Southeast University

Objectives of project work:
To implement of work study charts to obtain
maximum utilization of the resources and to
optimize workplace by changing.

3
Southeast University

Role of industrial engineering department in
apparel industry:
Importance of industrial engineering (IE) tools that can be used
to improve upon the productivity and thus enhance the profits.
Very few companies have been operating with a full fledged
industrial engineering department and even those which boast of
as an industrial engineering department(IED) are not allowing
freedom and scope to function to its full capabilities. The role of
IED is important for the garments industry for the following two
reasons:
It’s highly labor –intensive industry.
 Effective planning is emerging as one of the key factors for
the garments manufacturing industry.

4
Garments manufacturing
diagram:

Southeast University

Fabric from stores

Cutting section

Sewing section

Finishing section

Finished garments to warehouse

5
Southeast University

6
Southeast University

What is work study?
 Work study is mainly concerned with the examination of
human work.
There are two parts of work study:
Work Study

Method Study

Work
Measurement

7
Why work study?

Southeast University

• To eliminate wastage of time and labor.
• To reduce fatigue and boredom of work by avoiding
unnecessary movements.
• To find a best way of doing a job.
• To have more utilization of materials, machines and
workers.
• To improve the design of work place layout.
• To train the individual operator in its practice as per
standardized methods.

8
Southeast University

Why Work Measurement is Important?
Set target
Manpower allocation
Calculate efficiency
Production planning and
control
• Determine cost
•
•
•
•

9
Southeast University

Method study:
The main purpose of method study is to
eliminate the unnecessary operations and
to achieve the best method of performing
the operation.
10
Southeast University

Time Study:
To determine the time it should take for a
qualified worker to perform a specific
task using a specified method by directly
observing an operator.

11
Southeast University

Time Study Sheet of IE Department:

12
Southeast University

How it Works?
3.

Compute the basic time

Basic Time = Observed time X
•
4.

Observed rating
Standard rating

Compute the standard minute value
SMV = Basic Time + Allowance

13
Southeast University

14
Southeast University

In this case, we need to follow PDCA process improvement
chart which can give us a solution.

PDCA

Figure : The Shewhart Cycle is a fundamental idea for continuous process improvement.
15
Quality:
Quality means customer satisfaction
16
Benefits of TQM:
The benefits of TQM can be classified into the following two categories:
1. Customer satisfaction oriented benefits.
2. Economic improvements oriented benefits.
1. Customer satisfaction oriented
this category are listed below:
(a) Improvement in product quality.
(b) Improvement in product design.
(c) Improvement in production flow.

benefits: The benefits under

2. Economic improvements oriented benefits: The benefits
under this category are as follows:
(a) Reductions in operating costs.
(b) Reductions in operating losses.
(c) Reductions in field service costs.
(d) Reductions in liability exposure.
17
Time Study Exercise
Process Name

= Side Seam

Observed Time = 35.27 Sec
Observed Rating = 92%
Allowance
= 25%
Basic Time
SMV

Capacity

= (35.27 X 0.92) Sec
= 32.45 Sec
= 32.45 + (32.45 X 0.25) Sec
= 40.56 Sec
= (3600 ÷ 40.56) Pcs/ Hour
= 88 Pcs/ Hour
18
Product enhancements
Design innovations
Standardizing design
Investing in training and the development of employees.
Investing in better plant and equipment.

Management – Worker
Improving the planning or work
Improving methods of production
Effective worker selection process

19
Ways of improving productivity

Southeast University

– improving worker effectiveness
– Providing workers with
adequate training
– Improving morale
– Rewarding success
– Improving attendance levels
– Reducing labour turnover
– Effective communications
– Measuring the performance.

20
Southeast University

Conclusion
WITH THE APPLICATION OF WORK STUDY CHARTS
IN APPAREL MANUFACTURING, THE EFFECTIVE
UTILIZATION OF RESOURCES ( MAN, MATERIAL &
MACHINES) CAN BE ACHIEVED.


 THE COST INVOLVED IN USING THESE CHARTS ARE
VERY MINIMUM AND A SOLUTION CAN BE DERIVED
IN A SHORT PERIOD OF TIME.

