SlideShare uma empresa Scribd logo
1 de 47
REINFORCING DETAILING
OF R.C.C MEMBERS

            PRESENTED BY
Er.T.RANGARAJAN,B.E,M.Sc(struct.engg),F.I.E,
          FACCE,LACI,LISSE,LIASE
WHO IS AN ENGINEER?

According to USA President Herbert Hoover, who
was an engineer before he became a politician, said:
The great liability of the engineer …compared to men
of other professions……is that his works are out in
the open where all can see them.
His acts …..step by step …are in hard substances.
He cannot bury his mistakes in the grave like the
DOCTORS.
He cannot argue them into thin air…..or blame the
judge…..like the LAWYERS.
He cannot, like the ARCHITECT, cover his figures
with trees and vines.
He cannot, like the politicians, screen his
shortcomings by blaming his opponents….and hope
the people will forget. The ENGINEER simply cannot
deny he did it.
If his works do not work……he is damned.
A design engineer’s responsibility should include
assuring the structural safety of the design,
details, checking shop drawing.
Detailing is as important as design since proper
detailing of engineering designs is an essential
link in the planning and engineering process as
some of the most devasting collapses in history
have been caused by defective connections or
DETAILING. There are many examples explained
in the book" DESIGN AND CONSTRUCTION
FAILURES by Dov Kaminetzky.
Detailing is very important not only for the
proper execution of the structures but for the
safety of the structures.
Detailing is necessary not only for the steel
structures but also for the RCC members as it is
the translation of all the mathematical
expression’s and equation’s results.
For the RCC members for most commonly used for buildings we can
      divide the detailing for

1.     SLABS-WITH OR WITHOUT OPENINGS.(RECTANGULAR,CIRCULAR,NON-
       RECTANGULAR-PYRAMID SLAB,TRIANGULAR ETC)
     -BALCONY SLAB,LOFT SLAB,CORNER SLAB etc

2.    BEAMS- WITH OR WITHOUT OPENIGS.(SHALLOW & DEEP BEAMS)

3.    COLUMNS.(RECTANGULAR,L-SHAPE,T-SHAPE,
     CIRCULAR,OCTAGONAL,CROSS SHAPE etc)


4. FOUNDATIONS.

      Detailing for gravity loads is different from the lateral loads specially for
      the SEISMIC FORCES.

      Apart from the detailing for the above there is a different detailing
      required for the Rehabilitation and strengthening of damaged structures.

      We will now dwell on the DETAILING OF MEMBERS FOR THE GRAVITY
      AND SOME CODAL DETAILINGS AS PER IS CODE IS 13920 AND IS 4326
      AS REQUIRED FOR SEISMIC FORCES.
DO’S & DONOT’S FOR DETAILING
       DO’S-GENERAL
1.     Prepare drawings properly & accurately if possible label each bar
       and show its shape for clarity.

                                      12”


                                            I ¼”dia@12”c/c



                                                      1- ¼”dia@12”c/c




Cross section of retaining wall which collapsed immediately after placing of soil
backfill because ¼” rather than 1-1/4” dia. were used. Error occurred because
Correct rebar dia. Was covered by a dimension line.
2.   Prepare bar-bending schedule , if necessary.
3.   Indicate proper cover-clear cover, nominal cover
     or effective cover to reinforcement.
4.   Decide detailed location of opening/hole and
     supply adequate details for reinforcements
     around the openings.
5.   Use commonly available size of bars and spirals.
     For a single structural member the number of
     different sizes of bars shall be kept minimum.
6.   The grade of the steel shall be clearly stated in
     the drawing.
7.   Deformed bars need not have hooks at their
     ends.
8.   Show enlarged details at corners, intersections
     of walls, beams and column joint and at similar
     situations.
9.  Congestion of bars should be avoided at points where
     members intersect and make certain that all rein. Can be
     properly placed.
10. In the case of bundled bars, lapped splice of bundled bars
     shall be made by splicing one bar at a time; such
     individual splices within the bundle shall be staggered.
11. Make sure that hooked and bent up bars can be placed
     and have adequate concrete protection.
12.  Indicate all expansion, construction and contraction joints
     on plans and provide details for such joints.
13. The location of construction joints shall be at the point of
     minimum shear approximately at mid or near the mid points.
     It shall be formed vertically and not in a sloped manner.
DO’S – BEAMS & SLABS:
1.   Where splices are provided in bars, they shall be , as far as
     possible, away from the sections of maximum stresses and
     shall be staggered.
2.   Were the depth of beams exceeds 750mm in case of beams
     without torsion and 450mm with torsion provide face rein.
     as per IS456-2000.
3.   Deflection in slabs/beams may be reduced by providing
     compression reinforcement.
4.   Only closed stirrups shall be used for transverse rein. For
     members subjected to torsion and for members likely to be
     subjected to reversal of stresses as in Seismic forces.
5.   To accommodate bottom bars, it is good practice to make
     secondary beams shallower than main beams, at least by
     50mm.
Do’s –COLUMNS.
1.   A reinforced column shall have at least six bars of
     longitudinal reinforcement for using in transverse helical
     reinforcement.-for CIRCULAR sections.
2.   A min four bars one at each corner of the column in the
     case of rectangular sections.
3.   Keep outer dimensions of column constant, as far as
     possible , for reuse of forms.
4.   Preferably avoid use of 2 grades of vertical bars in the
     same element.
     DONOT’S-GENERAL:
1.   Reinforcement shall not extend across an expansion joint
     and the break between the sections shall be complete.
2.   Flexural reinforcement preferably shall not be terminated
     in a tension zone.
3.   Bars larger than 36mm dia. Shall not be bundled.
4.   Lap splices shall be not be used for bars larger than
     36mm dia. Except where welded.
5.   Where dowels are provided, their diameter shall not
     exceed the diameter of the column bars by more than
     3mm.
6.   Where bent up bars are provided, their contribution
     towards shear resistance shall not be more than 50% of
     the total shear to be resisted. USE OF SINGEL BENT UP
     BARS(CRANKED) ARE NOT ALLOWED IN THE CASE
     OF EARTHQUAKE RESISTANCE STRUCTURES.
DETAILING OF SLABS WITHOUT ANY CUT
OR OPENINGS.
 The building plan DX-3 shows the
 slabs in different levels for the
 purpose of eliminating the inflow of
 rainwater into the room from the open
 terrace and also the sunken slab for
 toilet in first floor.
 The building plan DX-A3 is one in
 which the client asked the architect to
 provide opening all round.
   Refer the 3d
   elevation
Different shapes of slabs used in the
                         6”depression for OT &
  buildings.             9” for sunken slabs.




