Getting Started with Project SUST-CSIT Ahmed Hamza
Understand the family of Microsoft Office Project 2007 products.  Understand what a good project management tool can help you accomplish. Start Project Standard or Project Professional, and identify the major parts of the Project window. Use views to work with project plan details in different ways. Use reports to print project plan details. Create a project plan and enter a project start date. Set the working and nonworking time for a project. Enter a project plan’s properties Objectives SUST-CSIT Ahmed Hamza
With a good project management system in place, you should be able to answer such questions as What tasks must be performed, and in what order, to produce the deliverable of the project? When should each task be performed? Who will complete these tasks? How much will it cost? What if some tasks are not completed as scheduled? What’s the best way to communicate project details to those who have an interest in the project? SUST-CSIT Ahmed Hamza
Good project management does not guarantee the success of every project, but poor project management usually contributes to failure. SUST-CSIT Ahmed Hamza
Succeeding as a project manager requires that you complete your projects on time, finish within budget, and make sure your customers are happy with what you deliver First, a project is temporary Next, a project is an endeavor. Resources, such as people and equipment, need to do work. Finally, every project creates a unique product or service. This is the deliverable for the project and the reason that the project was undertaken Understanding What Defines a Project SUST-CSIT Ahmed Hamza
SUST-CSIT Ahmed Hamza
The Project Triangle: Viewing Projects in Terms of Time, Cost, and Scope SUST-CSIT Ahmed Hamza
SUST-CSIT Ahmed Hamza
Time, Cost, and Scope: Managing Project Constraints Time, cost, and scope are the three essential elements of any project. To succeed as a project manager, you should know quite a bit about how all three of these constraints apply to your projects this model is a useful learning tool but not always a reflection of the real world SUST-CSIT Ahmed Hamza
you might see projects delivered late but at planned cost or with expected scope SUST-CSIT Ahmed Hamza
The best project management tool in the world can never replace your own good judgment. However, the tool can and should help you accomplish the following: Track all of the information you gather about the work, duration, costs, and resource requirements of your project. Visualize and present your project plan in standard, well-defined formats. Schedule tasks and resources consistently and effectively. SUST-CSIT Ahmed Hamza Managing Your Projects with Project
Communicate with resources and other stakeholders while you, the project manager, retain ultimate control of the project. Manage projects using a program that looks and feels like other desktop productivity applications Exchange project information with other Microsoft Office System applications. SUST-CSIT Ahmed Hamza Cont
It’s common to see task and resource lists from spreadsheet programs, such as Microsoft Office Excel One big advantage that Project has over such applications is that it includes a scheduling engine-a computational brain that can handle issues  This scheduling engine can also consider nonworking time, such as weekends, when calculating a task’s start and finish dates SUST-CSIT Ahmed Hamza What Can a Scheduling Engine Do for You?
On the File menu, click New. The New Project task pane appears. In the New Project task pane, under Templates, click On computer. The Templates dialog box appears. Click the Project Templates tab. Click New Business (you may need to scroll down through the list of Project Templates to see it), and then click OK. Tip Depending on how Project was installed on your computer, the templates included with Project might not be installed at this point. SUST-CSIT Ahmed Hamza
Exploring Views The working space in Project is called a view. Project contains dozens of views, but you normally work with just one view (sometimes two) at a time. You use views to enter, edit, analyze, and display your project information. The default view-the one you see when Project starts-is the Gantt Chart view shown here. On the View menu, click  Resource Sheet Resource Usage Task Usage Calendar SUST-CSIT Ahmed Hamza
