Virtual Design Master After the Outbreak
After the Outbreak
Project: HA, Backup, and Disaster Recovery Solutions
Focus Area: Provide HA, backup and disaster recovery solutions VMware
vSphere, Active Directory, SQL, Network, Storage, Remote Access and other
managed applications
Prepared By: Jonathan Frappier @jfrappier www.virtxpert.com
Project Quality Plan Version Control
Version Date Author Change Description
.5 8/19/13 Jonathan Frappier Draft
.75 8/19/13 Phoummala Schmitt Technical Consultant for Exchange HA
Solution (verified solution is valid)
1.0 8/22/13 Jonathan Frappier Final
Virtual Design Master Page 2 After the Outbreak
TABLE OF CONTENTS
1 EXECUTIVE SUMMARY............................................................................................ 3
1.1 DEFINITIONS....................................................................................................... 3
1.2 SCOPE............................................................................................................... 3
2 SITE INFRASTRUCTURE UPDATES........................................................................ 4
2.1 EQUIPMENT SPECIFICATIONS .............................................................................. 4
2.2 LAN & WAN...................................................................................................... 4
2.3 PHYSICAL SERVERS ........................................................................................... 4
2.4 STORAGE........................................................................................................... 4
2.5 SLA DEFINITIONS............................................................................................... 4
2.6 UPDATED SITE DIAGRAM .................................................................................... 4
3 REQUIREMENTS, ASSUMPTIONS, CONSTRAINTS & RISKS ................................ 5
3.1 REQUIREMENTS.................................................................................................. 5
3.2 ASSUMPTIONS.................................................................................................... 5
3.3 CONSTRAINTS .................................................................................................... 6
3.4 RISKS ................................................................................................................ 6
4 APPLICATION BACKUP, HA, RPO AND RTO ......................................................... 6
4.1 RPO AND RTO CLASSIFICATIONS ....................................................................... 6
4.2 SOFTWARE SOLUTIONS FOR BACKUP AND REPLICATION ...................................... 6
4.3 IDENTIFIED APPLICATIONS & FAILOVER PROCESS BRIEFS .................................... 7
5 IP ALLOCATION........................................................................................................ 12
6 APPENDICES ............................................................................................................ 12
6.1 HARDWARE MANIFEST........................................................................................ 12
6.2 SOFTWARE MANIFEST ........................................................................................ 13
6.3 REFERENCE ....................................................................................................... 13
6.4 VMWARE CONFIGURATION MAXIMUMS (DOUBLE CLICK TO OPEN).......................... 14
6.5 ORIGINAL SITE DESIGN (DOUBLE CLICK TO OPEN) ................................................ 14
6.6 EXCHANGE 2010 SIZING CALCULATOR (DOUBLE CLICK TO OPEN) ......................... 14
Virtual Design Master Page 3 After the Outbreak
1 EXECUTIVE SUMMARY
The world is in disarray after a virus outbreak that turned many into zombies. You’ve been recruited to
build an infrastructure for a wealthy philanthropist to use in order to put the world back together.
During phase 2 of the build out, appropriate High Availability, backup and disaster recovery solutions
must be designed, documented and implemented.
The disaster recovery solution will failover all virtual server workloads from the primary site to the
secondary site, and all virtual desktop workloads to the tertiary site. The solution will use several
methods for failover and recovery based on the RPO and RTO of the application. This will provide the
most cost effective solution for failing over all applications.
1.1 Definitions
Backup: The process of making a backup copy of important information
Business Continuity Plan (BCP): A plan for how the business will continue to operate in the event of a
disaster. Information in a BCP may include escalation procedures, designation as to who may declare an
emergency, contact and emergency contact information for key personnel, directions on how to access
systems after a DRP has been implemented.
Disaster Recovery Plan (DRP): A disaster recovery plan is the process for restoring access to
infrastructure and applications in the event of a disaster. Disasters may range from small/isolated
incidents such as a server failure that affects access to key systems or a major/catastrophic incident that
causes major damage or prevents access to an entire site.
High Availability (HA): High Availability is the process of enabling application resilency such that
applications remain available, or are quickly restore in the event of an outage. An example of HA may be
a virtual server being restarted if it has become unresponsive, quickly and automatically restoring access
to the application with little to no human intervention.
HA By Design (HABD): HA By Design is the concept of building HA into your normal application design
such that during a disaster, connectivity remains unaffected, or requires very little intervention to be
accessed (for example using an alternate URL for access).
Recovery Point Objective (RPO): Recovery Point Objective defines an acceptable amount of data loss
(or lag) in the event of a disaster. For example a system with an RPO of one (1) hour will need to have
data recoverable within one (1) hour of an outage or disaster.
Recovery Time Objective (RTO): Recovery Time Objective defines how long a system may remain
offline after a disaster. The RTO and RPO do not need to be closely related. For example a system may
have an RPO of only five (5) or ten (10) minutes but during a disaster may not need to be brought back
online for several hours, or even days; an RTO of five (five) days may be acceptable even with a low
RTO. Conversely a systems with a low RTO may contain static data, such as a web server, and thus
have a very high RPO because the data does not change (often).
1.2 Scope
Mr. Billionaire needs you to build him an infrastructure so he can continue his efforts across the globe.
There are 3 locations that must be use because there is not enough power in each of the locations to host
all of the equipment. The primary site supports up to 5000 virtual servers, 1000 virtual servers in the
secondary site and 500 in the tertiary site. The primary site also hosts 3000 virtual desktops available for
full desktop access and mobile application delivery for at least 1500 devices.
A plan for appropriate High Availability solutions, backup and Disaster Recovery must be implemented to
support a major failure in the primary site. Business Continuity, communication and escalation
procedures are outside the scope of this document.
Virtual Design Master Page 4 After the Outbreak
2 Site Infrastructure Updates
2.1 Equipment Specifications
All systems used to support disaster recovery efforts will be the same make, model and configuration as
the original installation. Additionally, this document will only list the required changes to each site;
detailed system details can be found in the original site design (Appendix 5.5).
2.2 LAN & WAN
• LAN
An additional Cisco 6513 will be added to the secondary site to ensure support for up to 50
additional hosts if required.
• WAN
A 100Mbps internet link has been added to the secondary and tertiary site. To support this, a
Cisco 7600 router and Cisco ASA 5540 will be added to each site.
2.3 Physical Servers
The secondary site will need to add an additional 50 physical hosts to support full recovery of the virtual
servers in the primary site. The tertiary site will require an additional 10 physical hosts to support the full
recovery of the virtual desktops from the tertiary site.
2.4 Storage
During the original design, an assumption was made at the tertiary site to install an EMC Celerra NS-480
with 32TB of storage to support failover from the secondary site. The requirements for the DRP calls for
failover of the primary site only, the spare NS-480 in the tertiary site will be upgrade to 64TB to match the
NS-480 in the primary site supporting the VDI workloads.
2.5 SLA Definitions
No service levels were defined; will use 99.9% as a standard.
2.6 Additional Equipment Required
Device Type Manufacturer Model Quantity
Server HP DL580 G5 60 (50 to secondary, 10 to
tertiary)
Add-On NIC Broadcom 5709 Based 120 (2 cards per server)
Add-On HBA EMC Qlogic QLE2462-E-SP 240 (4 cards per server)
Add-On HD OCZ 32GB SSD 1560 (16 drives per sever)
Storage Array EMC 146GB FC 15K 232 (fill remaining DAE’s in
tertiary site 2
nd
Celerra)
Load Balancer F5 BigIP 6800 6 (4 primary site, 2 secondary
site, 2 tertiary site)
2.7 Updated Site Diagram
Virtual Design Master Page 5 After the Outbreak
3 Requirements, Assumptions, Constraints & Risks
3.1 Requirements
The purpose of this project is to define, document and create a highly available infrastructure capable of
surviving a disaster to the primary site.
3.2 Assumptions
• Secondary and tertiary sites have been upgrade to support the failover of select capacity from the
primary listed in Section 2.5.
• 50 physical hosts will be required to meet the assumed server consolidation ratio in the primary
datacenter.
• 10 physical hosts will be required to meet the assumed server consolidation ratio in the
secondary datacenter.
• 5 physical hosts will be required to meet the assumed server consolidation ratio in the tertiary
datacenter.
• Three hundred (300) desktop VMs to a single physical host will be an assumed average
consolidation ratio (300-to-1).
• 10 physical hosts will be required to meet the assumed desktop consolidation ratio.
• The 100Mbps link will provide sufficient bandwidth for normal internal traffic (AD replication,
vCenter management of hosts and system monitoring) as well as replication.
Virtual Design Master Page 6 After the Outbreak
3.3 Constraints
• Hardware is limited to stock on hand at a discovered warehouse; components are believed to be
from 2008.
• Power and cooling at each location are limited.
• Each site has a 100Mbps link for connectivity to the other sites. This may impact RPO for select
systems.
3.4 Risks
• Each site has a 100Mbps link for connectivity to the other sites. This may impact RPO for select
systems.
• The requirements call for a DRP only for the primary site, failures of the secondary or tertiary
sites are accounted for.
• Hardware available is believed to be reliable and in working order.
