Impressed current Cathodic Protection system
Design
• Impressed current cathodic protection systems (ICCP) are used to provide cathodic
protection for pipelines, ship hulls, offshore production platforms, water and
wastewater treatment equipment, tank farm and of course underground storage tanks.
• The principle advantage of ICCP is its much greater output capacity as compared to
galvanic anode systems. Therefore when protection is desired for large, poorly coated
and bare structures ICCP is often the choice.
• ICCP systems require external DC power source that is energized by standard AC
current.
•There are many anode materials available and most of them provide 100-10000 times
current provided by galvanic anodes.
•The amount of Metal exposed in UST’s is very large, so to inhibit corrosion, current
required is typically in excess of 4-8 amps per service station.
Advantages and Limitations
There are several advantages of using ICCP systems:
• Unlimited current output capacity: The amount of current can be designed
from few amperes to several 100 amperes. The amt of current will be a function of
no. of anodes provided, the rectifier voltage and amperage capacity and soil
(electrolyte) resistivity.
• Adjustable output capacity: The output of rectifier can easily be adjusted to
accommodate the changes in circuit resistance or current requirement. It can be
automatic or manually controllable.
• Low cost per ampere of CP system: Galvanic anodes are expensive where
amperes rather mill amperes are required.
The ICCP do have disadvantages as well, and can be listed as:
• They are most costly even if only a mill amperes of current is required. Their base
cost itself is several thousand dollars.
• ICCP have higher maintenance cost because they are prone to failure of switches,
fuses and need to be monitored frequently.
• ICCP may create stray current corrosion on other near by structures and it is
inherent potential problem of system. This can be minimized sometimes by
distributed anode designs where by anodes are placed near to protected structure.
Available Anode Materials
There are no. of anode materials used, which are selected depending on environment
and congestion. Like HSCI and Graphite anodes are used for Pipelines while Ti based
Precious metal oxide anodes are used in UST because of light wt and small diameter.
Canisters are filled with high conductivity
coal or calcined petroleum breeze.
Canisters are metallic spiral galvanized
ducts with dia of 3’’, 4’’, 6’’ etc. Package shd
be provided 2-3’’ bore.
The type and no. of anodes is dictated by user experience and current required for
protection of structure.
Jobs for Corrosion engineers include:
• Current requirement test: by installing temporary current anode bed of cu
electrodes and measuring the potential of structure with Cu-CuSO4 electrode versus
increase in current.
• Continuity: All metallic components that are to be protected must be electrically
continuous. Nearby foreign structures must also be made continuous to avert stray
corrosion effect.
• soil resistivity: Resistivity test is most essential to the design and are measured with
varying depths by 4 pin Resisitivity meter or two pin shepard canes device.
• Anode Location and Size: one method is to install anodes at depth of 10-20 feet in
augured holes with a spacing centre to centre of 10-30 feet with first anode being
placed 100 to 500 feet from the pipeline depending upon soil resistivity and structure
coating.
Continued……
•Another option is to distribute the anodes along the structure with each anode being
placed 10-20 feet from the structure. This is occasionally done on large diameter bare
pipelines while almost always done on UST’s.
•The anodes are generally distributed based on current requirement testing and
current requirement for each metallic component to be protected.
• All the resistance formulas mentioned in Galvanic protection system design
equally apply to Impressed current anodes. The tables provide below are based on
1000 ohm cm resistivity spaced between 10-20 feet. Incase ,If soil resistivity is 4500
ohm cm then multiply it by 4.5, because of linear relationship with resistance.
Anodes and Ground Lead wires
• The most common insulation for anode lead wires are High MW low density
polyethylene CP cable. Other cables for more arduous atmosphere are Halar, Kynar and
Hypalon insulations. The cu conductor is most commonly #8 AWG 7 strand annealed
copper.
• Use of individual wires has the double benefit, one is to eliminate splices and assuring
only one anode become inoperative if it got damaged.
• System ground wire: Ground wire should be from structure to negative terminal of
Rectifier and connection is done by thermite brazing directly to the metal.
Thermite brazing
Rectifier power supply
For selection of Power supply, these things are to be considered:
• DC output
• Capacity
• AC supply voltage
• In addition the method of control (manual/automatic), cabinetry, monitoring
devices etc must be clearly defined and selected.
• The control selection will depend on location of Test station. Far off places with
no frequent checkups will be monitored by remote methods while nearby places
are usually monitored by Manual controls.
• Some features which are suggested for underground operation are constant
current control and remote monitoring with the ability of requesting potential
readings from permanent reference electrodes.
Resistance of Prepackaged Anodes
Graphic Representation of Resistance for 3’’ canister
Graphic Representation of Resistance for 4 and 6’’ canister
Potential required for cathodic protection
Metal Potential
(Cu/CuSO4)
Steel -850 mV
Steel (sulphate reducing bacteria) -950 mV
Copper alloys -500 to –650 mV
Lead -600 mV
Aluminium -950 to –1200 mV
Useful Data for Protection of Steel in Various environment
Current densities required to protect steel
Environment Current density
A m-2
Acidic solutions 350 – 500
Saline solutions 0.3 – 10
Sea water 0.05 – 0.15
Saline mud 0.025 – 0.05
Current densities
Environment Resistivity (ohm cm)
Brackish river water 1
Sea water 25
Town supply water 1000 – 1200
Alluvial soils 1000 – 2000
Clays 1000 – 5000
Gravel 10000 – 25000
Sand 25000 – 50000
Average resistivity's of some soils
Impressed Current Cathodic Protection System Design ICCP