   Portico slab in elevation



                                                   19’-6”

                                                  5’wide corridor all
                                                  round
                                     9’-6”suare
Portico slab in plan                 opening


                       Portico and other rooms
                       roof slab in plan
Minimum and max.reinforcement % in beams, slabs and
columns as per codal provisions should be followed.

SLABS:
It is better to provide a max spacing of 200mm(8”) for main
bars and 250mm(10”) in order to control the crack width and
spacing.

A min. of 0.24% shall be used for the roof slabs since it is
subjected to higher temperature. Variations than the floor
slabs. This is required to take care of temp. differences.

It is advisable to not to use 6mm bars as main bars as this
size available in the local market is of inferior not only with
respect to size but also the quality since like TATA and SAIL
are not producing this size of bar.
BEAMS:
A min. of 0.2% is to be provided for the compression bars in
order to take care of the deflection.
The stirrups shall be min.size of
8mm in the case of lateral load
resistance .
The hooks shall be bent to 135
degree .
CANTILEVER BEAM


      crack




                          INCORRECT

                 Ldt
  CLOSE
  STIRRUPS



                              Ldt/2




         Ld/2          Ld/2
                                      CORRECT

                Ld
NON PRISMATIC BEAM

    crack




                      INCORRECT

              Ldt
CLOSE
STIRRUPS



                       Ldt/2




       Ld/2    Ld/2
              Ld               CORRECT
GRID BEAM
GRID BEAM



                                          INCORRECT



                          Close rings

               1.5d                       1.5d

                                           300
                    300
                                                               d




                           2#extra bars          Hanger bars
            Slope 1:10                           CORRECT
Details of Main & Secondary beams
                                   Secondary beam




                                                         Main beam
                                        INCORRECT


                                        Secondary beam
                          Close rings

                       1.5d             1.5d

                                         300
                          300
                                                                     d
                                          60degree




                                               Hanger bars    Main beam
                                               CORRECT
BEAM

                                                            d




     1/4OR                           INCORRECT
     1/5 SPAN




                    Ld
Ld
                                     LINE OF CRACK

                                                          d/2
                              t
                t                                         d/2



     1.5d            d/2+d/2Cot(t)
                                                CORRECT
Continuous beam
• continuous beam              Span/4     Span/4




                                Span/4
      Span/4                               Span/4


                  incorrect


                              Span/4     Span/4




                              1.5d
    1.5d                                 1.5d


                  correct
CONTINUOUS BEAM
                                           SPAN/4                   SPAN/4
        SPAN/4




 .08L1              100%            CRACK                                          100%
                                                               CRACK
            CRACK
                              L1                    .08L1                     L2
                                                               .08L2


                        INCORRECT

          100%                      L1/4                     L2/4
 L1/4                                                                                 20%
                        20%




0.1L1            100%                                                          100%


                        L1                    .15L1                      L2
                                                            .15L2


                    CORRECT
NONPRISMATIC
SECTION OF BEAM

                   CRACK
                                                D


             D
                               D
                                    INCORRECT




                                   CLOSE RING



                                                D


             D
                                    CORRECT
                               D
                  CLOSE RING
CANTILEVER BEAM PROJECTING
FROM COLUMN




                                                                  COLUMN
                                 INCORRECT
NOT LESS
THAN 0.5Ast        NOT LESS THAN GREATER OF 0.5L OR Ld
                                     50mm




                                                    Ld



              0.25Ast
                                                         COLUMN
         CORRECT                     Ld/3
SLOPING BEAM


                     CRACK




                Ld

                         Ld




               CORRECT
HAUNCH BEAMS




              CRACK                     CRACK


                                L


                           INCORRECT

                      Ld                Ld




                           CORRECT
Ld   L/8 TO                                              Ld
     L/10                                       L/8 TO
                                    L           L/10
STRESSES AT CORNERS                                  C-COMPRESSION
                                                     T-TENSION

                                            C

                                            t

       C                        CRACK
           t

                    RESULTANT TENSILE STRESS FOR
                    ACROSS CORNER(ONE PLANE)




                            RESULTANT TENSILE STRESS FOR
                t           ACROSS CORNER(DIFFERENT PLANE)

                                    CRACK
               c
                                                 t


                                                c
SHEAR AND TORSION REIN. IN
             BEAMS
                                            Stirrups taken round outermost
                                            bars spacing<=x1
                                                   <=(x1+y1)/4
                                                    <=300mm
                                    Min 0.2%bd to control deflection as
                                    well as for seismic requ.
                  INCORRECT

                                                                 n

                          d                               y1
Skin rein.10dia is             D
required when depth                              100 to          D-n>500mm
exceeds 450mm(0.1%                               200mm

of web area distributed
equally on two faces)         D/5

                                       x1            CORRECT

                                       b
CANTILEVER BEAM WITH
           POINT LOAD




                           Shear rein.

