SlideShare uma empresa Scribd logo
1 de 3
Baixar para ler offline
NAME:      Tarek Salah Ali  
TITLE:       INSTRUMENTATION  JUNIOR TECHNICIAN                   
ADDRESS:    ALMARAKBEA ELKADEMA –KAFR ELDAWAR NIHERA EGYPT – EGYPT   
EMAIL:      KaremTark2006@yahoo.com 
MOBILE:                         +201223791819 
DATE of BIRTH:  10 JULY 1974 
MARITAL STATUS:  MARRIED  
DRIVING LICENCE STATUS :  INTERNATIONAL 
EDUCATION  
• DEPLOM INDUSTRY 1992 
Profile 
• Calibration of all   CALIBRATION    
• loop check    
• pre ‐Commissioning and commissioning for all Instrument Deviccs and valves at sile and start‐up 
all systems. 
• Trouble shooting commissioning
• Maintenance of various types of systems. 
• Installation of all instrument devices. 
CAREER HISTORY  
1. Dietsmann Maintenance Energy  
 From May 2013 till now  
 Project : Mabruk Oil Field  
Client : Total & MOO   
2. Calro Gavazzi Egypt Bonatti                                                                                         
From   :November2011 To July2012                                           
Project :Mellitah Gas Plant                                                        
 Client :  Eni Gas  Libyan Branch                                                                                   
                       
3.  Calro Gavazzi Egypt Bonatti
 From    :  july2008 to February2011  
Project : Mellitah  Gas plant
Client:  Eni Gas  Libyan Branch                                                                                     
4.  Calro  Gavazzi  Egypt‐ Orascom 
  From  :   August2007 to February2008                                       
           Project  :   seawaterDesalion plant‐hamma‐algiers
  Client  :   hnd‐GEin fras trusture – orascom –Besix 
5.   Bonatti  –Technip  
From     : March 2007‐to July 2007
Project  : Amal‐pro duced water wi ection‐Libya 
Client  : Veba Oil Operation –  Libya  
6.  SECC‐Bonatti –SnamProgetti Lummius cas ltd 
Project  : Westrem libya GAS‐Project‐ Meelitah  plant
From     :  July 2006 tojunory2007 
Client  : Eni  GAS –Libya Branch 
7. BONATTi S.P.A.(Letco.)‐Snamprogetti lummiusGasltd
From    : February 2005 up to July 2006 
Project : Western Libya Gas project‐Mellitah plant (WlGP) 
Client :  Eni GAS Libyan Branch 
 
 
 
8. BONATTI S.P.A. (Lt l. CO)‐GREEN STREAM 
From    : november2004 up to January2005 
Project  : Mellitah Gas compression station (MGCS)‐LIBYA.
Nuovo  Pignone commissioning Team to start‐up of4Gas turbines 
and Compressors type (Mss50021DLN)controlled by Markvl  
control system 
 Client   :Eni GAS GREENSTREAM
9.  Carlo   Gavazzi  EGYPT ‐ENPPI 
From      :  september2003 up to October2004 
Project   : UGD C    N.G.L.‐PORTSAIDPROJECT 
Client    : United gas derivatives CO
10.  EDF   (EIetricitede  france)   .(under the name of3EC 
Egyptian Engineering CO)
From      :  August     2002   up   to   August 2003 
Project   :   Boot   project   East portsaid power plant Gas‐fuel 
Fired 
Power plantof2*341 MW Units
Client   : EDF Egyptian   Engineering CO. 
 
 
 
LANGUAGE SKILLS  
Arabic: Mother Tongue 
English: Very Good 
 

Mais conteúdo relacionado

Destaque

Nsaids and GORD - Julie Cornish
Nsaids and GORD - Julie CornishNsaids and GORD - Julie Cornish
Nsaids and GORD - Julie Cornish
welshbarbers
 
G i toxicity of NSAIDs
G i toxicity of NSAIDsG i toxicity of NSAIDs
G i toxicity of NSAIDs
mohmeet
 
High impact articles m.luisetto 2016 an useful instrument in future health c...
High impact articles m.luisetto 2016  an useful instrument in future health c...High impact articles m.luisetto 2016  an useful instrument in future health c...
High impact articles m.luisetto 2016 an useful instrument in future health c...
M. Luisetto Pharm.D.Spec. Pharmacology
 
Editorial pharmaceutical care in surgery field m.luisetto 2016 18 journal of...
Editorial pharmaceutical care in surgery field  m.luisetto 2016 18 journal of...Editorial pharmaceutical care in surgery field  m.luisetto 2016 18 journal of...
Editorial pharmaceutical care in surgery field m.luisetto 2016 18 journal of...
M. Luisetto Pharm.D.Spec. Pharmacology
 
Nsaids and cvs risk
Nsaids and cvs riskNsaids and cvs risk
Nsaids and cvs risk
Richin Koshy
 
