  1. SAMPLE “REQUEST FOR PROPOSALS” TEMPLATE Request for Proposals (RFP) For:
  [Title of RFP Project] Note: This sample is for a fabrication type of RFP. [RFP ID #] Issued:
  [Date] Submission deadline: [Time/Date] Bidders Meeting: [Day/Date] Deadline for final
  submission of questions: [Day/ Date/ Time] Questions: Questions can be submitted prior to
  the Bidders Meeting on [Date]; however, no answers will be provided and/or circulated prior
  to that date. ALL QUESTIONS PERTAINING TO THIS RFP MUST BE SUBMITTED BY
  [Day/Date/Time] No interpretation of the meaning of the Bid Documents (drawings,
  specifications, et. al.) will be made to any bidder. Questions may be submitted, in written
  form, to: [Contact details] or emailed to _________ . Questions will be answered by the
  appropriate individuals and answered within 2 business days via email with a return reply
  acknowledging receipt of the email requested. Questions and answers will be shared with all
  bidders. Introduction [Institution], (Owner) invites proposals for [RFP work description].
  Based on previous work experience, your firm has been selected to receive this RFP and is
  invited to submit a proposal to produce the exhibition experiences described herein.
  BIDDERS SHOULD NOTE THAT ANY AND ALL WORK INTENDED TO BE
  SUBCONTRACTED AS PART OF THE BID SUBMITTAL MUST BE ACCOMPANIED BY
  BACKGROUND            MATERIALS          AND       REFERENCES            FOR       PROPOSED
  SUBCONTRACTOR(S) - - NO EXCEPTIONS. Bidders Meeting There will be an opportunity
  for prospective Bidders to meet with [Institution} staff for a Question and Answer session at
  [place] on [date]. Bidders Meeting details: Date: Time: Location:
  2. Participation at the Bidders Meeting is not mandatory, however, it is limited to two (2)
  people per firm. The purpose of this meeting is to give vendors the opportunity to ask
  [Institution] questions about the exhibition(s). If you are intending to send representatives to
  this meeting please send an RSVP to [Name], who can be reached at [contact info]. Please
  provide us names and titles of those attending by [date]. Each bidder will be responsible to
  provide detailed minutes and notes of the meeting within two (2) business days of the
  conclusion of the conference including detailed description of any changes made to the
  scope of work. These should be forwarded to [contact info] as Microsoft Word documents.
  [Institution] will then create a master meeting record that will be distributed to Bidders within
  the following two (2) days. The minutes will serve as the (only) official record of the items
  discussed and resolutions made during the meeting. All modifications noted in these
  minutes will be shared with all bidders Exhibition(s) included in this RFP: Please refer to the
attached [Title of List] for the complete roster of exhibit experiences included in this RFP
package. The experiences listed on this roster are part of the following exhibition(s) in
development, slated to open [date]: [List Exhibition(s)] The scope of work for each of these
exhibitions is detailed in the Proposed Scope of Work section of this RFP. To bid on an
exhibit, the Contractor must complete all scopes of work listed therein. [Optional:] Bidders
must bid on complete exhibitions. Bidders may bid on all of the exhibitions, or only select
ones, but the bid(s) must incorporate all of the identified scopes for ALL of the exhibits
described within each selected exhibition project. Background [Provide background on
Institution and project(s) relevant to the RFP.] Submission Procedure Proposals conforming
to the requirements set out below must be received by [Contact info] by US mail, courier or
email [Contact info] no later than the deadline given above. All submittals must be received
in PC - CD form along with hard copies. [X #] copies of each format are required. Text
portions of the submittals are acceptable in Adobe Acrobat® form by the deadline (including
via email) but must be followed in CD and hard copy form within two (2) business days. All
electronic Bid Sheets must be submitted as Excel documents, not PDFs. Proposals must
state that they are valid for a period of at least ninety (90) days from the closing deadline.
Physical proposals must be submitted in sealed opaque containers and marked, [RFP title].
The name and address of the bidder must also appear on the envelope and CD cover. RFP
SAMPLE TEMPLATE 2
3. [Institution] reserves the right to waive irregularities and to reject any or all bids. The
Owner also reserves the right to negotiate with the selected bidder in the event that the
price exceeds available funds. [Institution] may consider informal any bid not prepared
and/or not submitted in accordance with the provisions hereof and may waive any
informalities or reject any and all bids. Any bid may be withdrawn prior to the above
scheduled time for the opening of bids or authorized postponement thereof. Any bid
received after the time and date specified shall not be considered. No bidder may withdraw
a bid within sixty (60) days after the actual date of the opening thereof. Modification of Bids
Modifications to bids already submitted will be allowed if submitted in writing prior to the time
fixed in the Request for Proposals. Modifications shall be submitted as such and shall not
reveal the total amount of either the original or revised bids. Standards, Documentation and
Training The Contractor (Fabricator) is required to review [insert and Institutional
design/fabrication standards documents that might be applicable]. Any deviation from these
standards must be approved by [Institution]. [Optional:] These standards and other RFP
documents will be made available on the web. Bidders will be notified via email once the
RFP website is established. PROJECT DOCUMENTS: The following accompany this RFP
in [Disc] Format: [Institution] [RFP Title] [Institution] [RFP Title] Bid Sheets: Each electronic
project folder includes a tab for individual exhibits plus a Consolidated Bid Sheet listing all of
the exhibits within [the/each] project. [List Bid Sheet titles] Exhibition Documentation: These
files include [Exhibit Descriptions/Exhibit Drawings] for the exhibitions included in this RFP:
[List exhibition(s) and reference appropriate supporting docs] Exhibition Project Overviews
[Institution] Sample Contract Template [date] [Institution] Standards/Guidelines Documents:
[List any applicable docs] RFP SAMPLE TEMPLATE 3
4. [Optional] Accessing the Project Documents via the web. The above documents will be
made accessible via the web at: [URL] If you have difficulties accessing these documents
please contact [contact info]. Opening, Evaluation and Contracting Proposals may be
opened by [Institution] at any time after the submission deadline. All proposals satisfying the
requirements of this Request for Proposals will be evaluated to establish which of the
offerors best fulfills the needs of [Institution] and this project. [Institution] anticipates entering
into a contract with this/these offeror(s) to execute the proposed work. This Request for
Proposals, however, does not commit [Institution] to award a contract, to pay any costs
incurred in the preparation of a proposal or to contract for the goods and/or services offered.
[Institution] reserves the right to accept or reject any or all proposals received as a result of
this request, to negotiate with all qualified offerors or to cancel this Request for Proposals, if
it is in the best interests of [Institution] to do so. The decision of [Institution] shall be final.
After the selection of a Contractor the schedule should include a period of collaboration
between [Institution] and the Contractor to better define, elaborate upon and fix the
Contractor’s exact and final scope of Work (the “Final Scope”) starting with the date of this
Agreement and extending until [date]. In collaboration with [Institution], the Final Scope will
be fixed no later than [date]. While the Contractor should assume work begins immediately
upon notification that they have been selected, the Final Scope will be defined by editing,
redlining or adding superseding documents or drawings to the Proposed Scope of Work as
attached hereto. Once contracted, with respect to the Exhibit Documentation, Contractor
warrants to Owner that the Scope of Work reflected therein can be completed by Contractor,
in a form substantially similar to the preliminary scope, for the amount of the compensation
set forth below. Standards and Work Summary Parts of this invitation’s documents are
[Institution]'s [list any applicable standards documents and/or official guidelines included in
the RFP]. [Institution] expects to enter into a contract using these standards, especially
those sections establishing warranties, guarantees and [Institution]'s rights to intellectual
property. Form of Contract Enclosed with this Request for Proposal is a sample copy of
[Institution]’s typical form of contract. [Institution] expects to enter into contract with the
successful bidder on the basis of this form of contract. The submission of a proposal implies
an acceptance of determining final scope amounts and general acceptance on the part of
the bidder of the terms of this form of contract, and especially of those parts establishing
warranties, guarantees and [Institution]’s rights to intellectual property. In addition, all
aspects of the proposed work must comply with [Institution’s] [Standards doc(s)] and
[Institution]’s Liquidated Damages policy (reference below). Owner’s Liquidated Damages.
[Insert Institution’s Liquidated Damages requirements.] RFP SAMPLE TEMPLATE 4
5. Project Completion The Project is to be completed on or before [date]. Proposal Contents
Proposals, together with letters of transmittal, should include the bidder’s description of the
work that would be performed and the following information: • For each exhibit describe the
level work of work to be performed. • The team of people who would execute the work, with
descriptions of the experiences and skills of each and his/her role in the bidder’s firm and in
the team. • Names, addresses and descriptions of key subcontractors which your firm would
employ and a description of their relevant experience and past performance. Any
subcontractors must be identified in the bid. [Institution] must know if work is being done