Exploring Reports Project contains two types of reports tabular reports that are intended for printing visual reports that allow you to export Project data to Excel and Visio On the Report menu, click Reports Click Custom, and then click the Selectbutton On the Reports list, click Resource (work), and then click the Preview button SUST-CSIT Ahmed Hamza
Next, you will create a visual report to get a close look at overall resource workload and availability through the life of the project On the Report menu, click Visual Reports. For Show Report Template Created In, make sure that Microsoft Office Excel is selected and that the All tab is visible. Click Resource Remaining Work Report, and then click View. SUST-CSIT Ahmed Hamza
On the File menu, click the New command. Then, in the New Project task pane, click Blank Project. Project creates a new, blank project plan. Next, you’ll set the project’s start date. On the Project menu, click Project Information. The Project Information dialog box appears. In the Start date box, type or select 1/7/11.  SUST-CSIT Ahmed Hamza Creating a New Project Plan
Tip In most cases when you need to enter a date in Project, you can click the down arrow next to the Date field to show a small monthly calendar. There you can navigate to any month and then click the date you want, or click Today to quickly choose the current date. SUST-CSIT Ahmed Hamza cont
The project calendar defines the general working and nonworking time for tasks On the Tools menu, click Change Working Time In the For calendar box, click the down arrow. The list that appears contains the three base calendars included with Project. These calendars are as follows: 24 Hours: Has no nonworking time. Night Shift: Covers a “graveyard” shift schedule of Monday night through Saturday morning, 11 P.M. to 8 A.M., with a one-hour break. SUST-CSIT Ahmed Hamza Setting Nonworking Days
Standard: The traditional working day, Monday through Friday from 8 A.M. to 5 P.M., with a one-hour lunch break. Only one of the base calendars serves as the project calenda SUST-CSIT Ahmed Hamza cont
Like other Microsoft Office programs, Project keeps track of several file properties. Some of these properties are statistics, such as how many times the file has been revised. Other properties include information you might want to record about a project plan, such as the project manager’s name or keywords to support a file search. Project also uses properties in page headers and footers when printing. SUST-CSIT Ahmed Hamza Entering Project Properties
you enter some properties that you will use later when printing project information and for other purposes. On the File menu, click Properties. The Properties dialog box appears. Click the Summary tab if it is not already visible. In the Subject box, type Video production schedule. In the Author box, type your name. In the Manager box, type your name, type your manager’s name, or leave the box blank. In the Company box, type Southridge Video. Select the Save preview picture check box SUST-CSIT Ahmed Hamza cont
The Project product family includes Project Standard, Project Professional, Project Server, and Project Web Access. Normally, you would use Project Standard on the desktop or the latter three in combination to form an EPM solution. One of the key distinguishing factors that separates Project from other list-keeping tools, such as Excel, is that Project has a scheduling engine that can work with time. Project includes several sophisticated templates that can provide you with a good start to a new project plan. SUST-CSIT Ahmed Hamza Key Points
The main working space in Project is a view. One or sometimes two views are typically displayed at a time. The Gantt Chart view is the default and probably best known view in Project. Project includes a large number of built-in reports that are intended for viewing (but not editing) Project data. You use calendars in Project to control when work can be scheduled to occur SUST-CSIT Ahmed Hamza cont

