Advanced	
  EVM	
  Workshop	
  
	
  
	
  

	
  

	
  

	
  

Duration: 4-days
Audience: Attendees should have attended the Ten Six 3-day EVMS Training class or
have some prior working knowledge of Earned Value Management.
Description: This 4-day workshop is targeted at Program Management and Program
Planning & Cost Controls personnel that need a more thorough and practical
understanding of the implementation requirements of the ANSI-748 EV Guidelines.
Numerous case studies are utilized enabling attendees to understand both the
philosophy and mechanics of implementing the 32 ANSI-748 Guidelines on an atypical
example Project. The ultimate takeaway goal of this class, is for attendees to be able to
more effectively engage the cost, schedule and technical management requirements of
their respective projects as a result of hands on experience gained in the classroom.

Course Contents
	
  

Day One
1.0
1.1
1.2
1.3
1.4

General
Course Outline
PMI Program Management Process flow
Overview of ANSI-748 EVM Concepts
Discussion of Statement of Work (SOW) to be used throughout workshop

2.0 Organization Guidelines Section
2.1 Review of Organization Guidelines
2.2 Discussion of internal processes impacted by Organization Guidelines
2.3 MIL-STD-881 Work Breakdown Structure (WBS) Preparation
2.4 Organization Breakdown Structure (OBS) Chart Preparation
2.5 Control Account (CA) Designation Review
2.6 Responsibility Assignment Matrix (RAM) development requirements
2.7 WBS/SOW Alignment Matrix Development
2.8 Case Study 1, Preparation of WBS, OBS, CA Designation, RAM Preparation
and WBS/SOW Alignment Charts
3.0 Planning, Scheduling and Budgeting Guidelines Section
3.1 Review of Planning, Scheduling & Budgeting Guidelines
 

3.2 Discussion of internal processes impacted by Planning, Scheduling & Budgeting
Guidelines
3.3 Review of Earned Value Techniques (EVTs) and their applications
3.4 Discussion of Case Study Deliverables and Integrated Master Schedule
requirements
3.5 Review of critical path scheduling process and slack (float determination)
3.6 Case Study 2, Development of Critical Path and Slack (float) calculation
3.7 Discussion of significance of linkage between critical path schedule and Gantt
schedules for presentations
3.8 Scheduling hierarchy and scheduling techniques
3.9 Task Interrelationships and their determination
3.10 Schedule Vertical & Horizontal Traceability
3.11 Introduction/discussion of development of Integrated Master Schedule (IMS)
elements to be used in follow-up Case Study 3
3.12 Case Study 3, Development of Summary Level & Detail IMS For Follow-on
class work & RAM updates

Day 2
3.11 Completion of Case Study 3 & review of solution sets
3.12 Control Account Plan (CAP) elements & it’s preparation
3.13 Review of Material & Subcontract EVTs and their applications
3.14 Budgeting process and elements (Labor, Material, ODC) to be used in Case
Studies
3.15 Case Study 4, Development of CAPs from Case Study materials prepared
to date
3.16 Work Authorization Document (WAD) content, attachments, usage & approval
cycles
3.17 Case Study 5, Preparation of WADs for Case study materials
4.0 Accounting Guidelines Section
4.1 Review of ANSI-748 Accounting Guidelines
4.2 Discussion of internal processes impacted by Accounting Guidelines
4.3 Cost Element Matrix contents & preparation discussion
4.4 Case Study 6, Population of Cost Element Matrix from RAM & CAPs
4.5 Review of Cost Charge Number (CCN) assignment to CA process for traceability
4.6 Role of WBS/SOW Alignment Matrix in CCN requirements
4.7 Case Study 7, Determination of minimum number of CCNs required for CA
traceability using RAM, Cost Element Matrix & WBS/SOW Alignment Matrix as
basis
4.8 Review of Indirect Cost allocation requirements in EV environment
4.9 Group Case Study 8, Determination of Indirect Cost Collection Sources
5.0
5.1
5.2
5.3

