2. Problem Statement Show locations and layouts of power plant(s) (type also), switchyard & local distributing unit, distribution / feeder lines, protection scheme for whole system along with proper ratings for the given city. Give a list of equipments (also give their numbers).
6. Cost of generation is cheapest highest efficiency and highest project life amongst renewable . Sector Rs/kWh Efficiency (%) Project Life Small hydro 1.00–1.50 85-90 60 Wind energy 2.00–2.75 40 20 Solar PV 10.00–12.00 15 20