POLY-QUAL (INDIA) PVT.LTD . ENGINEERS  ٠ TOWER MANUFACTURERS  ٠ ERECTORS A-210, OKHLA INDUSTRIAL AREA, PHASE – I, NEW DELHI – 110020, INDIA Tel. : +91-(011) 26817236, 26814137  Fax : +91-(011) 26812231, 26811397 Email:  [email_address]  Website:  httpwww.polyqual.com
Buying a Telecommunication Tower Tower is a Capital expenditure with operational life of several decades. Hence  buying a tower needs careful determination of requirements or specifications. Important specification include 1. Survival wind Speed.  2. Physical size, Type, Number and levels of Antennas. 3. Twist & Sway requirements. While offering a product, almost all bidders, uniformly say “Complied” against all the required specifications including above i.e. wind speed, antenna loading etc. While compliance for some of the specifications is easily confirmable, the requirement of wind speed and antenna loading cannot be checked without looking into  detailed design calculations . Hence experienced and shrewd buyers always insist on design calculations, before finalization of purchase contract.  Unfortunately these two parameters are main parameters, which determine suitability of tower and are responsible for cost of tower also. Factors like size of antennas, type of antenna, level of antenna have considerable effect on the required strength (read cost) of tower. Placing antenna at mid height of tower will reduce the loading on tower by 50%. On the other hand, if the wind speed is double, the forces acting on tower are 4 times. Buying a communication tower is not the same as buying a bunch of steel angle, pipes, plates etc. Tower is matched set of its various components.
Each component of this set has a vital role to play in the strength of WHOLE tower, for example, if One small segment of the leg is slightly weaker than required, that the entire tower’s strength will be determined by this small component, because tower will fail from this point only when full loading occurs. Moreover, putting extra strength at any non-required point is wastage of materials, because strength of the tower is determined by weakest link in the structure only. Hence it becomes imperative that all members should be capable of resisting the applied loads to the same extent uniformly. To ensure that all these things have been considered properly, availability of design competency with the tower supplier is the most desirable eligibility criterion.  Design competency in supplier is a must for copying also. For example, if bolt grade changes, the joints have to be redesigned. If any member is replaced due to non availability of any section then also detailing of all adjoining members has to be changed. Approx.95% of price paid by buyer for tower, consists of materials cost. In  today’s competitive world, all bidders work  on small margins.  Hence material cost is the all encompassing component of total cost. Anybody can reduce  the cost by reducing the materials. That reduction is  normally not without  compromising on the performance or strength. The buyer has no way to  recognize this  compromise without looking into detailed calculations  and  verify  that the product is as per design calculations.
[object Object],[object Object],[object Object]
[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Materials Used Our tower designs  are based  on strengths of Indian Steels.  Certificate from a Govt. approved test laboratory certifying  the  strength  of  material  is  as  specified  in  design,  can  also be provided with  material supply.  All materials  are hot  dip galvanized  after  fabrication. The length of all members  is maintained less than  6 meters,  so that transportation of  material by truck or containers is not a problem. Fabrication of Tower Materials Tower material is fabricated using precision machinery.  Accuracy of all  drilled or punched holes  are  maintained  as  per engineering drawing. Buyer can choose any type of tower. Each  type  will  be  guaranteed  to  meet  the  performance  specifications  laid out by buyer. The design  will be certified  to meet the performance requirements by chartered  engineer   /Govt. Approved Authority. Certificates, showing.  ●   The strength of materials as per design. ●  Thickness of zinc coating as per standards will be enclosed  with supply of materials, if desired. ● An erection manual, showing location of all members & their  code is provided, when only tower materials are ordered. All members in the supply carry code in permanent punch and permanent ink as per erection manual.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
E N D

Mais conteúdo relacionado

Mais procurados

Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-ResumeKhaja Afsar Mohiuddin
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final ReportjolynnTJL
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
Telecommunication for high rise building presentation
Telecommunication for high rise building presentationTelecommunication for high rise building presentation
Telecommunication for high rise building presentationJäkê Čhŷį Śêrñ
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionMadan Mohan Jana
 