Managerial Analysis Section
Review of Managerial Analysis Guidelines
Discussion of internal processes impacted by Managerial Analysis Guidelines
Review Business Rhythm schedules and status update process guidelines
 

5.4 Case Study 9, Statusing IMS and CAP updates
5.5 Review of EVM SV, CV & VAC managerial reports and their content
5.6 Case Study 10, Preparation of Cost & Schedule Status Reports using
updated IMS and CAP info
5.7 Discussion of Case Study 10 solution set

Day 3
5.8 Definition of Variance Thresholds usage & determination
5.9 Group Case Study 11, Definition of Variance Thresholds to be used for
internal & external variance reporting
5.10 Discussion of necessity of internal vs external Variance Analysis Reports (VAR)
thresholds
5.11 Case Study 12, Identification of CVs & SVs that would require VARs based
upon Case Studies 10 & 11 output
5.12 Discussion of statistical tools (Independent Estimate at Completion Tools, IEAC)
to use in evaluating Estimate at Completions (EACs)
5.13 Case Study 13, Utilization of IEAC tools to analyze EACs shown in Case
Study 10
5.14 Definition of VAR sections, their content and approval cycles
5.15 Group Case Study 14, Definition of CV, SV & VACs that will require VARs based
upon Variance Thresholds
5.16 Discussion of appropriate content to be addressed in VAR write-ups
5.17 Case Study 15, Development of internal VARs based upon Case Study
materials prepared to date
5.18 Group Case Study 16, Review of internal VARs prepared to determine
acceptability of content
5.19 Discussion of internal VAR content vs external VAR content
5.20 Review of external ANSI-748 Integrated Performance Management Reports
(IPMR) Formats 1 thru 6 formats & content
5.21 Case Study 17, Preparation of external IPMR Reports from Case Study
materials prepared to date

Day 4
5.22 Discussion of Case Study 17 solution set with emphasis upon differentiation
between external and internal report content/traceability
6.0 Baseline Maintenance and Revision of Data Section
6.1 Review of Baseline Maintenance Guidelines
6.2 Discussion of roles of Contract Change Requests (CCRs) and Baseline Logs
6.3 CCR & Baseline Log process flow discussion
6.3 Review of Change Criteria for generation of CCRs
6.4 Review of Case Study materials to be used in follow-up Case Study 18
6.5 Case Study 18, Generation of various scenarios traceability with CCR and
Baseline Log entries
6.6 Group discussion of Case Study 18 material solution sets
6.7 Review of CAM Interview Process and CAM Notebook documentation required
 

6.8 Review of Case Study materials to be used in follow-up Case Study 19
6.9 Case Study 19, Assembling CAM Notebooks using Case Study materials
completed to date
6.10 Discussion of Case Study 19 material solution sets
6.11 Questions and Answers regarding materials covered Day 1 thru 4
6.12 Dismissal
	
  
	
  
	
  
For more details please contact Ten Six Consulting at (703) 910-2600 or email us at
training@tensixconsulting.com

More Related Content

Similar to Advanced evm workshop

Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)jntuhcej
 
2. steps in a simulation study
2. steps in a simulation study 2. steps in a simulation study
2. steps in a simulation study MdFazleRabbi18
 
B2 2006 sizing_benchmarking
B2 2006 sizing_benchmarkingB2 2006 sizing_benchmarking
B2 2006 sizing_benchmarkingSteve Feldman
 
B2 2006 sizing_benchmarking (1)
B2 2006 sizing_benchmarking (1)B2 2006 sizing_benchmarking (1)
B2 2006 sizing_benchmarking (1)Steve Feldman
 
It5304 syllabus
It5304 syllabusIt5304 syllabus
It5304 syllabusnimal83
 
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...YesserProgram
 
Operation management ibs text book
Operation management  ibs text bookOperation management  ibs text book
Operation management ibs text bookStudsPlanet.com
 
"Erp implementation at Tata Steel" XIMB
"Erp implementation at Tata Steel" XIMB"Erp implementation at Tata Steel" XIMB
"Erp implementation at Tata Steel" XIMBRahul Singh Chauhan
 
