SlideShare uma empresa Scribd logo
1 de 2
SOUNDARARAJAN T
ESTIMATION ENGINEER
M/S. DICOTECH, ABU DUBAI
 + 971 55 8100 986, +91 97 91 61 3686
 rajansoundar120@gmail.com
B.E MECHANICAL ENGINEER - 1) SENIOR SITE ENGINEER FOR PAINTING INB.E MECHANICAL ENGINEER - 1) SENIOR SITE ENGINEER FOR PAINTING IN ADCOADCO
,QUANTITY SURVEYOR FOR STURCTURAL – FIRE PROOF PAINTING & INSULATION 2),QUANTITY SURVEYOR FOR STURCTURAL – FIRE PROOF PAINTING & INSULATION 2)
ERECTION 0f STURCTURAL, INSULATION & REFRACTORY PROJECT MANAGEMENT -ERECTION 0f STURCTURAL, INSULATION & REFRACTORY PROJECT MANAGEMENT -
THERMAL POWER PLANTTHERMAL POWER PLANT
Seeking a challenging assignment across the Industry which provides me avenues for professional learning and makes good use
of my technical skills and encourages individual growth
PROFILE - Total have 6 Years’ ExperiencePROFILE - Total have 6 Years’ Experience
 Project Scheduling, monitoring and preparation of `Bar Chart' ,Review engineering drawing and specifications and ensure
the correctness of transfer of drawing details to ground ,Coordinating with Design & Construction team, Ensure the quality
of the materials used for construction and also the completed member of the structure ,Supervision and Quality of structure
works as per drawing & specifications & ensure no rework. ,Maintain Quality Records, Ensuring timely resource
availability ,Ensuring Safety on site ,Pursue the contractor for progress with quality, Preparation of Bar Bending Schedule,
Currently work as QUANTITY SURVEYOR (COST & ESTIMATION ) & SENIOR SITE ENGINEER IN M/S.
DICOTECH, ABU DHABI.,
 Competent, diligent and result oriented Mechanical Engineer offering 3 years of experience across the Maintenance ,
Erection of steam Boiler, Structural, Piping, ESP, Refractory & Insulation in Power Plant, Project Management, Quality
Management, Safety, Resource Management, Team Management, spearheading functions as Engineer E1 – ERECTION
ENGINEER WITH M/S.CETHAR LIMITED, TRICHY (EPC CONTRACTORS),TEXCEL ENGINEERING (P) LTD.,CHENNAI.
 Demonstrated professional excellence in project planning, scheduling, monitoring, Site Supervision, and execution of
projects without incidences of time/cost overruns. Understanding of the TQM, ISO & Industrial Standards and Safety
Norms (EHS - Environment, Health & Safety), while commissioning projects.
 Proven strengths in mobilizing and managing materials, machines and manpower resources to generate highest productivity
levels; expertise in implementation of planned, preventive & predictive maintenance practices to optimize machines
availability with constant endeavors to realize ZERO downtime.
 Adept in ensuring Safety and observing physical conditions of work & work practices; adequate understanding in the areas of
Work Place Safety, Process Safety Management, Documentation, Site Management etc.
 Decisive Leader with hands on exposure to General Management, Industrial Relations and Training & Development –
capable of fostering an atmosphere that motivates highly talented professionals to balance high-level skills with maximum
productivity,
Functional Competencies
 Coating and Wrapping application on various sizes Pipeline in ADCO Sites .
 As per drawing or/and BOQ used to make PRC (Quotation).
 Make the PRC and Invoice for monthly.
 Boiler Structures & Pressure Parts Erection.
 Insulation & Refractory application on Boiler, ESP & Piping as per Indian Standard 14164:1994.
 Insulation & Refractory contractor’s RA Billing prepared & cleared.
 As per Engineering Schedule (Density & Thickness) apply the insulation on boiler, piping & ESP.
Some of the Projects:
 ADCO – SITE ENGINEER
 Dubai International Airport Expansion – Concourse C4
 Dubai Airport Terminal 1 Upgrade - SP500
 APM Station-Dubai AirportAPM Station-Dubai Airport
 Dubai MallDubai Mall
 Mall of EmiratesMall of Emirates
CAREER GLIMPSECAREER GLIMPSE
M/S DICOTECH, ABU DUBAI FROM DEC 2015 TO TILL DATE
QUANTITY SURVEYOR ENGINEER & SENIOR SITE ENGINEER IN ADCO
M/S PROCON EMIRATES, DUBAI FROM MAY 13 TO DEC 2015
QUANTITY SURVEYOR ENGINEER FOR BUILDING AND STRUCTURAL
M/S CETHAR LIMITED, TAMIL NADU, INDIA SINCE JUN’10 TO APR 2013
Engineer E1 – Erection & Fabrication
 As per ADCO Task orders prepare the Manpower, Material & Equipment.