Telecommunication Services for High Rise Buildings
Telecommunication Services for High Rise BuildingsTelecommunication Services for High Rise Buildings
Telecommunication Services for High Rise BuildingsPang Shuen
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectIOSR Journals
 
Ppt pdf for pre casr pre stressed concrte road panels
Ppt pdf for pre casr pre stressed concrte road panelsPpt pdf for pre casr pre stressed concrte road panels
Ppt pdf for pre casr pre stressed concrte road panelsmilinddigrajkar
 

Mais procurados (20)

Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Spun pile
Spun pileSpun pile
Spun pile
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Building Construction Project 01 Final Report
Building Construction Project 01 Final ReportBuilding Construction Project 01 Final Report
Building Construction Project 01 Final Report
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Telecommunication for high rise building presentation
Telecommunication for high rise building presentationTelecommunication for high rise building presentation
Telecommunication for high rise building presentation
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Material approval procedure
Material approval procedureMaterial approval procedure
Material approval procedure
 
Munger ganga bridge
Munger ganga bridgeMunger ganga bridge
Munger ganga bridge
 
Telecommunication Services for High Rise Buildings
Telecommunication Services for High Rise BuildingsTelecommunication Services for High Rise Buildings
Telecommunication Services for High Rise Buildings
 
Sample Wall Shop Drawings
Sample Wall Shop DrawingsSample Wall Shop Drawings
Sample Wall Shop Drawings
 
CV - ELV ENGINEER
CV - ELV ENGINEERCV - ELV ENGINEER
CV - ELV ENGINEER
 
Bs 8100 3-1999
Bs 8100 3-1999Bs 8100 3-1999
Bs 8100 3-1999
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)
 
Ppt pdf for pre casr pre stressed concrte road panels
Ppt pdf for pre casr pre stressed concrte road panelsPpt pdf for pre casr pre stressed concrte road panels
Ppt pdf for pre casr pre stressed concrte road panels
 

Destaque

Bts-site-installation
 Bts-site-installation Bts-site-installation
Bts-site-installationAli Usman
 
Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennasnimay1
 
Etisalat masters management program presentation
Etisalat masters management program presentationEtisalat masters management program presentation
Etisalat masters management program presentationAbdelrahman Magdy
 
OTT TV: A Telco threat or opportunity?
OTT TV: A Telco threat or opportunity?OTT TV: A Telco threat or opportunity?
OTT TV: A Telco threat or opportunity?Mohsen Malaki
 
Telecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
Telecom Industry: Networking Function Virtualization: CapEx and OpEx SavingsTelecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
Telecom Industry: Networking Function Virtualization: CapEx and OpEx SavingsHarilaos Koumaras
 
Opex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmiOpex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmiQarib Raza
 
Network Optimization for a Telecommunication Industry Client Helps Identify C...
Network Optimization for a Telecommunication Industry Client Helps Identify C...Network Optimization for a Telecommunication Industry Client Helps Identify C...
Network Optimization for a Telecommunication Industry Client Helps Identify C...Quantzig
 
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's ApproachMobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's ApproachColeago Consulting
 
Opex saving in transmission network
Opex saving in transmission networkOpex saving in transmission network
Opex saving in transmission networkAhmed Dafalla
 
Oracle Approach for Telecom Challenges
Oracle Approach for Telecom ChallengesOracle Approach for Telecom Challenges
Oracle Approach for Telecom ChallengesAna Galindo
 
Telecom Sector
Telecom SectorTelecom Sector
Telecom Sectorsantossb
 
telecommunication-ppt
telecommunication-ppttelecommunication-ppt
telecommunication-pptsecomps
 

Destaque (14)

Bts-site-installation
 Bts-site-installation Bts-site-installation
Bts-site-installation
 
Cell tower, BTS & antennas
Cell tower, BTS & antennasCell tower, BTS & antennas
Cell tower, BTS & antennas
 
Etisalat masters management program presentation
Etisalat masters management program presentationEtisalat masters management program presentation
Etisalat masters management program presentation
 
OTT TV: A Telco threat or opportunity?
OTT TV: A Telco threat or opportunity?OTT TV: A Telco threat or opportunity?
OTT TV: A Telco threat or opportunity?
 
Telecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
Telecom Industry: Networking Function Virtualization: CapEx and OpEx SavingsTelecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
Telecom Industry: Networking Function Virtualization: CapEx and OpEx Savings
 
Technology Cost Optimization Strategies
Technology Cost Optimization StrategiesTechnology Cost Optimization Strategies
Technology Cost Optimization Strategies
 
Opex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmiOpex reduction in telecom industry qarib kazmi
Opex reduction in telecom industry qarib kazmi
 
Network Optimization for a Telecommunication Industry Client Helps Identify C...
Network Optimization for a Telecommunication Industry Client Helps Identify C...Network Optimization for a Telecommunication Industry Client Helps Identify C...
Network Optimization for a Telecommunication Industry Client Helps Identify C...
 
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's ApproachMobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
Mobile Network Infrastructure Sharing - Industry Overview & Coleago's Approach
 
Opex saving in transmission network
Opex saving in transmission networkOpex saving in transmission network
Opex saving in transmission network
 
Economics of Network Sharing
Economics of Network SharingEconomics of Network Sharing
Economics of Network Sharing
 
Oracle Approach for Telecom Challenges
Oracle Approach for Telecom ChallengesOracle Approach for Telecom Challenges
Oracle Approach for Telecom Challenges
 
Telecom Sector
Telecom SectorTelecom Sector
Telecom Sector
 
telecommunication-ppt
telecommunication-ppttelecommunication-ppt
telecommunication-ppt
 

Semelhante a telecommunication Towers

Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageGirish Damle
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...Firdaurs Abdullah
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureDoug Olson
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction BrochureRICHARD GORDON
 
STEP UP ENGINEERING SERVICES PROFILE
STEP UP ENGINEERING SERVICES PROFILESTEP UP ENGINEERING SERVICES PROFILE
STEP UP ENGINEERING SERVICES PROFILEFazal Quadir
 
Numeko Tech Presentation
Numeko Tech PresentationNumeko Tech Presentation
Numeko Tech PresentationNumeko Tech
 
Panel Built Catalog 2015
Panel Built Catalog 2015Panel Built Catalog 2015
Panel Built Catalog 2015Panel Built
 
SCentre Infra- The Leading Steel Construction Company In India
SCentre Infra- The Leading Steel Construction Company In IndiaSCentre Infra- The Leading Steel Construction Company In India
SCentre Infra- The Leading Steel Construction Company In Indiaseo2artistonk
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final WebFaris Alwan
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a buildingTeow Beng Hur
 
Vogl Presentation
Vogl PresentationVogl Presentation
Vogl Presentationronancoffey
 

Semelhante a telecommunication Towers (20)

Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 Page
 
Company brochure
Company brochureCompany brochure
Company brochure
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete Brochure
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction Brochure
 
Mermaid Telecommunication
Mermaid Telecommunication Mermaid Telecommunication
Mermaid Telecommunication
 
STEP UP ENGINEERING SERVICES PROFILE
STEP UP ENGINEERING SERVICES PROFILESTEP UP ENGINEERING SERVICES PROFILE
STEP UP ENGINEERING SERVICES PROFILE
 
OPT brouchure N
OPT brouchure NOPT brouchure N
OPT brouchure N
 
Delta Steel Structures PEB Products and Accessories
Delta Steel Structures PEB Products and AccessoriesDelta Steel Structures PEB Products and Accessories
Delta Steel Structures PEB Products and Accessories
 
Numeko Tech Presentation
Numeko Tech PresentationNumeko Tech Presentation
Numeko Tech Presentation
 
Panel Built Catalog 2015
Panel Built Catalog 2015Panel Built Catalog 2015
Panel Built Catalog 2015
 
SCentre Infra- The Leading Steel Construction Company In India
SCentre Infra- The Leading Steel Construction Company In IndiaSCentre Infra- The Leading Steel Construction Company In India
SCentre Infra- The Leading Steel Construction Company In India
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)StanCV1[1][1].dcc (1)
StanCV1[1][1].dcc (1)
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final Web
 
