Whitepaper
Modular Substation Cable Termination Design

Author: Allan Bozek P.Eng, MBA,
EngWorks Inc, Calgary, Canada
Abstract
The methods for cable penetrations into modular industrial
substations are summarized. The requirements for
structural and environmental integrity, grounding, fire
protection and ease of expansion for a cable termination
system are discussed. Current methods of installation are
compared to using a cable transit design for installing and
terminating cables in electrical substations.
Index Terms – cable termination, modular substation, cable
transit.

Introduction
Modular substations are becoming the preferred approach
for installing electrical and control equipment in industrial
facilities. The ability to prefabricate a building, pre-install
both electrical and control equipment and the ability to
pre-commission equipment prior to the installation helps
to reduce on-site construction installation costs. This is
particularly advantageous in remote project locations where
the cost of labor can be very high.
The on-site termination of conductors and cables into
equipment can often be an issue. The equipment layout,
the design of the modular building skid base frame, the
number of terminations and the termination method can
all influence the speed and ease of installation. Choosing
the wrong penetration approach can compromise the
environmental integrity of the building and equipment,
significantly increase installation cost and complicate the
ability to install cables and conductors in the future. This
has a direct impact on the cost of ownership over the life
of the asset.
Modular substation
fundamentals
A typical modular substation consists of a steel frame
skid base supporting a prefabricated insulated panel
constructed building. The dimensions of the building can
vary and is usually determined by the amount of equipment
installed and the transportation logistics for a project. It is
common to see substation buildings with dimensions in
excess of 30 meters in length, 7 meters wide and 6 meters
high for domestic onshore projects. If the equipment layout
dictates a larger building footprint, often the building will be
split in two for transport to site.
Interconnecting wiring between equipment is usually done
in one of two ways. If the substation is constructed on
raised piles, and the wiring connections are internal to the
substation, the conduits or cables are run overhead within
the substation. External field cable connections are then
terminated into the floor of the substation directly into the
equipment item. This approach has the advantage of
minimizing the height of the building and allowing for
convenient access for workers to terminate field cables.
Fig. 1 illustrates this concept.

Fig 1
Internal Control Connections

Internal Power Connections
Internal Building
Cable Tray

Control Panel

LV SWGR

MCC

Field
Control
Cables
Field Cable Tray
Field Power Connections

Field Motor Connections
Terminating cables
in substations
There are a number of challenges associated with
terminating cables in a modular substation. The first
being the number of field terminations. In a medium sized
industrial substation servicing a large number of motor
interconnections, there may be up to 300 or more power
and control cable terminations. The terminations must
be coordinated with the location of the electrical and
control equipment and the skid frame steel members
supporting the building. Often, a large number of cables
must be terminated in a very limited area leading to cable
and connector congestion which can impact worker
productivity.
Another challenge associated with terminating field
cables is maintaining the environmental integrity of the
equipment and the substation building envelope. This
requires that the termination method maintain a vapor-tight
weather barrier with a suitable insulation ‘R’ factor value to
avoid condensation within the equipment and the building
envelope. The cable termination method should also
provide a fire resistant barrier in the unlikely event of a fire.
The cable termination method must accommodate a
variety of cable construction configurations and wiring
methods. Cable diameters can vary with some control
conductors with diameters of 5mm or less to 3/C
500MCM armored power cables which may have
diameters of 100mm or more. In each case, the cable must
be properly secured and grounded in accordance with the
local electrical installation codes and requirements.
One often overlooked aspect of the cable termination
method is the ability to add cables in the future. The
flexibility to easily add additional cable can pay dividends
even during the initial installation when design modifications
are made late in the installation phase of a project.
Traditional cable
termination options
Fig 2

Switchgear
or MCC

Ground Bus

Bottom of
equipment is
left open
for cable access

Removable
plate

Cable Termination into Floor of Substation

Fig 3

Switchgear
or MCC
Ground Bus

Bottom of floor
is left open for
cable access

Cable Termination directly into
Switchgear/MCC

Removable plate
incorporated
into switchgear
or MCC

There are several cable termination methods currently used
to terminate conductors into industrial substations. Some
projects prefer that all cables are terminated into the top
of electrical and control equipment mounted inside the
building. A cable transit barrier is often used to allow cables
to pass through an exterior wall.
Fig. 2 illustrates a method where cables are terminated
into the floor of a substation. A ¼” steel removable panel
is used to facilitate the pre-drilling of holes for the cable
connectors prior to the field installation. This helps to
improve construction productivity by allowing the majority
of the cable connector entry holes to be drilled in a shop
environment. Once the connector plate is fastened in place,
drilling becomes more difficult and time consuming. There
is also the potential for metal filings to contaminate the
switchgear cable termination compartment. Each connector
hole must also be de-burred to prevent the conductor
insulation from being damaged when the cable conductors
are pulled into place.
A second option for terminating cables is illustrated in
Fig. 3. A section of the floor is removed and the cable is
terminated directly into the floor mounted equipment.
Some equipment, such as low voltage motor control
centers (MCCs) incorporate a removable plate to facilitate
the punching of holes for cable connectors. The removable
plate is usually constructed of sheet metal steel and is
easily punched using a hydraulic punch.
The primary disadvantage to this termination method is
that large sections of the floor must often be removed to
gain access to the underside of the equipment. This may
compromise the structural integrity of the floor and building
envelope. Future cable entry is also difficult as access to
the plate must be provided both above and below the cable
connector location. In certain cases, if the plate is not of
sufficient thickness, large cables can deform the plate,
further compromising the integrity of the installation.
Improved cable
termination option using
a cable transit system
Fig 4

