SlideShare uma empresa Scribd logo
1 de 25
AIRCRAFT Maintenance Programme  S P Singh
General The MP is an important feature of the airworthiness management process. Ref. CAR M 302 Definition Information Control Approval component
Abbriviation MPD : maintenance planning document CMM : component maintenance manual SB       : service bulletin SIL      : service information letter AMP   : Aircraft Maintenance  Programme CAM   : Continuing Airworthiness Manager
Contains 1. what is maintenance programme ? 2. Information for AMP 3. Approval of AMP 4. personnel 5. Component 6. AMP specialist 7. Optimization
Contains 8.Review 9.Task 10.Task card 11.Training 12.Responsibilities of CAM 13.Conclusion
Definition What is a Maintenance Programme? A Maintenance Programme is comprised of a schedule of maintenance tasks with documented management procedures which describe how the scheduled maintenance will be managed. The scheduled tasks are initially developed from the TCH/STCH/OEM schedule recommendations Each aircraft may require individual task development as each aircraft service history develops –e.g. corrosion, repairs, modifications
 Information  Information may come from a range of documents MPD CMM Repair approval instructions SB, SIL STC
Control of AMP Provision for the control of Maintenance Programme or Schedule Amendments is contained in Part M.A.302  – Maintenance Programme Approval by Sub part G organisation (see also appendix 1 to AMC M.A.302)
Approval of AMP Approval may be issued to Sub Part G approved organisation with approved procedures in CAME Approval may be used for control of ‘In House’ Programmes / Schedules Contracted Operators Ultimate Responsibility for effectiveness of Programme / Schedule (Part M.A.301) remains with operator
Personnel Nominated Post holder  to liaise with dgca and ‘manage’ control of Programme In-House Sufficient numbers of trained and competent personnel with knowledge of Reliability Centred Maintenance MSG Analysis and MRB Procedures (as applicable)
AMP component Type Certification Requirements Aircraft or System or Component (Type) Organisation Procedures relating to Schedule or Programme Amendment Control Requirements applicable to control of Schedules / Programmes including Powerplant and Structures Programmes
AMP specialist The MP is an important feature of the airworthiness management process. In order to manage the MP the operator will need to employ specialists related to Systems Weight Control Power plant Structures Maintenance Programme Management Reliability Programme management
The role of the specialists Assessment of ICAW –SB, SIL, MPD, AD, CMM Continuing Review of fleet performance –reliability, MP effectiveness, ASR/MOR, strip reports, check findings, function check reports, corrosion findings Planning MOR Action/follow up to MOR/ASR/SDR Raise Engineering Orders as necessary
The role of the specialists-cont. Liaison with TCH/OEM/DGCA Liaison with operations Liaison/oversight of service providers –e.g. maintenance, ground operations Review of operator technical instructions MEL/ADD rates Trend monitoring reports Preparation of work scopes –esp. Powerplant
specialists require In order to fulfill the function associated with maintenance programme management the specialists require Specialised technical training/qualifications Familiarity with the TCH procedures Knowledge of MP management processes
organisation structure There is no idealised organisation structure for the management of maintenance programmes – the organisation should have the following features Independent Quality Audit Sufficient numbers of qualified specialists Appropriate level of management Reporting lines within the airworthiness management structure Applicable and effective procedures to ensure appropriate liaison and decision making
Optimization Optimization could result in the following changes to the Scheduled Maintenance Programme; Change to compliance interval category (FH, FC, Calendar, Check etc) Escalation or reduction of compliance interval• Revision of task or process (insp, CK, FC, OPC, CM, OC, HT etc) Revision of accomplishment instructions Deletion of Task or Process Revision of work scope Addition of tasks
Optimization Procedures to be adopted Reliability Monitoring (Part M.A.302 (d) – AMC M.A.302 (d)) Task escalation and adjustment SB Policy, Review and Assessment MP / MS Review and Revision Independent Quality Audit Component Equipment & Structures In- Service Programme Review Programme Rules
Review Maintenance Procedures effectiveness Review and Amendment MPD Review and Assessment Quality Audit Variation Procedures Operator / Maintenance Liaison Sub-Contractor and Supplier Evaluation Training
Reliability Procedure Reliability Procedures - Reliability review must additionally take account of Maintenance Standards Operating Rules Aircraft Age SB / Mod. Standard Utilisation Maintenance Procedures
Task The scheduled maintenance tasks are often transcribed on to Task Cards The task cards are then used by the maintenance supplier to control the maintenance at the point of delivery – hangar, line etc.
Task Card The task card contains the Inspection Standard – General Visual Inspection The definition of General Visual Inspection is in the MPD programme rules – not on the task card!
Task Card Task Card Development Process In accordance with approved procedures subject to independent audit ensure traceability in each case Ensure that any additional data e.g. inspection standards – are included
Responsibility of the CAM It is the responsibility of the operator CAM – to ensure that the inspection standards are advised to the maintenance supplier – the task card will not do this It is the responsibility of the maintenance supplier to ensure that the Inspectors are suitably trained in the inspection standards
In conclusion: A maintenance programme is a combination of management procedures as well as scheduled maintenance tasks In order to be applicable and effective a maintenance programme requires an integrated organisational structure and qualified personnel to manage the scheduled maintenance The management process is of primary importance –what is scheduled is meaningless without the management process

