberto De Martino Jannuzzi
 
Coupling Universal Energy Access with Financial Sustainability: the Case of L...
Coupling Universal Energy Access with Financial Sustainability: the Case of L...Coupling Universal Energy Access with Financial Sustainability: the Case of L...
Coupling Universal Energy Access with Financial Sustainability: the Case of L...Jacopo Pendezza
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaSimeon Arnaudov
 
Non-Profit/For-Profit Partnerships in SHPP: CEFA’s Experiences and Perspectiv...
Non-Profit/For-Profit Partnerships in SHPP: CEFA’s Experiences and Perspectiv...Non-Profit/For-Profit Partnerships in SHPP: CEFA’s Experiences and Perspectiv...
Non-Profit/For-Profit Partnerships in SHPP: CEFA’s Experiences and Perspectiv...Jacopo Pendezza
 
Public private partnerships - the case of lebanon first ppp - pierre el-hnoud
Public private partnerships - the case of lebanon first ppp - pierre el-hnoudPublic private partnerships - the case of lebanon first ppp - pierre el-hnoud
Public private partnerships - the case of lebanon first ppp - pierre el-hnoudPierre Hnoud
 
Djibouti geothermal proposal 2012 drilling
Djibouti geothermal proposal 2012 drillingDjibouti geothermal proposal 2012 drilling
Djibouti geothermal proposal 2012 drillingParti Djibouti
 
Climate change and energy policy in the construction sector berlin-germany-...
Climate change and energy policy in the construction sector   berlin-germany-...Climate change and energy policy in the construction sector   berlin-germany-...
Climate change and energy policy in the construction sector berlin-germany-...Pierre Hnoud
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in Indiamohkab1
 
Macro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeMacro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeStatkraft
 
Klibel5 law 8
Klibel5 law 8Klibel5 law 8
Klibel5 law 8KLIBEL
 
Cost of Electricity Generation and the National Economy
Cost of Electricity Generation and the National EconomyCost of Electricity Generation and the National Economy
Cost of Electricity Generation and the National EconomyIshara Gamage
 

Mais procurados (20)

Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...Detailed comparison of Brazilian and French obligation schemes to promote ene...
Detailed comparison of Brazilian and French obligation schemes to promote ene...
 
Moldova
MoldovaMoldova
Moldova
 
Montenegro
MontenegroMontenegro
Montenegro
 
Coupling Universal Energy Access with Financial Sustainability: the Case of L...
Coupling Universal Energy Access with Financial Sustainability: the Case of L...Coupling Universal Energy Access with Financial Sustainability: the Case of L...
Coupling Universal Energy Access with Financial Sustainability: the Case of L...
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case Bulgaria
 
Non-Profit/For-Profit Partnerships in SHPP: CEFA’s Experiences and Perspectiv...
Non-Profit/For-Profit Partnerships in SHPP: CEFA’s Experiences and Perspectiv...Non-Profit/For-Profit Partnerships in SHPP: CEFA’s Experiences and Perspectiv...
Non-Profit/For-Profit Partnerships in SHPP: CEFA’s Experiences and Perspectiv...
 
Bhiwandi electricity distribution
Bhiwandi electricity distributionBhiwandi electricity distribution
Bhiwandi electricity distribution
 
Public private partnerships - the case of lebanon first ppp - pierre el-hnoud
Public private partnerships - the case of lebanon first ppp - pierre el-hnoudPublic private partnerships - the case of lebanon first ppp - pierre el-hnoud
Public private partnerships - the case of lebanon first ppp - pierre el-hnoud
 
Kazakhstan
KazakhstanKazakhstan
Kazakhstan
 
Djibouti geothermal proposal 2012 drilling
Djibouti geothermal proposal 2012 drillingDjibouti geothermal proposal 2012 drilling
Djibouti geothermal proposal 2012 drilling
 
Poland
PolandPoland
Poland
 
Prabin kc
Prabin kcPrabin kc
Prabin kc
 
Climate change and energy policy in the construction sector berlin-germany-...
Climate change and energy policy in the construction sector   berlin-germany-...Climate change and energy policy in the construction sector   berlin-germany-...
Climate change and energy policy in the construction sector berlin-germany-...
 
