WHITEPAPER
CABLE CONDUCTOR SIZING
FOR MINIMUM LIFE CYCLE COST
Bruno De Wachter, Walter Hulshorst, Rodolfo di Stefano
July 2011
ECI Publication No Cu0105
Available from www.leonardo-energy.org/node/156451
Publication No Cu0105
Issue Date: July 2011
Page i
Document Issue Control Sheet
Document Title: White Paper – Cable Conductor Sizing for Minimum Life Cycle Cost
Publication No: Cu0105
Issue: 01
Release: 06/07/2011
Author(s): Bruno De Wachter, Walter Hulshorst, Rodolfo di Stefano
Reviewer(s): David Chapman, Hans De Keulenaer, Stefan Fassbinder
Document History
Issue Date Purpose Prepared Approved
1 06/07/2011 Initial publication
2
3
Disclaimer
While this publication has been prepared with care, European Copper Institute and other contributors provide
no warranty with regards to the content and shall not be liable for any direct, incidental or consequential
damages that may result from the use of the information or the data contained.
Copyright© European Copper Institute.
Reproduction is authorised providing the material is unabridged and the source is acknowledged.
Publication No Cu0105
Issue Date: July 2011
Page ii
CONTENTS
Summary ........................................................................................................................................................ 1
Optimum is several times larger than standard .............................................................................................. 2
Cable sizing according to the standards .......................................................................................................... 2
Economical cable sizing: the basics ................................................................................................................. 4
Searching for the cross section with lowest LCC............................................................................................5
Recalculating the cost to a present value ..........................................................................................5
Taking the actual loading of the cable into account .........................................................................5
Isolating cable characteristics from operational and financial values ............................................5
Optimal cross section depending on the cable price........................................................................6
An example of a calculation .................................................................................................................6
Table with optimal values .....................................................................................................................7
Searching for the current density with lowest LCC .........................................................................................7
Calculating the losses based on the current density........................................................................7
The cost of energy losses per ton of conductor material.................................................................8
Choosing an optimal current density for a particular economic lifetime ........................................8
Graphical representation ......................................................................................................................8
Taking the scrap value into account ...................................................................................................9
Table with optimal values ...................................................................................................................10
Additional advantages of larger cross sections .............................................................................................10
Improved power quality.......................................................................................................................10
Increased flexibility ..............................................................................................................................10
Round-up...................................................................................................................................................... 11
Annex ........................................................................................................................................................ 12
Table with a few optimal conductor cross sections .............................................................................................12
Table with a few optimal current densities..........................................................................................................12
Publication No Cu0105
Issue Date: July 2011
Page 1
SUMMARY
Energy prices are high and expected to rise. All CO2 emissions are being scrutinized by regulators as well as by
public opinion. As a result, energy management has become a key factor in almost every business. To get the
most out of each kilowatt-hour, appliances must be carefully evaluated for their energy efficiency.
It is an often overlooked fact that electrical energy gets lost in both end-use and in the supply system (cables,
busbars, transformers, etc.). Every cable has resistance, so part of the electrical energy that it carries is
dissipated as heat and is lost.
Such energy losses can be reduced by increasing the cross section of the copper conductor in a cable or
busbar. Obviously, the conductor size cannot be increased endlessly. The objective should be the economic
and/or environmental optimum. What is the optimal cross section necessary to maximize the Return on
Investment (ROI) and minimize the Net Present Value (NPV) and/or the Life Cycle Cost (LCC)?
This paper will demonstrate that the maximizing of the ROI results in a cross section that is far larger than
which technical standards prescribe. Those standards are based entirely on safety and certain power quality
aspects. This means there is room for improvement—a great deal of improvement in fact.
Two different models are used in this presentation:
1) The first model (see page 4) is more detailed and calculates the most economical cross section for a
specific cable connection.
2) The second model (see page 6) is ideal for obtaining an approximation of the ROI with copper
conductors and for developing a company-wide policy for cable sizing, independent of the particular
rated current of a single connection. It calculates the optimal current density.
Calculating the environmental optimum using a Life Cycle Analysis (LCA) is not within the scope of this
whitepaper. However, it is worth mentioning that this environmental optimum lies at an even larger cable
cross section than the economic one. Indeed, the environmental impact of energy losses quickly mounts to
high levels compared to the environmental impact of copper—a 100% recyclable material.
We will calculate the conductor cross section for minimum LCC and maximum RoI.
Publication No Cu0105
Issue Date: July 2011
Page 2
OPTIMUM IS SEVERAL TIMES LARGER THAN STANDARD
The following examples show the order of magnitude of the gap between the technical minimum standard and
the economic optimum.
Take for instance a cable with a rated current of 100 A and a nominal voltage of 230 V. According to the
minimum technical standard, this cable should have a minimum cross section of 25 mm
2
to avoid excessive
heat production.
The economic optimum depends on market and operational conditions. Assume an electricity price of
€100/MWh, a cable price of €0.30/(mm
2
x m), a life time of 10 years, and an interest rate of 7.5%.
Furthermore, suppose an average loading of 65% over 3,700 hours per year (42% of the time). Those figures
result in an optimal cable section of 71.77 mm
2
, a cross section that is nearly three times the standard.
Assuming an average loading of only 40% during a mere 1,400 hours per year (16% of the time) for the same
cable, electricity prices, and lifetime of 10 years, the optimal cable section would still be 44.12 mm
2
, or nearly
twice the safety standard.
The following chapters will show how those calculations are made.
CABLE SIZING ACCORDING TO THE STANDARDS
The international technical standards for cable sizing take safety and certain power quality aspects into
account, but NOT energy efficiency. According to these technical standards, the minimum cross section of a
cable is defined by the most stringent of three restrictions:
1) The thermal impact of the maximum rated current
2) The voltage drop created by the maximum rated current
3) The electro-dynamic impact of the strongest short circuit current