outside of the firm. Please see the contract on details of subcontractors. Please remember
that after contract signing [Institution] reserves the right to approve all subcontractors that
were not approved during the RFP process. Denial of a subcontractor by [Institution] will
NOT absolve the bidder from getting the work done for the contracted price. • The name of
the person in your firm who would be the official contact person for any contractual
relationship. • At least two comparable previous projects in which the bidder has engaged,
with names and telephone numbers of contacts with whom the bidder’s previous
performance can be discussed. • Examples from past projects that reflect the deliverables
and scope that are listed in the scope of work. • A management plan for the work. • A
schedule for the work, including the range of start dates to which your firm is prepared to
commit and anticipated completion dates. This schedule should work within the timeframes
outlined by [Institution]. Any conflict in the two should be described. The schedule should
include a list of all anticipated meetings with [Institution] and their locations. • Proof of
insurance and bonding. • Completed Bid Sheets. • Written description and explanation of the
completed Bid Sheets. • A completed [Institution] Consolidated Bid Sheet, an estimated
detailed budget, an estimate for the full scope of work described for the exhibition(s) in
its(their) entirety, and the anticipated cash flow. P LEASE NOTE: BUDGET ENTRIES
SHOULD BE MADE IN THE SAME ORDER AS THE EXHIBITS LISTED ON THE BID
SHEETS. With their proposal, the Contractor must complete the [RFP title] Bid Sheets. RFP
SAMPLE TEMPLATE 5
6. Each exhibition project includes individual Bid Sheets for each of the exhibit experiences
included in this Request for Proposals, as well as a Consolidated Bid Sheet which lists all of
the experiences in that project. Each bidder shall use the Bid Forms included in the Bid
Documents to prepare their bid. No other bid forms or formats will be allowed except as part
of the supplemental information described above (e.g. estimated detailed budgets). For Bid
A on the bid sheets we are asking each bidder to describe the experience that comes as
close as possible to the Exhibit Description provided. Bid A is mandatory. All blank spaces
must be filled in. Bidders should also review the preliminary equipment lists and identify any
issues (e.g., either overkill on equipment or lack of necessary equipment to make the
experience work) [Optional:] Additionally we are inviting bidders to propose up to three (3)
Alternate Bids that provide for cost savings and value engineering. Bidders should include
the cost estimate(s) for Alternate Bids on the Bid Sheets, in the spaces allocated, and
provide a short description of the experience and any fabrication approach. Submission of
Alternate Bids is optional. Total calculated prices shall be given in both words and figures.
These sheets have been included in an electronic form as Excel documents. Contractors
can decide to bid only on one or more exhibitions within this RFP, however, as noted
previously, bid submittals should be for the [RFP type] project(s) as a complete package. In
other words, Contractors cannot bid on select scopes of work and/or experiences within a
single exhibition project. If a Contractor selects not to bid on the entire RFP, please provide
the reasoning for your selection(s). PROPOSED SCOPE OF WORK: Exhibit Elements
Covered by this Request for Proposals This Request for Proposals covers defined elements
for each exhibition. These elements are described in the Scopes of Work section of the
Drawings / Descriptions provided for each of the exhibit experiences within each exhibition
project. These include the Scopes of Work listed under the header, “General Fabricator” in
the Exhibit Descriptions and Drawings. As mentioned in the “Opening, Evaluation and
Contracting” section above, the final scope and thus final fee will be determined in meetings
immediately following the award of the work. The actual elements and a list of
implementation responsibilities are found for each exhibit in the Scope of Work section of
the Exhibit Descriptions and the Exhibit Drawings under the title “of “General Fabricator.”
For each of these elements, the Contractor must perform “The Work” as listed in this
document. [Institution] will be operating as Project Manager and Coordinator for the work.
Request for Proposals Overview Details on the exhibitions and exhibits accompany this
Request for Proposals in three forms: RFP SAMPLE TEMPLATE 6
7. (1) The first is the Exhibition Overview documents for [Exhibition(s)], which provide a
short summary of the exhibition(s). (2) The second are Exhibit Descriptions for exhibit
experiences for: [List exhibit experiences] These describe each of the exhibits that are part
of each of the RFP exhibition projects, including the educational goals, how the exhibit
should operate, the content we are drawing on for each exhibit and a description of the
scopes of work. The Contractor should review these carefully, as these indicate the desired
operation of the exhibit. Contractors should point out in their RFP any conflict between the
designs and their indicated operation. [Optional under #2:] Additionally, as part of the Exhibit
Descriptions, a tentative equipment list is included as well. As mentioned before, bidders
should indicate if they feel the equipment will not allow for a successful exhibit and offer
alternates. (3) The third component set is the Exhibit Drawings and an exhibition
floorplan(s). Contract [Institution] intends to enter into a contract, which will include the
fabrication scope of work outlined in the Project Documents. RFP Scope Clarifications and
Exceptions [List anything applicable] THE WORK: All proposals must account for the
following scope of work for the elements of the exhibition described in the Scopes of Work
section of the Exhibit Descriptions and Drawings listed under the headers, “Scope of Work:
General Fabricator.“ If the offeror recommends additional scope, substitutions and/or value
engineering alternatives, it should be clearly described in full with the reasons for the
alternative and a separate pricing for its inclusion. The [Institution] Standards provide the
details on many points of the work listed below. All work must comply with the following
[Institution] standards including: - [List any applicable Institutional Standards doc and/or
Guidelines] - All applicable [State] Codes [Optional:] In addition, the successful bidder may
need to meet with [Institution]’s contracted vendors in the future to detail specialty work as
required, and with our multimedia/video software vendors to finalize the scope of work to be
performed by the AV Installer. RFP SAMPLE TEMPLATE 7
8. 1. Work Parameters The Exhibit Descriptions describe in as much detail as possible at
this time the design intent, pertinent content and any resources available for each of these
exhibits. For each exhibit, bidders must describe in specific terms, the experience in the
exhibit they will provide as compared to the description provided in the Exhibit Description.
These should be supplied on the bid forms. There is a place on each Bid Form for estimated
costs for Alternates to the exhibits, as regards design, format, materials, etc. Bidders are
encouraged to describe alternates that will accomplish a program’s objectives while
reducing the cost of a program. Design The Contractor will be required to produce shop
drawings of the exhibit experiences found in this RFP. The Contractor is to collaborate with
the [Institution] team to complete the detailed design of the experiences. Creativity must be
a strong suit here. [Institution] is looking to improve upon and be innovative with these
experiences. As part of the design, engineering or shop drawings, the Contractor may need
to work with [Institution]'s lighting Contractor: [list lighting contact as applicable] The
successful bidder will be able to call on [Lighting Designer] for any lighting questions. The
successful bidder will be responsible to work with the AV installer to ensure that lighting
does not interfere with the visual elements that the AV installer is providing. Drawings The
Contractor shall include in their proposal all elements required for a complete exhibition,
even if not shown on the attached drawings or design development drawings when
complete. For the contract, the Contractor must submit a schedule for fabrication and
installation that is approved by [Institution]. All exhibits must have shop drawings that are
approved by [Institution] prior to fabrication. Final approval will be from the official
[Institution] representative, [Name/Title]. If required, the Contractor shall provide drawings
and calculations, stamped by a [State] registered structural engineer, which may be
submitted to the required [State] agencies for permits, where necessary. All engineering
drawings must be reviewed by [Institution] prior to the start of complete engineering shop
drawings. Shop drawings and "As Built" drawings will be a final deliverable in both printed
and electronic formats. Engineering/Permitting The Contractor is responsible for all
necessary engineering and shop drawings of the exhibition, including determining if
stamped drawings are necessary. The Contractor is solely responsible to apply, pay for and
obtain all permits required for this project including not limited to: Building and Trade permits
from [applicable State agency] for hauling equipment and any and all other City, State and
Federal permits required for the execution of this contract. Responsibility includes obtaining
engineering drawings by a professional engineer licensed in [State], which may be required
by applicable authorities. RFP SAMPLE TEMPLATE 8
9. In addition to shop drawings the Contractor is responsible for supplying fabrication
documentation necessary for the permitting authorities. This may include, but is not limited
to materials spec sheets with flame spread information and final equipment lists with power
distribution documentation. Prototyping As specified in the Scopes of Work, certain exhibits
will require prototyping. All prototypes must be reviewed by [Institution], and [Institution]
must approve any changes to the exhibit resulting from the prototype prior to final