Mais conteúdo relacionado

Mais procurados

MS Project 2016
MS Project 2016MS Project 2016
MS Project 2016Tuan Yang
 
Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides SlideTeam
 
Microsoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner'sMicrosoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner'sAbhik Tushar Das
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and schedulingSulman Ahmed
 
Pdf primavera tutorial
Pdf primavera tutorialPdf primavera tutorial
Pdf primavera tutorialKetut Swandana
 
Ms project management
Ms  project managementMs  project management
Ms project managementchinunki4
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...Ed Kozak
 
Ms project training ppt
Ms project training pptMs project training ppt
Ms project training pptglobalp7
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)douggillis
 
Ms project 2010 level 1&2
Ms project 2010 level 1&2 Ms project 2010 level 1&2
Ms project 2010 level 1&2 Rolf Kühnast
 
Top 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers MakeTop 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers Makejoshnankivel
 
Work breakdownstructure
Work breakdownstructureWork breakdownstructure
Work breakdownstructureRahul Saini
 
CMGT 410 HOMEWORK Education Planning--cmgt410homework.com
CMGT 410 HOMEWORK Education Planning--cmgt410homework.comCMGT 410 HOMEWORK Education Planning--cmgt410homework.com
CMGT 410 HOMEWORK Education Planning--cmgt410homework.comcampfort8
 
Project scheduling and work break down structure(wbs) 12 cs18
Project scheduling and work break down structure(wbs) 12 cs18Project scheduling and work break down structure(wbs) 12 cs18
Project scheduling and work break down structure(wbs) 12 cs18Engr Imran Ashraf
 
How to create project plans in orangescrum
How to create project plans in orangescrumHow to create project plans in orangescrum
How to create project plans in orangescrumOrangescrum
 

Mais procurados (20)

Microsoft Project 2013
Microsoft Project 2013Microsoft Project 2013
Microsoft Project 2013
 
MS Project 2016
MS Project 2016MS Project 2016
MS Project 2016
 
Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides Project Schedule PowerPoint Presentation Slides
Project Schedule PowerPoint Presentation Slides
 
Ms Project 2010
Ms Project 2010Ms Project 2010
Ms Project 2010
 
MS Project
MS Project MS Project
MS Project
 
Microsoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner'sMicrosoft Projects; a step by-step guide for beginner's
Microsoft Projects; a step by-step guide for beginner's
 
Wbs, estimation and scheduling
Wbs, estimation and schedulingWbs, estimation and scheduling
Wbs, estimation and scheduling
 
Pdf primavera tutorial
Pdf primavera tutorialPdf primavera tutorial
Pdf primavera tutorial
 
Ms project management
Ms  project managementMs  project management
Ms project management
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
 
Ms project training ppt
Ms project training pptMs project training ppt
Ms project training ppt
 
Wbs
WbsWbs
Wbs
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)
 
Ms project 2010 level 1&2
Ms project 2010 level 1&2 Ms project 2010 level 1&2
Ms project 2010 level 1&2
 
Top 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers MakeTop 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers Make
 
Work breakdownstructure
Work breakdownstructureWork breakdownstructure
Work breakdownstructure
 
CMGT 410 HOMEWORK Education Planning--cmgt410homework.com
CMGT 410 HOMEWORK Education Planning--cmgt410homework.comCMGT 410 HOMEWORK Education Planning--cmgt410homework.com
CMGT 410 HOMEWORK Education Planning--cmgt410homework.com
 
Project scheduling and work break down structure(wbs) 12 cs18
Project scheduling and work break down structure(wbs) 12 cs18Project scheduling and work break down structure(wbs) 12 cs18
Project scheduling and work break down structure(wbs) 12 cs18
 
How to create project plans in orangescrum
How to create project plans in orangescrumHow to create project plans in orangescrum
How to create project plans in orangescrum
 
Graphical Indicators in MS Project
Graphical Indicators in MS ProjectGraphical Indicators in MS Project
Graphical Indicators in MS Project
 

Destaque

The philosophical background of childhood education in
The philosophical background of childhood education inThe philosophical background of childhood education in
The philosophical background of childhood education inShadid Al
 
Blood group, Blood Pressure, and Heart Beat
Blood group, Blood Pressure, and Heart BeatBlood group, Blood Pressure, and Heart Beat
Blood group, Blood Pressure, and Heart BeatHasri Sasmita
 
אמנות נשים והומור בד בבד ב
אמנות נשים והומור בד בבד באמנות נשים והומור בד בבד ב
אמנות נשים והומור בד בבד בHadassa Gorohovski
 
Generalized Bradley-Terry Modelling of Football Results
Generalized Bradley-Terry Modelling of Football ResultsGeneralized Bradley-Terry Modelling of Football Results
Generalized Bradley-Terry Modelling of Football Resultshtstatistics
 