The first restriction is defined in the technical standard IEC 60364-4-43 (Electrical Installations for buildings):
 The heat production in the cable should be restricted to avoid the creation of hot spots that could
affect the insulation quality or which could be dangerously hot to touch. By choosing a sufficient cross
section for the cable, its electrical resistance will remain low, as will the production of heat.
The second restriction is stipulated in the standard DIN 18015-1:2007-09:
 The maximum rated current will create a voltage drop in the cable. This should not be higher than 3%
of the nominal voltage to ensure the proper functioning of all appliances. By choosing a sufficient
cross section for the cable, its electrical resistance will remain low, as will the voltage drop.
The third restriction is defined in the technical standard IEC 60909 (Short-circuit currents in three phase AC
systems):
 The short-circuit current Isc, multiplied by the time-current curve of the circuit breaker, should not
cross the time-current characteristic expressing the electro-dynamic strength of the cable. The latter
is proportional to the cable cross-section.
Publication No Cu0105
Issue Date: July 2011
Page 3
For shorter cables and/or higher voltages, the first restriction (heat production) will be the most stringent in
most cases. For longer cables and/or lower voltages, the second restriction (voltage drop) that will be the most
stringent in most cases.
This whitepaper will demonstrate that a fourth criterion should be taken into account when choosing the
conductor cross section:
4) The cost of the total energy losses in the cable over its economic lifetime should not be higher than
the investment cost of the cable.
This whitepaper will show that this fourth criterion will be the most stringent in the large majority of the
cases.
Publication No Cu0105
Issue Date: July 2011
Page 4
ECONOMICAL CABLE SIZING: THE BASICS
The power losses in a cable at a given moment in time can be calculated using the following formula:
Ploss = I2
x (ρ/A) x l
With:
I = the current in the conductor (depending on the load)
ρ = the specific electrical resistance of the conductor
A = the cross section of the conductor
l = the length of the cable
This should be multiplied by the total time of operation over the lifetime of a cable to obtain the total lifetime
energy losses El:
Elosses = (I2
x (ρ/A) x l) x tlife
We see that the energy losses are inversely proportional to the cross section of the conductor.
The investment cost of the cable, on the contrary, increases close to linear with its cross section.
CTotal = CInvestment + CLosses
The economic cable cross section will be the point where the sum of the investment
cost and the cost of the losses goes through a minimum.
Publication No Cu0105
Issue Date: July 2011
Page 5
SEARCHING FOR THE CROSS SECTION WITH LOWEST LCC
Even though the basic principle is simple, calculating the cable section S leading to the lowest life cycle cost
CTotal introduces a few complexities.
CTotal = CInvestment [S] + CLosses [1/S]
RECALCULATING THE COST TO A PRESENT VALUE
The initial step in this process is to recalculate the cost of the losses to reveal the operational cost at the date
of installation. An interest rate (i) should be set, as well as the economic lifetime of the cable (n). The cost of
the losses should then be multiplied by the following capitalization factor:
N(i,n) = ((1 + i)
n
– 1) / (i – (1 + i)
n
)
Moreover, the average electricity tariff (T) over the economic lifetime of the cable should be estimated.
This leads to the formula for the cost of the energy losses:
Closses = (I
2
x (ρ/A) x L) x tecon life x Tariff electr (€/kWh) x N(i,n)
TAKING THE ACTUAL LOADING OF THE CABLE INTO ACCOUNT
A second point is that the cable will not be loaded at its rated power continuously. This means the time t is not
the complete economic lifetime of the cable, but only the time the cable will be loaded: toperational hours econ life.
Moreover, the current I will not be the rated current, but the average of the currents that really flow through
the cable, a figure that depends on the average relative loading
Ploading = Pload/Prated.
Ireal = (Ireal/Irated) x Irated
= (Pload/Prated) x Irated
= Ploading x Irated
with Ploading a figure varying between 0 and 1
This leads to the following equation:
CLosses = (Ploading)2
(Irated
2
x (ρ/A) x l) x thours x Tariff [€/kWh] x N(i,n)
ISOLATING CABLE CHARACTERISTICS FROM OPERATIONAL AND FINANCIAL VALUES
Now we can put all the factors which are not cable characteristics into one operational and financial value F.
F = (Ploading)2
x thours x Tariff[€/kWh] x N(i, n)
The following table gives a few average values for F per sector.
Industry Interest N (year) Energy Price (euro/MWh) Loading T (hours) F (euro/W)
Iron 7,5% 10 100 65% 3700 7,62
Non Ferrous 7,5% 10 100 35-45% 2730 5,62
Paper 7,5% 10 100 65% 3700 7,62
Chemical 7,5% 10 100 40% 1400 2,88
Datahotel 7,5% 5 100 25-75% 2735 3,32
Office 7,5% 10 100 20-40% 1182 2,43
Publication No Cu0105
Issue Date: July 2011
Page 6
In general industrial conditions, F will vary between 0.5 and 20 €/W. The average value of F across all European
industry sectors is 4.24 €/W. For a long-term investment in a cable that will be constantly loaded close to its
rated power, F can rise above 50 €/W.
The LCC formula now becomes:
CT = CI + CL
CT = CI[S] + 1/A x Irated
2
x ρ x length x F
OPTIMAL CROSS SECTION DEPENDING ON THE CABLE PRICE
The specific resistance of a copper conductor is 2.054 µΩ*cm at a typical operating temperature of 105 °C
(1.720 µΩ*cm at 20 °C) or 0.02054 mΩ*mm.
Consequently, the equation for one meter of cable (1,000 mm) now becomes:
CT = Cc x A + 1/A x Ir
2
x 0.02054 x F
With:
 Cc the cable price in euro per mm
2
cable cross section and per meter cable length
 A the cable cross section expressed in mm
2
 Ir the rated current in Ampère
 F the operational and financial value in €/Watt
This equation gives the total Life Cycle Cost of 1 meter of cable in euro.
The optimal cross section A of a cable is the point where the curve of this equation goes through its minimum.
It can be proved mathematically that this minimum will always lie at the point where the first part and the
second part of the sum are equal.
This occurs when:
Cc x A = 1/A x Ir
2
x 0.02054 x F
Or: A2
= Ir
2
x 0.02054 x F / Cc
AN EXAMPLE OF A CALCULATION
Assume a cable in the Iron Sector that will carry a rated current of 200 A. The average loading in this sector is
65%, while the average operating time is 3,700 hours per year. If the additional assumptions are an interest
rate of 7.5% and an economic lifetime of 10 years, the F factor will be 7.62 euro/W.
At the current copper price, the cost of one meter of cable (3 phases + neutral) can be estimated to be
approximately €0.30 per square millimeter of conductor cross section: €0.30 /(mm
2
x m), or €0.075 for each of
the four conductors.
We can calculate the optimal cross section A from:
A = Ir x 0.1433 x (F/Cc)1/2
With Ir the rated current of the connection, F a financial and operational value varying per
sector, and Cc the cable price per meter and per mm2
cross section.
Publication No Cu0105
Issue Date: July 2011
Page 7
The most economical conductor cross section for this cable will be:
A = 200 x 0.1433 x (7.62/0.30)
1/2
= 144.44 mm
2
Note that according to the technical standard, the minimum conductor cross section for this cable should only
be 53 mm
2
.
TABLE WITH OPTIMAL VALUES
There is a table in the annex providing the optimal cross section for a number of representative sectors,
depending on the rated current Ir.
SEARCHING FOR THE CURRENT DENSITY WITH LOWEST LCC
The calculations executed above are relevant for anyone interest in the most economical cross section for a
single connection. However, to develop a general, company-wide policy for cable sizing, the optimum should
be expressed in terms that are independent of the particular rated current of a single connection.
This can be accomplished by setting a general, company-wide figure for the ratio between the current and the
cross section. This figure is also called the current density (A/mm
2
).
CALCULATING THE LOSSES BASED ON THE CURRENT DENSITY
How can the optimal current density for a company be set?
Remember that the goal is to minimize the Total Present Value of the cables throughout the entire company.
This Total Present Value will be composed of an investment cost paying for the material plus the cost of losses
that are induced in this material over its economic lifetime, recalculated to the present time.
Those losses per amount of conductor material are related to the current density:
Plosses = Ir
2
x ρ/A x L
If J = Ir/A is the current density, then it follows that:
Plosses = J2
x A2
x ρ/A x L
= J2
x A x L x ρ
= J2
x Volume x ρ
In other words, the power loss per volume is:
Plosses / Volume = J2
x ρ
Or with the density of copper being 8.94 ton/m
3
and the value of ρ being 2.054 µΩ*cm at an average operating
temperature of 105 °C (1.720 µΩ*cm at 20 °C), we get:
Plosses [kW/ ton] = (J[A/mm2
])2
x 2.3
The power loss per ton of copper conductor is proportional to the square of the current
density.
Publication No Cu0105
Issue Date: July 2011
Page 8
THE COST OF ENERGY LOSSES PER TON OF CONDUCTOR MATERIAL
If the cable is fully loaded all the time, we must multiply Plosses by 8,760 hours (one year) to get the annual
energy losses. However, while not impossible, this is almost never the case. We therefore need a correction
factor, the Hour-Loss-Equivalent (HLE). This figure is calculated by taking the average over the year of the
(actual power/rated power)
2
. To give an idea of this figure, the HLE in the electricity distribution grid in France
is 3,050 hours. In most industrial sectors, this figure will probably be lower.
A good estimate for HLE is
HLE = 0.65 x Wannual[TWh] / Ptotal [MW]
= 0.65 x HPE
with Wannual the total annual energy consumption of the site (= Work), Ptotal the total power of the site, and HPE
the Hour-Power-Equivalent.
CHOOSING AN OPTIMAL CURRENT DENSITY FOR A PARTICULAR ECONOMIC LIFETIME
In the optimal economic situation, the sum of the losses that are induced in one ton of copper conductor over
its economic lifetime should be equal to the investment cost, namely the cost of one ton of copper.
This means the optimal current density can be calculated using:
J = (C1ton / (Tariff[€/kWh] x HLE x 2.3 x N(i, n)))0.5
GRAPHICAL REPRESENTATION
A graphical representation of the current density can be derived from the above equation.
Suppose a current density of 1.4 A/mm². Note that this density is consistent with the example in the former
calculation model (page 6), where the optimal conductor cross section was calculated to be 144 mm
2
for a
cable of 200 A rated current.
The annual cost of energy losses Cannual energy loss of one ton of copper conductor:
Cannual energy loss / ton = Tariff [€/kW] x HLE x J2
x 2.3
With Tariff the electricity tariff, HLE the Hours of Load Equivalent, and D the current
density.
If:
The cost of 1 ton of copper cable = the cost of the energy losses induced in this ton of
copper over its lifetime
Then:
The economic optimal current density is achieved
Publication No Cu0105
Issue Date: July 2011
Page 9
Furthermore, suppose an HPE of 3,700 hours, an electricity price of 0.1 €/kWh, and a copper price of 6,000
€/ton. This copper price needs to be multiplied with an adjustment factor to get the actual cable price. A factor
of 1.3 is a good estimate for this ratio, giving a cable price of €7,800 per ton of copper conductor used.
The graph that follows presents the curves for the cumulative annual losses, recalculated to the present time
with interest rates of respectively 5% (purple), 7.5% (blue), and 10% (orange). The green curve represents the
investment cost. Thus the economic lifetime of the cable will be 8.5 years, 10 years, and 12.5 years
respectively.
Varying the current density causes the economic lifetime to vary as well. The optimal current density can be
found for a specific economic lifetime through iteration.
Note that the payback period of 10 years for an interest rate of 7.5% is exactly the same as given in the
example of the former model (page 6), meaning that both models are consistent.
TAKING THE SCRAP VALUE INTO ACCOUNT
There is still one element missing in the former example. When a copper cable is dismantled, the copper is not
thrown away but recycled. The owner will receive a significant sum for the scrap. This scrap value should be
recalculated according to current prices and subtracted from the investment value.
Suppose for example a scrap value that is 50% of the value of new copper.
INPUT DATA
density (A/sq.mm) 1,4
loss (kw/ton) 4,508
HPE (hours) 3700
HLE/HPE 0,65
HLE/HPE x HPE 2405
electricity price (€/kwh) 0,1
yearly cost of loss (€) 1084
cable price € / ton copper 7800
Scrap value / new value 0
INPUT DATA
density (A/sq.mm) 1,4
loss (kw/ton) 4,508
HPE (hours) 3700
HLE/HPE 0,65
HLE/HPE x HPE 2405
electricity price (€/kwh) 0,1
yearly cost of loss (€) 1084
cable price € / ton copper 7800
Scrap value / new value 0,5
Publication No Cu0105
Issue Date: July 2011
Page 10
In this case, the curves of the former example are as follows:
The economic lifetime is reduced to approximately 5.5 years. To achieve a higher economic lifetime, a larger
cable cross-section should be chosen.
TABLE WITH OPTIMAL VALUES
In the annex you can find a table providing the optimal current density depending on the loading (Hour Power
Equivalent) and the chosen economic lifetime n.
ADDITIONAL ADVANTAGES OF LARGER CROSS SECTIONS
The advantages of a larger cable cross section are not limited to economic and ecological benefits. A larger
cable cross section also has certain technical advantages, including increased power quality and the flexibility
of the connection.
IMPROVED POWER QUALITY
When the cross section of a conductor is increased, the voltage drop over the line is reduced. This means that
the voltage variation between a loaded and unloaded cable is reduced as well. As a result, power quality issues
(harmonics, voltage dips, transients, etc.) will be less severe.
Furthermore, since the line will be carrying a lower load, the risk of a power outage caused by an overload will
be lower.
INCREASED FLEXIBILITY
The power of the load has to be estimated when a new connection is designed. This is not always an easy task.
An increased cross section of the cable makes the connection more flexible in regards to a future increase in
the load. As long as the cable remains within safety limits, the load increase will not require an immediate
replacement of the cable.
The higher the scrap value, the lower the current density should be chosen (= higher
cross sections) to achieve a particular economic life-time of the cable.
Publication No Cu0105
Issue Date: July 2011
Page 11
ROUND-UP
 Technical standards prescribing the minimum cross section of cables take only safety and certain
power quality arguments into account. However, the most economical cross-section is several times
larger.
 This economical cross section follows from the minimum Net Present Value (NPV) of the cable,
taking the energy losses over the lifetime of the cable into account.
Calculating the NPV requires the rated current of the connection, as well as a few boundary values,
such as the actual loading, the electricity tariff, the interest rate, and a chosen economic lifetime.
 A company-wide policy for choosing economic cable sections can be established by determining a
preferred current density. This optimal current density will minimize the NPV of each ton of copper
conductor, taking the energy losses over its lifetime into account. Calculating this current density
requires the average loading of the cables, the electricity tariff, the interest rate, and a chosen
economic lifetime.
Once a company-wide current density is established, the optimal cross-section for each individual
connection follows directly from the rated current.
 The optimal current density will be even lower if the scrap value of the copper is taken into account.
This means the optimal cross-sections will differ even more from the standard.
 Note that economic and environmental advantages are not the only ones derived from using a larger
cable cross section. It will also have a positive influence on power quality and increase flexibility
regarding future load increases.
Publication No Cu0105
Issue Date: July 2011
Page 12
ANNEX
TABLE WITH A FEW OPTIMAL CONDUCTOR CROSS SECTIONS
For a cable price of 0.3 €/(mm
2
x m)
TABLE WITH A FEW OPTIMAL CURRENT DENSITIES
Standard cross section (mm2)
I rated F = 2.43 (office) F = 7.62 (iron, paper)
20 10 16 1,5
30 16 25 2,5
40 35 35 4
50 35 50 4
60 35 50 6
75 35 70 10
100 50 95 25
150 70 120 35
200 95 150 50
250 120 185 70
300 150 240 95
Economic cross section (mm2)
Standard (approximately)
HPE = 2000 HPE = 3000 HPE = 4000
n = 5 years 1.99 1.63 1.41 6.25
n = 8 years 1.76 1.44 1.25 6.25
n = 10 years 1.68 1.37 1.18 6.25
n = 15 years 1.56 1.27 1.10 6.25
i = 7.5%
HLE/HPE = 0.65
Copper price = € 6000
Cable price = € 6000 x 1.3 = 7800 €/ton of copper conductor
Electricity cost = 0.1 €/kWh
Scrap value = 50% of the value of new copper
Optimal current
density for lowest
NPV of losses
Economic