fabrication. The Contractor can suggest elements that do not require prototyping; however,
these must be reviewed and approved by [Institution]. Equipment Identification and
Acquisition Early in the design development and engineering process an equipment list with
vendor sources shall be provided to [Institution] for review and approval for purchasing, as
necessary. A final equipment list with contracted vendors will be required for approval by
[Institution]. [Institution] has strong relationships with many industries and may elect to seek
donations of some equipment. The Contractor should, at the earliest point, identify
fabricators of preferred equipment in order to facilitate [Institution]'s desire to ask for
support. The Contractor will be responsible for notifying [Institution] of any conflicts with the
approved schedule, should [Institution] seek these donations. Construction The Contractor
is responsible for the construction of exhibition elements as noted in the Scopes of Work
sections of the drawings and Exhibit Operational Descriptions. These include the Scopes of
Work listed under the header, “General Fabricator.” [Institution] reserves the right to visit the
Contractor during construction of the components. Of special note: If the Contractor is
intending to subcontract any work outside of its shop, these Subcontractors must be listed in
the response to the Request for Proposals and examples of previous work supplied.
Acceptance of the Request for Proposals is NOT an acceptance of these Subcontractors.
Once in contract negotiations, [Institution] will reserve the right to review Subcontractors,
visit their facilities, talk with references and approve of their inclusion on the job. During
fabrication, if a Subcontractor becomes necessary, [Institution] must approve the
Subcontractor and reserves the right to review Subcontractors, visit their facilities, talk with
references and approve of their inclusion on the job. Fabrication Coordination As noted in
the Scopes of Work section of the attached Exhibit Descriptions, there [are/may be] other
contracted vendors responsible for production and installation work. The successful bidder
will be required to work closely with other vendors/contractors to coordinate construction,
shipping and installation details and schedules, as required. Power and Data Access to
power and data for all exhibits will be done through [describe details specific to institution].
[As applicable:] As noted in the Exhibit Descriptions and Drawings and the detailed Scopes
of Work contained therein, the Contractor is responsible for hard-wiring exhibits to the
overhead grid as well as supplying convenience power outlets and power strips. Pretest
RFP SAMPLE TEMPLATE 9
10. The Contractor will provide sample full-scale construction of the proposed designs, as
required, for testing before final fabrication. Shipping and Installation All components of the
exhibition(s) must be shipped and installed complete by the Contractor. The proposal should
indicate the intended means of shipping and any shipping concerns due to exhibit
configuration. If needed, Contractor is solely responsible for rigging all equipment into place
as designated on plans. Rigging includes lifting, hauling, erection, etc. Should Contractor
entertain utilizing cranes for such rigging, Contractor is responsible to perform field
engineering test for positioning of crane. Field engineering tests are to include soil borings
and a written report by a [State Geophysical Engineer reqt] with recommendations for crane
set-up. Guarantee and Service Contract The successful bidder will be required to guarantee
that all work shall remain free of defects for one (1) full year after the exhibit opening. A one-
year service contract should be included in the proposal. Service contracts should cover
periodic maintenance and emergency calls as required. Hardware shall be designed and
specified so that if there is a failure of a particular component, [Institution] staff can swap out
a back-up piece of equipment while the down part is repaired. Bidders shall describe in
detail what is included in their proposed service contract. [ Refer to [Institution] Standards
documents for more information regarding guarantees and service contracts.] Schedule
[sample] The Contractor's schedule of work must fit within the following estimated project
schedule. [List with dates:] RFP Issued Bidders Meeting (optional) RFP Due RFP
Awarded/Work Commences/Letter of Intent Sent 50% Design/Engineering Prototyping (as
required) 100% Design/Engineering Shop Drawing Deadline Fabrication Commences
Fabrication Ends Burn-In: Ready for Exhibit Opening: Warranty The Contractor must
warranty all products, work and services provided for a period of one year after the punch
list is completed. The Contractor must turn over all equipment warranties to [Institution].
Standards, Documentation and Training The Contractor must comply with all standards
described in the [Institution] Standards/Guidelines]. Any deviation from these standards
must be approved by [Institution]. The Contractor will be responsible for complete training of
[Institution] staff on the operation, maintenance and service of the exhibits and equipment. A
manual will be required that includes operation and upkeep RFP SAMPLE TEMPLATE 10
11. instructions, drawings, diagrams and equipment lists and vendors. This should be
supplied in CD - PC form. A second manual, with simplified operations and “fix-its” for floor
staff, is also required. Notes [List any other specific information that Bidders should be
aware of, e.g. as regards on-site installation work.] Other Work If a bidder has identified a
scope of work not listed in either the section called “The Work,” nor in “Proposed Scope of
Work” that the bidder feels is required to complete the project, then the bidder should
assume that scope falls within the bidder’s responsibilities. Any work identified as such must
be listed and described separately in the Request for Proposals response and detailed
estimates of costs provided. [As applicable:] Therefore, the Union Wage and Affirmative
Action Regulations apply to any trades work performed on site. For trade work performed
off-site to fabricate the exhibits, Union Wages and Affirmative Action Regulations do not
apply. If the onsite work is not trade work, then the regulations do not apply. [Describe any
specific requirements for on-site trade labor work and Affirmative Action Regulations.]
Ownership [Note: This section should be a summary overview - - with specifics outlined in
the contract sample; particularly as regards multimedia projects and 3rd party property.] Any
and all drawings, specifications, studies, electronic data, estimates, inventions, discoveries,
improvements, concepts, enhancements, and ideas or any portion thereof that the
Contractor may conceive, make, invent or suggest, either solely or jointly with [Institution] or
any other person or persons, at any time during the provision of the Services, whether at the
request or upon the suggestion of [Institution] or otherwise, and whether or not patentable or
copyrightable (any such drawings, specifications, studies, electronic data, estimates,
invention, discovery, improvement, concept, enhancement, idea, program or portion thereof
and any and all derivative works created or prepared from the foregoing being hereinafter
referred to as “Work Product”) shall fully, freely and immediately be communicated by
Contractor to [Institution] and shall belong to and be [Institution]’s sole and exclusive
property. Contractor shall not at any time, whether during or after the termination or
expiration of this Agreement, apply for any letters of patent, design, copyright, trademark,
mask work right or other form of protection whatsoever in the United States of America or
elsewhere for the Work Product. Without limiting any other provision of this Agreement, any
Work Product qualifying for protection under the copyright laws of the United States shall be
considered “works made for hire” under such copyright laws, and shall be the sole and
exclusive property of [Institution]. Contractor hereby irrevocably assigns to [Institution] any
right, title, or interest Contractor now has or may hereafter acquire in, to, and under all Work
Product, and to any patent, copyright, trademark, mask work right, or other proprietary or
intellectual property rights or interests in, to, and under such Work Product. [Institution] and
its assigns shall be the sole and exclusive owner of all patents, copyrights, trade secrets,
mask work rights, and other proprietary or intellectual property right or interest in connection
with such Work Product. Contractor agrees to assist [Institution], at RFP SAMPLE
TEMPLATE 11
12. [Institution]’s cost, in every proper way to obtain and from time to time enforce patents,
copyrights, trademarks, trade secrets, mask work rights, and all other proprietary and
intellectual property rights and interests in the Work Product, and to that end Contractor will
execute and deliver or procure the execution and delivery of all documents and other papers
and materials for use in applying for, obtaining and enforcing such patents, copyrights,
trademarks, mask work rights, and other proprietary and intellectual property rights and
interests, as [Institution] may request in writing, together with any assignments thereof to
[Institution] or persons designated by it. Insurance Insurance requirements are specified in
the Sample Contract Template provided as part of the RFP materials. Bonding [as
applicable] The successful bidder may need to furnish bonds covering faithful performance
of the Contract and payment of obligations arising there under as stipulated in this Request
for Proposals or specially required in the final Contract Documents on the execution of the
Contract. Bidders should assume the bonding amount to be equal to their bid. The Form for
Bid asks for the cost of establishing that Bond. Bonding costs should be itemized on the Bid
Sheets. Invoicing [List any requirements specific to the Institution.] Subcontractor Bid Please
list any subcontractor that you intend to use on this project, their scope of work, and the
amount that was included in the bid to cover their work. Subcontractor’s Scope of Work Bid
(Example: John Doe Acoustics – acoustic set up $XXXX RFP SAMPLE TEMPLATE 12