Switchgear
or MCC
Ground Bus

Bottom of
equipment is
left open for
cable access

Cable transit frame
welded in place

Cable transit blocks

Cable Transit Installation for
Switchgear/MCC Entry

A third option for terminating cables into a substation is to
use a transit entry frame. Fig. 4 illustrates a transit entry
installation.
The transit frame is welded or bolted to the substation
floor at strategic locations where cables will be terminated.
The cables are then pulled into place through the transit
frames and then sealed using Multidiameter™ cable transit
blocks and a mechanical compression wedge. The cable
transit system provides cable retention and provides an
environmental, fire resistant and gas tight seal to the
equipment and building enclosure.
There are several advantages to using a cable transit for
cable entry in to a substation. The first being efficiency.
A cable transit allows multiple cables to be pulled at the
same time though the transit opening. The large opening
eliminates the potential damage to the conductor insulation
during installation. Secondly, the transit frame maintains the
structural and environmental seal integrity of the floor and
allows for a high density and capital efficient installation of
cables within a very small footprint. Also, future expansion
capacity is provided for each transit via unused cable blocks
which can be easily removed and reinstalled for future cable
installation.
Another significant advantage of sealing cables with
a cable transit system is the additional room below
the building floor and equipment that is provided by
the extension of the transit frame. This depth may be
customized to a depth equal to the height of the structural
steel, and has a standard depth of 60mm. This additional
working space assists with the restrictive bend radius of
larger armored cables and allows for proper cable alignment
with equipment configuration.
Equipment Grounding for Tray Cables

Fig 5

MCC
Phase
conductors

Transit

Ground Bus
Bonding Connection
Tray Cable

RM
Module

Option 1 for Grounding Tray Cable

Unit Ground
Terminal

Fig 6

MCC

Option 2 for Grounding Tray Cable

There are two methods for terminating the bonding
conductor of a tray cable using a cable transit system.
The first involves connecting the bonding conductor
directly to the ground bus of a switchgear or MCC. The
PVC sheath is stripped back to the transit entry location
and the bonding conductor is removed and connected to
the equipment ground bus. The phase conductors then
continue to the termination point in the switchgear or MCC.
This is very similar to what occurs when a standard cable
connector is used to terminate a conductor.
Fig. 5 illustrates this method of bonding.
A second and less labor intensive option exists for
grounding tray cables in MCCs. Some MCC manufacturers
provide the option of a “unit” ground connection at the
MCC bucket rather than on the equipment ground bus.
This reduces the amount of cable sheath that must be
stripped back in order to connect the bonding conductor
to the equipment ground bus. This has the advantage of
keeping the phase and bonding conductors together as
an assembly within the equipment and breaking out the
bonding conductor closer to where the phase conductor
terminations actually occur. Fig. 6 illustrates this method
of bonding.
Fig 7

Work process
To use a cable transit system to its fullest advantage, an
understanding of the work process from design through
final installation is required.

A. Engineering

Engineering Drawing of Cable Transit System

The use of a cable transit for terminating cables into a
substation requires pre-planning. The location of electrical
and control equipment must be coordinated with the
structural steel base to insure that transit frames of an
adequate size and dimension can be installed without
interference from support steel in the steel base. If
possible, a standardized frame size helps to simplify the
design and installation process.
During the design phase, as cables are identified, they
are assigned to a transit frame. This information can be
integrated into the cable schedule or often dedicated
software is used to create detailed transit schedules. Once
the transit schedules are complete, the bill of material can
be generated for both the substation fabricator and field
installation contractor.
Fig. 7 illustrates a typical engineering drawing produced
by Roxtec RTM Software for an MCC transit with capacity
for 43 cables of various diameters installed within a 23cm x
26cm window. The flexibility of this system allows cable and
pipe sizes ranging from 3 mm (.118 in) to 99 mm (3.898 in)
to be sealed within the transit frames.

B. Fabrication
Once the size of the cable transit and the locations are
identified, the transit frames can be purchased and shipped
to the fabricator for installation. The transit frames are
mounted into the wall or floor by bolting or welding and
then temporarily sealed for transportation to site.
Fig 8

C. Site Installation
After the modular substation is shipped to site and set
in place, installation of the field conductors can begin.
The site installation contractor will install interconnecting
cables from source to destination via the cable transit
openings identified on the cable schedule. The large
opening provided by the cable transit helps the installer
pull the cable into place and minimizes any damage to the
conductor insulation. When all cables for a cable transit
are installed, the cables are secured and sealed using
the cable transit blocks with stay plates and a mechanical
compression wedge. The cable transit drawings help to
identify what cables should be placed where and what
size cable block should be used. The transit schedules
also record how much spare capacity is available in each
cable transit for future growth. Cables can be easily
added without cutting or drilling additional holes, simply by
loosening the compression wedge.
Training is essential to help field installers understand
the transit termination concept. Training can be provided
using on-site training services or by installation videos that
provide step-by-step instructions. Once the installer has
observed and installed the transit blocks for one transit
installation, subsequent transit installations are easily
completed. Figure 8 illustrates the installation of a transit
barrier in a modular substation application.
Conclusion
There are several advantages to using a cable transit for
installing and terminating cables in industrial substations.
It provides a standardized design with the flexibility
to terminate a variety of different sizes and cable
constructions. The ease of installation helps to reduce labor
costs and minimize the potential for insulation damage. The
structural and environmental integrity of the wall or floor
penetration is maintained providing an insulated, vaportight and fire-stop barrier and cables can be easily added
in the future. Cable transits are a viable alternative for
terminating cables into industrial substations.

H. Vita
Allan Bozek, P.Eng., MBA graduated from the
University of Waterloo in 1986 with BASc in Systems
Design Engineering and a MBA from the University of
Calgary in 1999. He is a Principal with EngWorks Inc.,
providing consulting engineering services to the oil and
gas sectors.
Roxtec International AB, the parent of Roxtec, Inc. was
established in 1990 and is the global leader in modular
cable and pipe sealing systems. Roxtec maintains
more than 250 registered tests and approvals and
serves the oil & gas, telecom, marine, industrial and
OEM industries in more than 70 markets around the
globe. Additional information about the company,
products, applications and engineering data may be
found by visiting www.roxtec.com.
BRO2009000101
ver_1.0/GB/0923/thoge
Roxtec ® and Multidiameter ® are registered trademarks of Roxtec in Sweden and/or other countries.

