SlideShare uma empresa Scribd logo
1 de 3
Timothy D. White
922 Huntington Drive                                           972.709.3977 or 469.446.6975
Duncanville, TX • 75137                                        twhiteldr1@yahoo.com

                             SENIOR IT LEADERSHIP PROFILE

Accomplished Senior Leader with a results charged career in the Information Technology
Leadership of several dynamic organizations. Accustomed to and effective in project
management of complex infrastructure, System architecture, Microsoft server and systems.
Offers high caliber qualifications, acute systems instincts, and experience backed judgment in
leadership roles, making high stakes decisions and overcoming complex business challenges
to achieve the IT requirements needed by the organizations. A true consensus-builder who
gets things done!

                                     Core Competencies:

               Leadership / IT                Critical System Management
               Management
               Relationship Management        Project Management
               MS Server / Architecture       Change Management
               Six Sigma Training             Local and Platform System Design
               Strategic Planning             National Systems infrastructure

                                  MAJOR ACHIEVEMENTS

•   Managed team in Data Center (city to city) migration with processes and enhancements to
    include: 1) the development, implementation, and execution of the project scope and plan
    ($1.7 M) 2) asset availability, selection and procurement, 3) budget and schedule
    management 4) the use of PMBOK Methodology and retention of all old information.

   Architected the consolidation and implementation of VMWare and SAN systems to reduce
    footprint of MS Windows Server systems. Made use of Converter by VMWare to deliver
    physical to virtual (P2V) consolidations. Reduced power and cooling requirements and
    increased availability of overall service delivery.

   Implementation of full service application development infrastructure environments.
    Database systems, VMWare/Server systems and other UNIX and SAN supporting systems.
    (i.e.: Test, Dev., Pre-Production and Production)

   Established partnerships that yielded technology solutions for the business and remote user
    communities. Examples: MS Windows server 20xx(00,03,08), VMWare ESX, SAN Storage,
    VDI(virtual desktop), In sourcing of IT support, data center move and change of outsourced
    vendor, build-out of new DC and office location. (Cost avoidance of 250
    Laptops/workstations $0.5M)

   Managed vendor relationships in the procurement and support for production hosted data
    center environments with focus on resilience and high availability systems.
   Institute best practices from the ITIL Methodology, Foundation training for staff,
    transformation of support; improved change management, asset management, service desk,
    SLA’s, and other services.

                              PROFESSIONAL EXPERIENCE

Carlisle and Gallagher Consulting Group – Executive Customer Representative
 Jun 2010 - Current
• Project Assignment – Secret project for a prominent national organization in the Dallas –
   Fort Worth area servicing the United States.
• Manage customer support and problem resolution in the executive offices.
• Trained and led various team members in the project to add skilled support into the project.
   Making use of Citrix remote connectivity via secure Cisco VPN. (200 active member team)
• Recommended solutions and change management techniques to add quality to the
   solutions provided by the project teams.

Broadlane. Inc. – Sr. Manager IT Operations                            Aug 2006 – Dec 2009
Managed teams to deliver coverage of production support, service desk, end user computing,
Server, storage and network.
• Data center management, Microsoft Server consolidation of 75% of hardware. (110 system
   reduced to 28 systems), Communication solution (MS - OCS) and others resulted in
   company savings and a lower cost support model.
• Piloted migration of 40 servers from MS server 2003 to MS server 2008. These systems
   were used for SQL, application and MS exchange. Also worked on MS Office
   communicator proof of concept as possible replacement solution for the site.
• Architected the consolidation and implementation of VMWare and SAN systems to reduce
   footprint of Microsoft Server environments and systems. Maintained a 20:1 ratio on average
   consolidations. Reduced power and cooling requirements and increased availability of
   overall service delivery.
• Managed vendor relationships for production hosted data center environments. Key
   deliverables around resilience and high availability systems. Implementation of VMWare
   ESX and VC with HA and DRS active for resilience. Also working on DR and business
   continuity.
• Established partnerships that yielded technology solutions for the business and remote
   user communities. Examples: MS Server upgrades (2000, 2003 up to 2003 and 2008) ,
   VMWare ESX (VC and VSphere), SAN Storage (EMC, IBM, HP and NetApp), VDI (virtual
   desktop), in sourcing of IT support, data center move and change of outsourced vendor.
• Institute best practices from the ITIL Methodology, Foundation training for staff,
   transformation of support; improved change management, asset management, service
   desk, SLA’s, and other services.

