Question 17: Chapter 2
Inventory Management and Risk Pooling
KLF Electronics is an American manufacturer of electronic equipment. The company has a single manufacturing facility in San Jose,
California. KLF Electronics distributes its products through five regional warehouses located in Atlanta, Boston, Chicago, Dallas, and
Los Angeles. In the current distribution system, the United States is partitioned into five major markets, each of which is served by a
single regional warehouse. Customers, typically retail outlets, receive items directly from the regional warehouse in their market. That is,
in the current distribution system, each customer is assigned to a single market and receives deliveries from one regional warehouse.

The warehouses receive items from the manufacturing facility. Typically, it takes about two weeks to satisfy an order placed by any of the regional
warehouses. Currently, KLF provides their customers with a service level of about 90 percent. In recent years, KLF has seen a significant increase in
competition and huge pressure from their customers to improve the service level and reduce costs. To improve the service level and reduce costs, KLF
would like to consider an alternative distribution strategy in which the five regional warehouses are replaced with a single, central warehouse that will
be in charge of all customer orders. This warehouse should be one of the existing warehouses. The company CEO insists that whatever distribution
strategy is used, KLF will design the strategy so that service level is increased to about 97 percent.

Answer the following three questions:
Issue 1: a. A detailed analysis of customer demand in the five market areas reveals that the demand in the five regions is very similar; that is, it is
common that if weekly demand in one region is above average, so is the weekly demand in the other regions. How does this observation affect the
attractiveness of the new system?

Issue 2: b. To perform a rigorous analysis, you have identified a typical product, Product A. Table 2-11 provides historical data and includes weekly
demand for this product for the last 12 weeks in each of the market areas. An order (placed by a warehouse to the factory) costs $5,550 (per order), and
holding inventory costs $1.25 per unit per week. In the current distribution system, the cost of transporting a product from the manufacturing facility to
a warehouse is given in Table 2-12 (see the column “Inbound”). Table 2-12 also provides information about transportation cost per unit from each
warehouse to the stores in its market area (see the column “Outbound”). Finally, Table 2-13 provides information about transportation costs per unit
product from each existing regional warehouse to all other market areas, assuming this regional warehouse becomes the central warehouse.
Suppose you are to compare the two systems for Product A only; what is your recommendation? To answer this question, you should compare costs
and average inventory levels for the two strategies assuming demands occur according to the historical data. Also, you should determine which regional
warehouse will be used as the centralized warehouse.

Issue 3: c. It is proposed that in the centralized distribution strategy, that is, the one with a single warehouse, products will be distributed using UPS
Ground Service, which guarantees that products will arrive at the warehouse in three days (0.5 week). Of course, in this case, transportation cost for
shipping a unit product from a manufacturing facility to the warehouse increases. In fact, in this case, transportation costs increase by 50%. Thus, for
instance, shipping one unit from the manufacturing facility to Atlanta will cost $18.Would you recommend using this strategy? Explain your answer.
Answer (a)
In this case, the demands from all warehouses are positively correlated.
Therefore the benefits derived from proposed system would not be considerable and new centralized system wouldn’t be attractive.
Part 2
Table 1: Historical Data
Week
Atlanta
Boston
Chicago
Dallas
LA
Total

1
33
26
44
27
32
162

2
45
35
34
42
43
199

3
37
41
22
35
54
189

4
38
40
55
40
40
213

5
55
46
48
51
46
246

6
30
48
72
64
74
288

7
18
55
62
70
40
245

8
58
18
28
65
35
204

9
47
62
27
55
45
236

10
37
44
95
43
38
257

11
23
30
35
38
48
174

12
55
45
45
47
56
248

Table 2: Current transportation costs per unit
Warehouse
Inbound
Outbound
Atlanta
12
13
Boston
11.5
13
Chicago
11
13
Dallas
9
13
LA
7
13
Table 3: Transportation costs per unit in centralized system
Warehouse
Atlanta
Boston
Chicago
Dallas
Atlanta
13
14
14
15

17

Boston
Chicago
Dallas
LA

17
16
22
13

14
14
15
17

13
22
15
17

22
13
15
16

15
15
13
22

LA

Service Level 90% and lead time 2 weeks
Avg. Demand

Centralized

CV

Q

Inbound per Unit

Outbound per unit

Avg. Inbound Cost

Avg. Outbound Cost

Avg. Inv. Level
(SR = 90% and L=2)

