THE INTEGRATED
PRODUCTION PROCESS IN
ERP
DPR105: MGMT INFO SYSTEMS
Instructor: Tom Matys
4/09/14
1
The Goal
Create a finished product using
the most efficient amount of
materials and resources, while
maintaining accurate levels of
inventory, managing time,
people, and costs.
4/09/14
2
How Product is made
• Make-To-Stock (SSB)
• Make-To-Order (Dell)
4/09/14
3
Routing (define the steps)
1.Material Staging
2.Assembly
3.Initial inspection
4.Packing
5.Final Inspection
6.Move to storage
4/09/14
4
Work Centers
• Staging Area
• Assembly Area
• Final Inspection Area
What two types of work centers
can there be?
4/09/14
5
Direct vs Indirect Costs
Direct costs: Consultants, supplies, travel,
labor, etc.
Indirect Costs: Overhead, functions, rent,
repairs, etc.
4/09/14
6
Document Flow
1) Planned Production Order
2) Production Order
3) Material issued to Production (Goods
Movement)
4) Confirm Production Order (mfg process
complete)
4/09/14
7
Planned Production order
• A request to make a specified quantity of goods
• Like a Purchase Requisition except: Instead of requesting
goods from a
vendor, the goods are requested from the company’s warehouse.
• Planned orders are received by a production
controller.
***************************************
*****
1. Planned Order Number
2. Request date
3. Material number (finished product)
4. Requested and approved by names
(compare to manual input pg 108) MS4/09/14
8
Production Order
• Created from a planned order by
the production controller
• Written authorization to make the
goods
• Can contain multiple planned
production orders
• Production Controller considers
resources, capacity, labor,
materials
• A new number created o the
production order, also has planned
order no.
• Is signed off, or checked off for
approval.
4/09/14
9
1) Finished Material No.
2) Quantity
3) Date to Finish
Goods Issue Materials (Document)
• Request made for materials
• Staging process begins
• Warehouse sends materials to
production
• Goods Issue is created
1) Material
2) Quantity
3) Storage Location to new
location
4/09/14
10
Make the product
4/09/14
11
Production Order Confirmation
Once the finished good is created a confirmation is
executed.
1) Material Number
2) Quantity created
3) Posting Date
4/09/14
12
Warehouse: Goods receipt
1) Production Order Number
2) Quantity received
3) New storage location
Of course, based on any
companies functionality,
the process could be more
complex
4/09/14
13
Next up….MRP)Materials Requirements Planning
• BOM: Recipe of finished product
• Sales History => Sales Forecast
• Inventory Levels
• Resource Capacity
• Demand Planning
• Stock Requirements List
….and more
4/09/14
14
QUESTIONS
?
4/09/14
15

Mais conteúdo relacionado

Mais procurados

U2 13 economic order quantity
U2 13 economic order quantityU2 13 economic order quantity
U2 13 economic order quantityry_moore
 
ProjectSlideShow revised
ProjectSlideShow revisedProjectSlideShow revised
ProjectSlideShow revisedRahul Anand
 
Analisis dan evaluasi penerapan kebijakan perencanaan manajemen sumber daya d...
Analisis dan evaluasi penerapan kebijakan perencanaan manajemen sumber daya d...Analisis dan evaluasi penerapan kebijakan perencanaan manajemen sumber daya d...
Analisis dan evaluasi penerapan kebijakan perencanaan manajemen sumber daya d...Rama Renspandy
 
Manufacturing Efficiency and Performance Calculation
Manufacturing Efficiency and Performance CalculationManufacturing Efficiency and Performance Calculation
Manufacturing Efficiency and Performance CalculationKanchana Weerasinghe
 
5 1 metode harga pokok pesanan-2
5   1 metode harga pokok pesanan-25   1 metode harga pokok pesanan-2
5 1 metode harga pokok pesanan-2Diana Marlyna
 
NAME OF THE THESIS 14-2-2014
NAME OF THE THESIS 14-2-2014NAME OF THE THESIS 14-2-2014
NAME OF THE THESIS 14-2-2014Jameel Shaikh
 

Mais procurados (7)

U2 13 economic order quantity
U2 13 economic order quantityU2 13 economic order quantity
U2 13 economic order quantity
 
ProjectSlideShow revised
ProjectSlideShow revisedProjectSlideShow revised
ProjectSlideShow revised
 
Analisis dan evaluasi penerapan kebijakan perencanaan manajemen sumber daya d...
Analisis dan evaluasi penerapan kebijakan perencanaan manajemen sumber daya d...Analisis dan evaluasi penerapan kebijakan perencanaan manajemen sumber daya d...
Analisis dan evaluasi penerapan kebijakan perencanaan manajemen sumber daya d...
 