Mais conteúdo relacionado

Mais procurados

400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protectionSalim Palayi
 
Transmission and Distribution.
Transmission and Distribution.Transmission and Distribution.
Transmission and Distribution.PRABHAHARAN429
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizingAsif Eqbal
 
Power quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUSPower quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUSMOHANASUNDARAM ANTHONY
 
Streamer theory of breakdown
Streamer theory of breakdownStreamer theory of breakdown
Streamer theory of breakdownvishalgohel12195
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformerRitesh Verma
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.pptSalim Palayi
 
Protective relay
Protective relay Protective relay
Protective relay Uday Wankar
 
Electrical Power Distribution Systems Design
Electrical Power Distribution Systems DesignElectrical Power Distribution Systems Design
Electrical Power Distribution Systems DesignCurrent Solutions PC
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmissionSumit Kumar
 
Circuit interruption
Circuit interruptionCircuit interruption
Circuit interruptionjawaharramaya
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoringash08031996
 
Flexible ac transmission system
Flexible ac transmission systemFlexible ac transmission system
Flexible ac transmission systemUday Wankar
 
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...Prashanta Sarkar
 
Bus Bar protection
Bus Bar protectionBus Bar protection
Bus Bar protectionsrini09
 
Principles of power systems v. k. mehta and r. mehta
Principles of power systems v. k. mehta and r. mehtaPrinciples of power systems v. k. mehta and r. mehta
Principles of power systems v. k. mehta and r. mehtaManoj Chowdary
 

Mais procurados (20)

400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protection
 
Transmission and Distribution.
Transmission and Distribution.Transmission and Distribution.
Transmission and Distribution.
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizing
 
Power quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUSPower quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUS
 
Streamer theory of breakdown
Streamer theory of breakdownStreamer theory of breakdown
Streamer theory of breakdown
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
 
substation protection basics.ppt
substation protection basics.pptsubstation protection basics.ppt
substation protection basics.ppt
 
Protective relay
Protective relay Protective relay
Protective relay
 
Electrical Power Distribution Systems Design
Electrical Power Distribution Systems DesignElectrical Power Distribution Systems Design
Electrical Power Distribution Systems Design
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmission
 
Circuit interruption
Circuit interruptionCircuit interruption
Circuit interruption
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoring
 
Flexible ac transmission system
Flexible ac transmission systemFlexible ac transmission system
Flexible ac transmission system
 
Power System Stability Introduction
Power System Stability IntroductionPower System Stability Introduction
Power System Stability Introduction
 
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
OPTIMAL PLACEMENT AND SIZING OF CAPACITOR BANKS BASED ON VOLTAGE PROFILE AND ...
 
Bus Bar protection
Bus Bar protectionBus Bar protection
Bus Bar protection
 
Principles of power systems v. k. mehta and r. mehta
Principles of power systems v. k. mehta and r. mehtaPrinciples of power systems v. k. mehta and r. mehta
Principles of power systems v. k. mehta and r. mehta
 

Destaque

Optimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case StudyOptimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case StudyLeonardo ENERGY
 
Power cable technology in cesc ltd
Power cable technology in cesc ltdPower cable technology in cesc ltd
Power cable technology in cesc ltdAritra Sarkar
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presentionRazu Khan
 

Destaque (6)

Optimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case StudyOptimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case Study
 
Power cable technology in cesc ltd
Power cable technology in cesc ltdPower cable technology in cesc ltd
Power cable technology in cesc ltd
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Cable sizing in ETAP
Cable sizing in ETAPCable sizing in ETAP
Cable sizing in ETAP
 
Cable sizing part 2
Cable sizing part 2Cable sizing part 2
Cable sizing part 2
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presention
 

Semelhante a Cable Conductor Sizing for Minimum Life Cycle Cost

Impact of economical cable conductor sizing
Impact of economical cable conductor sizingImpact of economical cable conductor sizing
Impact of economical cable conductor sizingLeonardo ENERGY
 
Review: Potential Ecodesign regulation for economic cable conductor sizing in...
Review: Potential Ecodesign regulation for economic cable conductor sizing in...Review: Potential Ecodesign regulation for economic cable conductor sizing in...
Review: Potential Ecodesign regulation for economic cable conductor sizing in...Leonardo ENERGY
 
Transformers in Power Distribution Networks
Transformers in Power Distribution NetworksTransformers in Power Distribution Networks
Transformers in Power Distribution NetworksLeonardo ENERGY
 
New generation of copper alloy conductors for overhead electricity lines
New generation of copper alloy conductors for overhead electricity linesNew generation of copper alloy conductors for overhead electricity lines
New generation of copper alloy conductors for overhead electricity linesLeonardo ENERGY
 
Influence choice of the injection nodes of energy source on on-line losses of...
Influence choice of the injection nodes of energy source on on-line losses of...Influence choice of the injection nodes of energy source on on-line losses of...
Influence choice of the injection nodes of energy source on on-line losses of...IJMER
 
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...Leonardo ENERGY
 
30167812 short-circuit-ppt
30167812 short-circuit-ppt30167812 short-circuit-ppt
30167812 short-circuit-pptAnto Damanik
 
Cost savings by low-loss distribution transformers in wind power plants
Cost savings by low-loss distribution transformers in wind power plantsCost savings by low-loss distribution transformers in wind power plants
Cost savings by low-loss distribution transformers in wind power plantsLeonardo ENERGY
 
MV Transformer Replacement Decisions
MV Transformer Replacement DecisionsMV Transformer Replacement Decisions
MV Transformer Replacement DecisionsLeonardo ENERGY
 
Small scale generation by harnessing the wind energy
Small scale generation by harnessing the wind energySmall scale generation by harnessing the wind energy
Small scale generation by harnessing the wind energyeSAT Publishing House
 
Small scale generation by harnessing the wind energy
Small scale generation by harnessing the wind energySmall scale generation by harnessing the wind energy
Small scale generation by harnessing the wind energyeSAT Journals
 
Position Paper: Ecodesign Requirements for Transformers
Position Paper: Ecodesign Requirements for TransformersPosition Paper: Ecodesign Requirements for Transformers
Position Paper: Ecodesign Requirements for TransformersLeonardo ENERGY
 