Tel: +44 (0)191 490 1547
Fax: +44 (0)191 477 5371
Email:Roxtec Inc
northernsales@thorneandderrick.co.uk
10127 E.Admiral Place, 74116 Tulsa, OK
Website: +1 800 520 4769, 918 254 9872
www.cablejoints.co.uk
+1 918 254 2544
onshore@us.roxtec.com, www.roxtec.com
www.thorneanderrick.co.uk
PHONE
FAX

EMAIL

More Related Content

What's hot

IRJET- Experimental Investigation on Mechanical Splices in Fiber Reinforc...
IRJET-  	  Experimental Investigation on Mechanical Splices in Fiber Reinforc...IRJET-  	  Experimental Investigation on Mechanical Splices in Fiber Reinforc...
IRJET- Experimental Investigation on Mechanical Splices in Fiber Reinforc...IRJET Journal
 
A Novel Field Effect Diode (Fed) Structure For Improvement Of Ion/Ioff Ratio ...
A Novel Field Effect Diode (Fed) Structure For Improvement Of Ion/Ioff Ratio ...A Novel Field Effect Diode (Fed) Structure For Improvement Of Ion/Ioff Ratio ...
A Novel Field Effect Diode (Fed) Structure For Improvement Of Ion/Ioff Ratio ...IOSR Journals
 
Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...Mahesh Chandra Manav
 
Jmv presentation smart metro rail project
Jmv  presentation  smart metro rail projectJmv  presentation  smart metro rail project
Jmv presentation smart metro rail projectMahesh Chandra Manav
 
CMOS_MEMS_Filter_Mixer
CMOS_MEMS_Filter_MixerCMOS_MEMS_Filter_Mixer
CMOS_MEMS_Filter_MixerTianhao Li
 
Design of Nanoscale 3-T DRAM using FinFET
Design of Nanoscale 3-T DRAM using FinFETDesign of Nanoscale 3-T DRAM using FinFET
Design of Nanoscale 3-T DRAM using FinFETIOSR Journals
 
Fine pitch connectors PTM
Fine pitch connectors PTMFine pitch connectors PTM
Fine pitch connectors PTMHarwin plc
 
IRJET- EBR and GM Methods for External Flexural Strengthening of RC Beams
IRJET-  	  EBR and GM Methods for External Flexural Strengthening of RC BeamsIRJET-  	  EBR and GM Methods for External Flexural Strengthening of RC Beams
IRJET- EBR and GM Methods for External Flexural Strengthening of RC BeamsIRJET Journal
 
Carlisle Interconnect Technologies - Product Overview
Carlisle Interconnect Technologies - Product OverviewCarlisle Interconnect Technologies - Product Overview
Carlisle Interconnect Technologies - Product OverviewStephenDavies40
 
Panduit EMEA SI Webinar 9
Panduit EMEA SI Webinar 9Panduit EMEA SI Webinar 9
Panduit EMEA SI Webinar 9Panduit
 
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable ManufacturersPrinciples Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturersneskkebcables
 
Latest Material and Construction Methods Provide the Highest Quality Rigid-Fl...
Latest Material and Construction Methods Provide the Highest Quality Rigid-Fl...Latest Material and Construction Methods Provide the Highest Quality Rigid-Fl...
Latest Material and Construction Methods Provide the Highest Quality Rigid-Fl...Epec Engineered Technologies
 
Geometric and process design of ultra-thin junctionless double gate vertical ...
Geometric and process design of ultra-thin junctionless double gate vertical ...Geometric and process design of ultra-thin junctionless double gate vertical ...
Geometric and process design of ultra-thin junctionless double gate vertical ...IJECEIAES
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentationguest080219
 
IRJET- Behaviour of Bolted Connection in the Vertical Joint of Precast Wal...
IRJET- 	  Behaviour of Bolted Connection in the Vertical Joint of Precast Wal...IRJET- 	  Behaviour of Bolted Connection in the Vertical Joint of Precast Wal...
IRJET- Behaviour of Bolted Connection in the Vertical Joint of Precast Wal...IRJET Journal
 
High Performance Data Bus Encoding Technique in DSM Technology
High Performance Data Bus Encoding Technique in DSM TechnologyHigh Performance Data Bus Encoding Technique in DSM Technology
High Performance Data Bus Encoding Technique in DSM TechnologyIDES Editor
 
Performance analysis of ultrathin junctionless double gate vertical MOSFETs
Performance analysis of ultrathin junctionless double gate vertical MOSFETsPerformance analysis of ultrathin junctionless double gate vertical MOSFETs
Performance analysis of ultrathin junctionless double gate vertical MOSFETsjournalBEEI
 
Comparative analysis of technology advancement from single gate to multi gate...
Comparative analysis of technology advancement from single gate to multi gate...Comparative analysis of technology advancement from single gate to multi gate...
Comparative analysis of technology advancement from single gate to multi gate...eSAT Journals
 

What's hot (19)

IRJET- Experimental Investigation on Mechanical Splices in Fiber Reinforc...
IRJET-  	  Experimental Investigation on Mechanical Splices in Fiber Reinforc...IRJET-  	  Experimental Investigation on Mechanical Splices in Fiber Reinforc...
IRJET- Experimental Investigation on Mechanical Splices in Fiber Reinforc...
 
A Novel Field Effect Diode (Fed) Structure For Improvement Of Ion/Ioff Ratio ...
A Novel Field Effect Diode (Fed) Structure For Improvement Of Ion/Ioff Ratio ...A Novel Field Effect Diode (Fed) Structure For Improvement Of Ion/Ioff Ratio ...
A Novel Field Effect Diode (Fed) Structure For Improvement Of Ion/Ioff Ratio ...
 
Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...
 
Jmv presentation smart metro rail project
Jmv  presentation  smart metro rail projectJmv  presentation  smart metro rail project
Jmv presentation smart metro rail project
 
CMOS_MEMS_Filter_Mixer
CMOS_MEMS_Filter_MixerCMOS_MEMS_Filter_Mixer
CMOS_MEMS_Filter_Mixer
 
Design of Nanoscale 3-T DRAM using FinFET
Design of Nanoscale 3-T DRAM using FinFETDesign of Nanoscale 3-T DRAM using FinFET
Design of Nanoscale 3-T DRAM using FinFET
 
Fine pitch connectors PTM
Fine pitch connectors PTMFine pitch connectors PTM
Fine pitch connectors PTM
 
C42042729
C42042729C42042729
C42042729
 
IRJET- EBR and GM Methods for External Flexural Strengthening of RC Beams
IRJET-  	  EBR and GM Methods for External Flexural Strengthening of RC BeamsIRJET-  	  EBR and GM Methods for External Flexural Strengthening of RC Beams
IRJET- EBR and GM Methods for External Flexural Strengthening of RC Beams
 
Carlisle Interconnect Technologies - Product Overview
Carlisle Interconnect Technologies - Product OverviewCarlisle Interconnect Technologies - Product Overview
Carlisle Interconnect Technologies - Product Overview
 
Panduit EMEA SI Webinar 9
Panduit EMEA SI Webinar 9Panduit EMEA SI Webinar 9
Panduit EMEA SI Webinar 9
 
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable ManufacturersPrinciples Of Cable Manufacturing Followed By Electric Cable Manufacturers
Principles Of Cable Manufacturing Followed By Electric Cable Manufacturers
 
Latest Material and Construction Methods Provide the Highest Quality Rigid-Fl...
Latest Material and Construction Methods Provide the Highest Quality Rigid-Fl...Latest Material and Construction Methods Provide the Highest Quality Rigid-Fl...
Latest Material and Construction Methods Provide the Highest Quality Rigid-Fl...
 