Study setup_Clinical Data Management_Katalyst HLS
Study setup_Clinical Data Management_Katalyst HLSStudy setup_Clinical Data Management_Katalyst HLS
Study setup_Clinical Data Management_Katalyst HLSKatalyst HLS
 
MES Business Process Study
MES Business Process StudyMES Business Process Study
MES Business Process StudyEdward Brown
 
Changes ISO 9001-2008 to ISO 9001-2015.pdf
Changes ISO 9001-2008 to ISO 9001-2015.pdfChanges ISO 9001-2008 to ISO 9001-2015.pdf
Changes ISO 9001-2008 to ISO 9001-2015.pdfRealDairy2
 
Project Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxProject Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxKareemBullard1
 
ACC 574 – Student Notes(Prerequisite ACC 562)COURSE DESCR.docx
ACC 574 – Student Notes(Prerequisite ACC 562)COURSE DESCR.docxACC 574 – Student Notes(Prerequisite ACC 562)COURSE DESCR.docx
ACC 574 – Student Notes(Prerequisite ACC 562)COURSE DESCR.docxnettletondevon
 
8. Process: ocp cfops document mgmt
8. Process: ocp cfops document mgmt8. Process: ocp cfops document mgmt
8. Process: ocp cfops document mgmtssusereb347d
 
Presentation for Six Sigma certification
Presentation for Six Sigma certificationPresentation for Six Sigma certification
Presentation for Six Sigma certificationElena Titova
 
Study Setup_Katalyst HLS
Study Setup_Katalyst HLSStudy Setup_Katalyst HLS
Study Setup_Katalyst HLSKatalyst HLS
 
Information Systems Acquisition.docx
Information Systems Acquisition.docxInformation Systems Acquisition.docx
Information Systems Acquisition.docxwrite4
 

Similar to Advanced evm workshop (20)

Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)Computer – Aided process planning (CAPP)
Computer – Aided process planning (CAPP)
 
2. steps in a simulation study
2. steps in a simulation study 2. steps in a simulation study
2. steps in a simulation study
 
B2 2006 sizing_benchmarking
B2 2006 sizing_benchmarkingB2 2006 sizing_benchmarking
B2 2006 sizing_benchmarking
 
B2 2006 sizing_benchmarking (1)
B2 2006 sizing_benchmarking (1)B2 2006 sizing_benchmarking (1)
B2 2006 sizing_benchmarking (1)
 
It5304 syllabus
It5304 syllabusIt5304 syllabus
It5304 syllabus
 
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
الوثيقة المتكاملة للمنهجية الوطنية للبنية المؤسسية National Overall Reference...
 
7.4 Control Costs
7.4 Control Costs7.4 Control Costs
7.4 Control Costs
 
Operation management ibs text book
Operation management  ibs text bookOperation management  ibs text book
Operation management ibs text book
 
Ieh a3
Ieh a3Ieh a3
Ieh a3
 
"Erp implementation at Tata Steel" XIMB
"Erp implementation at Tata Steel" XIMB"Erp implementation at Tata Steel" XIMB
"Erp implementation at Tata Steel" XIMB
 
Study setup_Clinical Data Management_Katalyst HLS
Study setup_Clinical Data Management_Katalyst HLSStudy setup_Clinical Data Management_Katalyst HLS
Study setup_Clinical Data Management_Katalyst HLS
 
MES Business Process Study
MES Business Process StudyMES Business Process Study
MES Business Process Study
 
SAP QM by Direct trainer
SAP QM by Direct trainerSAP QM by Direct trainer
SAP QM by Direct trainer
 
Changes ISO 9001-2008 to ISO 9001-2015.pdf
Changes ISO 9001-2008 to ISO 9001-2015.pdfChanges ISO 9001-2008 to ISO 9001-2015.pdf
Changes ISO 9001-2008 to ISO 9001-2015.pdf
 
Project Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxProject Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptx
 
ACC 574 – Student Notes(Prerequisite ACC 562)COURSE DESCR.docx
ACC 574 – Student Notes(Prerequisite ACC 562)COURSE DESCR.docxACC 574 – Student Notes(Prerequisite ACC 562)COURSE DESCR.docx
ACC 574 – Student Notes(Prerequisite ACC 562)COURSE DESCR.docx
 