 Get work permit (PTW) for related job from related department.
 Ensure the Safety & Quality of Blasting and painting as per ADCO Procedure.
 Ensure the ADCO LPR rules before start the job.
 Taking quantities off from drawings to prepare the Priced bill of quantities for making quotations/Tenders.
 Preparation of Daily, Weekly and Monthly reports & Monthly Valuation.
 Planning and Execution of work, tracking the project schedules.
 Preparing Variation statement, certifying the bill against the work
 Prepare /assist with enquiries to be sent to subcontractors and review tenders, interview and negotiation on
their offers, discuss potential problems and co-ordinate with Contract/Project Managers.
 Prepare /assist with tenders and subsequent accounts for work ancillary to the main contract.
 Notify the Employer/Representative of any variation from contract and claim for extension of time.
 Review the overall effect on project and convey proper information to Contracts Manager/ Project Manager.
 Prepare /assist on final accounts and submission.
 Attend strategy meeting as and when called by Group Commercial Manager.
 Responsible for the mobilization of production planning and material management of work at site, with proper safety and
quality measures, to meet the requirement of progress of project.
 Monitoring quality systems & compliance with pre set standards; troubleshooting and maintaining requisite documents to
ensure complete in-process quality & improvement in process capabilities.
 Responsible for make cutting plan as per Drawing and facilitating project completion in minimum turnaround time, while
ensuring the product quality as per FQP to maximize output.
 Ensuring effective standard inspection and testing procedures and discipline to ensure safe & timely execution of the
projects.
 Successfully coordinate tasks with customer and as well as contractors for the required plant maintenance and supervise
maintenance/ repairing work. Responsible for ensuring optimal utilization of available resources while controlling overhead
costs and enhancing productivity
Project Executing
Abu Dhabi Company for Onshore Oil Operations - LOCATION WORKED IN JABELDHANA & BAB-OIL
2X150MW (495TPH) Coal based Thermal Power plant (CFBC) for M/s. Shree Cement Ltd, Rajasthan
ACADEMIAACADEMIA
Bachelor in Mechanical Engineering, Pass out 2010, Anna University, 72%
Class XII, 2005, State Board of Education, 84%
Class X, 2003, State Board of Education, 70%
Software Proficiency – Auto CAD, MS Office, MS Project, Internet Applications
Date of Birth: 26th
July 1989
Languages Known: Tamil, English & Hindi
Passport No & Valid date: H8847459 & 02/08/2020

Mais conteúdo relacionado

Destaque

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Destaque (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Soundararajan.T Resume - Mechanical Engineer

  • 1. SOUNDARARAJAN T ESTIMATION ENGINEER M/S. DICOTECH, ABU DUBAI  + 971 55 8100 986, +91 97 91 61 3686  rajansoundar120@gmail.com B.E MECHANICAL ENGINEER - 1) SENIOR SITE ENGINEER FOR PAINTING INB.E MECHANICAL ENGINEER - 1) SENIOR SITE ENGINEER FOR PAINTING IN ADCOADCO ,QUANTITY SURVEYOR FOR STURCTURAL – FIRE PROOF PAINTING & INSULATION 2),QUANTITY SURVEYOR FOR STURCTURAL – FIRE PROOF PAINTING & INSULATION 2) ERECTION 0f STURCTURAL, INSULATION & REFRACTORY PROJECT MANAGEMENT -ERECTION 0f STURCTURAL, INSULATION & REFRACTORY PROJECT MANAGEMENT - THERMAL POWER PLANTTHERMAL POWER PLANT Seeking a challenging assignment across the Industry which provides me avenues for professional learning and makes good use of my technical skills and encourages individual growth PROFILE - Total have 6 Years’ ExperiencePROFILE - Total have 6 Years’ Experience  Project Scheduling, monitoring and preparation of `Bar Chart' ,Review engineering drawing and specifications and ensure the correctness of transfer of drawing details to ground ,Coordinating with Design & Construction team, Ensure the quality of the materials used for construction and also the completed member of the structure ,Supervision and Quality of structure works as per drawing & specifications & ensure no rework. ,Maintain Quality Records, Ensuring timely resource availability ,Ensuring Safety on site ,Pursue the contractor for progress with quality, Preparation of Bar Bending Schedule, Currently work as QUANTITY SURVEYOR (COST & ESTIMATION ) & SENIOR SITE ENGINEER IN M/S. DICOTECH, ABU DHABI.,  Competent, diligent and result oriented Mechanical Engineer offering 3 years of experience across the Maintenance , Erection of steam Boiler, Structural, Piping, ESP, Refractory & Insulation in Power Plant, Project Management, Quality Management, Safety, Resource Management, Team Management, spearheading functions as Engineer E1 – ERECTION ENGINEER WITH M/S.CETHAR LIMITED, TRICHY (EPC CONTRACTORS),TEXCEL ENGINEERING (P) LTD.,CHENNAI.  