Geometric and process design of ultra-thin junctionless double gate vertical ...
Geometric and process design of ultra-thin junctionless double gate vertical ...Geometric and process design of ultra-thin junctionless double gate vertical ...
Geometric and process design of ultra-thin junctionless double gate vertical ...
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentation
 
IRJET- Behaviour of Bolted Connection in the Vertical Joint of Precast Wal...
IRJET- 	  Behaviour of Bolted Connection in the Vertical Joint of Precast Wal...IRJET- 	  Behaviour of Bolted Connection in the Vertical Joint of Precast Wal...
IRJET- Behaviour of Bolted Connection in the Vertical Joint of Precast Wal...
 
High Performance Data Bus Encoding Technique in DSM Technology
High Performance Data Bus Encoding Technique in DSM TechnologyHigh Performance Data Bus Encoding Technique in DSM Technology
High Performance Data Bus Encoding Technique in DSM Technology
 
Performance analysis of ultrathin junctionless double gate vertical MOSFETs
Performance analysis of ultrathin junctionless double gate vertical MOSFETsPerformance analysis of ultrathin junctionless double gate vertical MOSFETs
Performance analysis of ultrathin junctionless double gate vertical MOSFETs
 
Comparative analysis of technology advancement from single gate to multi gate...
Comparative analysis of technology advancement from single gate to multi gate...Comparative analysis of technology advancement from single gate to multi gate...
Comparative analysis of technology advancement from single gate to multi gate...
 

Viewers also liked

White Paper - Humidity Effects In Substations By EA Technology For Roxtec Ltd
White Paper - Humidity Effects In Substations By EA Technology For Roxtec LtdWhite Paper - Humidity Effects In Substations By EA Technology For Roxtec Ltd
White Paper - Humidity Effects In Substations By EA Technology For Roxtec LtdThorne & Derrick International
 
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic StadiumEmtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic StadiumThorne & Derrick International
 
Cable entry seals for cabinets and enclosures
Cable entry seals for cabinets and enclosuresCable entry seals for cabinets and enclosures
Cable entry seals for cabinets and enclosuresRoxtec UK & Ireland
 
Duresca Busbar System Medium Voltage (Indoor & Outdoor)
Duresca Busbar System Medium Voltage (Indoor & Outdoor)Duresca Busbar System Medium Voltage (Indoor & Outdoor)
Duresca Busbar System Medium Voltage (Indoor & Outdoor)Thorne & Derrick International
 
SPS High Voltage Heat Shrink Cable Joint Kits - Shrink Polymer Systems 3 Core...
SPS High Voltage Heat Shrink Cable Joint Kits - Shrink Polymer Systems 3 Core...SPS High Voltage Heat Shrink Cable Joint Kits - Shrink Polymer Systems 3 Core...
SPS High Voltage Heat Shrink Cable Joint Kits - Shrink Polymer Systems 3 Core...Thorne & Derrick International
 
CSD RISE Rapid - Sealing 11kV 33kV Utility Power & Triplex Cables In HV Subst...
CSD RISE Rapid - Sealing 11kV 33kV Utility Power & Triplex Cables In HV Subst...CSD RISE Rapid - Sealing 11kV 33kV Utility Power & Triplex Cables In HV Subst...
CSD RISE Rapid - Sealing 11kV 33kV Utility Power & Triplex Cables In HV Subst...Thorne & Derrick International
 
ScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
ScottishPower Distribution Cables & Equipment Metal Theft - GuidebookScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
ScottishPower Distribution Cables & Equipment Metal Theft - GuidebookThorne & Derrick International
 
Nexans 11kV Single Core XLPE Cables (300mm2 Cu) UKPN Approved
Nexans 11kV Single Core XLPE Cables (300mm2 Cu) UKPN ApprovedNexans 11kV Single Core XLPE Cables (300mm2 Cu) UKPN Approved
Nexans 11kV Single Core XLPE Cables (300mm2 Cu) UKPN ApprovedThorne & Derrick International
 
Ellis Patents Vulcan Cable Cleats VRQ Quadrofoil Cleats - Specification
Ellis Patents Vulcan Cable Cleats VRQ Quadrofoil Cleats - SpecificationEllis Patents Vulcan Cable Cleats VRQ Quadrofoil Cleats - Specification
Ellis Patents Vulcan Cable Cleats VRQ Quadrofoil Cleats - SpecificationThorne & Derrick International
 
Roxtec RM BG B Sealing Solutions - Roxtec Frames, Modules for Roxtec BG Solut...
Roxtec RM BG B Sealing Solutions - Roxtec Frames, Modules for Roxtec BG Solut...Roxtec RM BG B Sealing Solutions - Roxtec Frames, Modules for Roxtec BG Solut...
Roxtec RM BG B Sealing Solutions - Roxtec Frames, Modules for Roxtec BG Solut...Thorne & Derrick International
 
Ellis Patents Cable Cleats, Clamps & Hangers - Catalogue
Ellis Patents Cable Cleats, Clamps & Hangers - CatalogueEllis Patents Cable Cleats, Clamps & Hangers - Catalogue
Ellis Patents Cable Cleats, Clamps & Hangers - CatalogueThorne & Derrick International
 

Viewers also liked (20)

Roxtec Cable Sealing Transits - Wind Power
Roxtec Cable Sealing Transits - Wind PowerRoxtec Cable Sealing Transits - Wind Power
Roxtec Cable Sealing Transits - Wind Power
 
