2. TUJUAN
KEGIATAN INI BERTUJUAN AGAR MASYARAKAT MENDAPATKAN DISTRIBUSI AIR
BERSIH UNTUK DIGUNAKAN DALAM AKTIVITAS SEHARI-HARI
3. RENCANA IMPLEMENTASI
• PERBAIKAN INSTALASI PIPA
• PEMASANGAN PIPA UTAMA 1,5” SEPANJANG 400 METER
• PEMASANGAN PERANGKAT PENGONTROL OTOMATIS
• PEMBUATAN REGULASI SISTEM
5. KALKUKASI BIAYA
• VARIABEL BIAYA:
• PELANGGAN = 25 ORANG
• PIPA UTAMA = 400 METER
• HARGA PIPA = RP43.500 PER 4 METER
• RADAR TOREN = RP50.000
• SELENOID VALVE = RP150.000
• OUTPUT DAYA POMPA = 880 WATT
• HARGA LISTRIK PER KWH = RP769
RP800
• ASUMSI WAKTU PENGISIAN TOREN = 1
JAM
• KAPASITAS TOTAL TOREN = 1.750
LITER
• ASUMSI PEMAKAIAN PELANGGAN = 40
LITER PER ORANG
• ASUMSI RATA-RATA PENGGUNA PER KK
= 5 ORANG
• GAJI KARYAWAN OPERATOR 1 ORANG =
RP200.000
• GAJI KARYAWAN PENCATAT WATER
METER = RP50.000 PER ORANG X 3
ORANG = RP150.000
6. KALKULASI BIAYA
BIAYA AWAL
• PEMASANGAN PIPA UTAMA:
• 400M X (RP43.500/4) = RP4.350.000
• PEMASANGAN PENGONTROL OTOMATIS (SELENOIDA + RADAR):
• (RP50.000 + RP150.000) X 2 = RP400.000
• HONOR 2 ORANG PEKERJA/TUKANG:
• RP100.000 X 2 (ORANG) X 3 (HARI) = RP600.000
7. KALKULASI BIAYA
BIAYA OPERASIONAL BERDASARKAN PENGISIAN TOREN:
• KEBUTUHAN VOLUME DISTRIBUSI AIR:
• 40 (LITER) X 5 (ORANG) X 25 (KK) = 5000 LITER PER HARI
• WAKTU PENGISIAN TOREN:
• 5000/1.750 = 2,86 (KALI PENGISIAN) X 1 (JAM) = 2,86 (JAM) PER HARI
• PEMAKAIAN LISTRIK PENGISIAN TOREN:
• (880 (WATT) / 1000) X 2,86 (JAM) X RP800 = RP2.013 (PER HARI) X 30 (HARI) =
RP60.390 (PER BULAN)
8. KALKULASI BIAYA
BIAYA OPERASIONAL KARYAWAN:
• KARYAWAN OPERATOR:
• RP200.000 X 1 (ORANG) = RP200.000
• KARYAWAN PENCATAT WATER METER:
• RP50.000 X 3 (ORANG) = RP150.000
NOTE:
• JUMLAH KARYAWAN 3 ORANG DENGAN ASUMSI KARYAWAN OPERATOR
DIBERDAYAKAN JUGA SEBAGAI KARYAWAN PENCATAT WATER METER
9. KALKULASI HARGA PELANGGAN
• ABONEMEN BERDASARKAN BIAYA KARYAWAN:
• RP350.000/25 (ORG) = RP14.000
• HARGA PER LITER:
• RP60.390/(5000 (LITER) X 30 (BULAN)) = RP0,4 RP400 PER KUBIK
• ASUMSI TAGIHAN PELANGGAN YANG MENGGUNAKAN YANG TERDIRI DARI 5
ORANG ANGGOTA KELUARGA:
• 40 (LITER) X 5 (ORANG) X 30 (HARI) = 6000 (LITER) X RP0,4 = RP2.400 + RP14.000
(ABONEMEN) = RP16.400 PER BULAN