8. Process: ocp cfops document mgmt
8. Process: ocp cfops document mgmt8. Process: ocp cfops document mgmt
8. Process: ocp cfops document mgmt
 
Presentation for Six Sigma certification
Presentation for Six Sigma certificationPresentation for Six Sigma certification
Presentation for Six Sigma certification
 
Study Setup_Katalyst HLS
Study Setup_Katalyst HLSStudy Setup_Katalyst HLS
Study Setup_Katalyst HLS
 
Information Systems Acquisition.docx
Information Systems Acquisition.docxInformation Systems Acquisition.docx
Information Systems Acquisition.docx
 

More from Ten Six Consulting

Primavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals TrainingPrimavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals TrainingTen Six Consulting
 
Primavera P6 Professional Advanced Training
Primavera P6 Professional Advanced TrainingPrimavera P6 Professional Advanced Training
Primavera P6 Professional Advanced TrainingTen Six Consulting
 
Primavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator TrainingPrimavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator TrainingTen Six Consulting
 
Deltek Cobra Advanced Training
Deltek Cobra Advanced TrainingDeltek Cobra Advanced Training
Deltek Cobra Advanced TrainingTen Six Consulting
 
Difficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White PaperDifficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White PaperTen Six Consulting
 
Online primavera p6 advanced topics training
Online primavera p6 advanced topics trainingOnline primavera p6 advanced topics training
Online primavera p6 advanced topics trainingTen Six Consulting
 
Primavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsPrimavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsTen Six Consulting
 
Primavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsPrimavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsTen Six Consulting
 
Primavera P6 Reports Tab Samples
Primavera P6 Reports Tab SamplesPrimavera P6 Reports Tab Samples
Primavera P6 Reports Tab SamplesTen Six Consulting
 
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...Ten Six Consulting
 
Installing Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standaloneInstalling Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standaloneTen Six Consulting
 
Primavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheetPrimavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheetTen Six Consulting
 
Primavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexPrimavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexTen Six Consulting
 
Primavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar MapPrimavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar MapTen Six Consulting
 
Measurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to AvoidMeasurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to AvoidTen Six Consulting
 
Earned Value Management Variance
Earned Value Management VarianceEarned Value Management Variance
Earned Value Management VarianceTen Six Consulting
 
Primavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar MapPrimavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar MapTen Six Consulting
 
Integrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) TrainingIntegrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) TrainingTen Six Consulting
 

More from Ten Six Consulting (20)

Primavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals TrainingPrimavera P6 Professional Fundamentals Training
Primavera P6 Professional Fundamentals Training
 
Primavera P6 Professional Advanced Training
Primavera P6 Professional Advanced TrainingPrimavera P6 Professional Advanced Training
Primavera P6 Professional Advanced Training
 
Primavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator TrainingPrimavera P6 EPPM Administrator Training
Primavera P6 EPPM Administrator Training
 
Deltek Cobra Advanced Training
Deltek Cobra Advanced TrainingDeltek Cobra Advanced Training
Deltek Cobra Advanced Training
 
Difficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White PaperDifficult Conversations For PMO Leaders To Have - White Paper
Difficult Conversations For PMO Leaders To Have - White Paper
 
Online primavera p6 advanced topics training
Online primavera p6 advanced topics trainingOnline primavera p6 advanced topics training
Online primavera p6 advanced topics training
 
Management Reserve
Management ReserveManagement Reserve
Management Reserve
 
Primavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation InstructionsPrimavera P6 Professional Windows 10 Installation Instructions
Primavera P6 Professional Windows 10 Installation Instructions
 
Primavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructionsPrimavera p6 professional windows 8 installation instructions
Primavera p6 professional windows 8 installation instructions
 
Primavera P6 Reports Tab Samples
Primavera P6 Reports Tab SamplesPrimavera P6 Reports Tab Samples
Primavera P6 Reports Tab Samples
 
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
Oracle Business Intelligence Publisher for Primavera Contract Management Trai...
 