Mais conteúdo relacionado

Mais procurados

Aircraft Maintenance Records and Airworthiness Directives for General Aviation
Aircraft Maintenance Records and Airworthiness Directives for General AviationAircraft Maintenance Records and Airworthiness Directives for General Aviation
Aircraft Maintenance Records and Airworthiness Directives for General Aviation
FAA Safety Team Central Florida
 
Aircraft inspection and_repair
Aircraft inspection and_repairAircraft inspection and_repair
Aircraft inspection and_repair
Agustin Limachi
 
helicopter ground handling equipment
helicopter ground handling equipmenthelicopter ground handling equipment
helicopter ground handling equipment
Bai Haqi
 
The concept and principles of helicopter maintenance
The concept and principles of helicopter maintenanceThe concept and principles of helicopter maintenance
The concept and principles of helicopter maintenance
Bai Haqi
 
Aircraft instrumentsystems
Aircraft instrumentsystemsAircraft instrumentsystems
Aircraft instrumentsystems
Mahnil
 
Avionics Systems Instruments
Avionics Systems InstrumentsAvionics Systems Instruments
Avionics Systems Instruments
Michael Bseliss
 

Mais procurados (20)

Aircraft maintenance package methods
Aircraft maintenance package methodsAircraft maintenance package methods
Aircraft maintenance package methods
 
Aircraft Maintenance Records and Airworthiness Directives for General Aviation
Aircraft Maintenance Records and Airworthiness Directives for General AviationAircraft Maintenance Records and Airworthiness Directives for General Aviation
Aircraft Maintenance Records and Airworthiness Directives for General Aviation
 
Aircraft maintenance program enhancement badawood mamdooh
Aircraft maintenance program enhancement  badawood mamdoohAircraft maintenance program enhancement  badawood mamdooh
Aircraft maintenance program enhancement badawood mamdooh
 
Aircraft inspection and_repair
Aircraft inspection and_repairAircraft inspection and_repair
Aircraft inspection and_repair
 
Learn how to Manage Aircraft Records
Learn how to Manage Aircraft RecordsLearn how to Manage Aircraft Records
Learn how to Manage Aircraft Records
 
Aircraft Certification and Type of Certificates 3-9-13
Aircraft Certification and Type of Certificates 3-9-13Aircraft Certification and Type of Certificates 3-9-13
Aircraft Certification and Type of Certificates 3-9-13
 
EWIS and Airworthiness
EWIS and AirworthinessEWIS and Airworthiness
EWIS and Airworthiness
 
Airworthiness: Preventive Maintenance
Airworthiness:  Preventive MaintenanceAirworthiness:  Preventive Maintenance
Airworthiness: Preventive Maintenance
 
Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction Aircraft Maintenance practices introduction
Aircraft Maintenance practices introduction
 
Structural Repair of Aircraft
Structural Repair of AircraftStructural Repair of Aircraft
Structural Repair of Aircraft
 
helicopter ground handling equipment
helicopter ground handling equipmenthelicopter ground handling equipment
helicopter ground handling equipment
 
Ppt 2 (1)
Ppt 2 (1)Ppt 2 (1)
Ppt 2 (1)
 
Aircraft inspections
Aircraft inspectionsAircraft inspections
Aircraft inspections
 
The concept and principles of helicopter maintenance
The concept and principles of helicopter maintenanceThe concept and principles of helicopter maintenance
The concept and principles of helicopter maintenance
 
Aircraft modifications 3-9-2013
Aircraft modifications 3-9-2013Aircraft modifications 3-9-2013
Aircraft modifications 3-9-2013
 
Aircraft instrumentsystems
Aircraft instrumentsystemsAircraft instrumentsystems
Aircraft instrumentsystems
 
Continuing airworthiness management organisation
Continuing airworthiness management organisationContinuing airworthiness management organisation
Continuing airworthiness management organisation
 
Aviation safety management
Aviation safety managementAviation safety management
Aviation safety management
 
Fadec and hums
Fadec and humsFadec and hums
Fadec and hums
 
Avionics Systems Instruments
Avionics Systems InstrumentsAvionics Systems Instruments
Avionics Systems Instruments
 

Semelhante a Aircraft maintenance programme

Work Project 1-latest
Work Project 1-latestWork Project 1-latest
Work Project 1-latest
Ranjit David
 
1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf
afiqahnasir8
 

Semelhante a Aircraft maintenance programme (20)

Airworthiness Management Camo
Airworthiness Management CamoAirworthiness Management Camo
Airworthiness Management Camo
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
CAM
CAMCAM
CAM
 
Core Competence Framework for CAMO Personnel
Core Competence Framework for CAMO PersonnelCore Competence Framework for CAMO Personnel
Core Competence Framework for CAMO Personnel
 
mp singh 15 12 2014
mp singh 15 12 2014mp singh 15 12 2014
mp singh 15 12 2014
 
Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...Development of instructions for continuing airworthiness and aircraft logisti...
Development of instructions for continuing airworthiness and aircraft logisti...
 
Work Project 1-latest
Work Project 1-latestWork Project 1-latest
Work Project 1-latest
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 
Cmr
CmrCmr
Cmr
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K Gupta
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 
Truck service manual
Truck service manualTruck service manual
Truck service manual
 
Machinery Maintenance
Machinery MaintenanceMachinery Maintenance
Machinery Maintenance
 
TYRONE WILLIAMS
TYRONE WILLIAMSTYRONE WILLIAMS
TYRONE WILLIAMS
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Modernizing complex MRO processes
Modernizing complex MRO processesModernizing complex MRO processes
Modernizing complex MRO processes
 
1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf1. ENGINE MANAGEMENT SYSTEM.pdf
1. ENGINE MANAGEMENT SYSTEM.pdf
 
Report on Engineering Services
Report on Engineering ServicesReport on Engineering Services
Report on Engineering Services
 
Presentation of Engineering Services
Presentation of Engineering ServicesPresentation of Engineering Services
Presentation of Engineering Services
 

Mais de S P Singh

Car 66 issue2 rev.2 170904
Car 66 issue2 rev.2 170904Car 66 issue2 rev.2 170904
Car 66 issue2 rev.2 170904
S P Singh
 
हिन्दी अँग्रेज़ी सब्दावली English hindi glossary
हिन्दी अँग्रेज़ी सब्दावली English hindi glossaryहिन्दी अँग्रेज़ी सब्दावली English hindi glossary
हिन्दी अँग्रेज़ी सब्दावली English hindi glossary
S P Singh
 

Mais de S P Singh (20)