21
THANKS
EVERYBODY
22

Mais conteúdo relacionado

Mais procurados

Presentation on Production Planning and Control
Presentation on Production Planning and ControlPresentation on Production Planning and Control
Presentation on Production Planning and ControlMd. Sirajul Islam
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and qualityMd. Mazadul Hasan Shishir
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurementJoseph Konnully
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods StudyJoseph Konnully
 
Application of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionApplication of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionRazib Mahmud
 
Ergonomics in the garment industry
Ergonomics in the garment industryErgonomics in the garment industry
Ergonomics in the garment industrydr Gordana Colovic
 
Work Study
Work StudyWork Study
Work Studyvishakeb
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industryAzmir Latif Beg
 
Fabric relaxation procedure
Fabric relaxation procedureFabric relaxation procedure
Fabric relaxation procedureMazharul Islam
 
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentK.K.T Madhusanka
 
Assignment: Comparative Study on Various Types of Garment Production System.
Assignment: Comparative Study on Various  Types of Garment Production System.Assignment: Comparative Study on Various  Types of Garment Production System.
Assignment: Comparative Study on Various Types of Garment Production System.Proshanto Saha
 

Mais procurados (20)

7 wastages
7 wastages7 wastages
7 wastages
 
Presentation on Production Planning and Control
Presentation on Production Planning and ControlPresentation on Production Planning and Control
Presentation on Production Planning and Control
 
QCO presentation
QCO presentationQCO presentation
QCO presentation
 
All in 1 IE
All in 1 IEAll in 1 IE
All in 1 IE
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Presentation1
Presentation1Presentation1
Presentation1
 
Work study
Work studyWork study
Work study
 
Application of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionApplication of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments production
 
Method Study
Method Study Method Study
Method Study
 
Ergonomics in the garment industry
Ergonomics in the garment industryErgonomics in the garment industry
Ergonomics in the garment industry
 
Work Study
Work StudyWork Study
Work Study
 
Work measurement
Work measurementWork measurement
Work measurement
 
Lean manufacturing tools for garment industry
Lean manufacturing tools for garment industryLean manufacturing tools for garment industry
Lean manufacturing tools for garment industry
 
Fabric relaxation procedure
Fabric relaxation procedureFabric relaxation procedure
Fabric relaxation procedure
 
Calculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a GarmentCalculate Standard Minute Value for a Garment
Calculate Standard Minute Value for a Garment
 
Assignment: Comparative Study on Various Types of Garment Production System.
Assignment: Comparative Study on Various  Types of Garment Production System.Assignment: Comparative Study on Various  Types of Garment Production System.
Assignment: Comparative Study on Various Types of Garment Production System.
 

Destaque

Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copyHareesh M
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementHarinadh Karimikonda
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivityahmad bassiouny
 
Motion and time study
Motion and time studyMotion and time study
Motion and time studyNiket Kawale
 
PWS-Time Study by-Amit Singh
PWS-Time Study by-Amit SinghPWS-Time Study by-Amit Singh
PWS-Time Study by-Amit Singhamit_k102
 
Work study and method study
Work study and method studyWork study and method study
Work study and method studyNitin Gulgulia
 
Lecture 1 work study according to amravati university syllabus
Lecture 1 work study according to amravati university syllabus Lecture 1 work study according to amravati university syllabus
Lecture 1 work study according to amravati university syllabus rahulmeshram14
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industryTanmoy Antu
 
บทที่ 14 การศึกษาเวลา
บทที่ 14 การศึกษาเวลาบทที่ 14 การศึกษาเวลา
บทที่ 14 การศึกษาเวลาTeetut Tresirichod
 
บทที่ 17 การกำหนดค่าเผื่อและการคำนวณเวลามาตรฐาน
บทที่ 17 การกำหนดค่าเผื่อและการคำนวณเวลามาตรฐานบทที่ 17 การกำหนดค่าเผื่อและการคำนวณเวลามาตรฐาน
บทที่ 17 การกำหนดค่าเผื่อและการคำนวณเวลามาตรฐานTeetut Tresirichod
 
Timestudy in Practice
Timestudy in PracticeTimestudy in Practice
Timestudy in PracticePanview
 
Industrial engineering – case study
Industrial engineering – case studyIndustrial engineering – case study
Industrial engineering – case studyJephin S John
 

Destaque (20)

Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Work study method and time study-final - copy
Work study method and time study-final - copyWork study method and time study-final - copy
Work study method and time study-final - copy
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Ch11
Ch11Ch11
Ch11
 
Time study
Time studyTime study
Time study
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
PWS-Time Study by-Amit Singh
PWS-Time Study by-Amit SinghPWS-Time Study by-Amit Singh
PWS-Time Study by-Amit Singh
 