Installing Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standaloneInstalling Oracle Primavera P6 Professional standalone
Installing Oracle Primavera P6 Professional standalone
 
Primavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheetPrimavera P6 EPPM Global and project security profile settings worksheet
Primavera P6 EPPM Global and project security profile settings worksheet
 
Primavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets IndexPrimavera P6 EPPM Portlets Index
Primavera P6 EPPM Portlets Index
 
Primavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar MapPrimavera P6 Professional Toolbar Map
Primavera P6 Professional Toolbar Map
 
Measurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to AvoidMeasurement Of Performance – Common Pitfalls to Avoid
Measurement Of Performance – Common Pitfalls to Avoid
 
Earned Value Management Variance
Earned Value Management VarianceEarned Value Management Variance
Earned Value Management Variance
 
Primavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar MapPrimavera P6 Professional R8.x Toolbar Map
Primavera P6 Professional R8.x Toolbar Map
 
Integrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) TrainingIntegrated Baseline Review (IBR) Training
Integrated Baseline Review (IBR) Training
 
Primavera P6 Hot Keys
Primavera P6 Hot KeysPrimavera P6 Hot Keys
Primavera P6 Hot Keys
 

Recently uploaded

TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 

Recently uploaded (20)

TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 

Advanced evm workshop

  • 1.   Advanced  EVM  Workshop             Duration: 4-days Audience: Attendees should have attended the Ten Six 3-day EVMS Training class or have some prior working knowledge of Earned Value Management. Description: This 4-day workshop is targeted at Program Management and Program Planning & Cost Controls personnel that need a more thorough and practical understanding of the implementation requirements of the ANSI-748 EV Guidelines. Numerous case studies are utilized enabling attendees to understand both the philosophy and mechanics of implementing the 32 ANSI-748 Guidelines on an atypical example Project. The ultimate takeaway goal of this class, is for attendees to be able to more effectively engage the cost, schedule and technical management requirements of their respective projects as a result of hands on experience gained in the classroom. Course Contents   Day One 1.0 1.1 1.2 1.3 1.4 General Course Outline PMI Program Management Process flow Overview of ANSI-748 EVM Concepts Discussion of Statement of Work (SOW) to be used throughout workshop 2.0 Organization Guidelines Section 2.1 Review of Organization Guidelines 2.2 Discussion of internal processes impacted by Organization Guidelines 2.3 MIL-STD-881 Work Breakdown Structure (WBS) Preparation 2.4 Organization Breakdown Structure (OBS) Chart Preparation 2.5 Control Account (CA) Designation Review 2.6 Responsibility Assignment Matrix (RAM) development requirements 2.7 WBS/SOW Alignment Matrix Development 2.8 Case Study 1, Preparation of WBS, OBS, CA Designation, RAM Preparation and WBS/SOW Alignment Charts 3.0 Planning, Scheduling and Budgeting Guidelines Section 3.1 Review of Planning, Scheduling & Budgeting Guidelines
  • 2.   3.2 Discussion of internal processes impacted by Planning, Scheduling & Budgeting Guidelines 3.3 Review of Earned Value Techniques (EVTs) and their applications 3.4 Discussion of Case Study Deliverables and Integrated Master Schedule requirements 3.5 Review of critical path scheduling process and slack (float determination) 3.6 Case Study 2, Development of Critical Path and Slack (float) calculation 3.7 Discussion of significance of linkage between critical path schedule and Gantt schedules for presentations 3.8 Scheduling hierarchy and scheduling techniques 3.9 Task Interrelationships and their determination 3.10 Schedule Vertical & Horizontal Traceability 3.11 Introduction/discussion of development of Integrated Master Schedule (IMS) elements to be used in follow-up Case Study 3 3.12 Case Study 3, Development of Summary Level & Detail IMS For Follow-on class work & RAM updates Day 2 3.11 Completion