Mais conteúdo relacionado

Mais procurados

Cathodic Protection
Cathodic ProtectionCathodic Protection
Cathodic Protectionmichaeljmack
 
(cathodic protection)
(cathodic protection) (cathodic protection)
(cathodic protection) Mohamed Safwat
 
Cathodic protection fundamentals
Cathodic protection fundamentalsCathodic protection fundamentals
Cathodic protection fundamentalsAbinash Padhy
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentationIan Moore
 
An introduction to cathodic protection
An introduction to cathodic protectionAn introduction to cathodic protection
An introduction to cathodic protectionHarry Mg
 
Methods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksMethods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksRajSamy
 
Corrosion in pipeline
Corrosion in pipelineCorrosion in pipeline
Corrosion in pipelineDuy Vu
 
Advanced Cathodic Protection - CP Series - Eric Langelund
Advanced Cathodic Protection - CP Series - Eric LangelundAdvanced Cathodic Protection - CP Series - Eric Langelund
Advanced Cathodic Protection - CP Series - Eric Langelundnacetwincities
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failureSreekumar K S
 
Weld Defects
Weld DefectsWeld Defects
Weld Defectsadminn2
 
Subsea pipeline Repair and Maintenance
Subsea pipeline Repair and Maintenance Subsea pipeline Repair and Maintenance
Subsea pipeline Repair and Maintenance JaidevSinghKalsi
 
CORROSION INHIBITORS (1).pptx
CORROSION INHIBITORS (1).pptxCORROSION INHIBITORS (1).pptx
CORROSION INHIBITORS (1).pptxRajesh Bhurke
 

Mais procurados (20)

Cathodic Protection
Cathodic ProtectionCathodic Protection
Cathodic Protection
 
cathodic protection
cathodic protectioncathodic protection
cathodic protection
 
Cathodic protection
Cathodic protectionCathodic protection
Cathodic protection
 
(cathodic protection)
(cathodic protection) (cathodic protection)
(cathodic protection)
 
Cathodic protection fundamentals
Cathodic protection fundamentalsCathodic protection fundamentals
Cathodic protection fundamentals
 
Cathodic protection
Cathodic protectionCathodic protection
Cathodic protection
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
Storage tank inspection presentation
Storage tank inspection presentationStorage tank inspection presentation
Storage tank inspection presentation
 
An introduction to cathodic protection
An introduction to cathodic protectionAn introduction to cathodic protection
An introduction to cathodic protection
 
Methods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 TanksMethods of examination of joints(RT) - API 650 Tanks
Methods of examination of joints(RT) - API 650 Tanks
 
Corrosion in pipeline
Corrosion in pipelineCorrosion in pipeline
Corrosion in pipeline
 
Advanced Cathodic Protection - CP Series - Eric Langelund
Advanced Cathodic Protection - CP Series - Eric LangelundAdvanced Cathodic Protection - CP Series - Eric Langelund
Advanced Cathodic Protection - CP Series - Eric Langelund
 
corrosion
corrosioncorrosion
corrosion
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failure
 
Corrosion Under Insulation
Corrosion Under InsulationCorrosion Under Insulation
Corrosion Under Insulation
 
Weld Defects
Weld DefectsWeld Defects
Weld Defects
 
Subsea pipeline Repair and Maintenance
Subsea pipeline Repair and Maintenance Subsea pipeline Repair and Maintenance
Subsea pipeline Repair and Maintenance
 
CORROSION INHIBITORS (1).pptx
CORROSION INHIBITORS (1).pptxCORROSION INHIBITORS (1).pptx
CORROSION INHIBITORS (1).pptx
 
Corrosion
CorrosionCorrosion
Corrosion
 

Semelhante a Impressed Current Cathodic Protection System Design ICCP

64132673-Cathodic-Protection- diseños-Design.ppt
64132673-Cathodic-Protection- diseños-Design.ppt64132673-Cathodic-Protection- diseños-Design.ppt
64132673-Cathodic-Protection- diseños-Design.pptomar681193
 