0903 Social Psychology
0903 Social Psychology0903 Social Psychology
0903 Social Psychology
 
MTOE
MTOEMTOE
MTOE
 
Car 66 issue2 rev.2 170904
Car 66 issue2 rev.2 170904Car 66 issue2 rev.2 170904
Car 66 issue2 rev.2 170904
 
AAC No. 02 of 2018
AAC No. 02 of 2018AAC No. 02 of 2018
AAC No. 02 of 2018
 
Car 145 issue 2, rev. 3 170614
Car 145 issue 2, rev. 3 170614Car 145 issue 2, rev. 3 170614
Car 145 issue 2, rev. 3 170614
 
Car 147 MTO Type Training
Car 147 MTO Type TrainingCar 147 MTO Type Training
Car 147 MTO Type Training
 
SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018SSP Circular No. 02 of 2018
SSP Circular No. 02 of 2018
 
CAR Sec 1 Series C
CAR Sec 1 Series CCAR Sec 1 Series C
CAR Sec 1 Series C
 
Safety Management System Manual
Safety Management System ManualSafety Management System Manual
Safety Management System Manual
 
Car 147 Basic
Car 147 Basic  Car 147 Basic
Car 147 Basic
 
Car 66 medical cerificate
Car 66 medical cerificateCar 66 medical cerificate
Car 66 medical cerificate
 
Car m
Car mCar m
Car m
 
Flying training organisation
Flying training organisationFlying training organisation
Flying training organisation
 
Happy aviation day
Happy aviation dayHappy aviation day
Happy aviation day
 
Car 147
Car 147Car 147
Car 147
 
Aircraft rules 2012
Aircraft rules 2012Aircraft rules 2012
Aircraft rules 2012
 
Sms ii implemention
Sms ii implementionSms ii implemention
Sms ii implemention
 
हिन्दी अँग्रेज़ी सब्दावली English hindi glossary
हिन्दी अँग्रेज़ी सब्दावली English hindi glossaryहिन्दी अँग्रेज़ी सब्दावली English hindi glossary
हिन्दी अँग्रेज़ी सब्दावली English hindi glossary
 
Instructor refresher 2013 HIET
 Instructor refresher 2013 HIET Instructor refresher 2013 HIET
Instructor refresher 2013 HIET
 
Safety Quotes
Safety QuotesSafety Quotes
Safety Quotes
 

Último

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Último (20)