Agribusiness in the XXI Century - Black Sea Economic Forum
Agribusiness in the XXI Century - Black Sea Economic ForumAgribusiness in the XXI Century - Black Sea Economic Forum
Agribusiness in the XXI Century - Black Sea Economic ForumNOVIROST Limited
 
Portifólio - Rota Eventos
Portifólio - Rota EventosPortifólio - Rota Eventos
Portifólio - Rota EventosRota Eventos
 
Delivering Reviews - ICA
Delivering Reviews - ICADelivering Reviews - ICA
Delivering Reviews - ICAJoAnn Corley
 
HTML5: New Possibilities for Publishing
HTML5: New Possibilities for PublishingHTML5: New Possibilities for Publishing
HTML5: New Possibilities for PublishingiFactory
 

Destaque (11)

The philosophical background of childhood education in
The philosophical background of childhood education inThe philosophical background of childhood education in
The philosophical background of childhood education in
 
Blood group, Blood Pressure, and Heart Beat
Blood group, Blood Pressure, and Heart BeatBlood group, Blood Pressure, and Heart Beat
Blood group, Blood Pressure, and Heart Beat
 
אמנות נשים והומור בד בבד ב
אמנות נשים והומור בד בבד באמנות נשים והומור בד בבד ב
אמנות נשים והומור בד בבד ב
 
Mario García
Mario GarcíaMario García
Mario García
 
Generalized Bradley-Terry Modelling of Football Results
Generalized Bradley-Terry Modelling of Football ResultsGeneralized Bradley-Terry Modelling of Football Results
Generalized Bradley-Terry Modelling of Football Results
 
Agribusiness in the XXI Century - Black Sea Economic Forum
Agribusiness in the XXI Century - Black Sea Economic ForumAgribusiness in the XXI Century - Black Sea Economic Forum
Agribusiness in the XXI Century - Black Sea Economic Forum
 
Portifólio - Rota Eventos
Portifólio - Rota EventosPortifólio - Rota Eventos
Portifólio - Rota Eventos
 
Presentation: Can your consumer find you
Presentation: Can your consumer find youPresentation: Can your consumer find you
Presentation: Can your consumer find you
 
Delivering Reviews - ICA
Delivering Reviews - ICADelivering Reviews - ICA
Delivering Reviews - ICA
 
הומור בסין חלק ב
הומור בסין חלק בהומור בסין חלק ב
הומור בסין חלק ב
 
HTML5: New Possibilities for Publishing
HTML5: New Possibilities for PublishingHTML5: New Possibilities for Publishing
HTML5: New Possibilities for Publishing
 

Semelhante a Getting started with project

Creating a task list
Creating a task listCreating a task list
Creating a task listahmed hamza
 
44259126 ms-project-presentation
44259126 ms-project-presentation44259126 ms-project-presentation
44259126 ms-project-presentationFarrukh Raja
 
Ms project presentation
Ms project presentationMs project presentation
Ms project presentationKhem Singh
 
Popular Project Management Template Set. (2).pdf
Popular Project Management Template Set.   (2).pdfPopular Project Management Template Set.   (2).pdf
Popular Project Management Template Set. (2).pdfCristyDiaz13
 
Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007Toney Sisk
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitydgahdazncvn
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityiutiuriaolcom
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitydfdhdfhdg
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityadadscacascas
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityfdbdfbdx
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universitydsvxxcvxc
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityscorpiosns123
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursesacascscasc
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursefdbdfbdx
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole coursedfdhdfhdg
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole courseadadscacascas
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole courseiutiuriaolcom
 

Semelhante a Getting started with project (20)

Creating a task list
Creating a task listCreating a task list
Creating a task list
 
BhadaniS Microsoft Project Manual Training
BhadaniS Microsoft Project Manual TrainingBhadaniS Microsoft Project Manual Training
BhadaniS Microsoft Project Manual Training
 
44259126 ms-project-presentation
44259126 ms-project-presentation44259126 ms-project-presentation
44259126 ms-project-presentation
 