• The number of host required to meet the assumed consolidation ratio is above the maximum
supported for a single cluster; multiple clusters will have to be used.
4 Application Backup, HA, RPO and RTO
4.1 RPO and RTO Classifications
There will be N categories classifying RPO and RTO for the systems deployed in the primary data center.
RPO Classifications
Class RPO Example Applications
Platinum < 5 minutes Active Directory, Exchange
Gold 5 minutes Web app DB tier
Silver 10 minutes Custom department applications
(HR, Financial Planning)
Bronze 30-60 minutes File servers, Web app front end
tier
Static 1 day Basic utility systems, monitoring
systems, VDI
RTO Classifications
Class RTO Example Applications
Critical < 5 minutes Active Directory, Exchange
Priority 30 minutes Minimum primary web app & DB
tier to restore access
Important 5 hours File servers, Basic utility
systems, monitoring systems,
VDI
Redundant 12 – 24 hours Redundant systems to ensure
HA
Standby 10 days Custom department applications
(HR, Financial Planning)
4.2 Software Solutions for Backup and Replication
We will be using different approaches for backup, replication and recovery for various systems based on
RPO/RTO to be the most cost effective.
Virtual Design Master Page 7 After the Outbreak
Product Use Cases Expected Cost
(MSRP/Published)
VMware HA Auto restarted of VMs on failed
host within the same site.
Included with vSphere Enterprise
Plus
VMware FT Hot spare kept in lock step with
primary VM; limited use case due
to single vCPU requirement but
useful for some web services.
Included with vSphere Enterprise
Plus
VMware PowerCLI / vMA Scripting configuration and setup
of hosts and VMs, to be used
with lower tier RTO/RPO
classifications.
Included with vSphere Enterprise
Plus
VMware vCenter Heartbeat Used to deliver HA for vCenter
server required components.
$9995
Zerto Virtual Replication v3 Used for select upper tier
RTO/RPO classifications to
automate the replication and
reconfiguration of systems at the
secondary site.
$745 / protected VM.
Unitrends Backup and Recovery Will be used for backup of mid-
tier RTO/RPO classifications
such as specialized applications
that can easily be
scripted/installed.
$nnn / protected ??
EMC Celerra Replication The Celerra will replicate select
LUNs/Storage Groups to the
appropriate DR site.
Included with NS-480
4.3 Identified Applications & Failover Process Briefs
Below are a list of applications and their required RPO, RTO and a brief overview of how those will be
achieved.
• Active Directory: All Domain Controllers will have a system state backup performed in
Unitrends
14
. Because Domain Controllers will be created in all data centers, there will be no
downtime and next to no data loss (if any) in the event of a site failure. Each site will contain at
least one (1) Global Catalog Server and the FSMO roles will be separate based on Microsoft best
practice
13
. In this configuration, I believe that the published best practice for FSMO role
placement will provide the necessary resources for our domain.
RTO: Critical
RPO: Platnium
Achieved in application design
• Windows 2008 R2 Exchange 2010 Client Access Server (CAS)
1
: Hot stand-by CAS servers
will be configured in the secondary site to ensure immediate access is available in the event of a
disaster. The number of CAS servers ready will be ¼ (25%) of the production CAS servers in use
(with a minimum of one running at all times). The CAS server will be configured to respond to an
alternate DNS A record while the primary DNS records are changed and replicated. TTL for the
CAS server DNS records will be set to 5 minutes (300s). CAS servers in the primary site will be
protected by Zerto.
RTO: Redundant
RPO: Bronze
Achieved by placing hot stand-by servers in the secondary site capable of handling workload
during a disaster.
Virtual Design Master Page 8 After the Outbreak
• Windows 2008 R2 Exchange 2010 Transport Server
1
: Hot standby Transport servers will be
configured in the secondary site. Transport servers will have log files backed up by Unitrends,
but will not need to be restored in the event of a disaster.
RTO: Redundant
RPO: Static
Achieved by placing hot stand-by servers in the secondary site; not data is required from the
primary site servers.
• Windows 2008 R2 Exchange 2010 Mailbox Server (BE)
1
: Hot stand-by mailbox servers will be
configured in the secondary site as part of a Database Availability Group (DAG) so that mail can
be replicated in near real time from the primary site to the secondary site due to the organizations
reliance on messaging. Based on the Exchange Server 2010 Role Requirement Calculator
(Appendix 5.6) that the 100Mbps site links between each data center; an estimated 43Mbps is
required for this replication to be maintained at a near 0 hour RPO.
RTO: Critical
RPO: Platinum
Achieved by application design, placing hot spare mailbox servers in the secondary data center
and configuring in a DAG.
Email flow with primary site online. When failed over to the secondary site, an alternate URL will
be available for immediate use while production DNS records are changed and replicated.
Virtual Design Master Page 9 After the Outbreak
Mailbox Server / DAG Design
• Windows 2008 R2 Standard Application Servers: There will be three (3) levels of application
server classifications, the first will include the minimum components required to bring the
application back online and capable of supporting all necessary traffic. For example a single web
server, application server and database server may be able to handle the load for a given
application, but due to its uptime requirements may have several other redundant servers to
support it. In this scenario only 1 web, application and database server would be brought online
initially and the redundant systems would be brought back online once all primary systems were
restored. Some application servers may only be providing utility level services.
RTO: Priority
RPO: Gold
Achieved by continuous replication using Zerto Virtual Replication v3 which will allow the desired
RPO level and assist with RTO by automating the changing of IP addresses in the secondary
data center.
RTO: Redundant
RPO: Bronze
Achieved by backing up systems with Unitrends and replicating Unitrends to the secondary site.
Data will be refreshed from the primary systems within an application cluster. In some scenarios
where tiers are stateless (i.e. no data is stored on the system), templates and scripts to restore
the redundant systems to a working state will be used rather than backing up with Unitrends.
Virtual Design Master Page 10 After the Outbreak
RTO: Standby
RPO: Static
Achieved by automating the installation of specific applications such as system monitoring
(OpsView). For systems that require data retention, systems will have the specific data sets
backed up by Unitrends (i.e. not using a full VM backup, rather just individual directories or
databases).
• VMware vCenter Server and SQL 2008 R2 Database Server (for vCenter)
2
: VMware vCenter
Server, and the required services which are also going to be installed on the vCenter server
(SSO, Inventory Service) and the vCenter Database server will be protected using VMware
vCenter Heartbeat. Give that vCenter is crucial to the operation of the environment, I feel it is
critical to provide a solid solution which is dedicated to this task. At $9995, the cost of the product
give the size and scope of the environment should be justified
15
.
RTO: Critical
RPO: Platnium
Achieved by leveraging vCenter Heartbeat which monitors vCenter and provides the ability to fail
over, and failback. vCenter Heartbeat is capable of operating over a WAN environment, and with
100Mbps dedicated links between the data center I feel this is an ideal solution.
Virtual Design Master Page 11 After the Outbreak
Graphic from www.vmware.com vCenter Heartbeat product page
• VMware View Infrastructure: Because many of our users rely the VMware View infrastructure
for remote access to systems and applications, we have decided to stand-up a warm VMware
View infrastructure in the tertiary data center. This will allow remote staff, some of who may be
required to access systems during a disaster, and alternate method for access. In order to
support users in this fashion, VMware View HTML Access will be configured. There is no data
saved in the view environment, rather it is saved in applications and file servers so there is no
RPO required. VM templates will be replicated from the primary data center.
RTO: Priority
RPO: N/A
Achieved by building a warm stand-by View infrastructure in the tertiary data center.
Virtual Design Master Page 12 After the Outbreak
5 IP Allocation
The following IP allocation will be used across all data centers. Each site will have a class B range, sub-
netted for traffic segmentation purposes. Routing and ACLs where appropriate will be handled by the
switch.
6 APPENDICES
6.1 Hardware Manifest
Device Type Manufacturer Model
Router Cisco 7600
Firewall Cisco ASA 5540
Network Switch Cisco Catalyst 6500
Storage Switch Cisco MDS 9513
Server HP DL580 G5
Add-On NIC Broadcom 5709 Based
Add-On HBA EMC Qlogic QLE2462-E-SP
Add-On HD OCZ 32GB SSD
Storage Array EMC Celerra NS480
Storage Array EMC 146GB FC 15K
Virtual Design Master Page 13 After the Outbreak
Load Balancer F5 BigIP 6800
6.2 Software Manifest
Vendor Software
Microsoft Windows 2008 R2
Microsoft Windows 7 64-bit
Microsoft Office 2010
Microsoft SQL 2010
VMware vSphere Enterprise Plus
VMware Horizon View
VMware Replication
VMware vSphere Data Protection
VMware Log Insight Manager
VMware vMA
VMware vSphere Support Assistant
VMware vShield Endpoint
VMware vCenter Server Heartbeat
Trend Micro Deep Security
Opsview Opsview Enterprise
Unitrends Enterprise Backup
Indeni Dynamic Knowledge Base
Zerto Zerto Virtual Replication v3
6.3 Reference
1 - http://goo.gl/7ohe4 - Microsoft Exchange 2010 on VMware Best Practices
2 - http://goo.gl/F2B4w - Installing vCenter Server 5.1 Best Practices
3 - http://goo.gl/ToZfWc - How old is my server
4 - http://goo.gl/PtlKT4 - Ark.intel.com
5 - http://goo.gl/LFBys - wmarow.com IOPS calculator
6 - http://goo.gl/xcF0h - RAIDcalc
7 - http://goo.gl/zRdhqT - Cisco 5500 Series Release Notes
8 - http://communities.vmware.com/docs/DOC-22981- vSphere 5.1 Hardening Guide
9 - http://goo.gl/WIC7Hb - vSphere 5.1 Documentation / Authentication
10 - http://goo.gl/KGJ7tK - vSphere 5.1 Host Conditions and Trigger States
11 - http://blogs.vmware.com/kb/2012/07/leveraging-multiple-nic-vmotion.html
12 - http://goo.gl/SEQfwH - MDS900 3.0(1) Release notes
13 - http://technet.microsoft.com/en-us/library/cc816945(v=ws.10).aspx – Managing Operations Master
Roles
14 - http://support.unitrends.com/ikm/questions.php?questionid=891 – AD Restore
15 - http://www.vmware.com/products/vcenter-server-heartbeat/features.html - vCenter Heartbeat
Virtual Design Master Page 14 After the Outbreak
6.4 VMware Configuration Maximums (double click to open)
vsphere-51-configur
ation-maximums.pdf
6.5 Original Site Design (double click to open)
jfrappier -
challenge1.pdf
6.6 Exchange 2010 Sizing Calculator (double click to open)
vDM-ExchangeWork
Book.xlsm