INCORRECT



                                         2/3d
       d     Ld




                          CORRECT
             Ld
                            Extra ties
INCORRECT
                          opening



          crack                            crack




                   OPENING IN WEB OF BEAM


                     d/2   opening   d/2


Closed stps
                                             Closed stps
for d/2
                                             for d/2
              Ld


                   OPENING IN WEB OF BEAM
                                             CORRECT
BEAM COLUMN JUNCTION-EXTERIOR COLUMN




INCORRECT

                           2”max
                                      CLOSED STPS
            U TYPE BARS




                      Ld


                            IN TENSION-Ld




                                      CORRECT
SPLICE DETAIL FOR COLUMN


                                                   COVER




                            CLOSE
                            TIES @S/2              SLOPE 1:6




                             S-SPACING




                                         CORRECT
INCORRECT
REDUCTION
COLUMN BOTH
SIDES




   INCORRECT




                                     SPLICE
               SLOPE 1:8 FROM
               BEAM BOTTOM                    3NO.CLOSE TIES




                                               CLOSE STPS SPACIN
                                               <=75mm
                            3NO.CLOSE TIES

                                                   CORRECT
TERMINATION OF COLUMN BARS INSIDE BEAM




INCORRECT




                    Ld




CORRECT
*COL.CORE HAS TO
                                              BE CONFINED BY
     EQ REGION-BEAM-COL JN-EXTERIOR           CIRCULAR OR
                                              RECTANGULAR TIES
                                              IN ACCORDANCE
                                              WITH END REGION

                                     SPACING OF
                                     LATERAL
                                     TIES <=d/2

                                                     COL.
                                      END REGION
                                                     CORE*



                        SPACING OF
                        LATERAL
                        TIES
                        <=100mm
                                     END REGION
BEAM COL. JUNCTION-EQ
REGION

INCORRECT                                     CORRECT
                        SPACING OF
                        LATERAL
                        TIES <=d/2    BEAM COL. JUNCTION-EQ
                                      REGION
COLUMN DETAILS IN EQ REGIONS

     incorrect
                         First stirrups                      correct
                         50mm from beam
                         face
END
REGION                              END REGION-h/6 or D or
                                    450MM whichever is
                                    greater




                     h
                                b                                   d

                                          D



END
REGION                                      END
                                            REGION


    Spacing of shear rein. In
    columns                                                  Spacing of shear rein. In
                                                             columns
EQ-REGION-CONTINUOUS BEAM

                 INCORRECT




     50mmmax
               CONTINUOUS BARS NOT LESS THAN ¼
               AREA OF BARS AT COL.FACE                CORRECT

               A=L1/3                     A=L1/3   A=L1/3


Ld



                        stp@maxd/2            2d     2d     stp@maxd/2
          2d     Stirrup spacing=d/4 or
                 100mm or 8dia which
                 ever is the least
FOOTING-DETAILS(INDEPENDENT)




INCORRECT                                                         COLUMN
                                                                  BARS



                                                                    STARTER
                        NATURAL
                                                                    BARS
                        G.L




                                                                  COVER TO
                                                                  STARTER



                                                         Lb
                        3” SIDE COVER         Ldt
                                                              Min.300




                                                                   COVER50mm
                                        Ldt
                                                                   IF p.c.c below
                                               CORRECT             or 75mm
TYPICAL REIN DETAILS OF
          INCORRECT   HAMMER FOUNDATION BLOCK




CORRECT



                             Ld

                        Ld
SECTION OF TRENCH
                            INCORRECT
                    CRACK




                                        CORRECT
             Ld




                                            Ld
                                   Ld
STAIRCASE-WITH WAIST SLAB




  INCORRECT




                Extra bar
    Ld(min)


                            Ld(min)


    Ld(min)

   CORRECT
SLABLESS STAIRCASE



Dist.




                      Alternate 1
           Main bar




Main bar
SLABLESS STAIRCASE




Main bar

                       L=horizontal span



                       Alternate 2
           A=0.25L
DEVELOPMENT LENGTH OF BARS
  FOR A CONCRETE GRADE M20 &STEEL STRENGTH Fy=415


    SLNO      BAR    TENSION     COMPRESSION   REMARKS
              DIA.   mm
       1         8      376.0        301.0

       2        10      470.0        376.0

       3        12      564.0        451.0

       4        16      752.0        602.0

       5        20      940.0        752.0

       6        22      1034.0       827.0

       7        25      1175.0       940.0

       8        28      1316.0       1053.0

       9        32      1504.0       1203.0


           APPROXIMATELY USE 50Xdia FOR TENSION
CONCLUSION:
     Before concluding I will show some more details drawn
     in autocad exported in wwf format
     As there is no time to elaborately explaining ,the following topics are not
     covered :
1.   Flat slabs, Folded plates, shell structures-cylindrical shells, silos,
2.   Staircases- helical staircase, central beam type, cantilever type etc.
3.   Different types of foundations-raft, pile foundation, strap foundation etc.
4.   Retaining wall structures,
5.   Liquid retaining structures.
6.   Deep beams.
7.   Shear wall, walls.

        Hope that I have enlighten some of the detailing technique for the most
     commonly encountered RCC members in buildings.
        In the above statements if my senior colleagues and ACCE members
     can find different method or any new detailing system it will be of immense
     help not only for me but to other young engineers who should learn in wright
     ways and not wrong lessons.
REFERENCES:
1.    HANDBOOK ON CONCRETE REINFORCEMENT AND
      DETAILING-SP:34(S&T)-1987.
2.    MANUAL OF ENGINEERING & PLACING DRAWINGS
      FOR REINFORCED CONCRETE STRUCTURES-
     (ACI 315-80
3.    MANUAL OF STANDARD PRACTICE –CONCRETE
      REINFORCING STEEL INSTITUTE.
4.    TWARD BOARD MANUAL FOR RURAL WATER
      SUPPLY SCHEMES.
5.    DESIGN PRINCIPLES AND DETAILING OF CONCRETE
      STRUCTURES. By D.S.PRAKASH RAO.
6.    SIMPLIFIED DESIGN-RC BUILDINGS OF MODERATE
      SIZE AND HEIGHT-BY PORTLAND CEMENT
      ASSOCIATION,USA.
7.    DESIGN AND CONSTRUCTION FAILURES BY DOV
      KAMINETZKY.
8.    IS:2502-1963 CODE OF PRACTICE FOR BENDING AND
      FIXING OF BARS FOR CONCRETE REINFORCEMENT.
9.    IS:1893:2000.
10.   IS:4326.
11.   IS:456:2000
12.   REINFORCED HAND BOOK BY REYNOLD.
THANK YOU.