Roxtec Cable Transits - Catalogue
Roxtec Cable Transits - CatalogueRoxtec Cable Transits - Catalogue
Roxtec Cable Transits - Catalogue
 
White Paper - Humidity Effects In Substations By EA Technology For Roxtec Ltd
White Paper - Humidity Effects In Substations By EA Technology For Roxtec LtdWhite Paper - Humidity Effects In Substations By EA Technology For Roxtec Ltd
White Paper - Humidity Effects In Substations By EA Technology For Roxtec Ltd
 
Roxtec Cable Transit Seals - R Transit Frames
Roxtec Cable Transit Seals - R Transit FramesRoxtec Cable Transit Seals - R Transit Frames
Roxtec Cable Transit Seals - R Transit Frames
 
CSD RISE - Cable Duct & Pipe Seals
CSD RISE - Cable Duct & Pipe SealsCSD RISE - Cable Duct & Pipe Seals
CSD RISE - Cable Duct & Pipe Seals
 
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic StadiumEmtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
Emtelle Fibre & Power Cable Ducts Helped To Construct London Olympic Stadium
 
CATU CZ-54-R Electrical Life Saving Kits
CATU CZ-54-R Electrical Life Saving KitsCATU CZ-54-R Electrical Life Saving Kits
CATU CZ-54-R Electrical Life Saving Kits
 
Emtelle FibreFlow Cable Ducts - Product Catalogue
Emtelle FibreFlow Cable Ducts - Product CatalogueEmtelle FibreFlow Cable Ducts - Product Catalogue
Emtelle FibreFlow Cable Ducts - Product Catalogue
 
Cable entry seals for cabinets and enclosures
Cable entry seals for cabinets and enclosuresCable entry seals for cabinets and enclosures
Cable entry seals for cabinets and enclosures
 
Triplex Cable Surround Data Sheet
Triplex Cable Surround Data SheetTriplex Cable Surround Data Sheet
Triplex Cable Surround Data Sheet
 
Duresca Busbar System Medium Voltage (Indoor & Outdoor)
Duresca Busbar System Medium Voltage (Indoor & Outdoor)Duresca Busbar System Medium Voltage (Indoor & Outdoor)
Duresca Busbar System Medium Voltage (Indoor & Outdoor)
 
SPS High Voltage Heat Shrink Cable Joint Kits - Shrink Polymer Systems 3 Core...
SPS High Voltage Heat Shrink Cable Joint Kits - Shrink Polymer Systems 3 Core...SPS High Voltage Heat Shrink Cable Joint Kits - Shrink Polymer Systems 3 Core...
SPS High Voltage Heat Shrink Cable Joint Kits - Shrink Polymer Systems 3 Core...
 
CSD RISE Rapid - Sealing 11kV 33kV Utility Power & Triplex Cables In HV Subst...
CSD RISE Rapid - Sealing 11kV 33kV Utility Power & Triplex Cables In HV Subst...CSD RISE Rapid - Sealing 11kV 33kV Utility Power & Triplex Cables In HV Subst...
CSD RISE Rapid - Sealing 11kV 33kV Utility Power & Triplex Cables In HV Subst...
 
ScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
ScottishPower Distribution Cables & Equipment Metal Theft - GuidebookScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
ScottishPower Distribution Cables & Equipment Metal Theft - Guidebook
 
Nexans 11kV Single Core XLPE Cables (300mm2 Cu) UKPN Approved
Nexans 11kV Single Core XLPE Cables (300mm2 Cu) UKPN ApprovedNexans 11kV Single Core XLPE Cables (300mm2 Cu) UKPN Approved
Nexans 11kV Single Core XLPE Cables (300mm2 Cu) UKPN Approved
 
SA Equip - SA Flexiheat SAPH15 400CEA ATEX Heaters
SA Equip - SA Flexiheat SAPH15 400CEA ATEX HeatersSA Equip - SA Flexiheat SAPH15 400CEA ATEX Heaters
SA Equip - SA Flexiheat SAPH15 400CEA ATEX Heaters
 
Ellis Patents Vulcan Cable Cleats VRQ Quadrofoil Cleats - Specification
Ellis Patents Vulcan Cable Cleats VRQ Quadrofoil Cleats - SpecificationEllis Patents Vulcan Cable Cleats VRQ Quadrofoil Cleats - Specification
Ellis Patents Vulcan Cable Cleats VRQ Quadrofoil Cleats - Specification
 
Roxtec RM BG B Sealing Solutions - Roxtec Frames, Modules for Roxtec BG Solut...
Roxtec RM BG B Sealing Solutions - Roxtec Frames, Modules for Roxtec BG Solut...Roxtec RM BG B Sealing Solutions - Roxtec Frames, Modules for Roxtec BG Solut...
Roxtec RM BG B Sealing Solutions - Roxtec Frames, Modules for Roxtec BG Solut...
 
Ellis Patents Cable Cleats, Clamps & Hangers - Catalogue
Ellis Patents Cable Cleats, Clamps & Hangers - CatalogueEllis Patents Cable Cleats, Clamps & Hangers - Catalogue
Ellis Patents Cable Cleats, Clamps & Hangers - Catalogue
 
Ellis Patents Cable Cleats Guide - Black Book
Ellis Patents Cable Cleats Guide - Black BookEllis Patents Cable Cleats Guide - Black Book
Ellis Patents Cable Cleats Guide - Black Book
 

Similar to Roxtec Cable Transits - Substation Cable Termination Design

report on electrical wiring
report on electrical wiringreport on electrical wiring
report on electrical wiringAbhidada123
 
Whether to go for underground or aerial deployment
Whether to go for underground or aerial deploymentWhether to go for underground or aerial deployment
Whether to go for underground or aerial deploymentAngelina Li
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvAlexander Decker
 
Everything You Need to Know About Breakout Cable
Everything You Need to Know About Breakout CableEverything You Need to Know About Breakout Cable
Everything You Need to Know About Breakout CableSun Telecom
 
Overhead Fiber Optic Cable Installation Method and Requirement
Overhead Fiber Optic Cable Installation Method and RequirementOverhead Fiber Optic Cable Installation Method and Requirement
Overhead Fiber Optic Cable Installation Method and RequirementSun Telecom
 
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...Ivan Rojas Soliz
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Mahesh Chandra Manav
 