More Related Content

What's hot

Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts finalFitBlar Mit
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTVISHNU VIJAYAN
 
LMS RFP Template / Sample
LMS RFP Template / SampleLMS RFP Template / Sample
LMS RFP Template / SampleParadiso LMS
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender NoticeSakshi Kirar
 
IMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONIMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONSagar Kaptan
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Tender & bidding in construction projects
Tender  & bidding in construction projectsTender  & bidding in construction projects
Tender & bidding in construction projectsTEJAS2011
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
Unit-3_Measurement and payment
Unit-3_Measurement and paymentUnit-3_Measurement and payment
Unit-3_Measurement and paymentAkash Bharti
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Kipcon Inc.
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTADVj NiroSh
 

What's hot (20)

Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 
LMS RFP Template / Sample
LMS RFP Template / SampleLMS RFP Template / Sample
LMS RFP Template / Sample
 
ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1
 
Tendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamiaTendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamia
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
IMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONIMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATION
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Tender & bidding in construction projects
Tender  & bidding in construction projectsTender  & bidding in construction projects
Tender & bidding in construction projects
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Unit-2_Tender
Unit-2_TenderUnit-2_Tender
Unit-2_Tender
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
 
Unit-3_Measurement and payment
Unit-3_Measurement and paymentUnit-3_Measurement and payment
Unit-3_Measurement and payment
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
 
Unit-1_Contracts
Unit-1_ContractsUnit-1_Contracts
Unit-1_Contracts
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTAD
 

Viewers also liked

SAN Feminine butt in style
SAN Feminine butt in styleSAN Feminine butt in style
SAN Feminine butt in stylesansourcing
 
SAN Betty Blouses
SAN Betty BlousesSAN Betty Blouses
SAN Betty Blousessansourcing
 
San Company Profile
San Company ProfileSan Company Profile
San Company Profilesansourcing
 
San S/S 2013 In house Design Collection
San S/S 2013 In house Design CollectionSan S/S 2013 In house Design Collection
San S/S 2013 In house Design Collectionsansourcing
 

Viewers also liked (8)

SAN Feminine butt in style
SAN Feminine butt in styleSAN Feminine butt in style
SAN Feminine butt in style
 
SAN COLORS
SAN COLORSSAN COLORS
SAN COLORS
 
SAN Betty Blouses
SAN Betty BlousesSAN Betty Blouses
SAN Betty Blouses
 
Lounge Wear
Lounge WearLounge Wear
Lounge Wear
 
Tees
TeesTees
Tees
 
San Company Profile
San Company ProfileSan Company Profile
San Company Profile
 
SAN collection!
SAN collection!SAN collection!
SAN collection!
 
San S/S 2013 In house Design Collection
San S/S 2013 In house Design CollectionSan S/S 2013 In house Design Collection
San S/S 2013 In house Design Collection
 

Similar to Request for proposals template

SAMPLE REQUEST FOR PROPOSALS” TEMPLATE Request for Propo.docx
SAMPLE REQUEST FOR PROPOSALS” TEMPLATE  Request for Propo.docxSAMPLE REQUEST FOR PROPOSALS” TEMPLATE  Request for Propo.docx
SAMPLE REQUEST FOR PROPOSALS” TEMPLATE Request for Propo.docxanhlodge
 
Introduction How to Use This TemplateA Request for Propos.docx
Introduction How to Use This TemplateA Request for Propos.docxIntroduction How to Use This TemplateA Request for Propos.docx
Introduction How to Use This TemplateA Request for Propos.docxnormanibarber20063
 
