SlideShare uma empresa Scribd logo
1 de 26
Pinehurst Country Club
  Greens Committee
       Meeting

 Thursday, August 9th
        2012
   Chairperson Report – Erich Tiepel
   General Manager’s Report – Loren Pippin
   Grounds Report – Steve Sarro
     Water Update: Lease Status, Pond Master Plan, Ft. Logan
      Ditch Upgrades
     Master Plan Objectives:
         15 Tee Renovation and budget estimate,
         In-house winter projects: par 3 tee leveling, Sand trap
          renovation on 4, 9, 18
       New Business
         Poa/bent trials
         Rounds 4 Research
   Currently we have used 60 AF of the 125 AF on
    lease.
   We are projecting to expire these leases near
    September 15th if there is no further rainfall.
   Denver Water has offered to extend the lease
    with us if needed through October.
   Irrigation demand is less in October, but
    recovery will be important
   Two projects to assist with delivery of water to
    Pinehurst and other constituents
       1st project: During the expansion of Quincy between
        Wadsworth and Kipling, a splitter box will be
        installed. Allows Harriman Ditch to flow into the
        Warrior Ditch and provide versatility.
       2nd project: A second splitter box to put Ft. Logan
        Ditch into Urban Drainage sooner to avoid ditch
        through the neighborhood and costly maintenance.
   15 Tee Renovation
       Includes all tee boxes
       Adds up to 30 yards in length to the 1 cone tees
       Upgrades the old “runway” design
       Increased potential for water savings with native
        grasses incorporated around the tee boxes
       Replaces the cart path and moves it to the right side
        of the tee box
       Minor enhancements to Windmill Hill
   Non-competitive bid was approximately $65,000
   Up to $6,200 in design fees. (Approximately 10% of the
    scope of work)
   Design Fees Include:
       Revised Grading Study
       Construction Specifications
       Bid Forms
       Solicit and Collect Competitive Bids
       Analyze Bids and Assist with Selecting Contractor
       Up to Four Site Visits for Field Adjustments
   Par 3 tees to be addressed on both Golf
    Courses
   Total of 30,950 square feet of Par 3 tees
   Till, Amend Soil, Compact and Level
    Surface:
     $3,000 Sand
     $7,800 Sod
     Contractor: Pinehurst Grounds
   Sand Traps are recommended to be
    renovated every 10-15 years.
   According to records the Maxwell
    traps are 12 years old.
   It is time to determine a replacement
    schedule
   Sand Bunker Goals
     Evaluate size and placement of the
      bunker
     Upgrade or install drainage
     Install irrigation around perimeter
     Re-grass edges of the bunker
     New screened sand into bunkers and
      proper depths
Goal: Remove Poa Annua from putting
surfaces to increase performance
   2012: We are providing a drier surface and we
    have seen a major improvement in bentgrass
    populations on all putting greens.
   Maxwell Greens average 20% bentgrass
   Pfluger Greens average 75% bentgrass
   Goal: 95-100% bentgrass populations
     Better roll and performance
     Less water due to deeper roots
     Higher tolerance for heat stress


   Use Chipping Green for poa annua trials
   Older varieties of bentgrass is contaminating
    tees, fairways and approaches.
   Inconsistent turf surfaces.
   A new chemical has been developed and
    studied for a few years that kills bentgrass in
    other turf species.
   Goal: To provide consistent turfgrass varieties
    in all short grass areas.
   Suggested trial locations: 5 Maxwell, 3 cone tee
    and/or 1 Pfluger Approach.
   Three applications are made in the fall and
    again in the spring if necessary.
   Bentgrass turns white and does not process
    photosynthesis and dies.
   Re-seeding with blue or ryegrass to fill in any
    bare spots.
Tenacity herbicide trial
 This trial was performed by
Ohio State University in a golf
         course setting.
www.rounds4research.com
PCC_Greens_Ccommittee_Mtg_8_9_12