Work study and method study
Work study and method studyWork study and method study
Work study and method study
 
Time study
Time studyTime study
Time study
 
What Is Work Study
What Is Work StudyWhat Is Work Study
What Is Work Study
 
Lecture 1 work study according to amravati university syllabus
Lecture 1 work study according to amravati university syllabus Lecture 1 work study according to amravati university syllabus
Lecture 1 work study according to amravati university syllabus
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
 
บทที่ 14 การศึกษาเวลา
บทที่ 14 การศึกษาเวลาบทที่ 14 การศึกษาเวลา
บทที่ 14 การศึกษาเวลา
 
บทที่ 17 การกำหนดค่าเผื่อและการคำนวณเวลามาตรฐาน
บทที่ 17 การกำหนดค่าเผื่อและการคำนวณเวลามาตรฐานบทที่ 17 การกำหนดค่าเผื่อและการคำนวณเวลามาตรฐาน
บทที่ 17 การกำหนดค่าเผื่อและการคำนวณเวลามาตรฐาน
 
Timestudy in Practice
Timestudy in PracticeTimestudy in Practice
Timestudy in Practice
 
Work Study Part- I
Work Study Part- IWork Study Part- I
Work Study Part- I
 
Industrial engineering – case study
Industrial engineering – case studyIndustrial engineering – case study
Industrial engineering – case study
 

Semelhante a Effect of work study & time study on production and quality

Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringAmanuzzaman Aman
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Khairul Bashar
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringIJECSJournal
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineeringSyed Jafri
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction ProjectIRJET Journal
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Negi
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdfNittamallik216
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
sathish resume -MAY 2016 updated
sathish resume -MAY 2016 updatedsathish resume -MAY 2016 updated
sathish resume -MAY 2016 updatedK Sathish
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layouthomeworkping3
 

Semelhante a Effect of work study & time study on production and quality (20)

Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
Work study
Work studyWork study
Work study
 
A case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ringA case study on productivity improvement of wearing insert and cutting ring
A case study on productivity improvement of wearing insert and cutting ring
 
Sabeer yadav
Sabeer yadavSabeer yadav
Sabeer yadav
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf9 Ways to Increase Sewing Operator Efficiency.pdf
9 Ways to Increase Sewing Operator Efficiency.pdf
 
Jivan work study
Jivan work studyJivan work study
Jivan work study
 
sudath
sudath sudath
sudath
 
10656595.ppt
10656595.ppt10656595.ppt
10656595.ppt
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
WORK study& LINE BALANCING
WORK study& LINE BALANCING WORK study& LINE BALANCING
WORK study& LINE BALANCING
 
sathish resume -MAY 2016 updated
sathish resume -MAY 2016 updatedsathish resume -MAY 2016 updated
sathish resume -MAY 2016 updated
 
Work study manual
Work study manualWork study manual
Work study manual
 
195846452 work-study-layout
195846452 work-study-layout195846452 work-study-layout
195846452 work-study-layout
 
MHCCV_02-08-16
MHCCV_02-08-16MHCCV_02-08-16
MHCCV_02-08-16
 
Improving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_studyImproving the productivity_and_introducing_the_work_study
Improving the productivity_and_introducing_the_work_study
 

Mais de Md. Mazadul Hasan Shishir

Handbook of garments manufacturing technology
Handbook of garments manufacturing technologyHandbook of garments manufacturing technology
Handbook of garments manufacturing technologyMd. Mazadul Hasan Shishir
 
project on Application of Disperse & Reactive Dyes In a P/C Blended Fabric of...
project on Application of Disperse & Reactive Dyes In a P/C Blended Fabric of...project on Application of Disperse & Reactive Dyes In a P/C Blended Fabric of...
project on Application of Disperse & Reactive Dyes In a P/C Blended Fabric of...Md. Mazadul Hasan Shishir
 
PROJECT : REACTION MECHANISM OF REACTIVE DYES IN ON CELLULOSE FIBER.
PROJECT  : REACTION MECHANISM OF  REACTIVE DYES IN  ON CELLULOSE FIBER.PROJECT  : REACTION MECHANISM OF  REACTIVE DYES IN  ON CELLULOSE FIBER.
PROJECT : REACTION MECHANISM OF REACTIVE DYES IN ON CELLULOSE FIBER.Md. Mazadul Hasan Shishir
 