EDS – PMD/ Project Management Delivery                               (Mar–Aug) 2006
Managed teams in Data Center (city to city) see major achievements
• Moved complete per plan with upgrades within budget ($1.7M) /deadline. Saved the
  organization $0.8 M.
• Data Center equipment consisted of MS server (2000 and 2003) and VMWare servers,
  SAN and enterprise systems. SUN, IBM, HP/Compaq and Dell systems took up 1.5 full AC
  regulated 18 wheel trucks to move.
TXU-Business Services / CapGemini Energy, Dallas, TX                    Jun 1987 – Mar 2006

Manager: Security, Disaster Recovery, Data Center, & Serve Consolidation 2003 – 2006
• Managed ITIL Plans for Server department and processes to improve secondary site
  operations. Directed and coordinated a managed Disaster Recovery Operation/Data Center
  with enhancements, to include complex server consolidation of Wintel and UNIX including
  IBM and SUN systems and security management. First year roll out of VMWare yielded
  savings over $5M.
• Implemented VMWare systems that used MS SQL databases with SAN connected systems
  for test and development teams. Applications installed in various phases of code life cycle.
• Managed roll out of company outsourced hosting for both Capgemini and its contracts for
  new clients. Security isolation of physical network to VPN and how the maintenance and
  monitoring for production would be achieved. Resulted in reduced FTE counts for support.
• Selected for special project to layout and construct a secondary backup data center for
  primary and backup recovery support and operations. Site hosting a full service data center
  populated with staff. Completed under budget and early, received special award.
• Project Team Lead for new storage solution initiative, consists of defining the technology
  environment, scope, RFP requirements, proposal evaluation, selection process,
  establishing a governance process, due diligence, contract negotiation, transition plan
  development, and implementation. Resulted in fast turn around in Storage request being
  fulfilled.

Manager: Distributed Platforms Corporate Servers                                 1998 – 2003
Managed team of 23 people in production server support group for UNIX and WinTtel
platforms. Implementation of IT infrastructure, consolidation of windows servers utilizing
VMWare. Migration of windows servers to VMWare host using P2V (physical to virtual)
toolset. Completed migrations of the development and test systems resulting in a 12 to 1 ratio.

Senior Engineer/Project manager: Power Plant-IT                                   1987 - 1998

                                        EDUCATION

              Bachelor of Science, Electrical Engineering; Southern University

                                      CERTIFICATIONS

 Six Sigma Yellow Belt                                 ITIL Certified
 Registered Microsoft Certified System Engineer        Registered Professional Engineer

                               Platforms / Application Tools

        IBM and Compaq                  UNIX / IBM / SUN      MS/Windows Server/Clustering
     VMWare / ESX Server               MS Active Directory            MS Project
           MS Office                       MS OCS              MS Exchange / Lotus Suite
  VMWare (ESX and Virtual Center)        DB2 and SQL           MS Office Communication

Mais conteúdo relacionado

Mais procurados

David Pate _resume_draft_final_1
David Pate _resume_draft_final_1David Pate _resume_draft_final_1
David Pate _resume_draft_final_1David Pate
 
David Pate Resume_MFT
David Pate Resume_MFTDavid Pate Resume_MFT
David Pate Resume_MFTDavid Pate
 
James L machie Jr Resume
James L machie Jr  ResumeJames L machie Jr  Resume
James L machie Jr ResumeJamesMachie
 
David Hays Resume 102514b
David Hays Resume 102514bDavid Hays Resume 102514b
David Hays Resume 102514bDavid Hays
 
DaaS/IaaS Forum Moscow - Ivo Murris
DaaS/IaaS Forum Moscow - Ivo MurrisDaaS/IaaS Forum Moscow - Ivo Murris
DaaS/IaaS Forum Moscow - Ivo MurrisDenis Gundarev
 
Addressing IT Services at Lamar University
Addressing IT Services at Lamar UniversityAddressing IT Services at Lamar University
Addressing IT Services at Lamar UniversityMichael Dobe, Ph.D.
 
KeshaOrr_Resume
KeshaOrr_ResumeKeshaOrr_Resume
KeshaOrr_ResumeKesha Orr
 
Dan Winko Admin
Dan Winko AdminDan Winko Admin
Dan Winko AdminDan Winko
 
DaaS/IaaS Forum Moscow - Rick Dehlinger
DaaS/IaaS Forum Moscow - Rick DehlingerDaaS/IaaS Forum Moscow - Rick Dehlinger
DaaS/IaaS Forum Moscow - Rick DehlingerDenis Gundarev
 
David Pate Resume Bus Obj 3
David Pate Resume Bus Obj 3David Pate Resume Bus Obj 3
David Pate Resume Bus Obj 3David Pate
 
Vdi complete
Vdi completeVdi complete
Vdi completeLinYiHui
 

Mais procurados (19)