[YOUR COMPANY]REQUEST FOR PROPOSALPURCHASE OF TRAINING FOR [PROG.docx
[YOUR COMPANY]REQUEST FOR PROPOSALPURCHASE OF TRAINING FOR [PROG.docx[YOUR COMPANY]REQUEST FOR PROPOSALPURCHASE OF TRAINING FOR [PROG.docx
[YOUR COMPANY]REQUEST FOR PROPOSALPURCHASE OF TRAINING FOR [PROG.docxtawnyataylor528
 
Business negotiations for purchasing and supply chain management
Business negotiations for purchasing and supply chain managementBusiness negotiations for purchasing and supply chain management
Business negotiations for purchasing and supply chain managementSajeena Justin
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Contractor Selection - Special District Meeting
Contractor Selection - Special District MeetingContractor Selection - Special District Meeting
Contractor Selection - Special District MeetingWaseem Khan, PG
 
World bank price adjustment documents.PDF
World bank price adjustment documents.PDFWorld bank price adjustment documents.PDF
World bank price adjustment documents.PDFGovinda Gaire
 
RFP Template - Managment HQ
RFP Template  - Managment HQRFP Template  - Managment HQ
RFP Template - Managment HQManagement-HQ
 
Prequalification document(1)
Prequalification document(1)Prequalification document(1)
Prequalification document(1)Muhammad Akram
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
RFQ-RFP Best Practices Workshop Jan2012.ppt
RFQ-RFP Best Practices Workshop Jan2012.pptRFQ-RFP Best Practices Workshop Jan2012.ppt
RFQ-RFP Best Practices Workshop Jan2012.pptAravindReddyKetham1
 
Srfp consultants 3 technical proposal
Srfp consultants 3   technical proposalSrfp consultants 3   technical proposal
Srfp consultants 3 technical proposalJoy Irman
 

Similar to Request for proposals template (20)

SAMPLE REQUEST FOR PROPOSALS” TEMPLATE Request for Propo.docx
SAMPLE REQUEST FOR PROPOSALS” TEMPLATE  Request for Propo.docxSAMPLE REQUEST FOR PROPOSALS” TEMPLATE  Request for Propo.docx
SAMPLE REQUEST FOR PROPOSALS” TEMPLATE Request for Propo.docx
 
Introduction How to Use This TemplateA Request for Propos.docx
Introduction How to Use This TemplateA Request for Propos.docxIntroduction How to Use This TemplateA Request for Propos.docx
Introduction How to Use This TemplateA Request for Propos.docx
 
[YOUR COMPANY]REQUEST FOR PROPOSALPURCHASE OF TRAINING FOR [PROG.docx
[YOUR COMPANY]REQUEST FOR PROPOSALPURCHASE OF TRAINING FOR [PROG.docx[YOUR COMPANY]REQUEST FOR PROPOSALPURCHASE OF TRAINING FOR [PROG.docx
[YOUR COMPANY]REQUEST FOR PROPOSALPURCHASE OF TRAINING FOR [PROG.docx
 
IT Service Desk Software RFP Template
IT Service Desk Software RFP TemplateIT Service Desk Software RFP Template
IT Service Desk Software RFP Template
 
Business negotiations for purchasing and supply chain management
Business negotiations for purchasing and supply chain managementBusiness negotiations for purchasing and supply chain management
Business negotiations for purchasing and supply chain management
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Contractor Selection - Special District Meeting
Contractor Selection - Special District MeetingContractor Selection - Special District Meeting
Contractor Selection - Special District Meeting
 
World bank price adjustment documents.PDF
World bank price adjustment documents.PDFWorld bank price adjustment documents.PDF
World bank price adjustment documents.PDF
 
Document samples
Document samplesDocument samples
Document samples
 
tendering
 tendering tendering
tendering
 
Tender
TenderTender
Tender
 
RFP Template - Managment HQ
RFP Template  - Managment HQRFP Template  - Managment HQ
RFP Template - Managment HQ
 
Chapter -Two (2).pdf
Chapter -Two (2).pdfChapter -Two (2).pdf
Chapter -Two (2).pdf
 
Prequalification document(1)
Prequalification document(1)Prequalification document(1)
Prequalification document(1)
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
RFQ-RFP Best Practices Workshop Jan2012.ppt
RFQ-RFP Best Practices Workshop Jan2012.pptRFQ-RFP Best Practices Workshop Jan2012.ppt
RFQ-RFP Best Practices Workshop Jan2012.ppt
 
Notes unit 2A.ppt
Notes unit 2A.pptNotes unit 2A.ppt
Notes unit 2A.ppt
 
Srfp consultants 3 technical proposal
Srfp consultants 3   technical proposalSrfp consultants 3   technical proposal
Srfp consultants 3 technical proposal
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Contracts & tenders
Contracts & tendersContracts & tenders
Contracts & tenders
 

Recently uploaded

PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 

Recently uploaded (20)

PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 

Request for proposals template

  • 1. SAMPLE "REQUEST FOR PROPOSALS" TEMPLATE — Document Transcript 1. SAMPLE “REQUEST FOR PROPOSALS” TEMPLATE Request for Proposals (RFP) For: [Title of RFP Project] Note: This sample is for a fabrication type of RFP. [RFP ID #] Issued: [Date] Submission deadline: [Time/Date] Bidders Meeting: [Day/Date] Deadline for final submission of questions: [Day/ Date/ Time] Questions: Questions can be submitted prior to the Bidders Meeting on [Date]; however, no answers will be provided and/or circulated prior to that date. ALL QUESTIONS PERTAINING TO THIS RFP MUST BE SUBMITTED BY [Day/Date/Time] No interpretation of the meaning of the Bid Documents (drawings, specifications, et. al.) will be made to any bidder. Questions may be submitted, in written form, to: [Contact details] or emailed to _________ . Questions will be answered by the appropriate individuals and answered within 2 business days via email with a return reply acknowledging receipt of the email requested. Questions and answers will be shared with all bidders. Introduction [Institution], (Owner) invites proposals for [RFP work description]. Based on previous work experience, your firm has been selected to receive this RFP and is invited to submit a proposal to produce the exhibition experiences described herein. BIDDERS SHOULD NOTE THAT ANY AND ALL WORK INTENDED TO BE SUBCONTRACTED AS PART OF THE BID SUBMITTAL MUST BE ACCOMPANIED BY BACKGROUND MATERIALS AND REFERENCES FOR PROPOSED SUBCONTRACTOR(S) - - NO EXCEPTIONS. Bidders Meeting There will be an opportunity for prospective Bidders to meet with [Institution} staff for a Question and Answer session at [place] on [date]. Bidders Meeting details: Date: Time: Location: 2. Participation at the Bidders Meeting is not mandatory, however, it is limited to two (2) people per firm. The purpose of this meeting is to give vendors the opportunity to ask [Institution] questions about the exhibition(s). If you are intending to send representatives to this meeting please send an RSVP to [Name], who can be reached at [contact info]. Please provide us names and titles of those attending by [date]. Each bidder will be responsible to provide detailed minutes and notes of the meeting within two (2) business days of the conclusion of the conference including detailed description of any changes made to the scope of work. These should be forwarded to [contact info] as Microsoft Word documents. [Institution] will then create a master meeting record that will be distributed to Bidders within the following two (2) days. The minutes will serve as the (only) official record of the items discussed and resolutions made during the meeting. All modifications noted in these minutes will be shared with all bidders Exhibition(s) included in this RFP: Please refer to the
  • 2. attached [Title of List] for the complete roster of exhibit experiences included in this RFP package. The experiences listed on this roster are part of the following exhibition(s) in development, slated to open [date]: [List Exhibition(s)] The scope of work for each of these exhibitions is detailed in the Proposed Scope of Work section of this RFP. To bid on an exhibit, the Contractor must complete all scopes of work listed therein. [Optional:] Bidders must bid on complete exhibitions. Bidders may bid on all of the exhibitions, or only select ones, but the bid(s) must incorporate all of the identified scopes for ALL of the exhibits described within each selected exhibition project. Background [Provide background on Institution and project(s) relevant to the RFP.] Submission Procedure Proposals conforming to the requirements set out below must be received by [Contact info] by US mail, courier or email [Contact info] no later than the deadline given above. All submittals must be received in PC - CD form along with hard copies. [X #] copies of each format are required. Text portions of the submittals are acceptable in Adobe Acrobat® form by the deadline (including via email) but must be followed in CD and hard copy form within two (2) business days. All electronic Bid Sheets must be submitted as Excel documents, not PDFs. Proposals must state that they are valid for a period of at least ninety (90) days from the closing deadline. Physical proposals must be submitted in sealed opaque containers and marked, [RFP title]. The name and address of the bidder must also appear on the envelope and CD cover. RFP SAMPLE TEMPLATE 2 3. [Institution] reserves the right to waive irregularities and to reject any or all bids. The Owner also reserves the right to negotiate with the selected bidder in the event that the price exceeds available funds. [Institution] may consider informal any bid not prepared and/or not submitted in accordance with the provisions hereof and may waive any informalities or reject any and all bids. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof. Modification of Bids Modifications to bids already submitted will be allowed if submitted in writing prior to the time fixed in the Request for Proposals. Modifications shall be submitted as such and shall not reveal the total amount of either the original or revised bids. Standards, Documentation and Training The Contractor (Fabricator) is required to review [insert and Institutional design/fabrication standards documents that might be applicable]. Any deviation from these standards must be approved by [Institution]. [Optional:] These standards and other RFP documents will be made available on the web. Bidders will be notified via email once the
  • 3. RFP website is established. PROJECT DOCUMENTS: The following accompany this RFP in [Disc] Format: [Institution] [RFP Title] [Institution] [RFP Title] Bid Sheets: Each electronic project folder includes a tab for individual exhibits plus a Consolidated Bid Sheet listing all of the exhibits within [the/each] project. [List Bid Sheet titles] Exhibition Documentation: These files include [Exhibit Descriptions/Exhibit Drawings] for the exhibitions included in this RFP: [List exhibition(s) and reference appropriate supporting docs] Exhibition Project Overviews [Institution] Sample Contract Template [date] [Institution] Standards/Guidelines Documents: [List any applicable docs] RFP SAMPLE TEMPLATE 3 4. [Optional] Accessing the Project Documents via the web. The above documents will be made accessible via the web at: [URL] If you have difficulties accessing these documents please contact [contact info]. Opening, Evaluation and Contracting Proposals may be opened by [Institution] at any time after the submission deadline. All proposals satisfying the requirements of this Request for Proposals will be evaluated to establish which of the offerors best fulfills the needs of [Institution] and this project. [Institution] anticipates entering into a contract with this/these offeror(s) to execute the proposed work. This Request for Proposals, however, does not commit [Institution] to award a contract, to pay any costs incurred in the preparation of a proposal or to contract for the goods and/or services offered. [Institution] reserves the right to accept or reject any or all proposals received as a result of this request, to negotiate with all qualified offerors or to cancel this Request for Proposals, if it is in the best interests of [Institution] to do so. The decision of [Institution] shall be final. After the selection of a Contractor the schedule should include a period of collaboration between [Institution] and the Contractor to better define, elaborate upon and fix the Contractor’s exact and final scope of Work (the “Final Scope”) starting with the date of this Agreement and extending until [date]. In collaboration with [Institution], the Final Scope will be fixed no later than [date]. While the Contractor should assume work begins immediately upon notification that they have been selected, the Final Scope will be defined by editing, redlining or adding superseding documents or drawings to the Proposed Scope of Work as attached hereto. Once contracted, with respect to the Exhibit Documentation, Contractor warrants to Owner that the Scope of Work reflected therein can be completed by Contractor, in a form substantially similar to the preliminary scope, for the amount of the compensation set forth below. Standards and Work Summary Parts of this invitation’s documents are [Institution]'s [list any applicable standards documents and/or official guidelines included in the RFP]. [Institution] expects to enter into a contract using these standards, especially those sections establishing warranties, guarantees and [Institution]'s rights to intellectual
  • 4. property. Form of Contract Enclosed with this Request for Proposal is a sample copy of [Institution]’s typical form of contract. [Institution] expects to enter into contract with the successful bidder on the basis of this form of contract. The submission of a proposal implies an acceptance of determining final scope amounts and general acceptance on the part of the bidder of the terms of this form of contract, and especially of those parts establishing warranties, guarantees and [Institution]’s rights to intellectual property. In addition, all aspects of the proposed work must comply with [Institution’s] [Standards doc(s)] and [Institution]’s Liquidated Damages policy (reference below). Owner’s Liquidated Damages. [Insert Institution’s Liquidated Damages requirements.] RFP SAMPLE TEMPLATE 4 5. Project Completion The Project is to be completed on or before [date]. Proposal Contents Proposals, together with letters of transmittal, should include the bidder’s description of the work that would be performed and the following information: • For each exhibit describe the level work of work to be performed. • The team of people who would execute the work, with descriptions of the experiences and skills of each and his/her role in the bidder’s firm and in the team. • Names, addresses and descriptions of key subcontractors which your firm would employ and a description of their relevant experience and past performance. Any subcontractors must be identified in the bid. [Institution] must know if work is being done outside of the firm. Please see the contract on details of subcontractors. Please remember that after contract signing [Institution] reserves the right to approve all subcontractors that were not approved during the RFP process. Denial of a subcontractor by [Institution] will NOT absolve the bidder from getting the work done for the contracted price. • The name of the person in your firm who would be the official contact person for any contractual relationship. • At least two comparable previous projects in which the bidder has engaged, with names and telephone numbers of contacts with whom the bidder’s previous performance can be discussed. • Examples from past projects that reflect the deliverables and scope that are listed in the scope of work. • A management plan for the work. • A schedule for the work, including the range of start dates to which your firm is prepared to commit and anticipated completion dates. This schedule should work within the timeframes outlined by [Institution]. Any conflict in the two should be described. The schedule should include a list of all anticipated meetings with [Institution] and their locations. • Proof of insurance and bonding. • Completed Bid Sheets. • Written description and explanation of the completed Bid Sheets. • A completed [Institution] Consolidated Bid Sheet, an estimated detailed budget, an estimate for the full scope of work described for the exhibition(s) in its(their) entirety, and the anticipated cash flow. P LEASE NOTE: BUDGET ENTRIES