Mais conteúdo relacionado

Mais procurados

Vizioncore Economical Disaster Recovery through Virtualization
Vizioncore Economical Disaster Recovery through VirtualizationVizioncore Economical Disaster Recovery through Virtualization
Vizioncore Economical Disaster Recovery through Virtualization1CloudRoad.com
 
Rha cluster suite wppdf
Rha cluster suite wppdfRha cluster suite wppdf
Rha cluster suite wppdfprojectmgmt456
 
Performance management in the virtual data center
Performance management in the virtual data centerPerformance management in the virtual data center
Performance management in the virtual data centerMark Friedman
 
D1.2 analysis and selection of low power techniques, services and patterns
D1.2 analysis and selection of low power techniques, services and patternsD1.2 analysis and selection of low power techniques, services and patterns
D1.2 analysis and selection of low power techniques, services and patternsBabak Sorkhpour
 
Xen and the art of virtualization
Xen and the art of virtualizationXen and the art of virtualization
Xen and the art of virtualizationAbdul417101
 
[EWiLi2016] Towards a performance-aware power capping orchestrator for the Xe...
[EWiLi2016] Towards a performance-aware power capping orchestrator for the Xe...[EWiLi2016] Towards a performance-aware power capping orchestrator for the Xe...
[EWiLi2016] Towards a performance-aware power capping orchestrator for the Xe...Matteo Ferroni
 
Resume - Donald W. Royer
Resume - Donald W. RoyerResume - Donald W. Royer
Resume - Donald W. RoyerDonald Royer
 
Galvin-operating System(Ch1)
Galvin-operating System(Ch1)Galvin-operating System(Ch1)
Galvin-operating System(Ch1)dsuyal1
 
IBM MQ Disaster Recovery
IBM MQ Disaster RecoveryIBM MQ Disaster Recovery
IBM MQ Disaster RecoveryMarkTaylorIBM
 
Chapter 1: Introduction to Operating System
Chapter 1: Introduction to Operating SystemChapter 1: Introduction to Operating System
Chapter 1: Introduction to Operating SystemShafaan Khaliq Bhatti
 
Considerations when implementing_ha_in_dmf
Considerations when implementing_ha_in_dmfConsiderations when implementing_ha_in_dmf
Considerations when implementing_ha_in_dmfhik_lhz
 
VMworld 2013: Implementing a Holistic BC/DR Strategy with VMware - Part Two
VMworld 2013: Implementing a Holistic BC/DR Strategy with VMware - Part TwoVMworld 2013: Implementing a Holistic BC/DR Strategy with VMware - Part Two
VMworld 2013: Implementing a Holistic BC/DR Strategy with VMware - Part TwoVMworld
 
Fastback Technical Enablementv1
Fastback Technical Enablementv1Fastback Technical Enablementv1
Fastback Technical Enablementv1petchpaitoon
 
Plate Spin Disaster Recovery Solution
Plate Spin Disaster Recovery SolutionPlate Spin Disaster Recovery Solution
Plate Spin Disaster Recovery Solutionmuralis3
 
cs8493 - operating systems unit 1
cs8493 - operating systems unit 1cs8493 - operating systems unit 1
cs8493 - operating systems unit 1SIMONTHOMAS S
 
White Paper: Monitoring EMC Greenplum DCA with Nagios - EMC Greenplum Data Co...
White Paper: Monitoring EMC Greenplum DCA with Nagios - EMC Greenplum Data Co...White Paper: Monitoring EMC Greenplum DCA with Nagios - EMC Greenplum Data Co...
White Paper: Monitoring EMC Greenplum DCA with Nagios - EMC Greenplum Data Co...EMC
 
Accelerate Your Signature Banking Applications with IBM Storage Offerings
Accelerate Your Signature Banking Applications with IBM Storage OfferingsAccelerate Your Signature Banking Applications with IBM Storage Offerings
Accelerate Your Signature Banking Applications with IBM Storage OfferingsPaula Koziol
 

Mais procurados (20)

Rtos
RtosRtos
Rtos
 
Vizioncore Economical Disaster Recovery through Virtualization
Vizioncore Economical Disaster Recovery through VirtualizationVizioncore Economical Disaster Recovery through Virtualization
Vizioncore Economical Disaster Recovery through Virtualization
 
OS_Ch4
OS_Ch4OS_Ch4
OS_Ch4
 
Rha cluster suite wppdf
Rha cluster suite wppdfRha cluster suite wppdf
Rha cluster suite wppdf
 
Performance management in the virtual data center
Performance management in the virtual data centerPerformance management in the virtual data center
Performance management in the virtual data center
 
Ina Pratt Fosdem Feb2008
Ina Pratt Fosdem Feb2008Ina Pratt Fosdem Feb2008
Ina Pratt Fosdem Feb2008
 
D1.2 analysis and selection of low power techniques, services and patterns
D1.2 analysis and selection of low power techniques, services and patternsD1.2 analysis and selection of low power techniques, services and patterns
D1.2 analysis and selection of low power techniques, services and patterns
 
Xen and the art of virtualization
Xen and the art of virtualizationXen and the art of virtualization
Xen and the art of virtualization
 
[EWiLi2016] Towards a performance-aware power capping orchestrator for the Xe...
[EWiLi2016] Towards a performance-aware power capping orchestrator for the Xe...[EWiLi2016] Towards a performance-aware power capping orchestrator for the Xe...
[EWiLi2016] Towards a performance-aware power capping orchestrator for the Xe...
 