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Mahesh Chandra Manav
 
Project sagarmala presentation jmv lps
Project sagarmala presentation jmv lpsProject sagarmala presentation jmv lps
Project sagarmala presentation jmv lpsMahesh Chandra Manav
 
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
1308794-2_-_AMP_CO_Handbook_12-06[1].pdfSabriGunaydin
 
Jmv presentation smart process plant (fertilizer)
Jmv  presentation  smart process  plant (fertilizer)Jmv  presentation  smart process  plant (fertilizer)
Jmv presentation smart process plant (fertilizer)Mahesh Chandra Manav
 
Electrification Clearance Solutions
Electrification Clearance SolutionsElectrification Clearance Solutions
Electrification Clearance SolutionsBalfour Beatty Rail
 
WIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptxWIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptxJayveeVillar3
 
PROCEDURES IN RACEWAY AND CABLE TRAY INSTALLATION
PROCEDURES IN RACEWAY AND CABLE TRAY INSTALLATIONPROCEDURES IN RACEWAY AND CABLE TRAY INSTALLATION
PROCEDURES IN RACEWAY AND CABLE TRAY INSTALLATIONELVISPAGATPAT1
 
PT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enPT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enMunir Kaderbhai
 
LS Busway Catalogue
LS Busway CatalogueLS Busway Catalogue
LS Busway Cataloguehairxoawn
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyMahesh Chandra Manav
 

Similar to Roxtec Cable Transits - Substation Cable Termination Design (20)

Electrical Trunking.ppt
Electrical Trunking.pptElectrical Trunking.ppt
Electrical Trunking.ppt
 
report on electrical wiring
report on electrical wiringreport on electrical wiring
report on electrical wiring
 
Whether to go for underground or aerial deployment
Whether to go for underground or aerial deploymentWhether to go for underground or aerial deployment
Whether to go for underground or aerial deployment
 
BICSI NEC ARTICLE
BICSI NEC ARTICLEBICSI NEC ARTICLE
BICSI NEC ARTICLE
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
 
Everything You Need to Know About Breakout Cable
Everything You Need to Know About Breakout CableEverything You Need to Know About Breakout Cable
Everything You Need to Know About Breakout Cable
 
Overhead Fiber Optic Cable Installation Method and Requirement
Overhead Fiber Optic Cable Installation Method and RequirementOverhead Fiber Optic Cable Installation Method and Requirement
Overhead Fiber Optic Cable Installation Method and Requirement
 
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
Undergrounding high voltage_electricity_transmission_lines_the_technical_issu...
 
Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...Power transmission and distribution along with power qualty presentation by j...
Power transmission and distribution along with power qualty presentation by j...
 
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
 
Project sagarmala presentation jmv lps
Project sagarmala presentation jmv lpsProject sagarmala presentation jmv lps
Project sagarmala presentation jmv lps
 
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
1308794-2_-_AMP_CO_Handbook_12-06[1].pdf
 
Jmv presentation smart process plant (fertilizer)
Jmv  presentation  smart process  plant (fertilizer)Jmv  presentation  smart process  plant (fertilizer)
Jmv presentation smart process plant (fertilizer)
 
Electrification Clearance Solutions
Electrification Clearance SolutionsElectrification Clearance Solutions
Electrification Clearance Solutions
 
WIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptxWIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptx
 
PROCEDURES IN RACEWAY AND CABLE TRAY INSTALLATION
PROCEDURES IN RACEWAY AND CABLE TRAY INSTALLATIONPROCEDURES IN RACEWAY AND CABLE TRAY INSTALLATION
PROCEDURES IN RACEWAY AND CABLE TRAY INSTALLATION
 
PT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-enPT-9018-ConnProvGenSets-en
PT-9018-ConnProvGenSets-en
 
LS Busway Catalogue
LS Busway CatalogueLS Busway Catalogue
LS Busway Catalogue
 
Cable Installation 2013
Cable Installation 2013Cable Installation 2013
Cable Installation 2013
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
 

More from Thorne & Derrick International

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Thorne & Derrick International
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptThorne & Derrick International
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018Thorne & Derrick International
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick InternationalThorne & Derrick International
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-AThorne & Derrick International
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...Thorne & Derrick International
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Thorne & Derrick International
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RoweThorne & Derrick International
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandThorne & Derrick International
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DThorne & Derrick International
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...Thorne & Derrick International
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetThorne & Derrick International
 

More from Thorne & Derrick International (20)

Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...Isolation procedures for safe working on electrical systems and equipment by ...
Isolation procedures for safe working on electrical systems and equipment by ...
 
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical EqptTHORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
THORNE & DERRICK LV MV HV Jointing, Earthing, Substation & Electrical Eqpt
 
The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018The Children North East Annual Golf Day Wednesday 9th May 2018
The Children North East Annual Golf Day Wednesday 9th May 2018
 
3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International3M Electrical Products Stocked By Thorne & Derrick International
3M Electrical Products Stocked By Thorne & Derrick International
 
CATU Electrical Safety Catalogue
CATU Electrical Safety CatalogueCATU Electrical Safety Catalogue
CATU Electrical Safety Catalogue
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
THORNE + DERRICK : LV, MV & HV Cable Installation, Jointing, Substation & Ele...
 
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
Ex d Enclosures - Explosion Proof Hazardous Area Technor EJB Galvanised Steel...
 
Roxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional DrawingRoxtec Cable Transit - B Frame Dimensional Drawing
Roxtec Cable Transit - B Frame Dimensional Drawing
 
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam RowePepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
Pepperl & Fuchs SIL Training Certificate - T&D Adam Rowe
 
T&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive AtmospheresT&D Experts In Equipment For Explosive Atmospheres
T&D Experts In Equipment For Explosive Atmospheres
 
Ultrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification DemandUltrasonic Flow Meters - Customer Specification Demand
Ultrasonic Flow Meters - Customer Specification Demand
 
Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016Emtelle Fibre Optic Cables - Product Catalogue 2016
Emtelle Fibre Optic Cables - Product Catalogue 2016
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282DSIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
SIRAI ASCO Numatics Solenoid Valves WRAS Approved - SIRAI L182D L282D
 
Ripley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation ToolsRipley Utility Tool Cable Preparation Tools
Ripley Utility Tool Cable Preparation Tools
 
RIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas DetectorRIDGID micro CD100 Combustible Gas Detector
RIDGID micro CD100 Combustible Gas Detector
 
Itron Fact Sheet
Itron Fact SheetItron Fact Sheet
Itron Fact Sheet
 
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
United Nations Environment Programme (UNEP) ‘2006 Report of the Refrigeration...
 