Mais conteúdo relacionado

Mais procurados

Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C BeamAr. Aakansha
 
WELDED_CONNECTIONS
WELDED_CONNECTIONSWELDED_CONNECTIONS
WELDED_CONNECTIONSssuser88f04f
 
Concrete shear wall design
Concrete shear wall designConcrete shear wall design
Concrete shear wall designaj aj
 
Steel Structural Design Manual for Engineers
Steel Structural Design Manual for EngineersSteel Structural Design Manual for Engineers
Steel Structural Design Manual for EngineersPrem Chand Sharma
 
Sp16 Civil Code Book (Civilqus.blogspot.com) Free Download
Sp16 Civil Code Book (Civilqus.blogspot.com) Free DownloadSp16 Civil Code Book (Civilqus.blogspot.com) Free Download
Sp16 Civil Code Book (Civilqus.blogspot.com) Free DownloadGowtham Raja
 
Theory for Welded connection.pdf
Theory for Welded connection.pdfTheory for Welded connection.pdf
Theory for Welded connection.pdfYatiTank
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleKailash Chander
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension membersSabna Thilakan
 
Wind Design to AS/NZ 1170.2 Webinar Slides - ClearCalcs
Wind Design to AS/NZ 1170.2 Webinar Slides - ClearCalcsWind Design to AS/NZ 1170.2 Webinar Slides - ClearCalcs
Wind Design to AS/NZ 1170.2 Webinar Slides - ClearCalcsClearCalcs
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)ahsanrabbani
 
Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelinesMain Uddin
 
aisc-bolting-and-welding
aisc-bolting-and-weldingaisc-bolting-and-welding
aisc-bolting-and-weldingtecnidibujos
 
Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000VVIETCIVIL
 

Mais procurados (20)

BBS Preparation
BBS PreparationBBS Preparation
BBS Preparation
 
Beam design
Beam designBeam design
Beam design
 
Reinfocing details of column
Reinfocing details of columnReinfocing details of column
Reinfocing details of column
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C Beam
 
WELDED_CONNECTIONS
WELDED_CONNECTIONSWELDED_CONNECTIONS
WELDED_CONNECTIONS
 
Concrete shear wall design
Concrete shear wall designConcrete shear wall design
Concrete shear wall design
 
Steel Structural Design Manual for Engineers
Steel Structural Design Manual for EngineersSteel Structural Design Manual for Engineers
Steel Structural Design Manual for Engineers
 
Sp16 Civil Code Book (Civilqus.blogspot.com) Free Download
Sp16 Civil Code Book (Civilqus.blogspot.com) Free DownloadSp16 Civil Code Book (Civilqus.blogspot.com) Free Download
Sp16 Civil Code Book (Civilqus.blogspot.com) Free Download
 
Theory for Welded connection.pdf
Theory for Welded connection.pdfTheory for Welded connection.pdf
Theory for Welded connection.pdf
 
Reinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending ScheduleReinforced Cement Concrete and Bar Bending Schedule
Reinforced Cement Concrete and Bar Bending Schedule
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension members
 
Wind Design to AS/NZ 1170.2 Webinar Slides - ClearCalcs
Wind Design to AS/NZ 1170.2 Webinar Slides - ClearCalcsWind Design to AS/NZ 1170.2 Webinar Slides - ClearCalcs
Wind Design to AS/NZ 1170.2 Webinar Slides - ClearCalcs
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)
 
Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelines
 
Two way slab
Two way slabTwo way slab
Two way slab
 
BOLTED CONNECTION
BOLTED CONNECTIONBOLTED CONNECTION
BOLTED CONNECTION
 
seismic ubc -97
seismic ubc -97seismic ubc -97
seismic ubc -97
 
aisc-bolting-and-welding
aisc-bolting-and-weldingaisc-bolting-and-welding
aisc-bolting-and-welding
 
Design of beam
Design of beamDesign of beam
Design of beam
 
Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000
 

Destaque

Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)mbrsalman
 
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Lamdade Akhil
 
Sp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailingSp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailingjemmabarsby
 
Analytical modeling of reinforced concrete walls
Analytical modeling of reinforced concrete wallsAnalytical modeling of reinforced concrete walls
Analytical modeling of reinforced concrete wallsANDRES BARZOLA
 
Earthquake Disaster
Earthquake DisasterEarthquake Disaster
Earthquake DisasterF.R. Khan
 
2 d vs. 3d external beam planning in cervical cancer by nelson mandela
2 d vs. 3d external beam planning in cervical cancer by nelson mandela2 d vs. 3d external beam planning in cervical cancer by nelson mandela
2 d vs. 3d external beam planning in cervical cancer by nelson mandelaKesho Conference
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing MethodMd Tanvir Alam
 
How do Beam-Column Joints in RC Buildings Resist Earthquakes?
How do Beam-Column Joints in RC Buildings Resist Earthquakes?How do Beam-Column Joints in RC Buildings Resist Earthquakes?
How do Beam-Column Joints in RC Buildings Resist Earthquakes?Malay Patel
 
3.1 structure analysis and design note.
3.1 structure analysis and design note.3.1 structure analysis and design note.
3.1 structure analysis and design note.Mohotasimur Anik
 
Guide to the design and construction of reinforced concrete flat slabs (1)
Guide to the design and construction of reinforced concrete flat slabs (1)Guide to the design and construction of reinforced concrete flat slabs (1)
Guide to the design and construction of reinforced concrete flat slabs (1)abbdou001
 
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALlpeakpilgrim
 
column and it's types
column and it's  types column and it's  types
column and it's types Asi Mahar
 

Destaque (20)

Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)Civil Engineering (Beams,Columns)
Civil Engineering (Beams,Columns)
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
Bar bending schedule(by akhil)
Bar bending schedule(by akhil)Bar bending schedule(by akhil)
Bar bending schedule(by akhil)
 
Sp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailingSp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailing
 