Energy and the EU budget 2014-2020
Energy and the EU budget 2014-2020Energy and the EU budget 2014-2020
Energy and the EU budget 2014-2020
 
power plants and working
power plants and workingpower plants and working
power plants and working
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in India
 
Macro-economic study on hydropower in Europe
Macro-economic study on hydropower in EuropeMacro-economic study on hydropower in Europe
Macro-economic study on hydropower in Europe
 
Klibel5 law 8
Klibel5 law 8Klibel5 law 8
Klibel5 law 8
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
 
Cost of Electricity Generation and the National Economy
Cost of Electricity Generation and the National EconomyCost of Electricity Generation and the National Economy
Cost of Electricity Generation and the National Economy
 

Semelhante a Albania[1]

Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...Lulzim
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...Lulzim
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniLorenc Gordani
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketEnerjimiz Güneş
 

Semelhante a Albania[1] (20)

Romania
RomaniaRomania
Romania
 
Croatia
CroatiaCroatia
Croatia
 
Slovenia
SloveniaSlovenia
Slovenia
 
Lithuania
LithuaniaLithuania
Lithuania
 
Slovakia
SlovakiaSlovakia
Slovakia
 
Macedonia
MacedoniaMacedonia
Macedonia
 
Armenia
ArmeniaArmenia
Armenia
 
Ukraine
UkraineUkraine
Ukraine
 
Latvia
LatviaLatvia
Latvia
 
Serbia
SerbiaSerbia
Serbia
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Energy a practical approach for the benefit of sustainable economic develop...
Energy   a practical approach for the benefit of sustainable economic develop...Energy   a practical approach for the benefit of sustainable economic develop...
Energy a practical approach for the benefit of sustainable economic develop...
 
Albania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordaniAlbania toward large and sustainable energy developments by lorenc gordani
Albania toward large and sustainable energy developments by lorenc gordani
 
Belarus
BelarusBelarus
Belarus
 
Uzbekistan
UzbekistanUzbekistan
Uzbekistan
 
Tajikistan
TajikistanTajikistan
Tajikistan
 
Turkey
TurkeyTurkey
Turkey
 
Hungary
HungaryHungary
Hungary
 
Kyrgyzstan
KyrgyzstanKyrgyzstan
Kyrgyzstan
 
Opportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy MarketOpportunities in the Hungarian Wind Energy Market
Opportunities in the Hungarian Wind Energy Market
 

Mais de UNDP Eurasia

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan ZverzhanovskiUNDP Eurasia
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben SlayUNDP Eurasia
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta AyoungUNDP Eurasia
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka CetkovicUNDP Eurasia
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim BouevUNDP Eurasia
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel StanderUNDP Eurasia
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill IlinskiUNDP Eurasia
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill SavrassovUNDP Eurasia
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` ConnellUNDP Eurasia
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri LaneUNDP Eurasia
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno HeuvelUNDP Eurasia
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke TaishiUNDP Eurasia
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga ButoUNDP Eurasia
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David SimmonsUNDP Eurasia
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie KrausUNDP Eurasia
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina WhalleyUNDP Eurasia
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom AvivUNDP Eurasia
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning LudolphsUNDP Eurasia
 

Mais de UNDP Eurasia (20)

2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer2018 DRR Financing 2.1 Andy Palmer
2018 DRR Financing 2.1 Andy Palmer
 
2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski2018 DRR Financing 6.2 Ivan Zverzhanovski
2018 DRR Financing 6.2 Ivan Zverzhanovski
 
2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay2018 DRR Financing 6.1 Ben Slay
2018 DRR Financing 6.1 Ben Slay
 
2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung2018 DRR Financing 5.8 Margaretta Ayoung
2018 DRR Financing 5.8 Margaretta Ayoung
 
2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic2018 DRR Financing 5.7 Jovanka Cetkovic
2018 DRR Financing 5.7 Jovanka Cetkovic
 
2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev2018 DRR Financing 5.6 Maxim Bouev
2018 DRR Financing 5.6 Maxim Bouev
 
2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander2018 DRR Financing 5.5 Daniel Stander
2018 DRR Financing 5.5 Daniel Stander
 
2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs
 

Último

GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 

Último (20)

GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Albania[1]