Resume - Donald W. Royer
Resume - Donald W. RoyerResume - Donald W. Royer
Resume - Donald W. Royer
 
Galvin-operating System(Ch1)
Galvin-operating System(Ch1)Galvin-operating System(Ch1)
Galvin-operating System(Ch1)
 
IBM MQ Disaster Recovery
IBM MQ Disaster RecoveryIBM MQ Disaster Recovery
IBM MQ Disaster Recovery
 
Chapter 1: Introduction to Operating System
Chapter 1: Introduction to Operating SystemChapter 1: Introduction to Operating System
Chapter 1: Introduction to Operating System
 
Considerations when implementing_ha_in_dmf
Considerations when implementing_ha_in_dmfConsiderations when implementing_ha_in_dmf
Considerations when implementing_ha_in_dmf
 
VMworld 2013: Implementing a Holistic BC/DR Strategy with VMware - Part Two
VMworld 2013: Implementing a Holistic BC/DR Strategy with VMware - Part TwoVMworld 2013: Implementing a Holistic BC/DR Strategy with VMware - Part Two
VMworld 2013: Implementing a Holistic BC/DR Strategy with VMware - Part Two
 
Fastback Technical Enablementv1
Fastback Technical Enablementv1Fastback Technical Enablementv1
Fastback Technical Enablementv1
 
Plate Spin Disaster Recovery Solution
Plate Spin Disaster Recovery SolutionPlate Spin Disaster Recovery Solution
Plate Spin Disaster Recovery Solution
 
cs8493 - operating systems unit 1
cs8493 - operating systems unit 1cs8493 - operating systems unit 1
cs8493 - operating systems unit 1
 
White Paper: Monitoring EMC Greenplum DCA with Nagios - EMC Greenplum Data Co...
White Paper: Monitoring EMC Greenplum DCA with Nagios - EMC Greenplum Data Co...White Paper: Monitoring EMC Greenplum DCA with Nagios - EMC Greenplum Data Co...
White Paper: Monitoring EMC Greenplum DCA with Nagios - EMC Greenplum Data Co...
 
Accelerate Your Signature Banking Applications with IBM Storage Offerings
Accelerate Your Signature Banking Applications with IBM Storage OfferingsAccelerate Your Signature Banking Applications with IBM Storage Offerings
Accelerate Your Signature Banking Applications with IBM Storage Offerings
 

Destaque

Joe Graziano – Challenge 2 Design Solution V dm2 datacenter3
Joe Graziano – Challenge 2 Design Solution  V dm2 datacenter3Joe Graziano – Challenge 2 Design Solution  V dm2 datacenter3
Joe Graziano – Challenge 2 Design Solution V dm2 datacenter3tovmug
 
Van Tilburgh Spring 2014
Van Tilburgh Spring 2014Van Tilburgh Spring 2014
Van Tilburgh Spring 2014Jenny Donley
 
Course Presentation
Course PresentationCourse Presentation
Course Presentationtutorlcoco
 
V Quest Company Profile (Pharmaclini).Pps
V Quest Company Profile (Pharmaclini).PpsV Quest Company Profile (Pharmaclini).Pps
V Quest Company Profile (Pharmaclini).Ppssunil0307
 
Toronto VMUG - November 13, 2013 - CiRBA
Toronto VMUG - November 13, 2013 - CiRBAToronto VMUG - November 13, 2013 - CiRBA
Toronto VMUG - November 13, 2013 - CiRBAtovmug
 

Destaque (7)

Joe Graziano – Challenge 2 Design Solution V dm2 datacenter3
Joe Graziano – Challenge 2 Design Solution  V dm2 datacenter3Joe Graziano – Challenge 2 Design Solution  V dm2 datacenter3
Joe Graziano – Challenge 2 Design Solution V dm2 datacenter3
 
B2B Presentation
B2B PresentationB2B Presentation
B2B Presentation
 
Van Tilburgh Spring 2014
Van Tilburgh Spring 2014Van Tilburgh Spring 2014
Van Tilburgh Spring 2014
 
Mumbai Advertising Agency - Global Avdertisers
Mumbai Advertising Agency - Global AvdertisersMumbai Advertising Agency - Global Avdertisers
Mumbai Advertising Agency - Global Avdertisers
 
Course Presentation
Course PresentationCourse Presentation
Course Presentation
 
V Quest Company Profile (Pharmaclini).Pps
V Quest Company Profile (Pharmaclini).PpsV Quest Company Profile (Pharmaclini).Pps
V Quest Company Profile (Pharmaclini).Pps
 
Toronto VMUG - November 13, 2013 - CiRBA
Toronto VMUG - November 13, 2013 - CiRBAToronto VMUG - November 13, 2013 - CiRBA
Toronto VMUG - November 13, 2013 - CiRBA
 

Semelhante a Jonathan Frappier – Challenge 2 Design Solution

Joe Graziano – Challenge 2 Design Solution (Part 1)
Joe Graziano – Challenge 2 Design Solution (Part 1)Joe Graziano – Challenge 2 Design Solution (Part 1)
Joe Graziano – Challenge 2 Design Solution (Part 1)tovmug
 
Virtual Design Master Challenge 1 - Akmal
Virtual Design Master Challenge 1  - AkmalVirtual Design Master Challenge 1  - Akmal
Virtual Design Master Challenge 1 - Akmaltovmug
 
Cyberdyne systems (2)
Cyberdyne systems (2)Cyberdyne systems (2)
Cyberdyne systems (2)Bryan Moss
 
Disaster Recovery Experience at CACIB: Hardening Hadoop for Critical Financia...
Disaster Recovery Experience at CACIB: Hardening Hadoop for Critical Financia...Disaster Recovery Experience at CACIB: Hardening Hadoop for Critical Financia...
Disaster Recovery Experience at CACIB: Hardening Hadoop for Critical Financia...DataWorks Summit
 
Hystax Acura Live Migration and Disaster Recovery
Hystax Acura Live Migration and Disaster RecoveryHystax Acura Live Migration and Disaster Recovery
Hystax Acura Live Migration and Disaster RecoveryNick Smirnov
 
Boomerang Total Recall
Boomerang Total RecallBoomerang Total Recall
Boomerang Total Recallbdoyle05
 
Adaptive backup & Recovery partner enablement
Adaptive backup & Recovery partner enablementAdaptive backup & Recovery partner enablement
Adaptive backup & Recovery partner enablementJuan Niekerk
 
Cloud-Native Patterns and the Benefits of MySQL as a Platform Managed Service
Cloud-Native Patterns and the Benefits of MySQL as a Platform Managed ServiceCloud-Native Patterns and the Benefits of MySQL as a Platform Managed Service
Cloud-Native Patterns and the Benefits of MySQL as a Platform Managed ServiceVMware Tanzu
 
2232016 Sample Implementation Plan1.htmlfileCUsers.docx
2232016 Sample Implementation Plan1.htmlfileCUsers.docx2232016 Sample Implementation Plan1.htmlfileCUsers.docx
2232016 Sample Implementation Plan1.htmlfileCUsers.docxeugeniadean34240
 
Pivotal Cloud Foundry 2.6: A First Look
Pivotal Cloud Foundry 2.6: A First LookPivotal Cloud Foundry 2.6: A First Look
Pivotal Cloud Foundry 2.6: A First LookVMware Tanzu
 
Cio Breakfast Roundtable 05142009 Final Virtualization
Cio Breakfast Roundtable 05142009 Final VirtualizationCio Breakfast Roundtable 05142009 Final Virtualization
Cio Breakfast Roundtable 05142009 Final Virtualizationguestc900809
 
IBM Integration Bus & WebSphere MQ - High Availability & Disaster Recovery
IBM Integration Bus & WebSphere MQ - High Availability & Disaster RecoveryIBM Integration Bus & WebSphere MQ - High Availability & Disaster Recovery
IBM Integration Bus & WebSphere MQ - High Availability & Disaster RecoveryRob Convery
 