Mais conteúdo relacionado

Mais procurados

Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation Tank
C. P. Kumar
 
Menarid: Managed Aquifer Recharge
Menarid: Managed Aquifer RechargeMenarid: Managed Aquifer Recharge
Menarid: Managed Aquifer Recharge
ICARDA
 
ABO salinity presentation pnnl
ABO salinity presentation pnnlABO salinity presentation pnnl
ABO salinity presentation pnnl
AlgaeBiomass
 
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Carl Greenstreet
 
Rainwater Harvesting And Groundwater Recharge In Urban Centres Experiences Fr...
Rainwater Harvesting And Groundwater Recharge In Urban Centres Experiences Fr...Rainwater Harvesting And Groundwater Recharge In Urban Centres Experiences Fr...
Rainwater Harvesting And Groundwater Recharge In Urban Centres Experiences Fr...
India Water Portal
 

Mais procurados (20)

AZ Brackish Groundwater_May2017
AZ Brackish Groundwater_May2017AZ Brackish Groundwater_May2017
AZ Brackish Groundwater_May2017
 
Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation Tank
 
Measured effects of conservation watershed scale
Measured effects of conservation watershed scaleMeasured effects of conservation watershed scale
Measured effects of conservation watershed scale
 
Ccwf restoration apwa
Ccwf restoration apwaCcwf restoration apwa
Ccwf restoration apwa
 
Menarid: Managed Aquifer Recharge
Menarid: Managed Aquifer RechargeMenarid: Managed Aquifer Recharge
Menarid: Managed Aquifer Recharge
 
Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015Coal Combustible Presentation 7 30_2015
Coal Combustible Presentation 7 30_2015
 
Recharge Well Brochure
Recharge Well BrochureRecharge Well Brochure
Recharge Well Brochure
 
Organic Amendment Restoration of Degraded Upland Landscapes in the Chestatee-...
Organic Amendment Restoration of Degraded Upland Landscapes in the Chestatee-...Organic Amendment Restoration of Degraded Upland Landscapes in the Chestatee-...
Organic Amendment Restoration of Degraded Upland Landscapes in the Chestatee-...
 
Unit 3 ground water lect-5
Unit 3 ground water lect-5Unit 3 ground water lect-5
Unit 3 ground water lect-5
 
ABO salinity presentation pnnl
ABO salinity presentation pnnlABO salinity presentation pnnl
ABO salinity presentation pnnl
 
Water Sustainability in RCE Grand Rapids, Michigan
Water Sustainability in RCE Grand Rapids, MichiganWater Sustainability in RCE Grand Rapids, Michigan
Water Sustainability in RCE Grand Rapids, Michigan
 
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
Greenstreet CW - Cooper Basin Unconventional Resources APPEA 2015
 
Sanders, Richard: Carbon Cycling along the GB Land Ocean Aquatic Continuum (L...
Sanders, Richard: Carbon Cycling along the GB Land Ocean Aquatic Continuum (L...Sanders, Richard: Carbon Cycling along the GB Land Ocean Aquatic Continuum (L...
Sanders, Richard: Carbon Cycling along the GB Land Ocean Aquatic Continuum (L...
 
Rainwater harvesting
Rainwater  harvestingRainwater  harvesting
Rainwater harvesting
 
Capstone
CapstoneCapstone
Capstone
 
Reservoir planing
Reservoir planing Reservoir planing
Reservoir planing
 
Rainwater Harvesting And Groundwater Recharge In Urban Centres Experiences Fr...
Rainwater Harvesting And Groundwater Recharge In Urban Centres Experiences Fr...Rainwater Harvesting And Groundwater Recharge In Urban Centres Experiences Fr...
Rainwater Harvesting And Groundwater Recharge In Urban Centres Experiences Fr...
 