  • 1. Albania has substantial potential to developed its renewable energy sources, particularly in small hydropower and solar power. Almost 90 percent of installed electricity capacity is based on hydropower, while one-third of its potential is utilized (ECS, 2013). The development of power plants from wind and biomass also has sub- stantial potential (Lalic et al., 2011). Currently, only small hydropower plants are eligible to receive feed-in tariffs in combination with power purchase obligations over 15 years by the grid operator, ERE (NANR, 2013). In May 2013, the Albanian parliament adopted a new Law on Renewable Energy Sources, making electricity produced from wind, solar, geothermal and biomass eligible for a feed-in tariff. The new tariff is currently being developed by the country’s energy regulator in line with the law’s requirements and methodology. It will allow a reasonable internal rate of return as well as investor security by power purchase obligations up Albania General Country Information Population: 3,162,083 Surface Area: 28,745 km² Capital City: Tirana GDP (2012): $ 13.119 billion GDP Per Capita (2012): $ 4,149 WB Ease of Doing Business: 90 Source: Karaj et al. (2010); AEA (2012);WBC-INFO (2012); AEA (2013); Republic of Albania, GEF and UNDP (2012);World Bank (2014); EIA (2010); Renewable Facts (2013); EIA (2013); SRS NET & EEE (2008); Hoogwijk and Graus (2008); Hoogwijk (2004); JRC (2011); and UNDP calculations. R E N E W A B L E E N E R G Y S N A P S H O T : Key information about renewable energy in Albania Empowered lives. Resilient nations. 2.7% RE Share 1,631 MW Total Installed Capacity Biomass Solar PV Wind Small Hydro 0 0 0 44 400 26,000 2,000 4,500 44 MW Installed RE Capacity Electricity Generating Capacity 2012 Installed Renewable Electricity Capacity 2012 in MW Technical Potential for Installed Renewable Electricity Capacity in MW
  • 2. to 15 years (Law on Renewable Energy Sources, Article 15). The previous support scheme, which was appli- cable only to small hydropower plants and used a concession-based competitive tender process, affected the investment climate in recent years. 90 MW of installed capacity was commissioned in 2010 and 2011 (Republic of Albania et al., 2012). IFC (2012) estimates that by the end of 2012, $256 million has been invested in small hydropower plants. The absence of a tender system and the expansion from eligible renewable en- ergy sources in the new law will make investment in those technologies even more attractive. In recent years, Albania has become more investor friendly (World Bank, 2011). Albania’s energy policy is defined in the National Strategy of Energy and Plan of Action. The country’s energy market will be integrated into the EU energy market by meeting the requirements of the Energy Charter Treaty and the EU’s Directive 96/92/EC on Electricity. Together with UNDP and the Global Environment Facility, the country developed a Draft Albanian Renewable Energy Plan. This draft estimates the maximum final tar- get share of renewable energy sources in gross final energy consumption until 2020 at 38 percent (Republic of Albania et al., 2012). With the EC Ministerial Council’s decision to adopt Directive 96/92/EC, Albania ac- cepted this target share as a national binding target (EC, 2012). The National Strategy of Energy and Plan of Action aims to maximize renewable energy sources and to increase investment in the energy market by in- ternational financial institutions. The Power Sector Law requires energy producers with an installed capacity higher than 50 MW to produce a quota of at least 3 percent of their annual electricity output from renewable sources. But since the law was adopted, no thermal power plant has yet been commissioned and the law is yet to be practically implemented. As well as the feed-in tariffs, the new Law on Renewable Energy Sources defines the national target for energy consumption from renewable sources, and aims to attract potential investors in renewable energy through priority grid access. Other incentives schemes exist for all technologies and all capacity sizes. Electricity from renewable sources is exempt from excise tax. Machinery and equipment used for the construction of renewable energy power plants are exempt from customs duties. Legislation and policy R E N E W A B L E E N E R G Y S N A P S H O T : Eligible Technology Feed-in tariff in €/MW-h Existing hydropower plants up to 10 MW 54 New hydropower plants up to 15 MW 49 Source: ERE (2013). ALL/€ as on 28 February 2014.
  • 3. Albania Institutions Organization Responsibility Website Ministry of Energy and Industry - Prepares and revises the National Energy Strategy - Promotes energy efficiency and renewable energy, including small hydropower plants - Approves the National Energy Efficiency Action Plan and National Renewable Energy Action Plan - Promotes domestic and foreign private investment www.mete.gov.al/ National Agency of Natural Resources - Advisory body on energy issues for the government - Develops the National Energy Strategy and policy for renewable energy www.akbn.gov.al/ Electricity Regulatory Commission (ERE) - Approves tariffs and develops as well as implements feed-in tariffs for small hydropower plants - Is responsible for establishing the feed-in tariffs under the new law on renewable energy sources for all other eligible renewable sources - Grants licencing for companies in the electrical en- ergy sector including