Underground Cable Fault Detection Using IOT
Underground Cable Fault Detection Using IOTUnderground Cable Fault Detection Using IOT
Underground Cable Fault Detection Using IOTIRJET Journal
 
Power Bank for Laptop using Paper Battery
Power Bank for Laptop using Paper BatteryPower Bank for Laptop using Paper Battery
Power Bank for Laptop using Paper BatteryIRJET Journal
 
Energy Efficient Wireless Internet Access
Energy Efficient Wireless Internet AccessEnergy Efficient Wireless Internet Access
Energy Efficient Wireless Internet AccessScienzainrete
 

Semelhante a Cable Conductor Sizing for Minimum Life Cycle Cost (20)

Impact of economical cable conductor sizing
Impact of economical cable conductor sizingImpact of economical cable conductor sizing
Impact of economical cable conductor sizing
 
Review: Potential Ecodesign regulation for economic cable conductor sizing in...
Review: Potential Ecodesign regulation for economic cable conductor sizing in...Review: Potential Ecodesign regulation for economic cable conductor sizing in...
Review: Potential Ecodesign regulation for economic cable conductor sizing in...
 
Transformers in Power Distribution Networks
Transformers in Power Distribution NetworksTransformers in Power Distribution Networks
Transformers in Power Distribution Networks
 
New generation of copper alloy conductors for overhead electricity lines
New generation of copper alloy conductors for overhead electricity linesNew generation of copper alloy conductors for overhead electricity lines
New generation of copper alloy conductors for overhead electricity lines
 
Influence choice of the injection nodes of energy source on on-line losses of...
Influence choice of the injection nodes of energy source on on-line losses of...Influence choice of the injection nodes of energy source on on-line losses of...
Influence choice of the injection nodes of energy source on on-line losses of...
 
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
Micro-alloyed copper overhead line conductors - Wire & Cable Technology Inter...
 
30167812 short-circuit-ppt
30167812 short-circuit-ppt30167812 short-circuit-ppt
30167812 short-circuit-ppt
 
Cost savings by low-loss distribution transformers in wind power plants
Cost savings by low-loss distribution transformers in wind power plantsCost savings by low-loss distribution transformers in wind power plants
Cost savings by low-loss distribution transformers in wind power plants
 
B011120723
B011120723B011120723
B011120723
 
MV Transformer Replacement Decisions
MV Transformer Replacement DecisionsMV Transformer Replacement Decisions
MV Transformer Replacement Decisions
 
Small scale generation by harnessing the wind energy
Small scale generation by harnessing the wind energySmall scale generation by harnessing the wind energy
Small scale generation by harnessing the wind energy
 
Small scale generation by harnessing the wind energy
Small scale generation by harnessing the wind energySmall scale generation by harnessing the wind energy
Small scale generation by harnessing the wind energy
 
Position Paper: Ecodesign Requirements for Transformers
Position Paper: Ecodesign Requirements for TransformersPosition Paper: Ecodesign Requirements for Transformers
Position Paper: Ecodesign Requirements for Transformers
 
Bl34395398
Bl34395398Bl34395398
Bl34395398
 
Underground Cable Fault Detection Using IOT
Underground Cable Fault Detection Using IOTUnderground Cable Fault Detection Using IOT
Underground Cable Fault Detection Using IOT
 
Power Bank for Laptop using Paper Battery
Power Bank for Laptop using Paper BatteryPower Bank for Laptop using Paper Battery
Power Bank for Laptop using Paper Battery
 
Iaem
IaemIaem
Iaem
 
Sheath bonding method for underground cables
Sheath bonding method for underground cablesSheath bonding method for underground cables
Sheath bonding method for underground cables
 
Energy Efficient Wireless Internet Access
Energy Efficient Wireless Internet AccessEnergy Efficient Wireless Internet Access
Energy Efficient Wireless Internet Access
 
Epcos 5
Epcos 5Epcos 5
Epcos 5
 

Mais de Leonardo ENERGY

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceLeonardo ENERGY
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Leonardo ENERGY
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewablesLeonardo ENERGY
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalLeonardo ENERGY
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects Leonardo ENERGY
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Leonardo ENERGY
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeLeonardo ENERGY
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsLeonardo ENERGY
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EULeonardo ENERGY
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Leonardo ENERGY
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Leonardo ENERGY
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Leonardo ENERGY
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Leonardo ENERGY
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...Leonardo ENERGY
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsLeonardo ENERGY
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotorsLeonardo ENERGY
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wireLeonardo ENERGY
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesLeonardo ENERGY
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...Leonardo ENERGY
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Leonardo ENERGY
 

Mais de Leonardo ENERGY (20)

A new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performanceA new generation of instruments and tools to monitor buildings performance
A new generation of instruments and tools to monitor buildings performance
 
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
 
Auctions for energy efficiency and the experience of renewables
 Auctions for energy efficiency and the experience of renewables Auctions for energy efficiency and the experience of renewables
Auctions for energy efficiency and the experience of renewables
 
Energy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock finalEnergy efficiency first – retrofitting the building stock final
Energy efficiency first – retrofitting the building stock final
 
How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects How auction design affects the financing of renewable energy projects
How auction design affects the financing of renewable energy projects
 
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe (updated)
 
Energy Efficiency Funds in Europe
Energy Efficiency Funds in EuropeEnergy Efficiency Funds in Europe
Energy Efficiency Funds in Europe
 
Five actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculationsFive actions fit for 55: streamlining energy savings calculations
Five actions fit for 55: streamlining energy savings calculations
 
Recent energy efficiency trends in the EU
Recent energy efficiency trends in the EURecent energy efficiency trends in the EU
Recent energy efficiency trends in the EU
 
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
 
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
 
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...Energy efficiency, structural change and energy savings in the manufacturing ...
Energy efficiency, structural change and energy savings in the manufacturing ...
 
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
 
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
 
Modelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windingsModelling and optimisation of electric motors with hairpin windings
Modelling and optimisation of electric motors with hairpin windings
 
Casting zero porosity rotors
Casting zero porosity rotorsCasting zero porosity rotors
Casting zero porosity rotors
 
Direct coil cooling through hollow wire
Direct coil cooling through hollow wireDirect coil cooling through hollow wire
Direct coil cooling through hollow wire
 
Motor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member StatesMotor renovation - Potential savings and views from various EU Member States
Motor renovation - Potential savings and views from various EU Member States
 
The need for an updated European Motor Study - key findings from the 2021 US...
The need for  an updated European Motor Study - key findings from the 2021 US...The need for  an updated European Motor Study - key findings from the 2021 US...
The need for an updated European Motor Study - key findings from the 2021 US...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 

Último

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 

Último (20)