Using Weep Berms to Control Water Quality by Richard Warner and Greg Higgins
Using Weep Berms to Control Water Quality by Richard Warner and Greg Higgins Using Weep Berms to Control Water Quality by Richard Warner and Greg Higgins
Using Weep Berms to Control Water Quality by Richard Warner and Greg Higgins
 
Feb 11 2014 public meeting
Feb 11 2014 public meetingFeb 11 2014 public meeting
Feb 11 2014 public meeting
 
Artificial recharge guide
Artificial recharge guideArtificial recharge guide
Artificial recharge guide
 

Destaque (7)

Pcc green comm_jan_10_13
Pcc green comm_jan_10_13Pcc green comm_jan_10_13
Pcc green comm_jan_10_13
 
November 12 green_committee
November 12 green_committeeNovember 12 green_committee
November 12 green_committee
 
2 21-12 meeting
2 21-12 meeting2 21-12 meeting
2 21-12 meeting
 
March_2013_PCC_green_committee
March_2013_PCC_green_committeeMarch_2013_PCC_green_committee
March_2013_PCC_green_committee
 
Обеспечение доступности в Узбекистане: успехи и извлеченные уроки
Обеспечение доступности в Узбекистане: успехи и извлеченные уроки Обеспечение доступности в Узбекистане: успехи и извлеченные уроки
Обеспечение доступности в Узбекистане: успехи и извлеченные уроки
 
Presentation on simple reporting system - akvo.org
Presentation on simple reporting system - akvo.orgPresentation on simple reporting system - akvo.org
Presentation on simple reporting system - akvo.org
 
Pinehurst CC Tree Management Guide Final
Pinehurst CC Tree Management Guide FinalPinehurst CC Tree Management Guide Final
Pinehurst CC Tree Management Guide Final
 

Semelhante a PCC_Greens_Ccommittee_Mtg_8_9_12

Use it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our citiesUse it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our cities
Martin O'Dea
 
DesalinationPresentation
DesalinationPresentationDesalinationPresentation
DesalinationPresentation
Zacary Richards
 
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Lucy McKay
 
Santee experimental forest wetland restoration
Santee experimental forest wetland restorationSantee experimental forest wetland restoration
Santee experimental forest wetland restoration
MadisonSocha
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_Portfolio
Kaitlyn Fulton
 
Be 4750 final presentation final
Be 4750 final presentation finalBe 4750 final presentation final
Be 4750 final presentation final
AshtonGuest
 

Semelhante a PCC_Greens_Ccommittee_Mtg_8_9_12 (20)

Drainage Salvation-JRiopelle
Drainage Salvation-JRiopelleDrainage Salvation-JRiopelle
Drainage Salvation-JRiopelle
 
Use it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our citiesUse it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our cities
 
4 impact on groundwater
4 impact on groundwater4 impact on groundwater
4 impact on groundwater
 
4 Impact On Groundwater
4 Impact On Groundwater4 Impact On Groundwater
4 Impact On Groundwater
 
Be 4750 midterm presentation
Be 4750 midterm presentationBe 4750 midterm presentation
Be 4750 midterm presentation
 
DesalinationPresentation
DesalinationPresentationDesalinationPresentation
DesalinationPresentation
 
Green Development
Green Development Green Development
Green Development
 
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
 
Be 4750 final presentation
Be 4750 final presentationBe 4750 final presentation
Be 4750 final presentation
 
Santee experimental forest wetland restoration
Santee experimental forest wetland restorationSantee experimental forest wetland restoration
Santee experimental forest wetland restoration
 
Cwwa optimized design for multiple tray aerators - riaz zalil
Cwwa   optimized design for multiple tray aerators  - riaz zalilCwwa   optimized design for multiple tray aerators  - riaz zalil
Cwwa optimized design for multiple tray aerators - riaz zalil
 
Abberton ICE Meeting
Abberton ICE MeetingAbberton ICE Meeting
Abberton ICE Meeting
 
Abberton ICE Meeting
Abberton ICE MeetingAbberton ICE Meeting
Abberton ICE Meeting
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_Portfolio
 
Undergraduate Capstone Design
Undergraduate Capstone DesignUndergraduate Capstone Design
Undergraduate Capstone Design
 
Be 4750 final presentation final
Be 4750 final presentation finalBe 4750 final presentation final
Be 4750 final presentation final
 
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingDead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
 
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
Pwg community info forum final hr_ms_081919_for stoppepperelltoxicdirt town w...
 