Analytical modeling of reinforced concrete walls
Analytical modeling of reinforced concrete wallsAnalytical modeling of reinforced concrete walls
Analytical modeling of reinforced concrete walls
 
Earthquake Disaster
Earthquake DisasterEarthquake Disaster
Earthquake Disaster
 
Beams
BeamsBeams
Beams
 
Concrete design
Concrete designConcrete design
Concrete design
 
2 d vs. 3d external beam planning in cervical cancer by nelson mandela
2 d vs. 3d external beam planning in cervical cancer by nelson mandela2 d vs. 3d external beam planning in cervical cancer by nelson mandela
2 d vs. 3d external beam planning in cervical cancer by nelson mandela
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
 
How do Beam-Column Joints in RC Buildings Resist Earthquakes?
How do Beam-Column Joints in RC Buildings Resist Earthquakes?How do Beam-Column Joints in RC Buildings Resist Earthquakes?
How do Beam-Column Joints in RC Buildings Resist Earthquakes?
 
Tos syllabus
Tos syllabusTos syllabus
Tos syllabus
 
Types of beam
Types of beamTypes of beam
Types of beam
 
3.1 structure analysis and design note.
3.1 structure analysis and design note.3.1 structure analysis and design note.
3.1 structure analysis and design note.
 
Guide to the design and construction of reinforced concrete flat slabs (1)
Guide to the design and construction of reinforced concrete flat slabs (1)Guide to the design and construction of reinforced concrete flat slabs (1)
Guide to the design and construction of reinforced concrete flat slabs (1)
 
Sp16 latest
Sp16 latestSp16 latest
Sp16 latest
 
Beams ppt
Beams pptBeams ppt
Beams ppt
 
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
29 JUN-2015 - ACI SP66 (040 RE-BAR DETAILING MANUALl
 
Flat slab
Flat slabFlat slab
Flat slab
 
column and it's types
column and it's  types column and it's  types
column and it's types
 

Semelhante a 54307684 beam-column

RCC detailing presentation Bis code Is 456.ppt
RCC detailing presentation Bis code Is 456.pptRCC detailing presentation Bis code Is 456.ppt
RCC detailing presentation Bis code Is 456.pptAmitRoy598780
 
reinforced concrete design 1
reinforced concrete design 1reinforced concrete design 1
reinforced concrete design 1Alemu Workeneh
 
column.pptoiluiutjrthrytuyluo;ulyutjryethrjyi
column.pptoiluiutjrthrytuyluo;ulyutjryethrjyicolumn.pptoiluiutjrthrytuyluo;ulyutjryethrjyi
column.pptoiluiutjrthrytuyluo;ulyutjryethrjyidenisvashi
 
YDM Laboratory Technique Catalogue
YDM Laboratory Technique CatalogueYDM Laboratory Technique Catalogue
YDM Laboratory Technique Cataloguevlnkhn
 
Endodontic instruments basic & hand instruments
Endodontic instruments basic & hand instrumentsEndodontic instruments basic & hand instruments
Endodontic instruments basic & hand instrumentsddert
 
912 en-bending-of-high-strength-steel
912 en-bending-of-high-strength-steel912 en-bending-of-high-strength-steel
912 en-bending-of-high-strength-steelSourabh Sharma
 
Grounding sytem components
Grounding sytem componentsGrounding sytem components
Grounding sytem componentsNam Pham
 
YDM Orthodontic Catalogue
YDM Orthodontic CatalogueYDM Orthodontic Catalogue
YDM Orthodontic Cataloguevlnkhn
 
Welders visual inspection_handbook-2013_web
Welders visual inspection_handbook-2013_webWelders visual inspection_handbook-2013_web
Welders visual inspection_handbook-2013_webmiguelbravo
 
Flashings Fasteners & Accessories
Flashings Fasteners & AccessoriesFlashings Fasteners & Accessories
Flashings Fasteners & Accessoriesdurolast
 
Prsesntation on Commercial building Project
Prsesntation on Commercial building ProjectPrsesntation on Commercial building Project
Prsesntation on Commercial building ProjectMD AFROZ ALAM
 

Semelhante a 54307684 beam-column (20)

I Download (1)
I Download (1)I Download (1)
I Download (1)
 
I download
I downloadI download
I download
 
download.ppt
download.pptdownload.ppt
download.ppt
 
download.ppt
download.pptdownload.ppt
download.ppt
 
download.ppt
download.pptdownload.ppt
download.ppt
 
RCC detailing presentation Bis code Is 456.ppt
RCC detailing presentation Bis code Is 456.pptRCC detailing presentation Bis code Is 456.ppt
RCC detailing presentation Bis code Is 456.ppt
 
download.ppt
download.pptdownload.ppt
download.ppt
 
Ductile detailing ppt
Ductile detailing pptDuctile detailing ppt
Ductile detailing ppt
 
reinforced concrete design 1
reinforced concrete design 1reinforced concrete design 1
reinforced concrete design 1
 
column.pptoiluiutjrthrytuyluo;ulyutjryethrjyi
column.pptoiluiutjrthrytuyluo;ulyutjryethrjyicolumn.pptoiluiutjrthrytuyluo;ulyutjryethrjyi
column.pptoiluiutjrthrytuyluo;ulyutjryethrjyi
 
Final detailingpp
Final detailingppFinal detailingpp
Final detailingpp
 
ACERO EN LA CONSTRUCCIÓN.pdf
ACERO EN LA CONSTRUCCIÓN.pdfACERO EN LA CONSTRUCCIÓN.pdf
ACERO EN LA CONSTRUCCIÓN.pdf
 
YDM Laboratory Technique Catalogue
YDM Laboratory Technique CatalogueYDM Laboratory Technique Catalogue
YDM Laboratory Technique Catalogue
 
Endodontic instruments basic & hand instruments
Endodontic instruments basic & hand instrumentsEndodontic instruments basic & hand instruments
Endodontic instruments basic & hand instruments
 