Jump start your recovery, with Muhammad Tahir
Jump start your recovery, with Muhammad TahirJump start your recovery, with Muhammad Tahir
Jump start your recovery, with Muhammad TahirVeritas Technologies LLC
 
Why Micro Focus Chose Pulsar for Data Ingestion - Pulsar Summit NA 2021
Why Micro Focus Chose Pulsar for Data Ingestion - Pulsar Summit NA 2021Why Micro Focus Chose Pulsar for Data Ingestion - Pulsar Summit NA 2021
Why Micro Focus Chose Pulsar for Data Ingestion - Pulsar Summit NA 2021StreamNative
 
MySQL Database Architectures - 2022-08
MySQL Database Architectures - 2022-08MySQL Database Architectures - 2022-08
MySQL Database Architectures - 2022-08Kenny Gryp
 
#VirtualDesignMaster 3 Challenge 2 - Harshvardhan Gupta
#VirtualDesignMaster 3 Challenge 2 - Harshvardhan Gupta#VirtualDesignMaster 3 Challenge 2 - Harshvardhan Gupta
#VirtualDesignMaster 3 Challenge 2 - Harshvardhan Guptavdmchallenge
 
PowerPoint PresentationThis section will include an online pre.docx
PowerPoint PresentationThis section will include an online pre.docxPowerPoint PresentationThis section will include an online pre.docx
PowerPoint PresentationThis section will include an online pre.docxChantellPantoja184
 

Semelhante a Jonathan Frappier – Challenge 2 Design Solution (20)

Joe Graziano – Challenge 2 Design Solution (Part 1)
Joe Graziano – Challenge 2 Design Solution (Part 1)Joe Graziano – Challenge 2 Design Solution (Part 1)
Joe Graziano – Challenge 2 Design Solution (Part 1)
 
Virtual Design Master Challenge 1 - Akmal
Virtual Design Master Challenge 1  - AkmalVirtual Design Master Challenge 1  - Akmal
Virtual Design Master Challenge 1 - Akmal
 
Cyberdyne systems (2)
Cyberdyne systems (2)Cyberdyne systems (2)
Cyberdyne systems (2)
 
Disaster Recovery Experience at CACIB: Hardening Hadoop for Critical Financia...
Disaster Recovery Experience at CACIB: Hardening Hadoop for Critical Financia...Disaster Recovery Experience at CACIB: Hardening Hadoop for Critical Financia...
Disaster Recovery Experience at CACIB: Hardening Hadoop for Critical Financia...
 
Hystax Acura Live Migration and Disaster Recovery
Hystax Acura Live Migration and Disaster RecoveryHystax Acura Live Migration and Disaster Recovery
Hystax Acura Live Migration and Disaster Recovery
 
Boomerang Total Recall
Boomerang Total RecallBoomerang Total Recall
Boomerang Total Recall
 
Adaptive backup & Recovery partner enablement
Adaptive backup & Recovery partner enablementAdaptive backup & Recovery partner enablement
Adaptive backup & Recovery partner enablement
 
Cloud-Native Patterns and the Benefits of MySQL as a Platform Managed Service
Cloud-Native Patterns and the Benefits of MySQL as a Platform Managed ServiceCloud-Native Patterns and the Benefits of MySQL as a Platform Managed Service
Cloud-Native Patterns and the Benefits of MySQL as a Platform Managed Service
 
2232016 Sample Implementation Plan1.htmlfileCUsers.docx
2232016 Sample Implementation Plan1.htmlfileCUsers.docx2232016 Sample Implementation Plan1.htmlfileCUsers.docx
2232016 Sample Implementation Plan1.htmlfileCUsers.docx
 
Pivotal Cloud Foundry 2.6: A First Look
Pivotal Cloud Foundry 2.6: A First LookPivotal Cloud Foundry 2.6: A First Look
Pivotal Cloud Foundry 2.6: A First Look
 
VDI-POC
VDI-POCVDI-POC
VDI-POC
 
Cio Breakfast Roundtable 05142009 Final Virtualization
Cio Breakfast Roundtable 05142009 Final VirtualizationCio Breakfast Roundtable 05142009 Final Virtualization
Cio Breakfast Roundtable 05142009 Final Virtualization
 
TRT - Plate Spin Presentation
TRT - Plate Spin PresentationTRT - Plate Spin Presentation
TRT - Plate Spin Presentation
 
IBM Integration Bus & WebSphere MQ - High Availability & Disaster Recovery
IBM Integration Bus & WebSphere MQ - High Availability & Disaster RecoveryIBM Integration Bus & WebSphere MQ - High Availability & Disaster Recovery
IBM Integration Bus & WebSphere MQ - High Availability & Disaster Recovery
 
Jump start your recovery, with Muhammad Tahir
Jump start your recovery, with Muhammad TahirJump start your recovery, with Muhammad Tahir
Jump start your recovery, with Muhammad Tahir
 
Why Micro Focus Chose Pulsar for Data Ingestion - Pulsar Summit NA 2021
Why Micro Focus Chose Pulsar for Data Ingestion - Pulsar Summit NA 2021Why Micro Focus Chose Pulsar for Data Ingestion - Pulsar Summit NA 2021
Why Micro Focus Chose Pulsar for Data Ingestion - Pulsar Summit NA 2021
 
CS_10_DR_CFD
CS_10_DR_CFDCS_10_DR_CFD
CS_10_DR_CFD
 
MySQL Database Architectures - 2022-08
MySQL Database Architectures - 2022-08MySQL Database Architectures - 2022-08
MySQL Database Architectures - 2022-08
 
#VirtualDesignMaster 3 Challenge 2 - Harshvardhan Gupta
#VirtualDesignMaster 3 Challenge 2 - Harshvardhan Gupta#VirtualDesignMaster 3 Challenge 2 - Harshvardhan Gupta
#VirtualDesignMaster 3 Challenge 2 - Harshvardhan Gupta
 
PowerPoint PresentationThis section will include an online pre.docx
PowerPoint PresentationThis section will include an online pre.docxPowerPoint PresentationThis section will include an online pre.docx
PowerPoint PresentationThis section will include an online pre.docx
 

Mais de tovmug

Akmal Khaleeq Waheed - Challenge 3 p3
Akmal Khaleeq Waheed - Challenge 3 p3Akmal Khaleeq Waheed - Challenge 3 p3
Akmal Khaleeq Waheed - Challenge 3 p3tovmug
 
Akmal Khaleeq Waheed - Challenge 3 p2
Akmal Khaleeq Waheed - Challenge 3 p2Akmal Khaleeq Waheed - Challenge 3 p2
Akmal Khaleeq Waheed - Challenge 3 p2tovmug
 
Akmal Khaleeq Waheed - Challenge 3 p1
Akmal Khaleeq Waheed - Challenge 3 p1Akmal Khaleeq Waheed - Challenge 3 p1
Akmal Khaleeq Waheed - Challenge 3 p1tovmug
 
Akmal Khaleeq Waheed - Challenge 3
Akmal Khaleeq Waheed - Challenge 3Akmal Khaleeq Waheed - Challenge 3
Akmal Khaleeq Waheed - Challenge 3tovmug
 
Jonathan Frappier - Challenge 3
Jonathan Frappier - Challenge 3Jonathan Frappier - Challenge 3
Jonathan Frappier - Challenge 3tovmug
 
Joe Graziano – Challenge 2 Design Solution - V dm2 datacenter2
Joe Graziano – Challenge 2 Design Solution  - V dm2 datacenter2Joe Graziano – Challenge 2 Design Solution  - V dm2 datacenter2
Joe Graziano – Challenge 2 Design Solution - V dm2 datacenter2tovmug
 
Joe Graziano – Challenge 2 Design Solution V dm2 datacenter1
Joe Graziano – Challenge 2 Design Solution V dm2 datacenter1Joe Graziano – Challenge 2 Design Solution V dm2 datacenter1
Joe Graziano – Challenge 2 Design Solution V dm2 datacenter1tovmug
 
Joe Graziano – Challenge 2 Design Solution Maxrep data-sheet-1727271
Joe Graziano – Challenge 2 Design Solution  Maxrep data-sheet-1727271Joe Graziano – Challenge 2 Design Solution  Maxrep data-sheet-1727271
Joe Graziano – Challenge 2 Design Solution Maxrep data-sheet-1727271tovmug
 