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020nacetwincities
 
Chapter 4 mechanical design of transmission lines
Chapter 4  mechanical design of transmission linesChapter 4  mechanical design of transmission lines
Chapter 4 mechanical design of transmission linesfiraoltemesgen1
 
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016Mahesh Chandra Manav
 
Electrical safety presentation by jmv railway and invitation ireee2019 at ...
Electrical safety  presentation by jmv   railway and invitation ireee2019 at ...Electrical safety  presentation by jmv   railway and invitation ireee2019 at ...
Electrical safety presentation by jmv railway and invitation ireee2019 at ...Mahesh Chandra Manav
 
Cables22-1-19.pptx
Cables22-1-19.pptxCables22-1-19.pptx
Cables22-1-19.pptxIAIvachan
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authorityMahesh Chandra Manav
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authorityMahesh Chandra Manav
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS LtdMahesh Chandra Manav
 
Power Shunts - Copper Braided Shunts For Switchgear & Transformers
Power Shunts - Copper Braided Shunts For Switchgear & TransformersPower Shunts - Copper Braided Shunts For Switchgear & Transformers
Power Shunts - Copper Braided Shunts For Switchgear & TransformersThorne & Derrick International
 
Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDMahesh Chandra Manav
 
Traction distribution
Traction distribution Traction distribution
Traction distribution Amit Kumar
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTDMahesh Chandra Manav
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsMahesh Chandra Manav
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Mahesh Chandra Manav
 
Design of Electrical Installation of Buildings.ppt
Design of Electrical Installation of Buildings.pptDesign of Electrical Installation of Buildings.ppt
Design of Electrical Installation of Buildings.pptSameeraShaman
 

Semelhante a Impressed Current Cathodic Protection System Design ICCP (20)

64132673-Cathodic-Protection- diseños-Design.ppt
64132673-Cathodic-Protection- diseños-Design.ppt64132673-Cathodic-Protection- diseños-Design.ppt
64132673-Cathodic-Protection- diseños-Design.ppt
 
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
 
Chapter 4 mechanical design of transmission lines
Chapter 4  mechanical design of transmission linesChapter 4  mechanical design of transmission lines
Chapter 4 mechanical design of transmission lines
 
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
Electrical Products and Human Live safety Umbrealla(SACHET) NBC2016
 
Cable Sizing Calculations
Cable Sizing CalculationsCable Sizing Calculations
Cable Sizing Calculations
 
Electrical safety presentation by jmv railway and invitation ireee2019 at ...
Electrical safety  presentation by jmv   railway and invitation ireee2019 at ...Electrical safety  presentation by jmv   railway and invitation ireee2019 at ...
Electrical safety presentation by jmv railway and invitation ireee2019 at ...
 
Cables22-1-19.pptx
Cables22-1-19.pptxCables22-1-19.pptx
Cables22-1-19.pptx
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS Ltd
 
Power Shunts - Copper Braided Shunts For Switchgear & Transformers
Power Shunts - Copper Braided Shunts For Switchgear & TransformersPower Shunts - Copper Braided Shunts For Switchgear & Transformers
Power Shunts - Copper Braided Shunts For Switchgear & Transformers
 
Cp1
Cp1Cp1
Cp1
 
Jmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTDJmv Presentation Airport and JMV LPS LTD
Jmv Presentation Airport and JMV LPS LTD
 
Electrical System Design
Electrical System Design Electrical System Design
Electrical System Design
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTD
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lps
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)
 
Residential wiring PPT.pptx
Residential wiring PPT.pptxResidential wiring PPT.pptx
Residential wiring PPT.pptx
 
Design of Electrical Installation of Buildings.ppt
Design of Electrical Installation of Buildings.pptDesign of Electrical Installation of Buildings.ppt
Design of Electrical Installation of Buildings.ppt
 

Último

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Último (20)