Peptic ulcer management in the era of nsaid
Peptic ulcer management in the era of nsaidPeptic ulcer management in the era of nsaid
Peptic ulcer management in the era of nsaid
Eva Puspita
 
Antiinflammatory and nsai ds
Antiinflammatory and nsai dsAntiinflammatory and nsai ds
Antiinflammatory and nsai ds
raj kumar
 

Destaque (20)

Perioperative management of anaphylactic reactions
Perioperative management of anaphylactic reactionsPerioperative management of anaphylactic reactions
Perioperative management of anaphylactic reactions
 
The organs damages as side effects of NSAIDs
The organs damages as side effects of NSAIDsThe organs damages as side effects of NSAIDs
The organs damages as side effects of NSAIDs
 
Nsaids and GORD - Julie Cornish
Nsaids and GORD - Julie CornishNsaids and GORD - Julie Cornish
Nsaids and GORD - Julie Cornish
 
G i toxicity of NSAIDs
G i toxicity of NSAIDsG i toxicity of NSAIDs
G i toxicity of NSAIDs
 
Ethical practice and rational use
Ethical practice and rational useEthical practice and rational use
Ethical practice and rational use
 
High impact articles m.luisetto 2016 an useful instrument in future health c...
High impact articles m.luisetto 2016  an useful instrument in future health c...High impact articles m.luisetto 2016  an useful instrument in future health c...
High impact articles m.luisetto 2016 an useful instrument in future health c...
 
Anti inflammatory drugs
Anti inflammatory drugsAnti inflammatory drugs
Anti inflammatory drugs
 
Editorial pharmaceutical care in surgery field m.luisetto 2016 18 journal of...
Editorial pharmaceutical care in surgery field  m.luisetto 2016 18 journal of...Editorial pharmaceutical care in surgery field  m.luisetto 2016 18 journal of...
Editorial pharmaceutical care in surgery field m.luisetto 2016 18 journal of...
 
Nsaid
Nsaid Nsaid
Nsaid
 
Pain management
Pain managementPain management
Pain management
 
NSAIDs
NSAIDsNSAIDs
NSAIDs
 
Rational use of NSAIDS
Rational use of NSAIDSRational use of NSAIDS
Rational use of NSAIDS
 
Nsai10
Nsai10Nsai10
Nsai10
 
Nsaids and cvs risk
Nsaids and cvs riskNsaids and cvs risk
Nsaids and cvs risk
 
NSAID hypersensitivity
NSAID hypersensitivityNSAID hypersensitivity
NSAID hypersensitivity
 
dr.Husni - paracetamol iv as a safety analgesic
dr.Husni - paracetamol iv as a safety analgesicdr.Husni - paracetamol iv as a safety analgesic
dr.Husni - paracetamol iv as a safety analgesic
 
Anti inflammatory drugs
Anti inflammatory drugsAnti inflammatory drugs
Anti inflammatory drugs
 
NSAIDs ASA GI protection
NSAIDs ASA GI protectionNSAIDs ASA GI protection
NSAIDs ASA GI protection
 
Peptic ulcer management in the era of nsaid
Peptic ulcer management in the era of nsaidPeptic ulcer management in the era of nsaid
Peptic ulcer management in the era of nsaid
 
Antiinflammatory and nsai ds
Antiinflammatory and nsai dsAntiinflammatory and nsai ds
Antiinflammatory and nsai ds
 

Semelhante a CV tareksalah

Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.
Eugene Lockett
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osman
Gomaa Khamis
 
CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3
cristito maghanoy
 
Mohamed Anis Ahmed 2
Mohamed Anis Ahmed 2Mohamed Anis Ahmed 2
Mohamed Anis Ahmed 2
mohamed anis
 
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
Hendri Siswanto
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction manager
Mohamed Roshdy
 
Gamal CV_Mat Cntrl Mngr
Gamal CV_Mat Cntrl MngrGamal CV_Mat Cntrl Mngr
Gamal CV_Mat Cntrl Mngr
gamal aly
 

Semelhante a CV tareksalah (20)

Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.Curriculum Vitae of Eugene Lockett.
Curriculum Vitae of Eugene Lockett.
 