1.6 _Important element required to complete a building
1.6  _Important element required to complete a building1.6  _Important element required to complete a building
1.6 _Important element required to complete a building
 
Vogl Presentation
Vogl PresentationVogl Presentation
Vogl Presentation
 
STEVEN cv
STEVEN cvSTEVEN cv
STEVEN cv
 
CV
CVCV
CV
 

Último

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 

Último (20)

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 

telecommunication Towers

  • 1. POLY-QUAL (INDIA) PVT.LTD . ENGINEERS ٠ TOWER MANUFACTURERS ٠ ERECTORS A-210, OKHLA INDUSTRIAL AREA, PHASE – I, NEW DELHI – 110020, INDIA Tel. : +91-(011) 26817236, 26814137 Fax : +91-(011) 26812231, 26811397 Email: [email_address] Website: httpwww.polyqual.com
  • 2. Buying a Telecommunication Tower Tower is a Capital expenditure with operational life of several decades. Hence buying a tower needs careful determination of requirements or specifications. Important specification include 1. Survival wind Speed. 2. Physical size, Type, Number and levels of Antennas. 3. Twist & Sway requirements. While offering a product, almost all bidders, uniformly say “Complied” against all the required specifications including above i.e. wind speed, antenna loading etc. While compliance for some of the specifications is easily confirmable, the requirement of wind speed and antenna loading cannot be checked without looking into detailed design calculations . Hence experienced and shrewd buyers always insist on design calculations, before finalization of purchase contract. Unfortunately these two parameters are main parameters, which determine suitability of tower and are responsible for cost of tower also. Factors like size of antennas, type of antenna, level of antenna have considerable effect on the required strength (read cost) of tower. Placing antenna at mid height of tower will reduce the loading on tower by 50%. On the other hand, if the wind speed is double, the forces acting on tower are 4 times. Buying a communication tower is not the same as buying a bunch of steel angle, pipes, plates etc. Tower is matched set of its various components.
  • 3. Each component of this set has a vital role to play in the strength of WHOLE tower, for example, if One small segment of the leg is slightly weaker than required, that the entire tower’s strength will be determined by this small component, because tower will fail from this point only when full loading occurs. Moreover, putting extra strength at any non-required point is wastage of materials, because strength of the tower is determined by weakest link in the structure only. Hence it becomes imperative that all members should be capable of resisting the applied loads to the same extent uniformly. To ensure that all these things have been considered properly, availability of design competency with the tower supplier is the most desirable eligibility criterion. Design competency in supplier is a must for copying also. For example, if bolt grade changes, the joints have to be redesigned. If any member is replaced due to non availability of any section then also detailing of all adjoining members has to be changed. Approx.95% of price paid by buyer for tower, consists of materials cost. In today’s competitive world, all bidders work on small margins. Hence material cost is the all encompassing component of total cost. Anybody can reduce the cost by reducing the materials. That reduction is normally not without compromising on the performance or strength. The buyer has no way to recognize this compromise without looking into detailed calculations and verify that the product is as per design calculations.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. Materials Used Our tower designs are based on strengths of Indian Steels. Certificate from a Govt. approved test laboratory certifying the strength of material is as specified in design, can also be provided with material supply. All materials are hot dip galvanized after fabrication. The length of all members is maintained less than 6 meters, so that transportation of material by truck or containers is not a problem. Fabrication of Tower Materials Tower material is fabricated using precision machinery. Accuracy of all drilled or punched holes are maintained as per engineering drawing. Buyer can choose any type of tower. Each type will be guaranteed to meet the performance specifications laid out by buyer. The design will be certified to meet the performance requirements by chartered engineer /Govt. Approved Authority. Certificates, showing. ● The strength of materials as per design. ● Thickness of zinc coating as per standards will be enclosed with supply of materials, if desired. ● An erection manual, showing location of all members & their code is provided, when only tower materials are ordered. All members in the supply carry code in permanent punch and permanent ink as per erection manual.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. E N D