David Pate _resume_draft_final_1
David Pate _resume_draft_final_1David Pate _resume_draft_final_1
David Pate _resume_draft_final_1
 
Mohammed qurram resume april 2017
Mohammed qurram resume april 2017Mohammed qurram resume april 2017
Mohammed qurram resume april 2017
 
Mohammed qurramresumeapril2017
Mohammed qurramresumeapril2017Mohammed qurramresumeapril2017
Mohammed qurramresumeapril2017
 
SubramanianRIyer2016
SubramanianRIyer2016SubramanianRIyer2016
SubramanianRIyer2016
 
David Pate Resume_MFT
David Pate Resume_MFTDavid Pate Resume_MFT
David Pate Resume_MFT
 
Neeharika karumanchi
Neeharika karumanchiNeeharika karumanchi
Neeharika karumanchi
 
James L machie Jr Resume
James L machie Jr  ResumeJames L machie Jr  Resume
James L machie Jr Resume
 
Darren Johnson CV
Darren Johnson CVDarren Johnson CV
Darren Johnson CV
 
2016 resume
2016 resume2016 resume
2016 resume
 
David Hays Resume 102514b
David Hays Resume 102514bDavid Hays Resume 102514b
David Hays Resume 102514b
 
DaaS/IaaS Forum Moscow - Ivo Murris
DaaS/IaaS Forum Moscow - Ivo MurrisDaaS/IaaS Forum Moscow - Ivo Murris
DaaS/IaaS Forum Moscow - Ivo Murris
 
Addressing IT Services at Lamar University
Addressing IT Services at Lamar UniversityAddressing IT Services at Lamar University
Addressing IT Services at Lamar University
 
KeshaOrr_Resume
KeshaOrr_ResumeKeshaOrr_Resume
KeshaOrr_Resume
 
SHOVIN
SHOVIN SHOVIN
SHOVIN
 
Dan Winko Admin
Dan Winko AdminDan Winko Admin
Dan Winko Admin
 
DaaS/IaaS Forum Moscow - Rick Dehlinger
DaaS/IaaS Forum Moscow - Rick DehlingerDaaS/IaaS Forum Moscow - Rick Dehlinger
DaaS/IaaS Forum Moscow - Rick Dehlinger
 
Resume_Rakesh_Kumawat
Resume_Rakesh_KumawatResume_Rakesh_Kumawat
Resume_Rakesh_Kumawat
 
David Pate Resume Bus Obj 3
David Pate Resume Bus Obj 3David Pate Resume Bus Obj 3
David Pate Resume Bus Obj 3
 
Vdi complete
Vdi completeVdi complete
Vdi complete
 

Semelhante a Resume Timothy White 2010 Tech

Resume Timothy White It Leader
Resume Timothy White It LeaderResume Timothy White It Leader
Resume Timothy White It Leadertwhiteldr1
 
Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15Rodger Berlin
 
Spry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-ManagementSpry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-ManagementStephen Spry
 
Summary of Skills and Projects
Summary of Skills and ProjectsSummary of Skills and Projects
Summary of Skills and ProjectsCory Larsen
 
Dan reznick resume_05102016
Dan reznick resume_05102016Dan reznick resume_05102016
Dan reznick resume_05102016Daniel Reznick
 
Pankaj Jagtap_Resume_Project Manager_TechMahindra
Pankaj Jagtap_Resume_Project Manager_TechMahindraPankaj Jagtap_Resume_Project Manager_TechMahindra
Pankaj Jagtap_Resume_Project Manager_TechMahindraPankaj Jagtap
 
Richard J Pollock Jr - Resume-rev2
Richard J Pollock Jr - Resume-rev2Richard J Pollock Jr - Resume-rev2
Richard J Pollock Jr - Resume-rev2Rick Pollock
 
Resume_Q2-2016.2
Resume_Q2-2016.2Resume_Q2-2016.2
Resume_Q2-2016.2Steve Long
 
Christopher S OBrien - 7-2016 (1)
Christopher S OBrien - 7-2016 (1)Christopher S OBrien - 7-2016 (1)
Christopher S OBrien - 7-2016 (1)Christopher O'Brien
 
John imor in resume
John imor in resumeJohn imor in resume
John imor in resumeJohn Imor
 

Semelhante a Resume Timothy White 2010 Tech (20)

Resume Timothy White It Leader
Resume Timothy White It LeaderResume Timothy White It Leader
Resume Timothy White It Leader
 
Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15Rodger+Berlins+Resume+1.15
Rodger+Berlins+Resume+1.15
 