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 

Cable Conductor Sizing for Minimum Life Cycle Cost

  • 1. WHITEPAPER CABLE CONDUCTOR SIZING FOR MINIMUM LIFE CYCLE COST Bruno De Wachter, Walter Hulshorst, Rodolfo di Stefano July 2011 ECI Publication No Cu0105 Available from www.leonardo-energy.org/node/156451
  • 2. Publication No Cu0105 Issue Date: July 2011 Page i Document Issue Control Sheet Document Title: White Paper – Cable Conductor Sizing for Minimum Life Cycle Cost Publication No: Cu0105 Issue: 01 Release: 06/07/2011 Author(s): Bruno De Wachter, Walter Hulshorst, Rodolfo di Stefano Reviewer(s): David Chapman, Hans De Keulenaer, Stefan Fassbinder Document History Issue Date Purpose Prepared Approved 1 06/07/2011 Initial publication 2 3 Disclaimer While this publication has been prepared with care, European Copper Institute and other contributors provide no warranty with regards to the content and shall not be liable for any direct, incidental or consequential damages that may result from the use of the information or the data contained. Copyright© European Copper Institute. Reproduction is authorised providing the material is unabridged and the source is acknowledged.
  • 3. Publication No Cu0105 Issue Date: July 2011 Page ii CONTENTS Summary ........................................................................................................................................................ 1 Optimum is several times larger than standard .............................................................................................. 2 Cable sizing according to the standards .......................................................................................................... 2 Economical cable sizing: the basics ................................................................................................................. 4 Searching for the cross section with lowest LCC............................................................................................5 Recalculating the cost to a present value ..........................................................................................5 Taking the actual loading of the cable into account .........................................................................5 Isolating cable characteristics from operational and financial values ............................................5 Optimal cross section depending on the cable price........................................................................6 An example of a calculation .................................................................................................................6 Table with optimal values .....................................................................................................................7 Searching for the current density with lowest LCC .........................................................................................7 Calculating the losses based on the current density........................................................................7 The cost of energy losses per ton of conductor material.................................................................8 Choosing an optimal current density for a particular economic lifetime ........................................8 Graphical representation ......................................................................................................................8 Taking the scrap value into account ...................................................................................................9 Table with optimal values ...................................................................................................................10 Additional advantages of larger cross sections .............................................................................................10 Improved power quality.......................................................................................................................10 Increased flexibility ..............................................................................................................................10 Round-up...................................................................................................................................................... 11 Annex ........................................................................................................................................................ 12 Table with a few optimal conductor cross sections .............................................................................................12 Table with a few optimal current densities..........................................................................................................12
  • 4. Publication No Cu0105 Issue Date: July 2011 Page 1 SUMMARY Energy prices are high and expected to rise. All CO2 emissions are being scrutinized by regulators as well as by public opinion. As a result, energy management has become a key factor in almost every business. To get the most out of each kilowatt-hour, appliances must be carefully evaluated for their energy efficiency. It is an often overlooked fact that electrical energy gets lost in both end-use and in the supply system (cables, busbars, transformers, etc.). Every cable has resistance, so part of the electrical energy that it carries is dissipated as heat and is lost. Such energy losses can be reduced by increasing the cross section of the copper conductor in a cable or busbar. Obviously, the conductor size cannot be increased endlessly. The objective should be the economic and/or environmental optimum. What is the optimal cross section necessary to maximize the Return on Investment (ROI) and minimize the Net Present Value (NPV) and/or the Life Cycle Cost (LCC)? This paper will demonstrate that the maximizing of the ROI results in a cross section that is far larger than which technical standards prescribe. Those standards are based entirely on safety and certain power quality aspects. This means there is room for improvement—a great deal of improvement in fact. Two different models are used in this presentation: 1) The first model (see page 4) is more detailed and calculates the most economical cross section for a specific cable connection. 2) The second model (see page 6) is ideal for obtaining an approximation of the ROI with copper conductors and for developing a company-wide policy for cable sizing, independent of the particular rated current of a single connection. It calculates the optimal current density. Calculating the environmental optimum using a Life Cycle Analysis (LCA) is not within the scope of this whitepaper. However, it is worth mentioning that this environmental optimum lies at an even larger cable cross section than the economic one. Indeed, the environmental impact of energy losses quickly mounts to high levels compared to the environmental impact of copper—a 100% recyclable material. We will calculate the conductor cross section for minimum LCC and maximum RoI.
  • 5. Publication No Cu0105 Issue Date: July 2011 Page 2 OPTIMUM IS SEVERAL TIMES LARGER THAN STANDARD The following examples show the order of magnitude of the gap between the technical minimum standard and the economic optimum. Take for instance a cable with a rated current of 100 A and a nominal voltage of 230 V. According to the minimum technical standard, this cable should have a minimum cross section of 25 mm 2 to avoid excessive heat production. The economic optimum depends on market and operational conditions. Assume an electricity price of €100/MWh, a cable price of €0.30/(mm 2 x m), a life time of 10 years, and an interest rate of 7.5%. Furthermore, suppose an average loading of 65% over 3,700 hours per year (42% of the time). Those figures result in an optimal cable section of 71.77 mm 2 , a cross section that is nearly three times the standard. Assuming an average loading of only 40% during a mere 1,400 hours per year (16% of the time) for the same cable, electricity prices, and lifetime of 10 years, the optimal cable section would still be 44.12 mm 2 , or nearly twice the safety standard. The following chapters will show how those calculations are made. CABLE SIZING ACCORDING TO THE STANDARDS The international technical standards for cable sizing take safety and certain power quality aspects into account, but NOT energy efficiency. According to these technical standards, the minimum cross section of a cable is defined by the most stringent of three restrictions: 1) The thermal impact of the maximum rated current 2) The voltage drop created by the maximum rated current 3) The electro-dynamic impact of the strongest short circuit current The first restriction is defined in the technical standard IEC 60364-4-43 (Electrical Installations for buildings):  The heat production in the cable should be restricted to avoid the creation of hot spots that could affect the insulation quality or which could be dangerously hot to touch. By choosing a sufficient cross section for the cable, its electrical resistance will remain low, as will the production of heat. The second restriction is stipulated in the standard DIN 18015-1:2007-09:  The maximum rated current will create a voltage drop in the cable. This should not be higher than 3% of the nominal voltage to ensure the proper functioning of all appliances. By choosing a sufficient cross section for the cable, its electrical resistance will remain low, as will the voltage drop. The third restriction is defined in the technical standard IEC 60909 (Short-circuit currents in three phase AC systems):  The short-circuit current Isc, multiplied by the time-current curve of the circuit breaker, should not cross the time-current characteristic expressing the electro-dynamic strength of the cable. The latter is proportional to the cable cross-section.