Ms project presentation
Ms project presentationMs project presentation
Ms project presentation
 
Popular Project Management Template Set. (2).pdf
Popular Project Management Template Set.   (2).pdfPopular Project Management Template Set.   (2).pdf
Popular Project Management Template Set. (2).pdf
 
Copper Training
Copper TrainingCopper Training
Copper Training
 
Project Management Quick Reference Guide
Project Management Quick Reference GuideProject Management Quick Reference Guide
Project Management Quick Reference Guide
 
Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry universityMgmt404 entire class course project + all 7 weeks i labs devry university
Mgmt404 entire class course project + all 7 weeks i labs devry university
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 
Mgmt404 project management whole course
Mgmt404 project management whole courseMgmt404 project management whole course
Mgmt404 project management whole course
 

Último

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 

Último (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 

Getting started with project

  • 1. Getting Started with Project SUST-CSIT Ahmed Hamza
  • 2. Understand the family of Microsoft Office Project 2007 products. Understand what a good project management tool can help you accomplish. Start Project Standard or Project Professional, and identify the major parts of the Project window. Use views to work with project plan details in different ways. Use reports to print project plan details. Create a project plan and enter a project start date. Set the working and nonworking time for a project. Enter a project plan’s properties Objectives SUST-CSIT Ahmed Hamza
  • 3. With a good project management system in place, you should be able to answer such questions as What tasks must be performed, and in what order, to produce the deliverable of the project? When should each task be performed? Who will complete these tasks? How much will it cost? What if some tasks are not completed as scheduled? What’s the best way to communicate project details to those who have an interest in the project? SUST-CSIT Ahmed Hamza
  • 4. Good project management does not guarantee the success of every project, but poor project management usually contributes to failure. SUST-CSIT Ahmed Hamza
  • 5. Succeeding as a project manager requires that you complete your projects on time, finish within budget, and make sure your customers are happy with what you deliver First, a project is temporary Next, a project is an endeavor. Resources, such as people and equipment, need to do work. Finally, every project creates a unique product or service. This is the deliverable for the project and the reason that the project was undertaken Understanding What Defines a Project SUST-CSIT Ahmed Hamza
  • 7. The Project Triangle: Viewing Projects in Terms of Time, Cost, and Scope SUST-CSIT Ahmed Hamza
  • 9. Time, Cost, and Scope: Managing Project Constraints Time, cost, and scope are the three essential elements of any project. To succeed as a project manager, you should know quite a bit about how all three of these constraints apply to your projects this model is a useful learning tool but not always a reflection of the real world SUST-CSIT Ahmed Hamza
  • 10. you might see projects delivered late but at planned cost or with expected scope SUST-CSIT Ahmed Hamza
  • 11. The best project management tool in the world can never replace your own good judgment. However, the tool can and should help you accomplish the following: Track all of the information you gather about the work, duration, costs, and resource requirements of your project. Visualize and present your project plan in standard, well-defined formats. Schedule tasks and resources consistently and effectively. SUST-CSIT Ahmed Hamza Managing Your Projects with Project
  • 12. Communicate with resources and other stakeholders while you, the project manager, retain ultimate control of the project. Manage projects using a program that looks and feels like other desktop productivity applications Exchange project information with other Microsoft Office System applications. SUST-CSIT Ahmed Hamza Cont
  • 13. It’s common to see task and resource lists from spreadsheet programs, such as Microsoft Office Excel One big advantage that Project has over such applications is that it includes a scheduling engine-a computational brain that can handle issues This scheduling engine can also consider nonworking time, such as weekends, when calculating a task’s start and finish dates SUST-CSIT Ahmed Hamza What Can a Scheduling Engine Do for You?