Joe Graziano – Challenge 2 Design Solution - Syncsort dpx 411
Joe Graziano – Challenge 2 Design Solution  - Syncsort dpx 411Joe Graziano – Challenge 2 Design Solution  - Syncsort dpx 411
Joe Graziano – Challenge 2 Design Solution - Syncsort dpx 411tovmug
 
Joe Graziano – Challenge 2 Design Solution (Part 2)
Joe Graziano – Challenge 2 Design Solution (Part 2)Joe Graziano – Challenge 2 Design Solution (Part 2)
Joe Graziano – Challenge 2 Design Solution (Part 2)tovmug
 
Rebuilding theworld
Rebuilding theworldRebuilding theworld
Rebuilding theworldtovmug
 
Virtual Design Master Challenge 1 - Joe
Virtual Design Master Challenge 1 - JoeVirtual Design Master Challenge 1 - Joe
Virtual Design Master Challenge 1 - Joetovmug
 
Virtual Design Master Challenge 1 - Jonathan
Virtual Design Master Challenge 1  - JonathanVirtual Design Master Challenge 1  - Jonathan
Virtual Design Master Challenge 1 - Jonathantovmug
 
Trend Micro Dec 6 Toronto VMUG
Trend Micro Dec 6 Toronto VMUGTrend Micro Dec 6 Toronto VMUG
Trend Micro Dec 6 Toronto VMUGtovmug
 
Cisco Dec 6 Toronto VMUG
Cisco Dec 6 Toronto VMUGCisco Dec 6 Toronto VMUG
Cisco Dec 6 Toronto VMUGtovmug
 

Mais de tovmug (15)

Akmal Khaleeq Waheed - Challenge 3 p3
Akmal Khaleeq Waheed - Challenge 3 p3Akmal Khaleeq Waheed - Challenge 3 p3
Akmal Khaleeq Waheed - Challenge 3 p3
 
Akmal Khaleeq Waheed - Challenge 3 p2
Akmal Khaleeq Waheed - Challenge 3 p2Akmal Khaleeq Waheed - Challenge 3 p2
Akmal Khaleeq Waheed - Challenge 3 p2
 
Akmal Khaleeq Waheed - Challenge 3 p1
Akmal Khaleeq Waheed - Challenge 3 p1Akmal Khaleeq Waheed - Challenge 3 p1
Akmal Khaleeq Waheed - Challenge 3 p1
 
Akmal Khaleeq Waheed - Challenge 3
Akmal Khaleeq Waheed - Challenge 3Akmal Khaleeq Waheed - Challenge 3
Akmal Khaleeq Waheed - Challenge 3
 
Jonathan Frappier - Challenge 3
Jonathan Frappier - Challenge 3Jonathan Frappier - Challenge 3
Jonathan Frappier - Challenge 3
 
Joe Graziano – Challenge 2 Design Solution - V dm2 datacenter2
Joe Graziano – Challenge 2 Design Solution  - V dm2 datacenter2Joe Graziano – Challenge 2 Design Solution  - V dm2 datacenter2
Joe Graziano – Challenge 2 Design Solution - V dm2 datacenter2
 
Joe Graziano – Challenge 2 Design Solution V dm2 datacenter1
Joe Graziano – Challenge 2 Design Solution V dm2 datacenter1Joe Graziano – Challenge 2 Design Solution V dm2 datacenter1
Joe Graziano – Challenge 2 Design Solution V dm2 datacenter1
 
Joe Graziano – Challenge 2 Design Solution Maxrep data-sheet-1727271
Joe Graziano – Challenge 2 Design Solution  Maxrep data-sheet-1727271Joe Graziano – Challenge 2 Design Solution  Maxrep data-sheet-1727271
Joe Graziano – Challenge 2 Design Solution Maxrep data-sheet-1727271
 
Joe Graziano – Challenge 2 Design Solution - Syncsort dpx 411
Joe Graziano – Challenge 2 Design Solution  - Syncsort dpx 411Joe Graziano – Challenge 2 Design Solution  - Syncsort dpx 411
Joe Graziano – Challenge 2 Design Solution - Syncsort dpx 411
 
Joe Graziano – Challenge 2 Design Solution (Part 2)
Joe Graziano – Challenge 2 Design Solution (Part 2)Joe Graziano – Challenge 2 Design Solution (Part 2)
Joe Graziano – Challenge 2 Design Solution (Part 2)
 
Rebuilding theworld
Rebuilding theworldRebuilding theworld
Rebuilding theworld
 
Virtual Design Master Challenge 1 - Joe
Virtual Design Master Challenge 1 - JoeVirtual Design Master Challenge 1 - Joe
Virtual Design Master Challenge 1 - Joe
 
Virtual Design Master Challenge 1 - Jonathan
Virtual Design Master Challenge 1  - JonathanVirtual Design Master Challenge 1  - Jonathan
Virtual Design Master Challenge 1 - Jonathan
 
Trend Micro Dec 6 Toronto VMUG
Trend Micro Dec 6 Toronto VMUGTrend Micro Dec 6 Toronto VMUG
Trend Micro Dec 6 Toronto VMUG
 
Cisco Dec 6 Toronto VMUG
Cisco Dec 6 Toronto VMUGCisco Dec 6 Toronto VMUG
Cisco Dec 6 Toronto VMUG
 

Último

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 

Último (20)

Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 

Jonathan Frappier – Challenge 2 Design Solution

  • 1. Virtual Design Master After the Outbreak After the Outbreak Project: HA, Backup, and Disaster Recovery Solutions Focus Area: Provide HA, backup and disaster recovery solutions VMware vSphere, Active Directory, SQL, Network, Storage, Remote Access and other managed applications Prepared By: Jonathan Frappier @jfrappier www.virtxpert.com Project Quality Plan Version Control Version Date Author Change Description .5 8/19/13 Jonathan Frappier Draft .75 8/19/13 Phoummala Schmitt Technical Consultant for Exchange HA Solution (verified solution is valid) 1.0 8/22/13 Jonathan Frappier Final
  • 2. Virtual Design Master Page 2 After the Outbreak TABLE OF CONTENTS 1 EXECUTIVE SUMMARY............................................................................................ 3 1.1 DEFINITIONS....................................................................................................... 3 1.2 SCOPE............................................................................................................... 3 2 SITE INFRASTRUCTURE UPDATES........................................................................ 4 2.1 EQUIPMENT SPECIFICATIONS .............................................................................. 4 2.2 LAN & WAN...................................................................................................... 4 2.3 PHYSICAL SERVERS ........................................................................................... 4 2.4 STORAGE........................................................................................................... 4 2.5 SLA DEFINITIONS............................................................................................... 4 2.6 UPDATED SITE DIAGRAM .................................................................................... 4 3 REQUIREMENTS, ASSUMPTIONS, CONSTRAINTS & RISKS ................................ 5 3.1 REQUIREMENTS.................................................................................................. 5 3.2 ASSUMPTIONS.................................................................................................... 5 3.3 CONSTRAINTS .................................................................................................... 6 3.4 RISKS ................................................................................................................ 6 4 APPLICATION BACKUP, HA, RPO AND RTO ......................................................... 6 4.1 RPO AND RTO CLASSIFICATIONS ....................................................................... 6 4.2 SOFTWARE SOLUTIONS FOR BACKUP AND REPLICATION ...................................... 6 4.3 IDENTIFIED APPLICATIONS & FAILOVER PROCESS BRIEFS .................................... 7 5 IP ALLOCATION........................................................................................................ 12 6 APPENDICES ............................................................................................................ 12 6.1 HARDWARE MANIFEST........................................................................................ 12 6.2 SOFTWARE MANIFEST ........................................................................................ 13 6.3 REFERENCE ....................................................................................................... 13 6.4 VMWARE CONFIGURATION MAXIMUMS (DOUBLE CLICK TO OPEN).......................... 14 6.5 ORIGINAL SITE DESIGN (DOUBLE CLICK TO OPEN) ................................................ 14 6.6 EXCHANGE 2010 SIZING CALCULATOR (DOUBLE CLICK TO OPEN) ......................... 14
  • 3. Virtual Design Master Page 3 After the Outbreak 1 EXECUTIVE SUMMARY The world is in disarray after a virus outbreak that turned many into zombies. You’ve been recruited to build an infrastructure for a wealthy philanthropist to use in order to put the world back together. During phase 2 of the build out, appropriate High Availability, backup and disaster recovery solutions must be designed, documented and implemented. The disaster recovery solution will failover all virtual server workloads from the primary site to the secondary site, and all virtual desktop workloads to the tertiary site. The solution will use several methods for failover and recovery based on the RPO and RTO of the application. This will provide the most cost effective solution for failing over all applications. 1.1 Definitions Backup: The process of making a backup copy of important information Business Continuity Plan (BCP): A plan for how the business will continue to operate in the event of a disaster. Information in a BCP may include escalation procedures, designation as to who may declare an emergency, contact and emergency contact information for key personnel, directions on how to access systems after a DRP has been implemented. Disaster Recovery Plan (DRP): A disaster recovery plan is the process for restoring access to infrastructure and applications in the event of a disaster. Disasters may range from small/isolated incidents such as a server failure that affects access to key systems or a major/catastrophic incident that causes major damage or prevents access to an entire site. High Availability (HA): High Availability is the process of enabling application resilency such that applications remain available, or are quickly restore in the event of an outage. An example of HA may be a virtual server being restarted if it has become unresponsive, quickly and automatically restoring access to the application with little to no human intervention. HA By Design (HABD): HA By Design is the concept of building HA into your normal application design such that during a disaster, connectivity remains unaffected, or requires very little intervention to be accessed (for example using an alternate URL for access). Recovery Point Objective (RPO): Recovery Point Objective defines an acceptable amount of data loss (or lag) in the event of a disaster. For example a system with an RPO of one (1) hour will need to have data recoverable within one (1) hour of an outage or disaster. Recovery Time Objective (RTO): Recovery Time Objective defines how long a system may remain offline after a disaster. The RTO and RPO do not need to be closely related. For example a system may have an RPO of only five (5) or ten (10) minutes but during a disaster may not need to be brought back online for several hours, or even days; an RTO of five (five) days may be acceptable even with a low RTO. Conversely a systems with a low RTO may contain static data, such as a web server, and thus have a very high RPO because the data does not change (often). 1.2 Scope Mr. Billionaire needs you to build him an infrastructure so he can continue his efforts across the globe. There are 3 locations that must be use because there is not enough power in each of the locations to host all of the equipment. The primary site supports up to 5000 virtual servers, 1000 virtual servers in the secondary site and 500 in the tertiary site. The primary site also hosts 3000 virtual desktops available for full desktop access and mobile application delivery for at least 1500 devices. A plan for appropriate High Availability solutions, backup and Disaster Recovery must be implemented to support a major failure in the primary site. Business Continuity, communication and escalation procedures are outside the scope of this document.
  • 4. Virtual Design Master Page 4 After the Outbreak 2 Site Infrastructure Updates 2.1 Equipment Specifications All systems used to support disaster recovery efforts will be the same make, model and configuration as the original installation. Additionally, this document will only list the required changes to each site; detailed system details can be found in the original site design (Appendix 5.5). 2.2 LAN & WAN • LAN An additional Cisco 6513 will be added to the secondary site to ensure support for up to 50 additional hosts if required. • WAN A 100Mbps internet link has been added to the secondary and tertiary site. To support this, a Cisco 7600 router and Cisco ASA 5540 will be added to each site. 2.3 Physical Servers The secondary site will need to add an additional 50 physical hosts to support full recovery of the virtual servers in the primary site. The tertiary site will require an additional 10 physical hosts to support the full recovery of the virtual desktops from the tertiary site. 2.4 Storage During the original design, an assumption was made at the tertiary site to install an EMC Celerra NS-480 with 32TB of storage to support failover from the secondary site. The requirements for the DRP calls for failover of the primary site only, the spare NS-480 in the tertiary site will be upgrade to 64TB to match the NS-480 in the primary site supporting the VDI workloads. 2.5 SLA Definitions No service levels were defined; will use 99.9% as a standard. 2.6 Additional Equipment Required Device Type Manufacturer Model Quantity Server HP DL580 G5 60 (50 to secondary, 10 to tertiary) Add-On NIC Broadcom 5709 Based 120 (2 cards per server) Add-On HBA EMC Qlogic QLE2462-E-SP 240 (4 cards per server) Add-On HD OCZ 32GB SSD 1560 (16 drives per sever) Storage Array EMC 146GB FC 15K 232 (fill remaining DAE’s in tertiary site 2 nd Celerra) Load Balancer F5 BigIP 6800 6 (4 primary site, 2 secondary site, 2 tertiary site) 2.7 Updated Site Diagram
  • 5. Virtual Design Master Page 5 After the Outbreak 3 Requirements, Assumptions, Constraints & Risks 3.1 Requirements The purpose of this project is to define, document and create a highly available infrastructure capable of surviving a disaster to the primary site. 3.2 Assumptions • Secondary and tertiary sites have been upgrade to support the failover of select capacity from the primary listed in Section 2.5. • 50 physical hosts will be required to meet the assumed server consolidation ratio in the primary datacenter. • 10 physical hosts will be required to meet the assumed server consolidation ratio in the secondary datacenter. • 5 physical hosts will be required to meet the assumed server consolidation ratio in the tertiary datacenter. • Three hundred (300) desktop VMs to a single physical host will be an assumed average consolidation ratio (300-to-1). • 10 physical hosts will be required to meet the assumed desktop consolidation ratio. • The 100Mbps link will provide sufficient bandwidth for normal internal traffic (AD replication, vCenter management of hosts and system monitoring) as well as replication.