Manufacturing Efficiency and Performance Calculation
Manufacturing Efficiency and Performance CalculationManufacturing Efficiency and Performance Calculation
Manufacturing Efficiency and Performance Calculation
 
5 1 metode harga pokok pesanan-2
5   1 metode harga pokok pesanan-25   1 metode harga pokok pesanan-2
5 1 metode harga pokok pesanan-2
 
NAME OF THE THESIS 14-2-2014
NAME OF THE THESIS 14-2-2014NAME OF THE THESIS 14-2-2014
NAME OF THE THESIS 14-2-2014
 
Material
MaterialMaterial
Material
 

Destaque

Business Functions & Business Processes in ERP
Business Functions & Business Processes in ERPBusiness Functions & Business Processes in ERP
Business Functions & Business Processes in ERPTom Matys
 
Emerging technologies
Emerging technologiesEmerging technologies
Emerging technologiesTom Matys
 
Accounting in ERP
Accounting in ERPAccounting in ERP
Accounting in ERPTom Matys
 
ERP Chapter 1 : Business functions and business processes
ERP Chapter 1 : Business functions and business processesERP Chapter 1 : Business functions and business processes
ERP Chapter 1 : Business functions and business processesRey-an Baricanosa
 
SAP Order To Cash Cycle
SAP Order To Cash CycleSAP Order To Cash Cycle
SAP Order To Cash CycleMohamed Talaat
 
The Erp Business Process
The Erp Business ProcessThe Erp Business Process
The Erp Business ProcessTom Matys
 
The Sales Order Process in SAP ERP
The Sales Order Process in SAP ERPThe Sales Order Process in SAP ERP
The Sales Order Process in SAP ERPTom Matys
 
ERP Module Finance
ERP Module FinanceERP Module Finance
ERP Module FinanceAshok Sinch
 

Destaque (9)

Business Functions & Business Processes in ERP
Business Functions & Business Processes in ERPBusiness Functions & Business Processes in ERP
Business Functions & Business Processes in ERP
 
Emerging technologies
Emerging technologiesEmerging technologies
Emerging technologies
 
Accounting in ERP
Accounting in ERPAccounting in ERP
Accounting in ERP
 
ERP Chapter 1 : Business functions and business processes
ERP Chapter 1 : Business functions and business processesERP Chapter 1 : Business functions and business processes
ERP Chapter 1 : Business functions and business processes
 
ERP module
ERP moduleERP module
ERP module
 
SAP Order To Cash Cycle
SAP Order To Cash CycleSAP Order To Cash Cycle
SAP Order To Cash Cycle
 
The Erp Business Process
The Erp Business ProcessThe Erp Business Process
The Erp Business Process
 
The Sales Order Process in SAP ERP
The Sales Order Process in SAP ERPThe Sales Order Process in SAP ERP
The Sales Order Process in SAP ERP
 
ERP Module Finance
ERP Module FinanceERP Module Finance
ERP Module Finance
 

Semelhante a Integrating Production in ERP

7_production-activity-control.pptx
7_production-activity-control.pptx7_production-activity-control.pptx
7_production-activity-control.pptxRidhoDarmawan10
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL Junaid Hassan
 
CE4250 CPM Lecture 4 Store Management.pdf
CE4250 CPM Lecture 4 Store Management.pdfCE4250 CPM Lecture 4 Store Management.pdf
CE4250 CPM Lecture 4 Store Management.pdfssusercbae26
 