  • 6. Publication No Cu0105 Issue Date: July 2011 Page 3 For shorter cables and/or higher voltages, the first restriction (heat production) will be the most stringent in most cases. For longer cables and/or lower voltages, the second restriction (voltage drop) that will be the most stringent in most cases. This whitepaper will demonstrate that a fourth criterion should be taken into account when choosing the conductor cross section: 4) The cost of the total energy losses in the cable over its economic lifetime should not be higher than the investment cost of the cable. This whitepaper will show that this fourth criterion will be the most stringent in the large majority of the cases.
  • 7. Publication No Cu0105 Issue Date: July 2011 Page 4 ECONOMICAL CABLE SIZING: THE BASICS The power losses in a cable at a given moment in time can be calculated using the following formula: Ploss = I2 x (ρ/A) x l With: I = the current in the conductor (depending on the load) ρ = the specific electrical resistance of the conductor A = the cross section of the conductor l = the length of the cable This should be multiplied by the total time of operation over the lifetime of a cable to obtain the total lifetime energy losses El: Elosses = (I2 x (ρ/A) x l) x tlife We see that the energy losses are inversely proportional to the cross section of the conductor. The investment cost of the cable, on the contrary, increases close to linear with its cross section. CTotal = CInvestment + CLosses The economic cable cross section will be the point where the sum of the investment cost and the cost of the losses goes through a minimum.
  • 8. Publication No Cu0105 Issue Date: July 2011 Page 5 SEARCHING FOR THE CROSS SECTION WITH LOWEST LCC Even though the basic principle is simple, calculating the cable section S leading to the lowest life cycle cost CTotal introduces a few complexities. CTotal = CInvestment [S] + CLosses [1/S] RECALCULATING THE COST TO A PRESENT VALUE The initial step in this process is to recalculate the cost of the losses to reveal the operational cost at the date of installation. An interest rate (i) should be set, as well as the economic lifetime of the cable (n). The cost of the losses should then be multiplied by the following capitalization factor: N(i,n) = ((1 + i) n – 1) / (i – (1 + i) n ) Moreover, the average electricity tariff (T) over the economic lifetime of the cable should be estimated. This leads to the formula for the cost of the energy losses: Closses = (I 2 x (ρ/A) x L) x tecon life x Tariff electr (€/kWh) x N(i,n) TAKING THE ACTUAL LOADING OF THE CABLE INTO ACCOUNT A second point is that the cable will not be loaded at its rated power continuously. This means the time t is not the complete economic lifetime of the cable, but only the time the cable will be loaded: toperational hours econ life. Moreover, the current I will not be the rated current, but the average of the currents that really flow through the cable, a figure that depends on the average relative loading Ploading = Pload/Prated. Ireal = (Ireal/Irated) x Irated = (Pload/Prated) x Irated = Ploading x Irated with Ploading a figure varying between 0 and 1 This leads to the following equation: CLosses = (Ploading)2 (Irated 2 x (ρ/A) x l) x thours x Tariff [€/kWh] x N(i,n) ISOLATING CABLE CHARACTERISTICS FROM OPERATIONAL AND FINANCIAL VALUES Now we can put all the factors which are not cable characteristics into one operational and financial value F. F = (Ploading)2 x thours x Tariff[€/kWh] x N(i, n) The following table gives a few average values for F per sector. Industry Interest N (year) Energy Price (euro/MWh) Loading T (hours) F (euro/W) Iron 7,5% 10 100 65% 3700 7,62 Non Ferrous 7,5% 10 100 35-45% 2730 5,62 Paper 7,5% 10 100 65% 3700 7,62 Chemical 7,5% 10 100 40% 1400 2,88 Datahotel 7,5% 5 100 25-75% 2735 3,32 Office 7,5% 10 100 20-40% 1182 2,43
  • 9. Publication No Cu0105 Issue Date: July 2011 Page 6 In general industrial conditions, F will vary between 0.5 and 20 €/W. The average value of F across all European industry sectors is 4.24 €/W. For a long-term investment in a cable that will be constantly loaded close to its rated power, F can rise above 50 €/W. The LCC formula now becomes: CT = CI + CL CT = CI[S] + 1/A x Irated 2 x ρ x length x F OPTIMAL CROSS SECTION DEPENDING ON THE CABLE PRICE The specific resistance of a copper conductor is 2.054 µΩ*cm at a typical operating temperature of 105 °C (1.720 µΩ*cm at 20 °C) or 0.02054 mΩ*mm. Consequently, the equation for one meter of cable (1,000 mm) now becomes: CT = Cc x A + 1/A x Ir 2 x 0.02054 x F With:  Cc the cable price in euro per mm 2 cable cross section and per meter cable length  A the cable cross section expressed in mm 2  Ir the rated current in Ampère  F the operational and financial value in €/Watt This equation gives the total Life Cycle Cost of 1 meter of cable in euro. The optimal cross section A of a cable is the point where the curve of this equation goes through its minimum. It can be proved mathematically that this minimum will always lie at the point where the first part and the second part of the sum are equal. This occurs when: Cc x A = 1/A x Ir 2 x 0.02054 x F Or: A2 = Ir 2 x 0.02054 x F / Cc AN EXAMPLE OF A CALCULATION Assume a cable in the Iron Sector that will carry a rated current of 200 A. The average loading in this sector is 65%, while the average operating time is 3,700 hours per year. If the additional assumptions are an interest rate of 7.5% and an economic lifetime of 10 years, the F factor will be 7.62 euro/W. At the current copper price, the cost of one meter of cable (3 phases + neutral) can be estimated to be approximately €0.30 per square millimeter of conductor cross section: €0.30 /(mm 2 x m), or €0.075 for each of the four conductors. We can calculate the optimal cross section A from: A = Ir x 0.1433 x (F/Cc)1/2 With Ir the rated current of the connection, F a financial and operational value varying per sector, and Cc the cable price per meter and per mm2 cross section.
  • 10. Publication No Cu0105 Issue Date: July 2011 Page 7 The most economical conductor cross section for this cable will be: A = 200 x 0.1433 x (7.62/0.30) 1/2 = 144.44 mm 2 Note that according to the technical standard, the minimum conductor cross section for this cable should only be 53 mm 2 . TABLE WITH OPTIMAL VALUES There is a table in the annex providing the optimal cross section for a number of representative sectors, depending on the rated current Ir. SEARCHING FOR THE CURRENT DENSITY WITH LOWEST LCC The calculations executed above are relevant for anyone interest in the most economical cross section for a single connection. However, to develop a general, company-wide policy for cable sizing, the optimum should be expressed in terms that are independent of the particular rated current of a single connection. This can be accomplished by setting a general, company-wide figure for the ratio between the current and the cross section. This figure is also called the current density (A/mm 2 ). CALCULATING THE LOSSES BASED ON THE CURRENT DENSITY How can the optimal current density for a company be set? Remember that the goal is to minimize the Total Present Value of the cables throughout the entire company. This Total Present Value will be composed of an investment cost paying for the material plus the cost of losses that are induced in this material over its economic lifetime, recalculated to the present time. Those losses per amount of conductor material are related to the current density: Plosses = Ir 2 x ρ/A x L If J = Ir/A is the current density, then it follows that: Plosses = J2 x A2 x ρ/A x L = J2 x A x L x ρ = J2 x Volume x ρ In other words, the power loss per volume is: Plosses / Volume = J2 x ρ Or with the density of copper being 8.94 ton/m 3 and the value of ρ being 2.054 µΩ*cm at an average operating temperature of 105 °C (1.720 µΩ*cm at 20 °C), we get: Plosses [kW/ ton] = (J[A/mm2 ])2 x 2.3 The power loss per ton of copper conductor is proportional to the square of the current density.