Resume_updated
Resume_updatedResume_updated
Resume_updated
 
Raghu-UpdatedCV -2016
Raghu-UpdatedCV -2016Raghu-UpdatedCV -2016
Raghu-UpdatedCV -2016
 
Jason_McCallum
Jason_McCallumJason_McCallum
Jason_McCallum
 
Spry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-ManagementSpry-Stephen-Short-Resume-Management
Spry-Stephen-Short-Resume-Management
 
Adam Bielinski Resume
Adam  Bielinski ResumeAdam  Bielinski Resume
Adam Bielinski Resume
 
Torben Verdich Resume TS-SCI
Torben Verdich Resume TS-SCITorben Verdich Resume TS-SCI
Torben Verdich Resume TS-SCI
 
Harikishan Thakar
Harikishan ThakarHarikishan Thakar
Harikishan Thakar
 
Summary of Skills and Projects
Summary of Skills and ProjectsSummary of Skills and Projects
Summary of Skills and Projects
 
Dan reznick resume_05102016
Dan reznick resume_05102016Dan reznick resume_05102016
Dan reznick resume_05102016
 
Pankaj Jagtap_Resume_Project Manager_TechMahindra
Pankaj Jagtap_Resume_Project Manager_TechMahindraPankaj Jagtap_Resume_Project Manager_TechMahindra
Pankaj Jagtap_Resume_Project Manager_TechMahindra
 
Torben Verdich Condensed TS-SCI
Torben Verdich Condensed TS-SCITorben Verdich Condensed TS-SCI
Torben Verdich Condensed TS-SCI
 
tanveer_ahamed
tanveer_ahamedtanveer_ahamed
tanveer_ahamed
 
Giri Uppuganti
Giri UppugantiGiri Uppuganti
Giri Uppuganti
 
Richard J Pollock Jr - Resume-rev2
Richard J Pollock Jr - Resume-rev2Richard J Pollock Jr - Resume-rev2
Richard J Pollock Jr - Resume-rev2
 
Resume_Q2-2016.2
Resume_Q2-2016.2Resume_Q2-2016.2
Resume_Q2-2016.2
 
Christopher S OBrien - 7-2016 (1)
Christopher S OBrien - 7-2016 (1)Christopher S OBrien - 7-2016 (1)
Christopher S OBrien - 7-2016 (1)
 