Ahmed CV
Ahmed CVAhmed CV
Ahmed CV
 
1 c.v gomaa khamis osman
1  c.v  gomaa khamis osman1  c.v  gomaa khamis osman
1 c.v gomaa khamis osman
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Moh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaaMoh roshdy curriculum vitae docxaaa
Moh roshdy curriculum vitae docxaaa
 
CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3CRISTITO MAGHANOY (Autosaved)-2-3
CRISTITO MAGHANOY (Autosaved)-2-3
 
Jeorga Lapastora CV
Jeorga Lapastora CVJeorga Lapastora CV
Jeorga Lapastora CV
 
CVword
CVwordCVword
CVword
 
Mohamed Anis Ahmed 2
Mohamed Anis Ahmed 2Mohamed Anis Ahmed 2
Mohamed Anis Ahmed 2
 
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
001.Int'l FOET New 23CV ELECTRICIANS Mr.Hendri Siswanto
 
QAQC-E&I -Resume
QAQC-E&I -ResumeQAQC-E&I -Resume
QAQC-E&I -Resume
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction manager
 
Gamal CV_Mat Cntrl Mngr
Gamal CV_Mat Cntrl MngrGamal CV_Mat Cntrl Mngr
Gamal CV_Mat Cntrl Mngr
 
MISHAR CV
MISHAR CVMISHAR CV
MISHAR CV
 
Fekry NEW 2NEW 2015 qatargas=segas
Fekry NEW 2NEW 2015 qatargas=segasFekry NEW 2NEW 2015 qatargas=segas
Fekry NEW 2NEW 2015 qatargas=segas
 
CURRICULUM VITAE (1)
CURRICULUM VITAE (1)CURRICULUM VITAE (1)
CURRICULUM VITAE (1)
 
Nayyar Abbas Zafar (CV )
Nayyar Abbas Zafar (CV )Nayyar Abbas Zafar (CV )
Nayyar Abbas Zafar (CV )
 
Instrument Supervisor CV
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CV
 
C.v gaber a. elrazek
C.v   gaber a. elrazekC.v   gaber a. elrazek
C.v gaber a. elrazek
 

CV tareksalah

  • 1. NAME:      Tarek Salah Ali   TITLE:       INSTRUMENTATION  JUNIOR TECHNICIAN                    ADDRESS:    ALMARAKBEA ELKADEMA –KAFR ELDAWAR NIHERA EGYPT – EGYPT    EMAIL:      KaremTark2006@yahoo.com  MOBILE:                         +201223791819  DATE of BIRTH:  10 JULY 1974  MARITAL STATUS:  MARRIED   DRIVING LICENCE STATUS :  INTERNATIONAL  EDUCATION   • DEPLOM INDUSTRY 1992  Profile  • Calibration of all   CALIBRATION     • loop check     • pre ‐Commissioning and commissioning for all Instrument Deviccs and valves at sile and start‐up  all systems.  • Trouble shooting commissioning • Maintenance of various types of systems.  • Installation of all instrument devices.  CAREER HISTORY   1. Dietsmann Maintenance Energy    From May 2013 till now    Project : Mabruk Oil Field   Client : Total & MOO    2. Calro Gavazzi Egypt Bonatti                                                                                          From   :November2011 To July2012                                            Project :Mellitah Gas Plant                                                          Client :  Eni Gas  Libyan Branch                                                                                   
  • 2.                         3.  Calro Gavazzi Egypt Bonatti  From    :  july2008 to February2011   Project : Mellitah  Gas plant Client:  Eni Gas  Libyan Branch                                                                                      4.  Calro  Gavazzi  Egypt‐ Orascom    From  :   August2007 to February2008                                                   Project  :   seawaterDesalion plant‐hamma‐algiers   Client  :   hnd‐GEin fras trusture – orascom –Besix  5.   Bonatti  –Technip   From     : March 2007‐to July 2007 Project  : Amal‐pro duced water wi ection‐Libya  Client  : Veba Oil Operation –  Libya   6.  SECC‐Bonatti –SnamProgetti Lummius cas ltd  Project  : Westrem libya GAS‐Project‐ Meelitah  plant From     :  July 2006 tojunory2007  Client  : Eni  GAS –Libya Branch  7. BONATTi S.P.A.(Letco.)‐Snamprogetti lummiusGasltd From    : February 2005 up to July 2006  Project : Western Libya Gas project‐Mellitah plant (WlGP)  Client :  Eni GAS Libyan Branch       
  • 3. 8. BONATTI S.P.A. (Lt l. CO)‐GREEN STREAM  From    : november2004 up to January2005  Project  : Mellitah Gas compression station (MGCS)‐LIBYA. Nuovo  Pignone commissioning Team to start‐up of4Gas turbines  and Compressors type (Mss50021DLN)controlled by Markvl   control system   Client   :Eni GAS GREENSTREAM 9.  Carlo   Gavazzi  EGYPT ‐ENPPI  From      :  september2003 up to October2004  Project   : UGD C    N.G.L.‐PORTSAIDPROJECT  Client    : United gas derivatives CO 10.  EDF   (EIetricitede  france)   .(under the name of3EC  Egyptian Engineering CO) From      :  August     2002   up   to   August 2003  Project   :   Boot   project   East portsaid power plant Gas‐fuel  Fired  Power plantof2*341 MW Units Client   : EDF Egyptian   Engineering CO.        LANGUAGE SKILLS   Arabic: Mother Tongue  English: Very Good