912 en-bending-of-high-strength-steel
912 en-bending-of-high-strength-steel912 en-bending-of-high-strength-steel
912 en-bending-of-high-strength-steel
 
Grounding sytem components
Grounding sytem componentsGrounding sytem components
Grounding sytem components
 
YDM Orthodontic Catalogue
YDM Orthodontic CatalogueYDM Orthodontic Catalogue
YDM Orthodontic Catalogue
 
Welders visual inspection_handbook-2013_web
Welders visual inspection_handbook-2013_webWelders visual inspection_handbook-2013_web
Welders visual inspection_handbook-2013_web
 
Flashings Fasteners & Accessories
Flashings Fasteners & AccessoriesFlashings Fasteners & Accessories
Flashings Fasteners & Accessories
 
Prsesntation on Commercial building Project
Prsesntation on Commercial building ProjectPrsesntation on Commercial building Project
Prsesntation on Commercial building Project
 

Último

[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Fact vs. Fiction: Autodetecting Hallucinations in LLMs
Fact vs. Fiction: Autodetecting Hallucinations in LLMsFact vs. Fiction: Autodetecting Hallucinations in LLMs
Fact vs. Fiction: Autodetecting Hallucinations in LLMsZilliz
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Exploring ChatGPT Prompt Hacks To Maximally Optimise Your Queries
Exploring ChatGPT Prompt Hacks To Maximally Optimise Your QueriesExploring ChatGPT Prompt Hacks To Maximally Optimise Your Queries
Exploring ChatGPT Prompt Hacks To Maximally Optimise Your QueriesSanjay Willie
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Scott Andery
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 

Último (20)

[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Fact vs. Fiction: Autodetecting Hallucinations in LLMs
Fact vs. Fiction: Autodetecting Hallucinations in LLMsFact vs. Fiction: Autodetecting Hallucinations in LLMs
Fact vs. Fiction: Autodetecting Hallucinations in LLMs
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Exploring ChatGPT Prompt Hacks To Maximally Optimise Your Queries
Exploring ChatGPT Prompt Hacks To Maximally Optimise Your QueriesExploring ChatGPT Prompt Hacks To Maximally Optimise Your Queries
Exploring ChatGPT Prompt Hacks To Maximally Optimise Your Queries
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
Enhancing User Experience - Exploring the Latest Features of Tallyman Axis Lo...
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 