  • 11. Publication No Cu0105 Issue Date: July 2011 Page 8 THE COST OF ENERGY LOSSES PER TON OF CONDUCTOR MATERIAL If the cable is fully loaded all the time, we must multiply Plosses by 8,760 hours (one year) to get the annual energy losses. However, while not impossible, this is almost never the case. We therefore need a correction factor, the Hour-Loss-Equivalent (HLE). This figure is calculated by taking the average over the year of the (actual power/rated power) 2 . To give an idea of this figure, the HLE in the electricity distribution grid in France is 3,050 hours. In most industrial sectors, this figure will probably be lower. A good estimate for HLE is HLE = 0.65 x Wannual[TWh] / Ptotal [MW] = 0.65 x HPE with Wannual the total annual energy consumption of the site (= Work), Ptotal the total power of the site, and HPE the Hour-Power-Equivalent. CHOOSING AN OPTIMAL CURRENT DENSITY FOR A PARTICULAR ECONOMIC LIFETIME In the optimal economic situation, the sum of the losses that are induced in one ton of copper conductor over its economic lifetime should be equal to the investment cost, namely the cost of one ton of copper. This means the optimal current density can be calculated using: J = (C1ton / (Tariff[€/kWh] x HLE x 2.3 x N(i, n)))0.5 GRAPHICAL REPRESENTATION A graphical representation of the current density can be derived from the above equation. Suppose a current density of 1.4 A/mm². Note that this density is consistent with the example in the former calculation model (page 6), where the optimal conductor cross section was calculated to be 144 mm 2 for a cable of 200 A rated current. The annual cost of energy losses Cannual energy loss of one ton of copper conductor: Cannual energy loss / ton = Tariff [€/kW] x HLE x J2 x 2.3 With Tariff the electricity tariff, HLE the Hours of Load Equivalent, and D the current density. If: The cost of 1 ton of copper cable = the cost of the energy losses induced in this ton of copper over its lifetime Then: The economic optimal current density is achieved
  • 12. Publication No Cu0105 Issue Date: July 2011 Page 9 Furthermore, suppose an HPE of 3,700 hours, an electricity price of 0.1 €/kWh, and a copper price of 6,000 €/ton. This copper price needs to be multiplied with an adjustment factor to get the actual cable price. A factor of 1.3 is a good estimate for this ratio, giving a cable price of €7,800 per ton of copper conductor used. The graph that follows presents the curves for the cumulative annual losses, recalculated to the present time with interest rates of respectively 5% (purple), 7.5% (blue), and 10% (orange). The green curve represents the investment cost. Thus the economic lifetime of the cable will be 8.5 years, 10 years, and 12.5 years respectively. Varying the current density causes the economic lifetime to vary as well. The optimal current density can be found for a specific economic lifetime through iteration. Note that the payback period of 10 years for an interest rate of 7.5% is exactly the same as given in the example of the former model (page 6), meaning that both models are consistent. TAKING THE SCRAP VALUE INTO ACCOUNT There is still one element missing in the former example. When a copper cable is dismantled, the copper is not thrown away but recycled. The owner will receive a significant sum for the scrap. This scrap value should be recalculated according to current prices and subtracted from the investment value. Suppose for example a scrap value that is 50% of the value of new copper. INPUT DATA density (A/sq.mm) 1,4 loss (kw/ton) 4,508 HPE (hours) 3700 HLE/HPE 0,65 HLE/HPE x HPE 2405 electricity price (€/kwh) 0,1 yearly cost of loss (€) 1084 cable price € / ton copper 7800 Scrap value / new value 0 INPUT DATA density (A/sq.mm) 1,4 loss (kw/ton) 4,508 HPE (hours) 3700 HLE/HPE 0,65 HLE/HPE x HPE 2405 electricity price (€/kwh) 0,1 yearly cost of loss (€) 1084 cable price € / ton copper 7800 Scrap value / new value 0,5
  • 13. Publication No Cu0105 Issue Date: July 2011 Page 10 In this case, the curves of the former example are as follows: The economic lifetime is reduced to approximately 5.5 years. To achieve a higher economic lifetime, a larger cable cross-section should be chosen. TABLE WITH OPTIMAL VALUES In the annex you can find a table providing the optimal current density depending on the loading (Hour Power Equivalent) and the chosen economic lifetime n. ADDITIONAL ADVANTAGES OF LARGER CROSS SECTIONS The advantages of a larger cable cross section are not limited to economic and ecological benefits. A larger cable cross section also has certain technical advantages, including increased power quality and the flexibility of the connection. IMPROVED POWER QUALITY When the cross section of a conductor is increased, the voltage drop over the line is reduced. This means that the voltage variation between a loaded and unloaded cable is reduced as well. As a result, power quality issues (harmonics, voltage dips, transients, etc.) will be less severe. Furthermore, since the line will be carrying a lower load, the risk of a power outage caused by an overload will be lower. INCREASED FLEXIBILITY The power of the load has to be estimated when a new connection is designed. This is not always an easy task. An increased cross section of the cable makes the connection more flexible in regards to a future increase in the load. As long as the cable remains within safety limits, the load increase will not require an immediate replacement of the cable. The higher the scrap value, the lower the current density should be chosen (= higher cross sections) to achieve a particular economic life-time of the cable.
  • 14. Publication No Cu0105 Issue Date: July 2011 Page 11 ROUND-UP  Technical standards prescribing the minimum cross section of cables take only safety and certain power quality arguments into account. However, the most economical cross-section is several times larger.  This economical cross section follows from the minimum Net Present Value (NPV) of the cable, taking the energy losses over the lifetime of the cable into account. Calculating the NPV requires the rated current of the connection, as well as a few boundary values, such as the actual loading, the electricity tariff, the interest rate, and a chosen economic lifetime.  A company-wide policy for choosing economic cable sections can be established by determining a preferred current density. This optimal current density will minimize the NPV of each ton of copper conductor, taking the energy losses over its lifetime into account. Calculating this current density requires the average loading of the cables, the electricity tariff, the interest rate, and a chosen economic lifetime. Once a company-wide current density is established, the optimal cross-section for each individual connection follows directly from the rated current.  The optimal current density will be even lower if the scrap value of the copper is taken into account. This means the optimal cross-sections will differ even more from the standard.  Note that economic and environmental advantages are not the only ones derived from using a larger cable cross section. It will also have a positive influence on power quality and increase flexibility regarding future load increases.
  • 15. Publication No Cu0105 Issue Date: July 2011 Page 12 ANNEX TABLE WITH A FEW OPTIMAL CONDUCTOR CROSS SECTIONS For a cable price of 0.3 €/(mm 2 x m) TABLE WITH A FEW OPTIMAL CURRENT DENSITIES Standard cross section (mm2) I rated F = 2.43 (office) F = 7.62 (iron, paper) 20 10 16 1,5 30 16 25 2,5 40 35 35 4 50 35 50 4 60 35 50 6 75 35 70 10 100 50 95 25 150 70 120 35 200 95 150 50 250 120 185 70 300 150 240 95 Economic cross section (mm2) Standard (approximately) HPE = 2000 HPE = 3000 HPE = 4000 n = 5 years 1.99 1.63 1.41 6.25 n = 8 years 1.76 1.44 1.25 6.25 n = 10 years 1.68 1.37 1.18 6.25 n = 15 years 1.56 1.27 1.10 6.25 i = 7.5% HLE/HPE = 0.65 Copper price = € 6000 Cable price = € 6000 x 1.3 = 7800 €/ton of copper conductor Electricity cost = 0.1 €/kWh Scrap value = 50% of the value of new copper Optimal current density for lowest NPV of losses Economic