Industrial attachment of Sadma fashion wear ltd
Industrial attachment of Sadma fashion wear ltdIndustrial attachment of Sadma fashion wear ltd
Industrial attachment of Sadma fashion wear ltdMd. Mazadul Hasan Shishir
 
Industrial attachment of Olio apparels ltd (envoy group)
Industrial attachment of Olio apparels ltd (envoy group)Industrial attachment of Olio apparels ltd (envoy group)
Industrial attachment of Olio apparels ltd (envoy group)Md. Mazadul Hasan Shishir
 
Industrial attachment of divine group of industries limited (dgi).
Industrial attachment of divine group of industries limited (dgi).Industrial attachment of divine group of industries limited (dgi).
Industrial attachment of divine group of industries limited (dgi).Md. Mazadul Hasan Shishir
 

Mais de Md. Mazadul Hasan Shishir (20)

A note of textile terms and definitions
A note of textile terms and definitionsA note of textile terms and definitions
A note of textile terms and definitions
 
Handbook of garments manufacturing technology
Handbook of garments manufacturing technologyHandbook of garments manufacturing technology
Handbook of garments manufacturing technology
 
carbon fibre
carbon fibrecarbon fibre
carbon fibre
 
Acrylic fiber
Acrylic fiber   Acrylic fiber
Acrylic fiber
 
Elastomeric Fiber
Elastomeric Fiber Elastomeric Fiber
Elastomeric Fiber
 
project on Application of Disperse & Reactive Dyes In a P/C Blended Fabric of...
project on Application of Disperse & Reactive Dyes In a P/C Blended Fabric of...project on Application of Disperse & Reactive Dyes In a P/C Blended Fabric of...
project on Application of Disperse & Reactive Dyes In a P/C Blended Fabric of...
 
Presentation of sayeed
Presentation of sayeedPresentation of sayeed
Presentation of sayeed
 
PROJECT : REACTION MECHANISM OF REACTIVE DYES IN ON CELLULOSE FIBER.
PROJECT  : REACTION MECHANISM OF  REACTIVE DYES IN  ON CELLULOSE FIBER.PROJECT  : REACTION MECHANISM OF  REACTIVE DYES IN  ON CELLULOSE FIBER.
PROJECT : REACTION MECHANISM OF REACTIVE DYES IN ON CELLULOSE FIBER.
 
INTERSTOFF APPARELS LTD
INTERSTOFF APPARELS LTDINTERSTOFF APPARELS LTD
INTERSTOFF APPARELS LTD
 
INDUSTRIAL ATTACHMENT OF GTA SPORTS LTD
INDUSTRIAL ATTACHMENT OF GTA SPORTS LTD INDUSTRIAL ATTACHMENT OF GTA SPORTS LTD
INDUSTRIAL ATTACHMENT OF GTA SPORTS LTD
 
Apex weaving & finishing mills limited
Apex weaving & finishing mills limitedApex weaving & finishing mills limited
Apex weaving & finishing mills limited
 
Industrial Attachment of GTA Sports Ltd.
Industrial Attachment of GTA Sports Ltd. Industrial Attachment of GTA Sports Ltd.
Industrial Attachment of GTA Sports Ltd.
 
Reactive Dye
Reactive Dye Reactive Dye
Reactive Dye
 
Weaving
Weaving Weaving
Weaving
 
Industrial attachment of urmi garments ltd
Industrial attachment of urmi garments ltdIndustrial attachment of urmi garments ltd
Industrial attachment of urmi garments ltd
 
Industrial attachment of Sadma fashion wear ltd
Industrial attachment of Sadma fashion wear ltdIndustrial attachment of Sadma fashion wear ltd
Industrial attachment of Sadma fashion wear ltd
 
Industrial attachment of mitali fasions ltd
Industrial attachment of mitali fasions ltdIndustrial attachment of mitali fasions ltd
Industrial attachment of mitali fasions ltd
 
Industrial attachment of Olio apparels ltd (envoy group)
Industrial attachment of Olio apparels ltd (envoy group)Industrial attachment of Olio apparels ltd (envoy group)
Industrial attachment of Olio apparels ltd (envoy group)
 
Industrial attachment of divine group of industries limited (dgi).
Industrial attachment of divine group of industries limited (dgi).Industrial attachment of divine group of industries limited (dgi).
Industrial attachment of divine group of industries limited (dgi).
 