54307684 beam-column

  • 1. REINFORCING DETAILING OF R.C.C MEMBERS PRESENTED BY Er.T.RANGARAJAN,B.E,M.Sc(struct.engg),F.I.E, FACCE,LACI,LISSE,LIASE
  • 2. WHO IS AN ENGINEER? According to USA President Herbert Hoover, who was an engineer before he became a politician, said: The great liability of the engineer …compared to men of other professions……is that his works are out in the open where all can see them. His acts …..step by step …are in hard substances. He cannot bury his mistakes in the grave like the DOCTORS. He cannot argue them into thin air…..or blame the judge…..like the LAWYERS. He cannot, like the ARCHITECT, cover his figures with trees and vines. He cannot, like the politicians, screen his shortcomings by blaming his opponents….and hope the people will forget. The ENGINEER simply cannot deny he did it. If his works do not work……he is damned.
  • 3. A design engineer’s responsibility should include assuring the structural safety of the design, details, checking shop drawing. Detailing is as important as design since proper detailing of engineering designs is an essential link in the planning and engineering process as some of the most devasting collapses in history have been caused by defective connections or DETAILING. There are many examples explained in the book" DESIGN AND CONSTRUCTION FAILURES by Dov Kaminetzky. Detailing is very important not only for the proper execution of the structures but for the safety of the structures. Detailing is necessary not only for the steel structures but also for the RCC members as it is the translation of all the mathematical expression’s and equation’s results.
  • 4. For the RCC members for most commonly used for buildings we can divide the detailing for 1. SLABS-WITH OR WITHOUT OPENINGS.(RECTANGULAR,CIRCULAR,NON- RECTANGULAR-PYRAMID SLAB,TRIANGULAR ETC) -BALCONY SLAB,LOFT SLAB,CORNER SLAB etc 2. BEAMS- WITH OR WITHOUT OPENIGS.(SHALLOW & DEEP BEAMS) 3. COLUMNS.(RECTANGULAR,L-SHAPE,T-SHAPE, CIRCULAR,OCTAGONAL,CROSS SHAPE etc) 4. FOUNDATIONS. Detailing for gravity loads is different from the lateral loads specially for the SEISMIC FORCES. Apart from the detailing for the above there is a different detailing required for the Rehabilitation and strengthening of damaged structures. We will now dwell on the DETAILING OF MEMBERS FOR THE GRAVITY AND SOME CODAL DETAILINGS AS PER IS CODE IS 13920 AND IS 4326 AS REQUIRED FOR SEISMIC FORCES.
  • 5. DO’S & DONOT’S FOR DETAILING DO’S-GENERAL 1. Prepare drawings properly & accurately if possible label each bar and show its shape for clarity. 12” I ¼”dia@12”c/c 1- ¼”dia@12”c/c Cross section of retaining wall which collapsed immediately after placing of soil backfill because ¼” rather than 1-1/4” dia. were used. Error occurred because Correct rebar dia. Was covered by a dimension line.
  • 6. 2. Prepare bar-bending schedule , if necessary. 3. Indicate proper cover-clear cover, nominal cover or effective cover to reinforcement. 4. Decide detailed location of opening/hole and supply adequate details for reinforcements around the openings. 5. Use commonly available size of bars and spirals. For a single structural member the number of different sizes of bars shall be kept minimum. 6. The grade of the steel shall be clearly stated in the drawing. 7. Deformed bars need not have hooks at their ends. 8. Show enlarged details at corners, intersections of walls, beams and column joint and at similar situations.
  • 7. 9. Congestion of bars should be avoided at points where members intersect and make certain that all rein. Can be properly placed. 10. In the case of bundled bars, lapped splice of bundled bars shall be made by splicing one bar at a time; such individual splices within the bundle shall be staggered. 11. Make sure that hooked and bent up bars can be placed and have adequate concrete protection.
  • 8. 12. Indicate all expansion, construction and contraction joints on plans and provide details for such joints. 13. The location of construction joints shall be at the point of minimum shear approximately at mid or near the mid points. It shall be formed vertically and not in a sloped manner. DO’S – BEAMS & SLABS: 1. Where splices are provided in bars, they shall be , as far as possible, away from the sections of maximum stresses and shall be staggered. 2. Were the depth of beams exceeds 750mm in case of beams without torsion and 450mm with torsion provide face rein. as per IS456-2000. 3. Deflection in slabs/beams may be reduced by providing compression reinforcement. 4. Only closed stirrups shall be used for transverse rein. For members subjected to torsion and for members likely to be subjected to reversal of stresses as in Seismic forces.
  • 9. 5. To accommodate bottom bars, it is good practice to make secondary beams shallower than main beams, at least by 50mm. Do’s –COLUMNS. 1. A reinforced column shall have at least six bars of longitudinal reinforcement for using in transverse helical reinforcement.-for CIRCULAR sections. 2. A min four bars one at each corner of the column in the case of rectangular sections. 3. Keep outer dimensions of column constant, as far as possible , for reuse of forms. 4. Preferably avoid use of 2 grades of vertical bars in the same element. DONOT’S-GENERAL: 1. Reinforcement shall not extend across an expansion joint and the break between the sections shall be complete. 2. Flexural reinforcement preferably shall not be terminated in a tension zone.
  • 10. 3. Bars larger than 36mm dia. Shall not be bundled. 4. Lap splices shall be not be used for bars larger than 36mm dia. Except where welded. 5. Where dowels are provided, their diameter shall not exceed the diameter of the column bars by more than 3mm. 6. Where bent up bars are provided, their contribution towards shear resistance shall not be more than 50% of the total shear to be resisted. USE OF SINGEL BENT UP BARS(CRANKED) ARE NOT ALLOWED IN THE CASE OF EARTHQUAKE RESISTANCE STRUCTURES.
  • 11. DETAILING OF SLABS WITHOUT ANY CUT OR OPENINGS. The building plan DX-3 shows the slabs in different levels for the purpose of eliminating the inflow of rainwater into the room from the open terrace and also the sunken slab for toilet in first floor. The building plan DX-A3 is one in which the client asked the architect to provide opening all round. Refer the 3d elevation
  • 12. Different shapes of slabs used in the 6”depression for OT & buildings. 9” for sunken slabs. Portico slab in elevation 19’-6” 5’wide corridor all round 9’-6”suare Portico slab in plan opening Portico and other rooms roof slab in plan