  • 5. SHOULD BE MADE IN THE SAME ORDER AS THE EXHIBITS LISTED ON THE BID SHEETS. With their proposal, the Contractor must complete the [RFP title] Bid Sheets. RFP SAMPLE TEMPLATE 5 6. Each exhibition project includes individual Bid Sheets for each of the exhibit experiences included in this Request for Proposals, as well as a Consolidated Bid Sheet which lists all of the experiences in that project. Each bidder shall use the Bid Forms included in the Bid Documents to prepare their bid. No other bid forms or formats will be allowed except as part of the supplemental information described above (e.g. estimated detailed budgets). For Bid A on the bid sheets we are asking each bidder to describe the experience that comes as close as possible to the Exhibit Description provided. Bid A is mandatory. All blank spaces must be filled in. Bidders should also review the preliminary equipment lists and identify any issues (e.g., either overkill on equipment or lack of necessary equipment to make the experience work) [Optional:] Additionally we are inviting bidders to propose up to three (3) Alternate Bids that provide for cost savings and value engineering. Bidders should include the cost estimate(s) for Alternate Bids on the Bid Sheets, in the spaces allocated, and provide a short description of the experience and any fabrication approach. Submission of Alternate Bids is optional. Total calculated prices shall be given in both words and figures. These sheets have been included in an electronic form as Excel documents. Contractors can decide to bid only on one or more exhibitions within this RFP, however, as noted previously, bid submittals should be for the [RFP type] project(s) as a complete package. In other words, Contractors cannot bid on select scopes of work and/or experiences within a single exhibition project. If a Contractor selects not to bid on the entire RFP, please provide the reasoning for your selection(s). PROPOSED SCOPE OF WORK: Exhibit Elements Covered by this Request for Proposals This Request for Proposals covers defined elements for each exhibition. These elements are described in the Scopes of Work section of the Drawings / Descriptions provided for each of the exhibit experiences within each exhibition project. These include the Scopes of Work listed under the header, “General Fabricator” in the Exhibit Descriptions and Drawings. As mentioned in the “Opening, Evaluation and Contracting” section above, the final scope and thus final fee will be determined in meetings immediately following the award of the work. The actual elements and a list of implementation responsibilities are found for each exhibit in the Scope of Work section of the Exhibit Descriptions and the Exhibit Drawings under the title “of “General Fabricator.” For each of these elements, the Contractor must perform “The Work” as listed in this document. [Institution] will be operating as Project Manager and Coordinator for the work.
  • 6. Request for Proposals Overview Details on the exhibitions and exhibits accompany this Request for Proposals in three forms: RFP SAMPLE TEMPLATE 6 7. (1) The first is the Exhibition Overview documents for [Exhibition(s)], which provide a short summary of the exhibition(s). (2) The second are Exhibit Descriptions for exhibit experiences for: [List exhibit experiences] These describe each of the exhibits that are part of each of the RFP exhibition projects, including the educational goals, how the exhibit should operate, the content we are drawing on for each exhibit and a description of the scopes of work. The Contractor should review these carefully, as these indicate the desired operation of the exhibit. Contractors should point out in their RFP any conflict between the designs and their indicated operation. [Optional under #2:] Additionally, as part of the Exhibit Descriptions, a tentative equipment list is included as well. As mentioned before, bidders should indicate if they feel the equipment will not allow for a successful exhibit and offer alternates. (3) The third component set is the Exhibit Drawings and an exhibition floorplan(s). Contract [Institution] intends to enter into a contract, which will include the fabrication scope of work outlined in the Project Documents. RFP Scope Clarifications and Exceptions [List anything applicable] THE WORK: All proposals must account for the following scope of work for the elements of the exhibition described in the Scopes of Work section of the Exhibit Descriptions and Drawings listed under the headers, “Scope of Work: General Fabricator.“ If the offeror recommends additional scope, substitutions and/or value engineering alternatives, it should be clearly described in full with the reasons for the alternative and a separate pricing for its inclusion. The [Institution] Standards provide the details on many points of the work listed below. All work must comply with the following [Institution] standards including: - [List any applicable Institutional Standards doc and/or Guidelines] - All applicable [State] Codes [Optional:] In addition, the successful bidder may need to meet with [Institution]’s contracted vendors in the future to detail specialty work as required, and with our multimedia/video software vendors to finalize the scope of work to be performed by the AV Installer. RFP SAMPLE TEMPLATE 7 8. 1. Work Parameters The Exhibit Descriptions describe in as much detail as possible at this time the design intent, pertinent content and any resources available for each of these exhibits. For each exhibit, bidders must describe in specific terms, the experience in the exhibit they will provide as compared to the description provided in the Exhibit Description. These should be supplied on the bid forms. There is a place on each Bid Form for estimated costs for Alternates to the exhibits, as regards design, format, materials, etc. Bidders are encouraged to describe alternates that will accomplish a program’s objectives while
  • 7. reducing the cost of a program. Design The Contractor will be required to produce shop drawings of the exhibit experiences found in this RFP. The Contractor is to collaborate with the [Institution] team to complete the detailed design of the experiences. Creativity must be a strong suit here. [Institution] is looking to improve upon and be innovative with these experiences. As part of the design, engineering or shop drawings, the Contractor may need to work with [Institution]'s lighting Contractor: [list lighting contact as applicable] The successful bidder will be able to call on [Lighting Designer] for any lighting questions. The successful bidder will be responsible to work with the AV installer to ensure that lighting does not interfere with the visual elements that the AV installer is providing. Drawings The Contractor shall include in their proposal all elements required for a complete exhibition, even if not shown on the attached drawings or design development drawings when complete. For the contract, the Contractor must submit a schedule for fabrication and installation that is approved by [Institution]. All exhibits must have shop drawings that are approved by [Institution] prior to fabrication. Final approval will be from the official [Institution] representative, [Name/Title]. If required, the Contractor shall provide drawings and calculations, stamped by a [State] registered structural engineer, which may be submitted to the required [State] agencies for permits, where necessary. All engineering drawings must be reviewed by [Institution] prior to the start of complete engineering shop drawings. Shop drawings and "As Built" drawings will be a final deliverable in both printed and electronic formats. Engineering/Permitting The Contractor is responsible for all necessary engineering and shop drawings of the exhibition, including determining if stamped drawings are necessary. The Contractor is solely responsible to apply, pay for and obtain all permits required for this project including not limited to: Building and Trade permits from [applicable State agency] for hauling equipment and any and all other City, State and Federal permits required for the execution of this contract. Responsibility includes obtaining engineering drawings by a professional engineer licensed in [State], which may be required by applicable authorities. RFP SAMPLE TEMPLATE 8 9. In addition to shop drawings the Contractor is responsible for supplying fabrication documentation necessary for the permitting authorities. This may include, but is not limited to materials spec sheets with flame spread information and final equipment lists with power distribution documentation. Prototyping As specified in the Scopes of Work, certain exhibits will require prototyping. All prototypes must be reviewed by [Institution], and [Institution] must approve any changes to the exhibit resulting from the prototype prior to final fabrication. The Contractor can suggest elements that do not require prototyping; however,