guarantees of origin for pro- ducers of renewable energy www.erc.go.ke/erc/index.php Transmission System and Market Operator - Operates, maintains and develops the transmission system - Provides grid access www.ost.al/english/taxonomy/term/19 Opportunities to finance renewable energy projects in Albania Financing organization Details Website Green Growth Fund Provides direct and indirect (through financial inter- mediaries) financing for small scale renewable energy projects, usually not larger than €50 million. www.ggf.lu/ Western Balkans Sustainable Energy Direct Financing Facility Local small and medium enterprises with a sound fi- nancial and economic structure and sufficient means of equity capital can apply for direct loans from the European Bank for Reconstruction and Development’s Western Balkan Sustainable Energy Direct Financing Facility of between €2 million and €6 million. www.websedff.com International Finance Corporation (IFC) Banks’capitalization and providing specialized prod- ucts for renewable energy projects and small and medium enterprises. www.ifc.org/ European Bank for Reconstruction and Development (EBRD) Provides renewable energy developers with equity, loans and loan guarantees for projects with good commercial prospects of up to 15 years’duration. www.ebrd.com/pages/workingwithus/pro jects.shtml
  • 4. Albania References Albania Energy Association (AEA), 2013: AlbaniaWind Energy. Available at: http://aea-al.org/albania-wind-energy/ Albania Energy Association (AEA), 2012: Renewable Energy Resources and Energy Efficiency in Albania, Available at: http://aea-al.org/wp-content/uploads/2012/04/ RENEWABLE-ENERGY-ALBANIA.pdf Energy Charter Secretariat (ECS), 2013: In-Depth Review of the Energy Efficiency Policy of ALBANIA. Available at: www.encharter.org/fileadmin/user_upload/ Publications/Albania_EE_2013_ENG.pdf Energy Community (EC), 2012: Energy Community Ministerial Council adopts Renewable Energy 2020 targets. Available at: www.energy-community.org/portal/page/portal/ ENC_HOME/NEWS/News_Details?p_new_id=6342 Enti Rregulatori I Energjise (ERE), 2013. Available at: www.ere.gov.al/doc/Tarifat_e_miratuara_nga_ERE_ per_1_janar_-_31_dhjetor_2011.pdf Hoogwijk, M., 2004: On the global and regional potential of renewable energy sources. Utrecht: Universiteit Utrecht, Faculteit Scheikunde. Dissertation. Available at: http://igitur-archive.library.uu.nl/dissertations/2004- 0309-123617/full.pdf Hoogwiijk, M. andW. Graus, 2008: Global Potential of Renewable Energy Sources: A Literature Assessment. Available at: www.ecofys.com/files/files/report_global _potential_of_renewable_energy_sources_a_literature _ assessment.pdf IFC Advisory Service, 2012 – Removing Market Barriers to Support Clean Energy: Development in Albania. Available at: https://www1.ifc.org/wps/wcm/connect/ dccbff804ce042a7858fc5f81ee631cc/sba-proj- albania.pdf?MOD=AJPERES IFC, 2012: Albania Renewable Energy - Removing market barriers to support clean energy development. Available at: www.ifc.org/wps/wcm/connect/dccbff804ce042a7858f c5f81ee631cc/sba-proj-albania.pdf?MOD=AJPERES Joint Research Centre of the European Commission (JRC), 2011:Technical Assessment of the Renewable Energy Action Plans. Available at: http://ec.europa.eu/dgs/jrc/downloads/jrc_reference _report_2011_reap.pdf Karaj, S., Rehl,T., Leis, H. and J. Mueller, 2010: Analysis of biomass residues potential for electrical energy generation in Albania, in: Renewable and Sustainable Energy Reviews, 14: 493-499 Lalic, D., Popovskib, K., Gecevskac,V.,Vasilevskad, S. and Z.Tesica, 2011: Analysis of the opportunities and challenges for renewable energy market in theWestern Balkan countries, in: Renewable and Sustainable Energy Reviews (15): 3187-3195 National Agency of Natural Resources (NANR), 2013. Available at: www.akbn.gov.al/images/pdf/hidroenergjetike/Hydrop ower_Situation_and_Current_Situation.pdf Renewable Facts, 2013: Albania. Available at: www.renewablefacts.com/country/albania/ Republic of Albania, 2013: Law No. 138/2013 On Renewable Energy Sources Republic of Albania, GEF and UNDP, 2012: Draft Albanian Renewable Energy Action Plan Scientific Reference System on New Energy Technologies, Energy End-use Efficiency and Energy (SRS NET & EEE), 2008:WP3-Technology data - Executive Summary on Small Hydro. Available at: http://srs.epu.ntua.gr/Portals/SRS/material/ technologyreview/Small%20Hydro.pdf U.S. Energy Information Administration (EIA), 2010: Electricity Data -Total Electricity Installed Capacity. Available at: www.eia.gov/cfapps/ipdbproject/IEDIndex3.cfm? tid=2&pid=2&aid=7 U.S. Energy Information Administration (EIA), 2013: Levelized Cost of New Generation Resources in the Annual Energy Outlook 2013. Available at: www.eia.gov/forecasts/aeo/electricity_generation.cfm WBC-INCO, 2012: National background report on Energy for Albania. Available at: http://wbc-inco.net/attach/WBC-INCO.net_ AL-Report_Energy_2012_v02.pdf World Bank, 2011: Doing business 2011 - Making a Difference for Entrepreneurs. Available at: www.doingbusiness.org/~/media/fpdkm/doing% 20business/documents/annual-reports/english/db11- fullreport.pdf World Bank, 2014: Data Catalog. Available at: http://datacatalog.worldbank.org/ Recent projects in Albania Company Project Status Marseglia Group (Italy) Construction of a biomass power plant (palm oil) with 140 MW installed capacity. Under Development Moncada Energy Group (Italy) Developing the 500 MW Vlore wind farm. Under Development