  • 13. Minimum and max.reinforcement % in beams, slabs and columns as per codal provisions should be followed. SLABS: It is better to provide a max spacing of 200mm(8”) for main bars and 250mm(10”) in order to control the crack width and spacing. A min. of 0.24% shall be used for the roof slabs since it is subjected to higher temperature. Variations than the floor slabs. This is required to take care of temp. differences. It is advisable to not to use 6mm bars as main bars as this size available in the local market is of inferior not only with respect to size but also the quality since like TATA and SAIL are not producing this size of bar. BEAMS: A min. of 0.2% is to be provided for the compression bars in order to take care of the deflection.
  • 14. The stirrups shall be min.size of 8mm in the case of lateral load resistance . The hooks shall be bent to 135 degree .
  • 15. CANTILEVER BEAM crack INCORRECT Ldt CLOSE STIRRUPS Ldt/2 Ld/2 Ld/2 CORRECT Ld
  • 16. NON PRISMATIC BEAM crack INCORRECT Ldt CLOSE STIRRUPS Ldt/2 Ld/2 Ld/2 Ld CORRECT
  • 17. GRID BEAM GRID BEAM INCORRECT Close rings 1.5d 1.5d 300 300 d 2#extra bars Hanger bars Slope 1:10 CORRECT
  • 18. Details of Main & Secondary beams Secondary beam Main beam INCORRECT Secondary beam Close rings 1.5d 1.5d 300 300 d 60degree Hanger bars Main beam CORRECT
  • 19. BEAM d 1/4OR INCORRECT 1/5 SPAN Ld Ld LINE OF CRACK d/2 t t d/2 1.5d d/2+d/2Cot(t) CORRECT
  • 20. Continuous beam • continuous beam Span/4 Span/4 Span/4 Span/4 Span/4 incorrect Span/4 Span/4 1.5d 1.5d 1.5d correct
  • 21. CONTINUOUS BEAM SPAN/4 SPAN/4 SPAN/4 .08L1 100% CRACK 100% CRACK CRACK L1 .08L1 L2 .08L2 INCORRECT 100% L1/4 L2/4 L1/4 20% 20% 0.1L1 100% 100% L1 .15L1 L2 .15L2 CORRECT
  • 22. NONPRISMATIC SECTION OF BEAM CRACK D D D INCORRECT CLOSE RING D D CORRECT D CLOSE RING
  • 23. CANTILEVER BEAM PROJECTING FROM COLUMN COLUMN INCORRECT NOT LESS THAN 0.5Ast NOT LESS THAN GREATER OF 0.5L OR Ld 50mm Ld 0.25Ast COLUMN CORRECT Ld/3
  • 24. SLOPING BEAM CRACK Ld Ld CORRECT
  • 25. HAUNCH BEAMS CRACK CRACK L INCORRECT Ld Ld CORRECT Ld L/8 TO Ld L/10 L/8 TO L L/10
  • 26. STRESSES AT CORNERS C-COMPRESSION T-TENSION C t C CRACK t RESULTANT TENSILE STRESS FOR ACROSS CORNER(ONE PLANE) RESULTANT TENSILE STRESS FOR t ACROSS CORNER(DIFFERENT PLANE) CRACK c t c
  • 27. SHEAR AND TORSION REIN. IN BEAMS Stirrups taken round outermost bars spacing<=x1 <=(x1+y1)/4 <=300mm Min 0.2%bd to control deflection as well as for seismic requ. INCORRECT n d y1 Skin rein.10dia is D required when depth 100 to D-n>500mm exceeds 450mm(0.1% 200mm of web area distributed equally on two faces) D/5 x1 CORRECT b
  • 28. CANTILEVER BEAM WITH POINT LOAD Shear rein. INCORRECT 2/3d d Ld CORRECT Ld Extra ties
  • 29. INCORRECT opening crack crack OPENING IN WEB OF BEAM d/2 opening d/2 Closed stps Closed stps for d/2 for d/2 Ld OPENING IN WEB OF BEAM CORRECT
  • 30. BEAM COLUMN JUNCTION-EXTERIOR COLUMN INCORRECT 2”max CLOSED STPS U TYPE BARS Ld IN TENSION-Ld CORRECT
  • 31. SPLICE DETAIL FOR COLUMN COVER CLOSE TIES @S/2 SLOPE 1:6 S-SPACING CORRECT INCORRECT
  • 32. REDUCTION COLUMN BOTH SIDES INCORRECT SPLICE SLOPE 1:8 FROM BEAM BOTTOM 3NO.CLOSE TIES CLOSE STPS SPACIN <=75mm 3NO.CLOSE TIES CORRECT
  • 33. TERMINATION OF COLUMN BARS INSIDE BEAM INCORRECT Ld CORRECT
  • 34. *COL.CORE HAS TO BE CONFINED BY EQ REGION-BEAM-COL JN-EXTERIOR CIRCULAR OR RECTANGULAR TIES IN ACCORDANCE WITH END REGION SPACING OF LATERAL TIES <=d/2 COL. END REGION CORE* SPACING OF LATERAL TIES <=100mm END REGION BEAM COL. JUNCTION-EQ REGION INCORRECT CORRECT SPACING OF LATERAL TIES <=d/2 BEAM COL. JUNCTION-EQ REGION
  • 35. COLUMN DETAILS IN EQ REGIONS incorrect First stirrups correct 50mm from beam face END REGION END REGION-h/6 or D or 450MM whichever is greater h b d D END REGION END REGION Spacing of shear rein. In columns Spacing of shear rein. In columns
  • 36. EQ-REGION-CONTINUOUS BEAM INCORRECT 50mmmax CONTINUOUS BARS NOT LESS THAN ¼ AREA OF BARS AT COL.FACE CORRECT A=L1/3 A=L1/3 A=L1/3 Ld stp@maxd/2 2d 2d stp@maxd/2 2d Stirrup spacing=d/4 or 100mm or 8dia which ever is the least
  • 37. FOOTING-DETAILS(INDEPENDENT) INCORRECT COLUMN BARS STARTER NATURAL BARS G.L COVER TO STARTER Lb 3” SIDE COVER Ldt Min.300 COVER50mm Ldt IF p.c.c below CORRECT or 75mm
  • 38. TYPICAL REIN DETAILS OF INCORRECT HAMMER FOUNDATION BLOCK CORRECT Ld Ld
  • 39. SECTION OF TRENCH INCORRECT CRACK CORRECT Ld Ld Ld
  • 40. STAIRCASE-WITH WAIST SLAB INCORRECT Extra bar Ld(min) Ld(min) Ld(min) CORRECT
  • 41. SLABLESS STAIRCASE Dist. Alternate 1 Main bar Main bar
  • 42. SLABLESS STAIRCASE Main bar L=horizontal span Alternate 2 A=0.25L
  • 43. DEVELOPMENT LENGTH OF BARS FOR A CONCRETE GRADE M20 &STEEL STRENGTH Fy=415 SLNO BAR TENSION COMPRESSION REMARKS DIA. mm 1 8 376.0 301.0 2 10 470.0 376.0 3 12 564.0 451.0 4 16 752.0 602.0 5 20 940.0 752.0 6 22 1034.0 827.0 7 25 1175.0 940.0 8 28 1316.0 1053.0 9 32 1504.0 1203.0 APPROXIMATELY USE 50Xdia FOR TENSION
  • 44. CONCLUSION: Before concluding I will show some more details drawn in autocad exported in wwf format As there is no time to elaborately explaining ,the following topics are not covered : 1. Flat slabs, Folded plates, shell structures-cylindrical shells, silos, 2. Staircases- helical staircase, central beam type, cantilever type etc. 3. Different types of foundations-raft, pile foundation, strap foundation etc. 4. Retaining wall structures, 5. Liquid retaining structures. 6. Deep beams. 7. Shear wall, walls. Hope that I have enlighten some of the detailing technique for the most commonly encountered RCC members in buildings. In the above statements if my senior colleagues and ACCE members can find different method or any new detailing system it will be of immense help not only for me but to other young engineers who should learn in wright ways and not wrong lessons.
  • 45. REFERENCES: 1. HANDBOOK ON CONCRETE REINFORCEMENT AND DETAILING-SP:34(S&T)-1987. 2. MANUAL OF ENGINEERING & PLACING DRAWINGS FOR REINFORCED CONCRETE STRUCTURES- (ACI 315-80 3. MANUAL OF STANDARD PRACTICE –CONCRETE REINFORCING STEEL INSTITUTE. 4. TWARD BOARD MANUAL FOR RURAL WATER SUPPLY SCHEMES. 5. DESIGN PRINCIPLES AND DETAILING OF CONCRETE STRUCTURES. By D.S.PRAKASH RAO. 6. SIMPLIFIED DESIGN-RC BUILDINGS OF MODERATE SIZE AND HEIGHT-BY PORTLAND CEMENT ASSOCIATION,USA. 7. DESIGN AND CONSTRUCTION FAILURES BY DOV KAMINETZKY.
  • 46. 8. IS:2502-1963 CODE OF PRACTICE FOR BENDING AND FIXING OF BARS FOR CONCRETE REINFORCEMENT. 9. IS:1893:2000. 10. IS:4326. 11. IS:456:2000 12. REINFORCED HAND BOOK BY REYNOLD.