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec SheetFiloform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
Filoform FiloSeal+HD Reenterable LV HV Power Cable Duct Seal System - Spec Sheet
 

Recently uploaded

Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 

Recently uploaded (20)

Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 

Roxtec Cable Transits - Substation Cable Termination Design

  • 1. Tel: +44 (0)191 490 1547 Fax: +44 (0)191 477 5371 Email: northernsales@thorneandderrick.co.uk Website: www.cablejoints.co.uk www.thorneanderrick.co.uk Whitepaper Modular Substation Cable Termination Design Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada
  • 2. Abstract The methods for cable penetrations into modular industrial substations are summarized. The requirements for structural and environmental integrity, grounding, fire protection and ease of expansion for a cable termination system are discussed. Current methods of installation are compared to using a cable transit design for installing and terminating cables in electrical substations. Index Terms – cable termination, modular substation, cable transit. Introduction Modular substations are becoming the preferred approach for installing electrical and control equipment in industrial facilities. The ability to prefabricate a building, pre-install both electrical and control equipment and the ability to pre-commission equipment prior to the installation helps to reduce on-site construction installation costs. This is particularly advantageous in remote project locations where the cost of labor can be very high. The on-site termination of conductors and cables into equipment can often be an issue. The equipment layout, the design of the modular building skid base frame, the number of terminations and the termination method can all influence the speed and ease of installation. Choosing the wrong penetration approach can compromise the environmental integrity of the building and equipment, significantly increase installation cost and complicate the ability to install cables and conductors in the future. This has a direct impact on the cost of ownership over the life of the asset.
  • 3. Modular substation fundamentals A typical modular substation consists of a steel frame skid base supporting a prefabricated insulated panel constructed building. The dimensions of the building can vary and is usually determined by the amount of equipment installed and the transportation logistics for a project. It is common to see substation buildings with dimensions in excess of 30 meters in length, 7 meters wide and 6 meters high for domestic onshore projects. If the equipment layout dictates a larger building footprint, often the building will be split in two for transport to site. Interconnecting wiring between equipment is usually done in one of two ways. If the substation is constructed on raised piles, and the wiring connections are internal to the substation, the conduits or cables are run overhead within the substation. External field cable connections are then terminated into the floor of the substation directly into the equipment item. This approach has the advantage of minimizing the height of the building and allowing for convenient access for workers to terminate field cables. Fig. 1 illustrates this concept. Fig 1 Internal Control Connections Internal Power Connections Internal Building Cable Tray Control Panel LV SWGR MCC Field Control Cables Field Cable Tray Field Power Connections Field Motor Connections
  • 4. Terminating cables in substations There are a number of challenges associated with terminating cables in a modular substation. The first being the number of field terminations. In a medium sized industrial substation servicing a large number of motor interconnections, there may be up to 300 or more power and control cable terminations. The terminations must be coordinated with the location of the electrical and control equipment and the skid frame steel members supporting the building. Often, a large number of cables must be terminated in a very limited area leading to cable and connector congestion which can impact worker productivity. Another challenge associated with terminating field cables is maintaining the environmental integrity of the equipment and the substation building envelope. This requires that the termination method maintain a vapor-tight weather barrier with a suitable insulation ‘R’ factor value to avoid condensation within the equipment and the building envelope. The cable termination method should also provide a fire resistant barrier in the unlikely event of a fire. The cable termination method must accommodate a variety of cable construction configurations and wiring methods. Cable diameters can vary with some control conductors with diameters of 5mm or less to 3/C 500MCM armored power cables which may have diameters of 100mm or more. In each case, the cable must be properly secured and grounded in accordance with the local electrical installation codes and requirements. One often overlooked aspect of the cable termination method is the ability to add cables in the future. The flexibility to easily add additional cable can pay dividends even during the initial installation when design modifications are made late in the installation phase of a project.
  • 5. Traditional cable termination options Fig 2 Switchgear or MCC Ground Bus Bottom of equipment is left open for cable access Removable plate Cable Termination into Floor of Substation Fig 3 Switchgear or MCC Ground Bus Bottom of floor is left open for cable access Cable Termination directly into Switchgear/MCC Removable plate incorporated into switchgear or MCC There are several cable termination methods currently used to terminate conductors into industrial substations. Some projects prefer that all cables are terminated into the top of electrical and control equipment mounted inside the building. A cable transit barrier is often used to allow cables to pass through an exterior wall. Fig. 2 illustrates a method where cables are terminated into the floor of a substation. A ¼” steel removable panel is used to facilitate the pre-drilling of holes for the cable connectors prior to the field installation. This helps to improve construction productivity by allowing the majority of the cable connector entry holes to be drilled in a shop environment. Once the connector plate is fastened in place, drilling becomes more difficult and time consuming. There is also the potential for metal filings to contaminate the switchgear cable termination compartment. Each connector hole must also be de-burred to prevent the conductor insulation from being damaged when the cable conductors are pulled into place. A second option for terminating cables is illustrated in Fig. 3. A section of the floor is removed and the cable is terminated directly into the floor mounted equipment. Some equipment, such as low voltage motor control centers (MCCs) incorporate a removable plate to facilitate the punching of holes for cable connectors. The removable plate is usually constructed of sheet metal steel and is easily punched using a hydraulic punch. The primary disadvantage to this termination method is that large sections of the floor must often be removed to gain access to the underside of the equipment. This may compromise the structural integrity of the floor and building envelope. Future cable entry is also difficult as access to the plate must be provided both above and below the cable connector location. In certain cases, if the plate is not of sufficient thickness, large cables can deform the plate, further compromising the integrity of the installation.