ScottSalyards
ScottSalyardsScottSalyards
ScottSalyards
 
John imor in resume
John imor in resumeJohn imor in resume
John imor in resume
 

Resume Timothy White 2010 Tech

  • 1. Timothy D. White 922 Huntington Drive 972.709.3977 or 469.446.6975 Duncanville, TX • 75137 twhiteldr1@yahoo.com SENIOR IT LEADERSHIP PROFILE Accomplished Senior Leader with a results charged career in the Information Technology Leadership of several dynamic organizations. Accustomed to and effective in project management of complex infrastructure, System architecture, Microsoft server and systems. Offers high caliber qualifications, acute systems instincts, and experience backed judgment in leadership roles, making high stakes decisions and overcoming complex business challenges to achieve the IT requirements needed by the organizations. A true consensus-builder who gets things done! Core Competencies: Leadership / IT Critical System Management Management Relationship Management Project Management MS Server / Architecture Change Management Six Sigma Training Local and Platform System Design Strategic Planning National Systems infrastructure MAJOR ACHIEVEMENTS • Managed team in Data Center (city to city) migration with processes and enhancements to include: 1) the development, implementation, and execution of the project scope and plan ($1.7 M) 2) asset availability, selection and procurement, 3) budget and schedule management 4) the use of PMBOK Methodology and retention of all old information.  Architected the consolidation and implementation of VMWare and SAN systems to reduce footprint of MS Windows Server systems. Made use of Converter by VMWare to deliver physical to virtual (P2V) consolidations. Reduced power and cooling requirements and increased availability of overall service delivery.  Implementation of full service application development infrastructure environments. Database systems, VMWare/Server systems and other UNIX and SAN supporting systems. (i.e.: Test, Dev., Pre-Production and Production)  Established partnerships that yielded technology solutions for the business and remote user communities. Examples: MS Windows server 20xx(00,03,08), VMWare ESX, SAN Storage, VDI(virtual desktop), In sourcing of IT support, data center move and change of outsourced vendor, build-out of new DC and office location. (Cost avoidance of 250 Laptops/workstations $0.5M)  Managed vendor relationships in the procurement and support for production hosted data center environments with focus on resilience and high availability systems.
  • 2. Institute best practices from the ITIL Methodology, Foundation training for staff, transformation of support; improved change management, asset management, service desk, SLA’s, and other services. PROFESSIONAL EXPERIENCE Carlisle and Gallagher Consulting Group – Executive Customer Representative Jun 2010 - Current • Project Assignment – Secret project for a prominent national organization in the Dallas – Fort Worth area servicing the United States. • Manage customer support and problem resolution in the executive offices. • Trained and led various team members in the project to add skilled support into the project. Making use of Citrix remote connectivity via secure Cisco VPN. (200 active member team) • Recommended solutions and change management techniques to add quality to the solutions provided by the project teams. Broadlane. Inc. – Sr. Manager IT Operations Aug 2006 – Dec 2009 Managed teams to deliver coverage of production support, service desk, end user computing, Server, storage and network. • Data center management, Microsoft Server consolidation of 75% of hardware. (110 system reduced to 28 systems), Communication solution (MS - OCS) and others resulted in company savings and a lower cost support model. • Piloted migration of 40 servers from MS server 2003 to MS server 2008. These systems were used for SQL, application and MS exchange. Also worked on MS Office communicator proof of concept as possible replacement solution for the site. • Architected the consolidation and implementation of VMWare and SAN systems to reduce footprint of Microsoft Server environments and systems. Maintained a 20:1 ratio on average consolidations. Reduced power and cooling requirements and increased availability of overall service delivery. • Managed vendor relationships for production hosted data center environments. Key deliverables around resilience and high availability systems. Implementation of VMWare ESX and VC with HA and DRS active for resilience. Also working on DR and business continuity. • Established partnerships that yielded technology solutions for the business and remote user communities. Examples: MS Server upgrades (2000, 2003 up to 2003 and 2008) , VMWare ESX (VC and VSphere), SAN Storage (EMC, IBM, HP and NetApp), VDI (virtual desktop), in sourcing of IT support, data center move and change of outsourced vendor. • Institute best practices from the ITIL Methodology, Foundation training for staff, transformation of support; improved change management, asset management, service desk, SLA’s, and other services. EDS – PMD/ Project Management Delivery (Mar–Aug) 2006 Managed teams in Data Center (city to city) see major achievements • Moved complete per plan with upgrades within budget ($1.7M) /deadline. Saved the organization $0.8 M. • Data Center equipment consisted of MS server (2000 and 2003) and VMWare servers, SAN and enterprise systems. SUN, IBM, HP/Compaq and Dell systems took up 1.5 full AC regulated 18 wheel trucks to move.
  • 3. TXU-Business Services / CapGemini Energy, Dallas, TX Jun 1987 – Mar 2006 Manager: Security, Disaster Recovery, Data Center, & Serve Consolidation 2003 – 2006 • Managed ITIL Plans for Server department and processes to improve secondary site operations. Directed and coordinated a managed Disaster Recovery Operation/Data Center with enhancements, to include complex server consolidation of Wintel and UNIX including IBM and SUN systems and security management. First year roll out of VMWare yielded savings over $5M. • Implemented VMWare systems that used MS SQL databases with SAN connected systems for test and development teams. Applications installed in various phases of code life cycle. • Managed roll out of company outsourced hosting for both Capgemini and its contracts for new clients. Security isolation of physical network to VPN and how the maintenance and monitoring for production would be achieved. Resulted in reduced FTE counts for support. • Selected for special project to layout and construct a secondary backup data center for primary and backup recovery support and operations. Site hosting a full service data center populated with staff. Completed under budget and early, received special award. • Project Team Lead for new storage solution initiative, consists of defining the technology environment, scope, RFP requirements, proposal evaluation, selection process, establishing a governance process, due diligence, contract negotiation, transition plan development, and implementation. Resulted in fast turn around in Storage request being fulfilled. Manager: Distributed Platforms Corporate Servers 1998 – 2003 Managed team of 23 people in production server support group for UNIX and WinTtel platforms. Implementation of IT infrastructure, consolidation of windows servers utilizing VMWare. Migration of windows servers to VMWare host using P2V (physical to virtual) toolset. Completed migrations of the development and test systems resulting in a 12 to 1 ratio. Senior Engineer/Project manager: Power Plant-IT 1987 - 1998 EDUCATION Bachelor of Science, Electrical Engineering; Southern University CERTIFICATIONS Six Sigma Yellow Belt ITIL Certified Registered Microsoft Certified System Engineer Registered Professional Engineer Platforms / Application Tools IBM and Compaq UNIX / IBM / SUN MS/Windows Server/Clustering VMWare / ESX Server MS Active Directory MS Project MS Office MS OCS MS Exchange / Lotus Suite VMWare (ESX and Virtual Center) DB2 and SQL MS Office Communication