September 1 - 0130 - Donald D. Etler
September 1 - 0130 - Donald D. EtlerSeptember 1 - 0130 - Donald D. Etler
September 1 - 0130 - Donald D. Etler
 
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017
 

Último

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Último (20)

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 

PCC_Greens_Ccommittee_Mtg_8_9_12

  • 1. Pinehurst Country Club Greens Committee Meeting Thursday, August 9th 2012
  • 2. Chairperson Report – Erich Tiepel  General Manager’s Report – Loren Pippin  Grounds Report – Steve Sarro  Water Update: Lease Status, Pond Master Plan, Ft. Logan Ditch Upgrades  Master Plan Objectives:  15 Tee Renovation and budget estimate,  In-house winter projects: par 3 tee leveling, Sand trap renovation on 4, 9, 18  New Business  Poa/bent trials  Rounds 4 Research
  • 3. Currently we have used 60 AF of the 125 AF on lease.  We are projecting to expire these leases near September 15th if there is no further rainfall.  Denver Water has offered to extend the lease with us if needed through October.  Irrigation demand is less in October, but recovery will be important
  • 4. Two projects to assist with delivery of water to Pinehurst and other constituents  1st project: During the expansion of Quincy between Wadsworth and Kipling, a splitter box will be installed. Allows Harriman Ditch to flow into the Warrior Ditch and provide versatility.  2nd project: A second splitter box to put Ft. Logan Ditch into Urban Drainage sooner to avoid ditch through the neighborhood and costly maintenance.
  • 5.
  • 6.
  • 7. 15 Tee Renovation  Includes all tee boxes  Adds up to 30 yards in length to the 1 cone tees  Upgrades the old “runway” design  Increased potential for water savings with native grasses incorporated around the tee boxes  Replaces the cart path and moves it to the right side of the tee box  Minor enhancements to Windmill Hill
  • 8.
  • 9.
  • 10. Non-competitive bid was approximately $65,000  Up to $6,200 in design fees. (Approximately 10% of the scope of work)  Design Fees Include:  Revised Grading Study  Construction Specifications  Bid Forms  Solicit and Collect Competitive Bids  Analyze Bids and Assist with Selecting Contractor  Up to Four Site Visits for Field Adjustments
  • 11. Par 3 tees to be addressed on both Golf Courses  Total of 30,950 square feet of Par 3 tees  Till, Amend Soil, Compact and Level Surface:  $3,000 Sand  $7,800 Sod  Contractor: Pinehurst Grounds
  • 12. Sand Traps are recommended to be renovated every 10-15 years.  According to records the Maxwell traps are 12 years old.  It is time to determine a replacement schedule
  • 13.
  • 14.
  • 15. Sand Bunker Goals  Evaluate size and placement of the bunker  Upgrade or install drainage  Install irrigation around perimeter  Re-grass edges of the bunker  New screened sand into bunkers and proper depths
  • 16. Goal: Remove Poa Annua from putting surfaces to increase performance
  • 17. 2012: We are providing a drier surface and we have seen a major improvement in bentgrass populations on all putting greens.  Maxwell Greens average 20% bentgrass  Pfluger Greens average 75% bentgrass  Goal: 95-100% bentgrass populations  Better roll and performance  Less water due to deeper roots  Higher tolerance for heat stress  Use Chipping Green for poa annua trials
  • 18.
  • 19.
  • 20. Older varieties of bentgrass is contaminating tees, fairways and approaches.  Inconsistent turf surfaces.  A new chemical has been developed and studied for a few years that kills bentgrass in other turf species.  Goal: To provide consistent turfgrass varieties in all short grass areas.
  • 21.
  • 22.
  • 23. Suggested trial locations: 5 Maxwell, 3 cone tee and/or 1 Pfluger Approach.  Three applications are made in the fall and again in the spring if necessary.  Bentgrass turns white and does not process photosynthesis and dies.  Re-seeding with blue or ryegrass to fill in any bare spots.
  • 24. Tenacity herbicide trial This trial was performed by Ohio State University in a golf course setting.