of Case Study 3 & review of solution sets 3.12 Control Account Plan (CAP) elements & it’s preparation 3.13 Review of Material & Subcontract EVTs and their applications 3.14 Budgeting process and elements (Labor, Material, ODC) to be used in Case Studies 3.15 Case Study 4, Development of CAPs from Case Study materials prepared to date 3.16 Work Authorization Document (WAD) content, attachments, usage & approval cycles 3.17 Case Study 5, Preparation of WADs for Case study materials 4.0 Accounting Guidelines Section 4.1 Review of ANSI-748 Accounting Guidelines 4.2 Discussion of internal processes impacted by Accounting Guidelines 4.3 Cost Element Matrix contents & preparation discussion 4.4 Case Study 6, Population of Cost Element Matrix from RAM & CAPs 4.5 Review of Cost Charge Number (CCN) assignment to CA process for traceability 4.6 Role of WBS/SOW Alignment Matrix in CCN requirements 4.7 Case Study 7, Determination of minimum number of CCNs required for CA traceability using RAM, Cost Element Matrix & WBS/SOW Alignment Matrix as basis 4.8 Review of Indirect Cost allocation requirements in EV environment 4.9 Group Case Study 8, Determination of Indirect Cost Collection Sources 5.0 5.1 5.2 5.3 Managerial Analysis Section Review of Managerial Analysis Guidelines Discussion of internal processes impacted by Managerial Analysis Guidelines Review Business Rhythm schedules and status update process guidelines
  • 3.   5.4 Case Study 9, Statusing IMS and CAP updates 5.5 Review of EVM SV, CV & VAC managerial reports and their content 5.6 Case Study 10, Preparation of Cost & Schedule Status Reports using updated IMS and CAP info 5.7 Discussion of Case Study 10 solution set Day 3 5.8 Definition of Variance Thresholds usage & determination 5.9 Group Case Study 11, Definition of Variance Thresholds to be used for internal & external variance reporting 5.10 Discussion of necessity of internal vs external Variance Analysis Reports (VAR) thresholds 5.11 Case Study 12, Identification of CVs & SVs that would require VARs based upon Case Studies 10 & 11 output 5.12 Discussion of statistical tools (Independent Estimate at Completion Tools, IEAC) to use in evaluating Estimate at Completions (EACs) 5.13 Case Study 13, Utilization of IEAC tools to analyze EACs shown in Case Study 10 5.14 Definition of VAR sections, their content and approval cycles 5.15 Group Case Study 14, Definition of CV, SV & VACs that will require VARs based upon Variance Thresholds 5.16 Discussion of appropriate content to be addressed in VAR write-ups 5.17 Case Study 15, Development of internal VARs based upon Case Study materials prepared to date 5.18 Group Case Study 16, Review of internal VARs prepared to determine acceptability of content 5.19 Discussion of internal VAR content vs external VAR content 5.20 Review of external ANSI-748 Integrated Performance Management Reports (IPMR) Formats 1 thru 6 formats & content 5.21 Case Study 17, Preparation of external IPMR Reports from Case Study materials prepared to date Day 4 5.22 Discussion of Case Study 17 solution set with emphasis upon differentiation between external and internal report content/traceability 6.0 Baseline Maintenance and Revision of Data Section 6.1 Review of Baseline Maintenance Guidelines 6.2 Discussion of roles of Contract Change Requests (CCRs) and Baseline Logs 6.3 CCR & Baseline Log process flow discussion 6.3 Review of Change Criteria for generation of CCRs 6.4 Review of Case Study materials to be used in follow-up Case Study 18 6.5 Case Study 18, Generation of various scenarios traceability with CCR and Baseline Log entries 6.6 Group discussion of Case Study 18 material solution sets 6.7 Review of CAM Interview Process and CAM Notebook documentation required
  • 4.   6.8 Review of Case Study materials to be used in follow-up Case Study 19 6.9 Case Study 19, Assembling CAM Notebooks using Case Study materials completed to date 6.10 Discussion of Case Study 19 material solution sets 6.11 Questions and Answers regarding materials covered Day 1 thru 4 6.12 Dismissal       For more details please contact Ten Six Consulting at (703) 910-2600 or email us at training@tensixconsulting.com