  • 14. On the File menu, click New. The New Project task pane appears. In the New Project task pane, under Templates, click On computer. The Templates dialog box appears. Click the Project Templates tab. Click New Business (you may need to scroll down through the list of Project Templates to see it), and then click OK. Tip Depending on how Project was installed on your computer, the templates included with Project might not be installed at this point. SUST-CSIT Ahmed Hamza
  • 15. Exploring Views The working space in Project is called a view. Project contains dozens of views, but you normally work with just one view (sometimes two) at a time. You use views to enter, edit, analyze, and display your project information. The default view-the one you see when Project starts-is the Gantt Chart view shown here. On the View menu, click Resource Sheet Resource Usage Task Usage Calendar SUST-CSIT Ahmed Hamza
  • 16. Exploring Reports Project contains two types of reports tabular reports that are intended for printing visual reports that allow you to export Project data to Excel and Visio On the Report menu, click Reports Click Custom, and then click the Selectbutton On the Reports list, click Resource (work), and then click the Preview button SUST-CSIT Ahmed Hamza
  • 17. Next, you will create a visual report to get a close look at overall resource workload and availability through the life of the project On the Report menu, click Visual Reports. For Show Report Template Created In, make sure that Microsoft Office Excel is selected and that the All tab is visible. Click Resource Remaining Work Report, and then click View. SUST-CSIT Ahmed Hamza
  • 18. On the File menu, click the New command. Then, in the New Project task pane, click Blank Project. Project creates a new, blank project plan. Next, you’ll set the project’s start date. On the Project menu, click Project Information. The Project Information dialog box appears. In the Start date box, type or select 1/7/11. SUST-CSIT Ahmed Hamza Creating a New Project Plan
  • 19. Tip In most cases when you need to enter a date in Project, you can click the down arrow next to the Date field to show a small monthly calendar. There you can navigate to any month and then click the date you want, or click Today to quickly choose the current date. SUST-CSIT Ahmed Hamza cont
  • 20. The project calendar defines the general working and nonworking time for tasks On the Tools menu, click Change Working Time In the For calendar box, click the down arrow. The list that appears contains the three base calendars included with Project. These calendars are as follows: 24 Hours: Has no nonworking time. Night Shift: Covers a “graveyard” shift schedule of Monday night through Saturday morning, 11 P.M. to 8 A.M., with a one-hour break. SUST-CSIT Ahmed Hamza Setting Nonworking Days
  • 21. Standard: The traditional working day, Monday through Friday from 8 A.M. to 5 P.M., with a one-hour lunch break. Only one of the base calendars serves as the project calenda SUST-CSIT Ahmed Hamza cont
  • 22. Like other Microsoft Office programs, Project keeps track of several file properties. Some of these properties are statistics, such as how many times the file has been revised. Other properties include information you might want to record about a project plan, such as the project manager’s name or keywords to support a file search. Project also uses properties in page headers and footers when printing. SUST-CSIT Ahmed Hamza Entering Project Properties
  • 23. you enter some properties that you will use later when printing project information and for other purposes. On the File menu, click Properties. The Properties dialog box appears. Click the Summary tab if it is not already visible. In the Subject box, type Video production schedule. In the Author box, type your name. In the Manager box, type your name, type your manager’s name, or leave the box blank. In the Company box, type Southridge Video. Select the Save preview picture check box SUST-CSIT Ahmed Hamza cont
  • 24. The Project product family includes Project Standard, Project Professional, Project Server, and Project Web Access. Normally, you would use Project Standard on the desktop or the latter three in combination to form an EPM solution. One of the key distinguishing factors that separates Project from other list-keeping tools, such as Excel, is that Project has a scheduling engine that can work with time. Project includes several sophisticated templates that can provide you with a good start to a new project plan. SUST-CSIT Ahmed Hamza Key Points
  • 25. The main working space in Project is a view. One or sometimes two views are typically displayed at a time. The Gantt Chart view is the default and probably best known view in Project. Project includes a large number of built-in reports that are intended for viewing (but not editing) Project data. You use calendars in Project to control when work can be scheduled to occur SUST-CSIT Ahmed Hamza cont