  • 6. Virtual Design Master Page 6 After the Outbreak 3.3 Constraints • Hardware is limited to stock on hand at a discovered warehouse; components are believed to be from 2008. • Power and cooling at each location are limited. • Each site has a 100Mbps link for connectivity to the other sites. This may impact RPO for select systems. 3.4 Risks • Each site has a 100Mbps link for connectivity to the other sites. This may impact RPO for select systems. • The requirements call for a DRP only for the primary site, failures of the secondary or tertiary sites are accounted for. • Hardware available is believed to be reliable and in working order. • The number of host required to meet the assumed consolidation ratio is above the maximum supported for a single cluster; multiple clusters will have to be used. 4 Application Backup, HA, RPO and RTO 4.1 RPO and RTO Classifications There will be N categories classifying RPO and RTO for the systems deployed in the primary data center. RPO Classifications Class RPO Example Applications Platinum < 5 minutes Active Directory, Exchange Gold 5 minutes Web app DB tier Silver 10 minutes Custom department applications (HR, Financial Planning) Bronze 30-60 minutes File servers, Web app front end tier Static 1 day Basic utility systems, monitoring systems, VDI RTO Classifications Class RTO Example Applications Critical < 5 minutes Active Directory, Exchange Priority 30 minutes Minimum primary web app & DB tier to restore access Important 5 hours File servers, Basic utility systems, monitoring systems, VDI Redundant 12 – 24 hours Redundant systems to ensure HA Standby 10 days Custom department applications (HR, Financial Planning) 4.2 Software Solutions for Backup and Replication We will be using different approaches for backup, replication and recovery for various systems based on RPO/RTO to be the most cost effective.
  • 7. Virtual Design Master Page 7 After the Outbreak Product Use Cases Expected Cost (MSRP/Published) VMware HA Auto restarted of VMs on failed host within the same site. Included with vSphere Enterprise Plus VMware FT Hot spare kept in lock step with primary VM; limited use case due to single vCPU requirement but useful for some web services. Included with vSphere Enterprise Plus VMware PowerCLI / vMA Scripting configuration and setup of hosts and VMs, to be used with lower tier RTO/RPO classifications. Included with vSphere Enterprise Plus VMware vCenter Heartbeat Used to deliver HA for vCenter server required components. $9995 Zerto Virtual Replication v3 Used for select upper tier RTO/RPO classifications to automate the replication and reconfiguration of systems at the secondary site. $745 / protected VM. Unitrends Backup and Recovery Will be used for backup of mid- tier RTO/RPO classifications such as specialized applications that can easily be scripted/installed. $nnn / protected ?? EMC Celerra Replication The Celerra will replicate select LUNs/Storage Groups to the appropriate DR site. Included with NS-480 4.3 Identified Applications & Failover Process Briefs Below are a list of applications and their required RPO, RTO and a brief overview of how those will be achieved. • Active Directory: All Domain Controllers will have a system state backup performed in Unitrends 14 . Because Domain Controllers will be created in all data centers, there will be no downtime and next to no data loss (if any) in the event of a site failure. Each site will contain at least one (1) Global Catalog Server and the FSMO roles will be separate based on Microsoft best practice 13 . In this configuration, I believe that the published best practice for FSMO role placement will provide the necessary resources for our domain. RTO: Critical RPO: Platnium Achieved in application design • Windows 2008 R2 Exchange 2010 Client Access Server (CAS) 1 : Hot stand-by CAS servers will be configured in the secondary site to ensure immediate access is available in the event of a disaster. The number of CAS servers ready will be ¼ (25%) of the production CAS servers in use (with a minimum of one running at all times). The CAS server will be configured to respond to an alternate DNS A record while the primary DNS records are changed and replicated. TTL for the CAS server DNS records will be set to 5 minutes (300s). CAS servers in the primary site will be protected by Zerto. RTO: Redundant RPO: Bronze Achieved by placing hot stand-by servers in the secondary site capable of handling workload during a disaster.
  • 8. Virtual Design Master Page 8 After the Outbreak • Windows 2008 R2 Exchange 2010 Transport Server 1 : Hot standby Transport servers will be configured in the secondary site. Transport servers will have log files backed up by Unitrends, but will not need to be restored in the event of a disaster. RTO: Redundant RPO: Static Achieved by placing hot stand-by servers in the secondary site; not data is required from the primary site servers. • Windows 2008 R2 Exchange 2010 Mailbox Server (BE) 1 : Hot stand-by mailbox servers will be configured in the secondary site as part of a Database Availability Group (DAG) so that mail can be replicated in near real time from the primary site to the secondary site due to the organizations reliance on messaging. Based on the Exchange Server 2010 Role Requirement Calculator (Appendix 5.6) that the 100Mbps site links between each data center; an estimated 43Mbps is required for this replication to be maintained at a near 0 hour RPO. RTO: Critical RPO: Platinum Achieved by application design, placing hot spare mailbox servers in the secondary data center and configuring in a DAG. Email flow with primary site online. When failed over to the secondary site, an alternate URL will be available for immediate use while production DNS records are changed and replicated.
  • 9. Virtual Design Master Page 9 After the Outbreak Mailbox Server / DAG Design • Windows 2008 R2 Standard Application Servers: There will be three (3) levels of application server classifications, the first will include the minimum components required to bring the application back online and capable of supporting all necessary traffic. For example a single web server, application server and database server may be able to handle the load for a given application, but due to its uptime requirements may have several other redundant servers to support it. In this scenario only 1 web, application and database server would be brought online initially and the redundant systems would be brought back online once all primary systems were restored. Some application servers may only be providing utility level services. RTO: Priority RPO: Gold Achieved by continuous replication using Zerto Virtual Replication v3 which will allow the desired RPO level and assist with RTO by automating the changing of IP addresses in the secondary data center. RTO: Redundant RPO: Bronze Achieved by backing up systems with Unitrends and replicating Unitrends to the secondary site. Data will be refreshed from the primary systems within an application cluster. In some scenarios where tiers are stateless (i.e. no data is stored on the system), templates and scripts to restore the redundant systems to a working state will be used rather than backing up with Unitrends.
  • 10. Virtual Design Master Page 10 After the Outbreak RTO: Standby RPO: Static Achieved by automating the installation of specific applications such as system monitoring (OpsView). For systems that require data retention, systems will have the specific data sets backed up by Unitrends (i.e. not using a full VM backup, rather just individual directories or databases). • VMware vCenter Server and SQL 2008 R2 Database Server (for vCenter) 2 : VMware vCenter Server, and the required services which are also going to be installed on the vCenter server (SSO, Inventory Service) and the vCenter Database server will be protected using VMware vCenter Heartbeat. Give that vCenter is crucial to the operation of the environment, I feel it is critical to provide a solid solution which is dedicated to this task. At $9995, the cost of the product give the size and scope of the environment should be justified 15 . RTO: Critical RPO: Platnium Achieved by leveraging vCenter Heartbeat which monitors vCenter and provides the ability to fail over, and failback. vCenter Heartbeat is capable of operating over a WAN environment, and with 100Mbps dedicated links between the data center I feel this is an ideal solution.
  • 11. Virtual Design Master Page 11 After the Outbreak Graphic from www.vmware.com vCenter Heartbeat product page • VMware View Infrastructure: Because many of our users rely the VMware View infrastructure for remote access to systems and applications, we have decided to stand-up a warm VMware View infrastructure in the tertiary data center. This will allow remote staff, some of who may be required to access systems during a disaster, and alternate method for access. In order to support users in this fashion, VMware View HTML Access will be configured. There is no data saved in the view environment, rather it is saved in applications and file servers so there is no RPO required. VM templates will be replicated from the primary data center. RTO: Priority RPO: N/A Achieved by building a warm stand-by View infrastructure in the tertiary data center.
  • 12. Virtual Design Master Page 12 After the Outbreak 5 IP Allocation The following IP allocation will be used across all data centers. Each site will have a class B range, sub- netted for traffic segmentation purposes. Routing and ACLs where appropriate will be handled by the switch. 6 APPENDICES 6.1 Hardware Manifest Device Type Manufacturer Model Router Cisco 7600 Firewall Cisco ASA 5540 Network Switch Cisco Catalyst 6500 Storage Switch Cisco MDS 9513 Server HP DL580 G5 Add-On NIC Broadcom 5709 Based Add-On HBA EMC Qlogic QLE2462-E-SP Add-On HD OCZ 32GB SSD Storage Array EMC Celerra NS480 Storage Array EMC 146GB FC 15K
  • 13. Virtual Design Master Page 13 After the Outbreak Load Balancer F5 BigIP 6800 6.2 Software Manifest Vendor Software Microsoft Windows 2008 R2 Microsoft Windows 7 64-bit Microsoft Office 2010 Microsoft SQL 2010 VMware vSphere Enterprise Plus VMware Horizon View VMware Replication VMware vSphere Data Protection VMware Log Insight Manager VMware vMA VMware vSphere Support Assistant VMware vShield Endpoint VMware vCenter Server Heartbeat Trend Micro Deep Security Opsview Opsview Enterprise Unitrends Enterprise Backup Indeni Dynamic Knowledge Base Zerto Zerto Virtual Replication v3 6.3 Reference 1 - http://goo.gl/7ohe4 - Microsoft Exchange 2010 on VMware Best Practices 2 - http://goo.gl/F2B4w - Installing vCenter Server 5.1 Best Practices 3 - http://goo.gl/ToZfWc - How old is my server 4 - http://goo.gl/PtlKT4 - Ark.intel.com 5 - http://goo.gl/LFBys - wmarow.com IOPS calculator 6 - http://goo.gl/xcF0h - RAIDcalc 7 - http://goo.gl/zRdhqT - Cisco 5500 Series Release Notes 8 - http://communities.vmware.com/docs/DOC-22981- vSphere 5.1 Hardening Guide 9 - http://goo.gl/WIC7Hb - vSphere 5.1 Documentation / Authentication 10 - http://goo.gl/KGJ7tK - vSphere 5.1 Host Conditions and Trigger States 11 - http://blogs.vmware.com/kb/2012/07/leveraging-multiple-nic-vmotion.html 12 - http://goo.gl/SEQfwH - MDS900 3.0(1) Release notes 13 - http://technet.microsoft.com/en-us/library/cc816945(v=ws.10).aspx – Managing Operations Master Roles 14 - http://support.unitrends.com/ikm/questions.php?questionid=891 – AD Restore 15 - http://www.vmware.com/products/vcenter-server-heartbeat/features.html - vCenter Heartbeat
  • 14. Virtual Design Master Page 14 After the Outbreak 6.4 VMware Configuration Maximums (double click to open) vsphere-51-configur ation-maximums.pdf 6.5 Original Site Design (double click to open) jfrappier - challenge1.pdf 6.6 Exchange 2010 Sizing Calculator (double click to open) vDM-ExchangeWork Book.xlsm