WIP Flow: A Card system for Production Planning and Control
WIP Flow: A Card system for Production Planning and ControlWIP Flow: A Card system for Production Planning and Control
WIP Flow: A Card system for Production Planning and ControlIBRAHIM MOHAMMED, PMP
 
PPT-Synchronous Motor-S.M.Chaudhari-AISSMS IOIT-With narration3.pptx
PPT-Synchronous Motor-S.M.Chaudhari-AISSMS IOIT-With narration3.pptxPPT-Synchronous Motor-S.M.Chaudhari-AISSMS IOIT-With narration3.pptx
PPT-Synchronous Motor-S.M.Chaudhari-AISSMS IOIT-With narration3.pptxspfindia
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxShivakumar Malagihal
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)razinbabaria786
 
What is the difference between production planning and scheduling
What is the difference between production planning and schedulingWhat is the difference between production planning and scheduling
What is the difference between production planning and schedulingMRPeasy
 
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...Rootstock Software
 
Pharmaceutical plant layout
Pharmaceutical plant layoutPharmaceutical plant layout
Pharmaceutical plant layoutArchana Chavhan
 
UNIT-IV.ppt
UNIT-IV.pptUNIT-IV.ppt
UNIT-IV.pptmahe49
 
PPC - Unit IV - PRODUCTION SCHEDULING
PPC - Unit IV -        PRODUCTION SCHEDULINGPPC - Unit IV -        PRODUCTION SCHEDULING
PPC - Unit IV - PRODUCTION SCHEDULINGDr.PERIASAMY K
 
MATERIAL MANAGEMENT
MATERIAL MANAGEMENTMATERIAL MANAGEMENT
MATERIAL MANAGEMENTZamri Yahya
 
ERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingRootstock Software
 
procurement of equipment
procurement of equipmentprocurement of equipment
procurement of equipmentThea Mathues
 
Unit 7 production scheduling
Unit 7 production scheduling Unit 7 production scheduling
Unit 7 production scheduling RASHMIPANWAR10
 
Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrpgsuicmez
 

Semelhante a Integrating Production in ERP (20)

7_production-activity-control.pptx
7_production-activity-control.pptx7_production-activity-control.pptx
7_production-activity-control.pptx
 
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
MATERIAL REQUIREMENT PLANNING AND BILLS OF MATERIAL
 
CE4250 CPM Lecture 4 Store Management.pdf
CE4250 CPM Lecture 4 Store Management.pdfCE4250 CPM Lecture 4 Store Management.pdf
CE4250 CPM Lecture 4 Store Management.pdf
 
WIP Flow: A Card system for Production Planning and Control
WIP Flow: A Card system for Production Planning and ControlWIP Flow: A Card system for Production Planning and Control
WIP Flow: A Card system for Production Planning and Control
 
PPT-Synchronous Motor-S.M.Chaudhari-AISSMS IOIT-With narration3.pptx
PPT-Synchronous Motor-S.M.Chaudhari-AISSMS IOIT-With narration3.pptxPPT-Synchronous Motor-S.M.Chaudhari-AISSMS IOIT-With narration3.pptx
PPT-Synchronous Motor-S.M.Chaudhari-AISSMS IOIT-With narration3.pptx
 
Module 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptxModule 3 - Aggregate Planning Tacticts2.pptx
Module 3 - Aggregate Planning Tacticts2.pptx
 
Material Requirement planning (factors,inputs,outputs,benifits)
Material Requirement planning  (factors,inputs,outputs,benifits)Material Requirement planning  (factors,inputs,outputs,benifits)
Material Requirement planning (factors,inputs,outputs,benifits)
 
What is the difference between production planning and scheduling
What is the difference between production planning and schedulingWhat is the difference between production planning and scheduling
What is the difference between production planning and scheduling
 
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
Shop Floor – Explore how ERP is used to create and mainain Work Centers, Rout...
 