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 

Aircraft maintenance programme

  • 2. General The MP is an important feature of the airworthiness management process. Ref. CAR M 302 Definition Information Control Approval component
  • 3. Abbriviation MPD : maintenance planning document CMM : component maintenance manual SB : service bulletin SIL : service information letter AMP : Aircraft Maintenance Programme CAM : Continuing Airworthiness Manager
  • 4. Contains 1. what is maintenance programme ? 2. Information for AMP 3. Approval of AMP 4. personnel 5. Component 6. AMP specialist 7. Optimization
  • 5. Contains 8.Review 9.Task 10.Task card 11.Training 12.Responsibilities of CAM 13.Conclusion
  • 6. Definition What is a Maintenance Programme? A Maintenance Programme is comprised of a schedule of maintenance tasks with documented management procedures which describe how the scheduled maintenance will be managed. The scheduled tasks are initially developed from the TCH/STCH/OEM schedule recommendations Each aircraft may require individual task development as each aircraft service history develops –e.g. corrosion, repairs, modifications
  • 7. Information Information may come from a range of documents MPD CMM Repair approval instructions SB, SIL STC
  • 8. Control of AMP Provision for the control of Maintenance Programme or Schedule Amendments is contained in Part M.A.302 – Maintenance Programme Approval by Sub part G organisation (see also appendix 1 to AMC M.A.302)
  • 9. Approval of AMP Approval may be issued to Sub Part G approved organisation with approved procedures in CAME Approval may be used for control of ‘In House’ Programmes / Schedules Contracted Operators Ultimate Responsibility for effectiveness of Programme / Schedule (Part M.A.301) remains with operator
  • 10. Personnel Nominated Post holder to liaise with dgca and ‘manage’ control of Programme In-House Sufficient numbers of trained and competent personnel with knowledge of Reliability Centred Maintenance MSG Analysis and MRB Procedures (as applicable)
  • 11. AMP component Type Certification Requirements Aircraft or System or Component (Type) Organisation Procedures relating to Schedule or Programme Amendment Control Requirements applicable to control of Schedules / Programmes including Powerplant and Structures Programmes
  • 12. AMP specialist The MP is an important feature of the airworthiness management process. In order to manage the MP the operator will need to employ specialists related to Systems Weight Control Power plant Structures Maintenance Programme Management Reliability Programme management
  • 13. The role of the specialists Assessment of ICAW –SB, SIL, MPD, AD, CMM Continuing Review of fleet performance –reliability, MP effectiveness, ASR/MOR, strip reports, check findings, function check reports, corrosion findings Planning MOR Action/follow up to MOR/ASR/SDR Raise Engineering Orders as necessary
  • 14. The role of the specialists-cont. Liaison with TCH/OEM/DGCA Liaison with operations Liaison/oversight of service providers –e.g. maintenance, ground operations Review of operator technical instructions MEL/ADD rates Trend monitoring reports Preparation of work scopes –esp. Powerplant
  • 15. specialists require In order to fulfill the function associated with maintenance programme management the specialists require Specialised technical training/qualifications Familiarity with the TCH procedures Knowledge of MP management processes
  • 16. organisation structure There is no idealised organisation structure for the management of maintenance programmes – the organisation should have the following features Independent Quality Audit Sufficient numbers of qualified specialists Appropriate level of management Reporting lines within the airworthiness management structure Applicable and effective procedures to ensure appropriate liaison and decision making
  • 17. Optimization Optimization could result in the following changes to the Scheduled Maintenance Programme; Change to compliance interval category (FH, FC, Calendar, Check etc) Escalation or reduction of compliance interval• Revision of task or process (insp, CK, FC, OPC, CM, OC, HT etc) Revision of accomplishment instructions Deletion of Task or Process Revision of work scope Addition of tasks
  • 18. Optimization Procedures to be adopted Reliability Monitoring (Part M.A.302 (d) – AMC M.A.302 (d)) Task escalation and adjustment SB Policy, Review and Assessment MP / MS Review and Revision Independent Quality Audit Component Equipment & Structures In- Service Programme Review Programme Rules
  • 19. Review Maintenance Procedures effectiveness Review and Amendment MPD Review and Assessment Quality Audit Variation Procedures Operator / Maintenance Liaison Sub-Contractor and Supplier Evaluation Training
  • 20. Reliability Procedure Reliability Procedures - Reliability review must additionally take account of Maintenance Standards Operating Rules Aircraft Age SB / Mod. Standard Utilisation Maintenance Procedures
  • 21. Task The scheduled maintenance tasks are often transcribed on to Task Cards The task cards are then used by the maintenance supplier to control the maintenance at the point of delivery – hangar, line etc.
  • 22. Task Card The task card contains the Inspection Standard – General Visual Inspection The definition of General Visual Inspection is in the MPD programme rules – not on the task card!
  • 23. Task Card Task Card Development Process In accordance with approved procedures subject to independent audit ensure traceability in each case Ensure that any additional data e.g. inspection standards – are included
  • 24. Responsibility of the CAM It is the responsibility of the operator CAM – to ensure that the inspection standards are advised to the maintenance supplier – the task card will not do this It is the responsibility of the maintenance supplier to ensure that the Inspectors are suitably trained in the inspection standards
  • 25. In conclusion: A maintenance programme is a combination of management procedures as well as scheduled maintenance tasks In order to be applicable and effective a maintenance programme requires an integrated organisational structure and qualified personnel to manage the scheduled maintenance The management process is of primary importance –what is scheduled is meaningless without the management process