  • 6. Improved cable termination option using a cable transit system Fig 4 Switchgear or MCC Ground Bus Bottom of equipment is left open for cable access Cable transit frame welded in place Cable transit blocks Cable Transit Installation for Switchgear/MCC Entry A third option for terminating cables into a substation is to use a transit entry frame. Fig. 4 illustrates a transit entry installation. The transit frame is welded or bolted to the substation floor at strategic locations where cables will be terminated. The cables are then pulled into place through the transit frames and then sealed using Multidiameter™ cable transit blocks and a mechanical compression wedge. The cable transit system provides cable retention and provides an environmental, fire resistant and gas tight seal to the equipment and building enclosure. There are several advantages to using a cable transit for cable entry in to a substation. The first being efficiency. A cable transit allows multiple cables to be pulled at the same time though the transit opening. The large opening eliminates the potential damage to the conductor insulation during installation. Secondly, the transit frame maintains the structural and environmental seal integrity of the floor and allows for a high density and capital efficient installation of cables within a very small footprint. Also, future expansion capacity is provided for each transit via unused cable blocks which can be easily removed and reinstalled for future cable installation. Another significant advantage of sealing cables with a cable transit system is the additional room below the building floor and equipment that is provided by the extension of the transit frame. This depth may be customized to a depth equal to the height of the structural steel, and has a standard depth of 60mm. This additional working space assists with the restrictive bend radius of larger armored cables and allows for proper cable alignment with equipment configuration.
  • 7. Equipment Grounding for Tray Cables Fig 5 MCC Phase conductors Transit Ground Bus Bonding Connection Tray Cable RM Module Option 1 for Grounding Tray Cable Unit Ground Terminal Fig 6 MCC Option 2 for Grounding Tray Cable There are two methods for terminating the bonding conductor of a tray cable using a cable transit system. The first involves connecting the bonding conductor directly to the ground bus of a switchgear or MCC. The PVC sheath is stripped back to the transit entry location and the bonding conductor is removed and connected to the equipment ground bus. The phase conductors then continue to the termination point in the switchgear or MCC. This is very similar to what occurs when a standard cable connector is used to terminate a conductor. Fig. 5 illustrates this method of bonding. A second and less labor intensive option exists for grounding tray cables in MCCs. Some MCC manufacturers provide the option of a “unit” ground connection at the MCC bucket rather than on the equipment ground bus. This reduces the amount of cable sheath that must be stripped back in order to connect the bonding conductor to the equipment ground bus. This has the advantage of keeping the phase and bonding conductors together as an assembly within the equipment and breaking out the bonding conductor closer to where the phase conductor terminations actually occur. Fig. 6 illustrates this method of bonding.
  • 8. Fig 7 Work process To use a cable transit system to its fullest advantage, an understanding of the work process from design through final installation is required. A. Engineering Engineering Drawing of Cable Transit System The use of a cable transit for terminating cables into a substation requires pre-planning. The location of electrical and control equipment must be coordinated with the structural steel base to insure that transit frames of an adequate size and dimension can be installed without interference from support steel in the steel base. If possible, a standardized frame size helps to simplify the design and installation process. During the design phase, as cables are identified, they are assigned to a transit frame. This information can be integrated into the cable schedule or often dedicated software is used to create detailed transit schedules. Once the transit schedules are complete, the bill of material can be generated for both the substation fabricator and field installation contractor. Fig. 7 illustrates a typical engineering drawing produced by Roxtec RTM Software for an MCC transit with capacity for 43 cables of various diameters installed within a 23cm x 26cm window. The flexibility of this system allows cable and pipe sizes ranging from 3 mm (.118 in) to 99 mm (3.898 in) to be sealed within the transit frames. B. Fabrication Once the size of the cable transit and the locations are identified, the transit frames can be purchased and shipped to the fabricator for installation. The transit frames are mounted into the wall or floor by bolting or welding and then temporarily sealed for transportation to site.
  • 9. Fig 8 C. Site Installation After the modular substation is shipped to site and set in place, installation of the field conductors can begin. The site installation contractor will install interconnecting cables from source to destination via the cable transit openings identified on the cable schedule. The large opening provided by the cable transit helps the installer pull the cable into place and minimizes any damage to the conductor insulation. When all cables for a cable transit are installed, the cables are secured and sealed using the cable transit blocks with stay plates and a mechanical compression wedge. The cable transit drawings help to identify what cables should be placed where and what size cable block should be used. The transit schedules also record how much spare capacity is available in each cable transit for future growth. Cables can be easily added without cutting or drilling additional holes, simply by loosening the compression wedge. Training is essential to help field installers understand the transit termination concept. Training can be provided using on-site training services or by installation videos that provide step-by-step instructions. Once the installer has observed and installed the transit blocks for one transit installation, subsequent transit installations are easily completed. Figure 8 illustrates the installation of a transit barrier in a modular substation application.
  • 10. Conclusion There are several advantages to using a cable transit for installing and terminating cables in industrial substations. It provides a standardized design with the flexibility to terminate a variety of different sizes and cable constructions. The ease of installation helps to reduce labor costs and minimize the potential for insulation damage. The structural and environmental integrity of the wall or floor penetration is maintained providing an insulated, vaportight and fire-stop barrier and cables can be easily added in the future. Cable transits are a viable alternative for terminating cables into industrial substations. H. Vita Allan Bozek, P.Eng., MBA graduated from the University of Waterloo in 1986 with BASc in Systems Design Engineering and a MBA from the University of Calgary in 1999. He is a Principal with EngWorks Inc., providing consulting engineering services to the oil and gas sectors. Roxtec International AB, the parent of Roxtec, Inc. was established in 1990 and is the global leader in modular cable and pipe sealing systems. Roxtec maintains more than 250 registered tests and approvals and serves the oil & gas, telecom, marine, industrial and OEM industries in more than 70 markets around the globe. Additional information about the company, products, applications and engineering data may be found by visiting www.roxtec.com.
  • 11.
  • 12. BRO2009000101 ver_1.0/GB/0923/thoge Roxtec ® and Multidiameter ® are registered trademarks of Roxtec in Sweden and/or other countries. Tel: +44 (0)191 490 1547 Fax: +44 (0)191 477 5371 Email:Roxtec Inc northernsales@thorneandderrick.co.uk 10127 E.Admiral Place, 74116 Tulsa, OK Website: +1 800 520 4769, 918 254 9872 www.cablejoints.co.uk +1 918 254 2544 onshore@us.roxtec.com, www.roxtec.com www.thorneanderrick.co.uk PHONE FAX EMAIL