PLANT LAYOUT TECHNIQUES AND MODEL
PLANT LAYOUT TECHNIQUES AND MODELPLANT LAYOUT TECHNIQUES AND MODEL
PLANT LAYOUT TECHNIQUES AND MODEL
 
Pharmaceutical plant layout
Pharmaceutical plant layoutPharmaceutical plant layout
Pharmaceutical plant layout
 
Mrp
Mrp Mrp
Mrp
 
UNIT-IV.ppt
UNIT-IV.pptUNIT-IV.ppt
UNIT-IV.ppt
 
PPC - Unit IV - PRODUCTION SCHEDULING
PPC - Unit IV -        PRODUCTION SCHEDULINGPPC - Unit IV -        PRODUCTION SCHEDULING
PPC - Unit IV - PRODUCTION SCHEDULING
 
MATERIAL MANAGEMENT
MATERIAL MANAGEMENTMATERIAL MANAGEMENT
MATERIAL MANAGEMENT
 
ERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of ManufacturingERP 101: Work Orders - The Starting Points of Manufacturing
ERP 101: Work Orders - The Starting Points of Manufacturing
 
procurement of equipment
procurement of equipmentprocurement of equipment
procurement of equipment
 
Module :- 8 Job layout (PART 2)
Module :- 8 Job layout (PART 2)Module :- 8 Job layout (PART 2)
Module :- 8 Job layout (PART 2)
 
Unit 7 production scheduling
Unit 7 production scheduling Unit 7 production scheduling
Unit 7 production scheduling
 
Presentation2 mrp
Presentation2 mrpPresentation2 mrp
Presentation2 mrp
 

Mais de Tom Matys

Procurement in Business
Procurement in BusinessProcurement in Business
Procurement in BusinessTom Matys
 
Dpr105 databases
Dpr105 databasesDpr105 databases
Dpr105 databasesTom Matys
 
Demand management for Students
Demand management for StudentsDemand management for Students
Demand management for StudentsTom Matys
 
Enron Scandal for Students
Enron Scandal for StudentsEnron Scandal for Students
Enron Scandal for StudentsTom Matys
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPTom Matys
 
Google Hangouts for Education
Google Hangouts for EducationGoogle Hangouts for Education
Google Hangouts for EducationTom Matys
 
Fmc Vision 2015
Fmc Vision 2015Fmc Vision 2015
Fmc Vision 2015Tom Matys
 
Thomas Matys
Thomas MatysThomas Matys
Thomas MatysTom Matys
 
Capstone neumann university gsa proposal
Capstone neumann university gsa proposal Capstone neumann university gsa proposal
Capstone neumann university gsa proposal Tom Matys
 
CSC and Dupont
CSC and DupontCSC and Dupont
CSC and DupontTom Matys
 
Csc LMP U.S. Army Project
Csc LMP U.S. Army ProjectCsc LMP U.S. Army Project
Csc LMP U.S. Army ProjectTom Matys
 
Wawa%20 sap%20netweaver%202004s%20bi%20ramp up%20customer%20feedback(1)
Wawa%20 sap%20netweaver%202004s%20bi%20ramp up%20customer%20feedback(1)Wawa%20 sap%20netweaver%202004s%20bi%20ramp up%20customer%20feedback(1)
Wawa%20 sap%20netweaver%202004s%20bi%20ramp up%20customer%20feedback(1)Tom Matys
 
Social Media Awareness for Students
Social Media Awareness for StudentsSocial Media Awareness for Students
Social Media Awareness for StudentsTom Matys
 
A Student Introduction to ERP
A Student Introduction to ERPA Student Introduction to ERP
A Student Introduction to ERPTom Matys
 
Supply Chain Management in ERP
Supply Chain Management in ERPSupply Chain Management in ERP
Supply Chain Management in ERPTom Matys
 

Mais de Tom Matys (16)

Procurement in Business
Procurement in BusinessProcurement in Business
Procurement in Business
 
Dpr105 databases
Dpr105 databasesDpr105 databases
Dpr105 databases
 
Demand management for Students
Demand management for StudentsDemand management for Students
Demand management for Students
 
Enron Scandal for Students
Enron Scandal for StudentsEnron Scandal for Students
Enron Scandal for Students
 
MRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERPMRP (Materials Requirements Planning) in ERP
MRP (Materials Requirements Planning) in ERP
 
Google Hangouts for Education
Google Hangouts for EducationGoogle Hangouts for Education
Google Hangouts for Education
 