Apparel Merchandising
Apparel MerchandisingApparel Merchandising
Apparel Merchandising
 

Último

Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinojohnmickonozaleda
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxPoojaSen20
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 

Último (20)

Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipino
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 

Effect of work study & time study on production and quality

  • 1. Southeast University Effect of work study & time study on production and quality. 1
  • 2. Southeast University Md.Tipu Sultan, Supervising Teacher, Department of Textile Engineering. Southeast University Prepared By: Name ID Batch • Shehab Uddin Mazumder 2009100400008 11th • Md. Azharul Hossain 2009100400011 11th • Md. Tanvir Hasan 2009100400017 11th 2
  • 3. Southeast University Objectives of project work: To implement of work study charts to obtain maximum utilization of the resources and to optimize workplace by changing. 3
  • 4. Southeast University Role of industrial engineering department in apparel industry: Importance of industrial engineering (IE) tools that can be used to improve upon the productivity and thus enhance the profits. Very few companies have been operating with a full fledged industrial engineering department and even those which boast of as an industrial engineering department(IED) are not allowing freedom and scope to function to its full capabilities. The role of IED is important for the garments industry for the following two reasons: It’s highly labor –intensive industry.  Effective planning is emerging as one of the key factors for the garments manufacturing industry. 4
  • 5. Garments manufacturing diagram: Southeast University Fabric from stores Cutting section Sewing section Finishing section Finished garments to warehouse 5
  • 7. Southeast University What is work study?  Work study is mainly concerned with the examination of human work. There are two parts of work study: Work Study Method Study Work Measurement 7
  • 8. Why work study? Southeast University • To eliminate wastage of time and labor. • To reduce fatigue and boredom of work by avoiding unnecessary movements. • To find a best way of doing a job. • To have more utilization of materials, machines and workers. • To improve the design of work place layout. • To train the individual operator in its practice as per standardized methods. 8
  • 9. Southeast University Why Work Measurement is Important? Set target Manpower allocation Calculate efficiency Production planning and control • Determine cost • • • • 9
  • 10. Southeast University Method study: The main purpose of method study is to eliminate the unnecessary operations and to achieve the best method of performing the operation. 10
  • 11. Southeast University Time Study: To determine the time it should take for a qualified worker to perform a specific task using a specified method by directly observing an operator. 11
  • 12. Southeast University Time Study Sheet of IE Department: 12
  • 13. Southeast University How it Works? 3. Compute the basic time Basic Time = Observed time X • 4. Observed rating Standard rating Compute the standard minute value SMV = Basic Time + Allowance 13
  • 15. Southeast University In this case, we need to follow PDCA process improvement chart which can give us a solution. PDCA Figure : The Shewhart Cycle is a fundamental idea for continuous process improvement. 15
  • 17. Benefits of TQM: The benefits of TQM can be classified into the following two categories: 1. Customer satisfaction oriented benefits. 2. Economic improvements oriented benefits. 1. Customer satisfaction oriented this category are listed below: (a) Improvement in product quality. (b) Improvement in product design. (c) Improvement in production flow. benefits: The benefits under 2. Economic improvements oriented benefits: The benefits under this category are as follows: (a) Reductions in operating costs. (b) Reductions in operating losses. (c) Reductions in field service costs. (d) Reductions in liability exposure. 17
  • 18. Time Study Exercise Process Name = Side Seam Observed Time = 35.27 Sec Observed Rating = 92% Allowance = 25% Basic Time SMV Capacity = (35.27 X 0.92) Sec = 32.45 Sec = 32.45 + (32.45 X 0.25) Sec = 40.56 Sec = (3600 ÷ 40.56) Pcs/ Hour = 88 Pcs/ Hour 18
  • 19. Product enhancements Design innovations Standardizing design Investing in training and the development of employees. Investing in better plant and equipment. Management – Worker Improving the planning or work Improving methods of production Effective worker selection process 19
  • 20. Ways of improving productivity Southeast University – improving worker effectiveness – Providing workers with adequate training – Improving morale – Rewarding success – Improving attendance levels – Reducing labour turnover – Effective communications – Measuring the performance. 20
  • 21. Southeast University Conclusion WITH THE APPLICATION OF WORK STUDY CHARTS IN APPAREL MANUFACTURING, THE EFFECTIVE UTILIZATION OF RESOURCES ( MAN, MATERIAL & MACHINES) CAN BE ACHIEVED.   THE COST INVOLVED IN USING THESE CHARTS ARE VERY MINIMUM AND A SOLUTION CAN BE DERIVED IN A SHORT PERIOD OF TIME. 21