Demonstrated professional excellence in project planning, scheduling, monitoring, Site Supervision, and execution of projects without incidences of time/cost overruns. Understanding of the TQM, ISO & Industrial Standards and Safety Norms (EHS - Environment, Health & Safety), while commissioning projects.  Proven strengths in mobilizing and managing materials, machines and manpower resources to generate highest productivity levels; expertise in implementation of planned, preventive & predictive maintenance practices to optimize machines availability with constant endeavors to realize ZERO downtime.  Adept in ensuring Safety and observing physical conditions of work & work practices; adequate understanding in the areas of Work Place Safety, Process Safety Management, Documentation, Site Management etc.  Decisive Leader with hands on exposure to General Management, Industrial Relations and Training & Development – capable of fostering an atmosphere that motivates highly talented professionals to balance high-level skills with maximum productivity, Functional Competencies  Coating and Wrapping application on various sizes Pipeline in ADCO Sites .  As per drawing or/and BOQ used to make PRC (Quotation).  Make the PRC and Invoice for monthly.  Boiler Structures & Pressure Parts Erection.  Insulation & Refractory application on Boiler, ESP & Piping as per Indian Standard 14164:1994.  Insulation & Refractory contractor’s RA Billing prepared & cleared.  As per Engineering Schedule (Density & Thickness) apply the insulation on boiler, piping & ESP. Some of the Projects:  ADCO – SITE ENGINEER  Dubai International Airport Expansion – Concourse C4  Dubai Airport Terminal 1 Upgrade - SP500  APM Station-Dubai AirportAPM Station-Dubai Airport  Dubai MallDubai Mall  Mall of EmiratesMall of Emirates
  • 2. CAREER GLIMPSECAREER GLIMPSE M/S DICOTECH, ABU DUBAI FROM DEC 2015 TO TILL DATE QUANTITY SURVEYOR ENGINEER & SENIOR SITE ENGINEER IN ADCO M/S PROCON EMIRATES, DUBAI FROM MAY 13 TO DEC 2015 QUANTITY SURVEYOR ENGINEER FOR BUILDING AND STRUCTURAL M/S CETHAR LIMITED, TAMIL NADU, INDIA SINCE JUN’10 TO APR 2013 Engineer E1 – Erection & Fabrication  As per ADCO Task orders prepare the Manpower, Material & Equipment.  Get work permit (PTW) for related job from related department.  Ensure the Safety & Quality of Blasting and painting as per ADCO Procedure.  Ensure the ADCO LPR rules before start the job.  Taking quantities off from drawings to prepare the Priced bill of quantities for making quotations/Tenders.  Preparation of Daily, Weekly and Monthly reports & Monthly Valuation.  Planning and Execution of work, tracking the project schedules.  Preparing Variation statement, certifying the bill against the work  Prepare /assist with enquiries to be sent to subcontractors and review tenders, interview and negotiation on their offers, discuss potential problems and co-ordinate with Contract/Project Managers.  Prepare /assist with tenders and subsequent accounts for work ancillary to the main contract.  Notify the Employer/Representative of any variation from contract and claim for extension of time.  Review the overall effect on project and convey proper information to Contracts Manager/ Project Manager.  Prepare /assist on final accounts and submission.  Attend strategy meeting as and when called by Group Commercial Manager.  Responsible for the mobilization of production planning and material management of work at site, with proper safety and quality measures, to meet the requirement of progress of project.  Monitoring quality systems & compliance with pre set standards; troubleshooting and maintaining requisite documents to ensure complete in-process quality & improvement in process capabilities.  Responsible for make cutting plan as per Drawing and facilitating project completion in minimum turnaround time, while ensuring the product quality as per FQP to maximize output.  Ensuring effective standard inspection and testing procedures and discipline to ensure safe & timely execution of the projects.  Successfully coordinate tasks with customer and as well as contractors for the required plant maintenance and supervise maintenance/ repairing work. Responsible for ensuring optimal utilization of available resources while controlling overhead costs and enhancing productivity Project Executing Abu Dhabi Company for Onshore Oil Operations - LOCATION WORKED IN JABELDHANA & BAB-OIL 2X150MW (495TPH) Coal based Thermal Power plant (CFBC) for M/s. Shree Cement Ltd, Rajasthan ACADEMIAACADEMIA Bachelor in Mechanical Engineering, Pass out 2010, Anna University, 72% Class XII, 2005, State Board of Education, 84% Class X, 2003, State Board of Education, 70% Software Proficiency – Auto CAD, MS Office, MS Project, Internet Applications Date of Birth: 26th July 1989 Languages Known: Tamil, English & Hindi Passport No & Valid date: H8847459 & 02/08/2020