Fmc Vision 2015
Fmc Vision 2015Fmc Vision 2015
Fmc Vision 2015
 
Thomas Matys
Thomas MatysThomas Matys
Thomas Matys
 
Capstone neumann university gsa proposal
Capstone neumann university gsa proposal Capstone neumann university gsa proposal
Capstone neumann university gsa proposal
 
CSC and Dupont
CSC and DupontCSC and Dupont
CSC and Dupont
 
FMC and SAP
FMC and SAPFMC and SAP
FMC and SAP
 
Csc LMP U.S. Army Project
Csc LMP U.S. Army ProjectCsc LMP U.S. Army Project
Csc LMP U.S. Army Project
 
Wawa%20 sap%20netweaver%202004s%20bi%20ramp up%20customer%20feedback(1)
Wawa%20 sap%20netweaver%202004s%20bi%20ramp up%20customer%20feedback(1)Wawa%20 sap%20netweaver%202004s%20bi%20ramp up%20customer%20feedback(1)
Wawa%20 sap%20netweaver%202004s%20bi%20ramp up%20customer%20feedback(1)
 
Social Media Awareness for Students
Social Media Awareness for StudentsSocial Media Awareness for Students
Social Media Awareness for Students
 
A Student Introduction to ERP
A Student Introduction to ERPA Student Introduction to ERP
A Student Introduction to ERP
 
Supply Chain Management in ERP
Supply Chain Management in ERPSupply Chain Management in ERP
Supply Chain Management in ERP
 

Último

Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 

Último (20)

Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 

Integrating Production in ERP

  • 1. THE INTEGRATED PRODUCTION PROCESS IN ERP DPR105: MGMT INFO SYSTEMS Instructor: Tom Matys 4/09/14 1
  • 2. The Goal Create a finished product using the most efficient amount of materials and resources, while maintaining accurate levels of inventory, managing time, people, and costs. 4/09/14 2
  • 3. How Product is made • Make-To-Stock (SSB) • Make-To-Order (Dell) 4/09/14 3
  • 4. Routing (define the steps) 1.Material Staging 2.Assembly 3.Initial inspection 4.Packing 5.Final Inspection 6.Move to storage 4/09/14 4
  • 5. Work Centers • Staging Area • Assembly Area • Final Inspection Area What two types of work centers can there be? 4/09/14 5
  • 6. Direct vs Indirect Costs Direct costs: Consultants, supplies, travel, labor, etc. Indirect Costs: Overhead, functions, rent, repairs, etc. 4/09/14 6
  • 7. Document Flow 1) Planned Production Order 2) Production Order 3) Material issued to Production (Goods Movement) 4) Confirm Production Order (mfg process complete) 4/09/14 7
  • 8. Planned Production order • A request to make a specified quantity of goods • Like a Purchase Requisition except: Instead of requesting goods from a vendor, the goods are requested from the company’s warehouse. • Planned orders are received by a production controller. *************************************** ***** 1. Planned Order Number 2. Request date 3. Material number (finished product) 4. Requested and approved by names (compare to manual input pg 108) MS4/09/14 8
  • 9. Production Order • Created from a planned order by the production controller • Written authorization to make the goods • Can contain multiple planned production orders • Production Controller considers resources, capacity, labor, materials • A new number created o the production order, also has planned order no. • Is signed off, or checked off for approval. 4/09/14 9 1) Finished Material No. 2) Quantity 3) Date to Finish
  • 10. Goods Issue Materials (Document) • Request made for materials • Staging process begins • Warehouse sends materials to production • Goods Issue is created 1) Material 2) Quantity 3) Storage Location to new location 4/09/14 10
  • 12. Production Order Confirmation Once the finished good is created a confirmation is executed. 1) Material Number 2) Quantity created 3) Posting Date 4/09/14 12
  • 13. Warehouse: Goods receipt 1) Production Order Number 2) Quantity received 3) New storage location Of course, based on any companies functionality, the process could be more complex 4/09/14 13
  • 14. Next up….MRP)Materials Requirements Planning • BOM: Recipe of finished product • Sales History => Sales Forecast • Inventory Levels • Resource Capacity • Demand Planning • Stock Requirements List ….and more 4/09/14 14