  • 8. these must be reviewed and approved by [Institution]. Equipment Identification and Acquisition Early in the design development and engineering process an equipment list with vendor sources shall be provided to [Institution] for review and approval for purchasing, as necessary. A final equipment list with contracted vendors will be required for approval by [Institution]. [Institution] has strong relationships with many industries and may elect to seek donations of some equipment. The Contractor should, at the earliest point, identify fabricators of preferred equipment in order to facilitate [Institution]'s desire to ask for support. The Contractor will be responsible for notifying [Institution] of any conflicts with the approved schedule, should [Institution] seek these donations. Construction The Contractor is responsible for the construction of exhibition elements as noted in the Scopes of Work sections of the drawings and Exhibit Operational Descriptions. These include the Scopes of Work listed under the header, “General Fabricator.” [Institution] reserves the right to visit the Contractor during construction of the components. Of special note: If the Contractor is intending to subcontract any work outside of its shop, these Subcontractors must be listed in the response to the Request for Proposals and examples of previous work supplied. Acceptance of the Request for Proposals is NOT an acceptance of these Subcontractors. Once in contract negotiations, [Institution] will reserve the right to review Subcontractors, visit their facilities, talk with references and approve of their inclusion on the job. During fabrication, if a Subcontractor becomes necessary, [Institution] must approve the Subcontractor and reserves the right to review Subcontractors, visit their facilities, talk with references and approve of their inclusion on the job. Fabrication Coordination As noted in the Scopes of Work section of the attached Exhibit Descriptions, there [are/may be] other contracted vendors responsible for production and installation work. The successful bidder will be required to work closely with other vendors/contractors to coordinate construction, shipping and installation details and schedules, as required. Power and Data Access to power and data for all exhibits will be done through [describe details specific to institution]. [As applicable:] As noted in the Exhibit Descriptions and Drawings and the detailed Scopes of Work contained therein, the Contractor is responsible for hard-wiring exhibits to the overhead grid as well as supplying convenience power outlets and power strips. Pretest RFP SAMPLE TEMPLATE 9 10. The Contractor will provide sample full-scale construction of the proposed designs, as required, for testing before final fabrication. Shipping and Installation All components of the exhibition(s) must be shipped and installed complete by the Contractor. The proposal should indicate the intended means of shipping and any shipping concerns due to exhibit
  • 9. configuration. If needed, Contractor is solely responsible for rigging all equipment into place as designated on plans. Rigging includes lifting, hauling, erection, etc. Should Contractor entertain utilizing cranes for such rigging, Contractor is responsible to perform field engineering test for positioning of crane. Field engineering tests are to include soil borings and a written report by a [State Geophysical Engineer reqt] with recommendations for crane set-up. Guarantee and Service Contract The successful bidder will be required to guarantee that all work shall remain free of defects for one (1) full year after the exhibit opening. A one- year service contract should be included in the proposal. Service contracts should cover periodic maintenance and emergency calls as required. Hardware shall be designed and specified so that if there is a failure of a particular component, [Institution] staff can swap out a back-up piece of equipment while the down part is repaired. Bidders shall describe in detail what is included in their proposed service contract. [ Refer to [Institution] Standards documents for more information regarding guarantees and service contracts.] Schedule [sample] The Contractor's schedule of work must fit within the following estimated project schedule. [List with dates:] RFP Issued Bidders Meeting (optional) RFP Due RFP Awarded/Work Commences/Letter of Intent Sent 50% Design/Engineering Prototyping (as required) 100% Design/Engineering Shop Drawing Deadline Fabrication Commences Fabrication Ends Burn-In: Ready for Exhibit Opening: Warranty The Contractor must warranty all products, work and services provided for a period of one year after the punch list is completed. The Contractor must turn over all equipment warranties to [Institution]. Standards, Documentation and Training The Contractor must comply with all standards described in the [Institution] Standards/Guidelines]. Any deviation from these standards must be approved by [Institution]. The Contractor will be responsible for complete training of [Institution] staff on the operation, maintenance and service of the exhibits and equipment. A manual will be required that includes operation and upkeep RFP SAMPLE TEMPLATE 10 11. instructions, drawings, diagrams and equipment lists and vendors. This should be supplied in CD - PC form. A second manual, with simplified operations and “fix-its” for floor staff, is also required. Notes [List any other specific information that Bidders should be aware of, e.g. as regards on-site installation work.] Other Work If a bidder has identified a scope of work not listed in either the section called “The Work,” nor in “Proposed Scope of Work” that the bidder feels is required to complete the project, then the bidder should assume that scope falls within the bidder’s responsibilities. Any work identified as such must be listed and described separately in the Request for Proposals response and detailed estimates of costs provided. [As applicable:] Therefore, the Union Wage and Affirmative
  • 10. Action Regulations apply to any trades work performed on site. For trade work performed off-site to fabricate the exhibits, Union Wages and Affirmative Action Regulations do not apply. If the onsite work is not trade work, then the regulations do not apply. [Describe any specific requirements for on-site trade labor work and Affirmative Action Regulations.] Ownership [Note: This section should be a summary overview - - with specifics outlined in the contract sample; particularly as regards multimedia projects and 3rd party property.] Any and all drawings, specifications, studies, electronic data, estimates, inventions, discoveries, improvements, concepts, enhancements, and ideas or any portion thereof that the Contractor may conceive, make, invent or suggest, either solely or jointly with [Institution] or any other person or persons, at any time during the provision of the Services, whether at the request or upon the suggestion of [Institution] or otherwise, and whether or not patentable or copyrightable (any such drawings, specifications, studies, electronic data, estimates, invention, discovery, improvement, concept, enhancement, idea, program or portion thereof and any and all derivative works created or prepared from the foregoing being hereinafter referred to as “Work Product”) shall fully, freely and immediately be communicated by Contractor to [Institution] and shall belong to and be [Institution]’s sole and exclusive property. Contractor shall not at any time, whether during or after the termination or expiration of this Agreement, apply for any letters of patent, design, copyright, trademark, mask work right or other form of protection whatsoever in the United States of America or elsewhere for the Work Product. Without limiting any other provision of this Agreement, any Work Product qualifying for protection under the copyright laws of the United States shall be considered “works made for hire” under such copyright laws, and shall be the sole and exclusive property of [Institution]. Contractor hereby irrevocably assigns to [Institution] any right, title, or interest Contractor now has or may hereafter acquire in, to, and under all Work Product, and to any patent, copyright, trademark, mask work right, or other proprietary or intellectual property rights or interests in, to, and under such Work Product. [Institution] and its assigns shall be the sole and exclusive owner of all patents, copyrights, trade secrets, mask work rights, and other proprietary or intellectual property right or interest in connection with such Work Product. Contractor agrees to assist [Institution], at RFP SAMPLE TEMPLATE 11 12. [Institution]’s cost, in every proper way to obtain and from time to time enforce patents, copyrights, trademarks, trade secrets, mask work rights, and all other proprietary and intellectual property rights and interests in the Work Product, and to that end Contractor will execute and deliver or procure the execution and delivery of all documents and other papers
  • 11. and materials for use in applying for, obtaining and enforcing such patents, copyrights, trademarks, mask work rights, and other proprietary and intellectual property rights and interests, as [Institution] may request in writing, together with any assignments thereof to [Institution] or persons designated by it. Insurance Insurance requirements are specified in the Sample Contract Template provided as part of the RFP materials. Bonding [as applicable] The successful bidder may need to furnish bonds covering faithful performance of the Contract and payment of obligations arising there under as stipulated in this Request for Proposals or specially required in the final Contract Documents on the execution of the Contract. Bidders should assume the bonding amount to be equal to their bid. The Form for Bid asks for the cost of establishing that Bond. Bonding costs should be itemized on the Bid Sheets. Invoicing [List any requirements specific to the Institution.] Subcontractor Bid Please list any subcontractor that you intend to use on this project, their scope of work, and the amount that was included in the bid to cover their work. Subcontractor’s Scope of Work Bid (Example: John Doe Acoustics – acoustic set up $XXXX RFP SAMPLE TEMPLATE 12