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 

Impressed Current Cathodic Protection System Design ICCP

  • 1. Impressed current Cathodic Protection system Design • Impressed current cathodic protection systems (ICCP) are used to provide cathodic protection for pipelines, ship hulls, offshore production platforms, water and wastewater treatment equipment, tank farm and of course underground storage tanks. • The principle advantage of ICCP is its much greater output capacity as compared to galvanic anode systems. Therefore when protection is desired for large, poorly coated and bare structures ICCP is often the choice. • ICCP systems require external DC power source that is energized by standard AC current. •There are many anode materials available and most of them provide 100-10000 times current provided by galvanic anodes. •The amount of Metal exposed in UST’s is very large, so to inhibit corrosion, current required is typically in excess of 4-8 amps per service station.
  • 2. Advantages and Limitations There are several advantages of using ICCP systems: • Unlimited current output capacity: The amount of current can be designed from few amperes to several 100 amperes. The amt of current will be a function of no. of anodes provided, the rectifier voltage and amperage capacity and soil (electrolyte) resistivity. • Adjustable output capacity: The output of rectifier can easily be adjusted to accommodate the changes in circuit resistance or current requirement. It can be automatic or manually controllable. • Low cost per ampere of CP system: Galvanic anodes are expensive where amperes rather mill amperes are required.
  • 3. The ICCP do have disadvantages as well, and can be listed as: • They are most costly even if only a mill amperes of current is required. Their base cost itself is several thousand dollars. • ICCP have higher maintenance cost because they are prone to failure of switches, fuses and need to be monitored frequently. • ICCP may create stray current corrosion on other near by structures and it is inherent potential problem of system. This can be minimized sometimes by distributed anode designs where by anodes are placed near to protected structure.
  • 4. Available Anode Materials There are no. of anode materials used, which are selected depending on environment and congestion. Like HSCI and Graphite anodes are used for Pipelines while Ti based Precious metal oxide anodes are used in UST because of light wt and small diameter. Canisters are filled with high conductivity coal or calcined petroleum breeze. Canisters are metallic spiral galvanized ducts with dia of 3’’, 4’’, 6’’ etc. Package shd be provided 2-3’’ bore.
  • 5. The type and no. of anodes is dictated by user experience and current required for protection of structure. Jobs for Corrosion engineers include: • Current requirement test: by installing temporary current anode bed of cu electrodes and measuring the potential of structure with Cu-CuSO4 electrode versus increase in current. • Continuity: All metallic components that are to be protected must be electrically continuous. Nearby foreign structures must also be made continuous to avert stray corrosion effect. • soil resistivity: Resistivity test is most essential to the design and are measured with varying depths by 4 pin Resisitivity meter or two pin shepard canes device. • Anode Location and Size: one method is to install anodes at depth of 10-20 feet in augured holes with a spacing centre to centre of 10-30 feet with first anode being placed 100 to 500 feet from the pipeline depending upon soil resistivity and structure coating.
  • 6. Continued…… •Another option is to distribute the anodes along the structure with each anode being placed 10-20 feet from the structure. This is occasionally done on large diameter bare pipelines while almost always done on UST’s. •The anodes are generally distributed based on current requirement testing and current requirement for each metallic component to be protected. • All the resistance formulas mentioned in Galvanic protection system design equally apply to Impressed current anodes. The tables provide below are based on 1000 ohm cm resistivity spaced between 10-20 feet. Incase ,If soil resistivity is 4500 ohm cm then multiply it by 4.5, because of linear relationship with resistance.
  • 7. Anodes and Ground Lead wires • The most common insulation for anode lead wires are High MW low density polyethylene CP cable. Other cables for more arduous atmosphere are Halar, Kynar and Hypalon insulations. The cu conductor is most commonly #8 AWG 7 strand annealed copper. • Use of individual wires has the double benefit, one is to eliminate splices and assuring only one anode become inoperative if it got damaged. • System ground wire: Ground wire should be from structure to negative terminal of Rectifier and connection is done by thermite brazing directly to the metal. Thermite brazing
  • 8. Rectifier power supply For selection of Power supply, these things are to be considered: • DC output • Capacity • AC supply voltage • In addition the method of control (manual/automatic), cabinetry, monitoring devices etc must be clearly defined and selected. • The control selection will depend on location of Test station. Far off places with no frequent checkups will be monitored by remote methods while nearby places are usually monitored by Manual controls. • Some features which are suggested for underground operation are constant current control and remote monitoring with the ability of requesting potential readings from permanent reference electrodes.
  • 10. Graphic Representation of Resistance for 3’’ canister
  • 11. Graphic Representation of Resistance for 4 and 6’’ canister
  • 12.
  • 13. Potential required for cathodic protection Metal Potential (Cu/CuSO4) Steel -850 mV Steel (sulphate reducing bacteria) -950 mV Copper alloys -500 to –650 mV Lead -600 mV Aluminium -950 to –1200 mV Useful Data for Protection of Steel in Various environment
  • 14. Current densities required to protect steel Environment Current density A m-2 Acidic solutions 350 – 500 Saline solutions 0.3 – 10 Sea water 0.05 – 0.15 Saline mud 0.025 – 0.05 Current densities
  • 15. Environment Resistivity (ohm cm) Brackish river water 1 Sea water 25 Town supply water 1000 – 1200 Alluvial soils 1000 – 2000 Clays 1000 – 5000 Gravel 10000 – 25000 Sand 25000 – 50000 Average resistivity's of some soils