Carrying Cost

Ordering cost

TC

12.8
12.2
21.2
13.2
11.3

0.32
0.30
0.45
0.27
0.25

590.8
599.4
644.8
650.5
635.7

12
11.5
11
9
7

13
13
13
13
13

476.0
469.6
519.8
432.8
321.4

515.7
530.8
614.3
625.1
596.9

397.8
403.5
455.2
445.3
430.2

497.3
504.4
569.0
556.7
537.7

369.3
374.7
403.0
406.6
397.3

1858.2
1879.5
2106.1
2021.1
1853.4

221.8

Atlanta
Boston
Chicago
Dallas
LA

STD

39.7
40.8
47.3
48.1
45.9

Regions

37.5

0.17

1396.9

766.4

958.0

873.1

Service Level 90% and lead time 2 weeks
Centralized

Atlanta

Boston

Chicago

Dallas

LA

Inbound

Atlanta

Boston

Chicago

Dallas

LA

Inbound

13
14
14
15
17

Atlanta
Boston
Chicago
Dallas
LA

14
13
22
15
17

14
22
13
15
16

15
15
15
13
22

17
17
16
22
13

12
11.5
11
9
7

515.7
555.3
555.3
595.0
674.3

571.7
530.8
898.3
612.5
694.2

661.5
1039.5
614.3
708.8
756.0

721.3
721.3
721.3
625.1
1057.8

780.6
780.6
734.7
1010.2
596.9

2661.0
2550.1
2439.3
1995.8
1552.3

Decentralized System:
Avg. Inventory =

2132.2

Centralized System:
Avg. Inventory =

766.4

Percentage reduction in inventory level (approx.) = 64%
So, by changing the system from decentralized to centralized, the company is expected to save 64% approximately in average inventory level.
Comparing the costs for each regional warehouse, LA is selected to be the centralized warehouse due to its lowest TC.

Carrying + Ordering
Cost
1831.1
1831.1
1831.1
1831.1
1831.1

TC
7742.7
8008.7
7794.1
7378.3
7162.6
Part 3 (L = 2)
Table 1: Historical Data
Week
1
Atlanta
33
Boston
26
Chicago
44
Dallas
27
LA
32
Total
162

2
45
35
34
42
43
199

3
37
41
22
35
54
189

4
38
40
55
40
40
213

5
55
46
48
51
46
246

6
30
48
72
64
74
288

7
18
55
62
70
40
245

8
58
18
28
65
35
204

9
47
62
27
55
45
236

10
37
44
95
43
38
257

11
23
30
35
38
48
174

12
55
45
45
47
56
248

Table 2: Current transportation costs per unit
Warehouse
Inbound
Outbound
Atlanta
12
13
Boston
11.5
13
Chicago
11
13
Dallas
9
13
LA
7
13
Table 3: Transportation costs per unit in centralized system
Warehouse
Atlanta
Boston
Chicago Dallas

LA

Atlanta

13

14

14

15

17

Boston
Chicago
Dallas
LA

14
14
15
17

13
22
15
17

22
13
15
16

15
15
13
22

17
16
22
13

Regions

Avg. Demand

STD

CV

Q

Inbound per Unit

Outbound per unit

Avg. Inbound Cost

Avg. Outbound Cost

Avg. Inv. Level
(SR = 90% and L=2)

Carrying Cost

Ordering cost

TC

Atlanta
Boston
Chicago
Dallas
LA

39.7
40.8
47.3
48.1
45.9

12.8
12.2
21.2
13.2
11.3

0.32
0.30
0.45
0.27
0.25

590.8
599.4
644.8
650.5
635.7

12
11.5
11
9
7

13
13
13
13
13

476.0
469.6
519.8
432.8
321.4

515.7
530.8
614.3
625.1
596.9

397.8
403.5
455.2
445.3
430.2

497.3
504.4
569.0
556.7
537.7

369.3
374.7
403.0
406.6
397.3

1858.2
1879.5
2106.1
2021.1
1853.4

221.8

37.5

0.17

1396.9

798.2

997.8

873.1

Centralized

Service Level 97% and lead time 2 weeks
Centralized
Atlanta
Boston
Chicago
Dallas
LA

Atlanta

Boston

Chicago

Dallas

LA

Inbound

Atlanta

Boston

Chicago

Dallas

LA

Inbound

13
14
14
15
17

14
13
22
15
17

14
22
13
15
16

15
15
15
13
22

17
17
16
22
13

12
11.5
11
9
7

515.7
555.3
555.3
595.0
674.3

571.7
530.8
898.3
612.5
694.2

661.5
1039.5
614.3
708.8
756.0

721.3
721.3
721.3
625.1
1057.8

780.6
780.6
734.7
1010.2
596.9

2661.0
2550.1
2439.3
1995.8
1552.3

Carrying + Ordering
Cost
1870.8
1870.8
1870.8
1870.8
1870.8

TC
7782.5
8048.5
7833.9
7418.1
7202.3
Part 3 (L = 0.5)
Table 1: Historical Data
Week
1
Atlanta
33
Boston
26
Chicago
44
Dallas
27
LA
32
Total
162

2
45
35
34
42
43
199

3
37
41
22
35
54
189

4
38
40
55
40
40
213

5
55
46
48
51
46
246

6
30
48
72
64
74
288

7
18
55
62
70
40
245

8
58
18
28
65
35
204

9
47
62
27
55
45
236

10
37
44
95
43
38
257

11
23
30
35
38
48
174

12
55
45
45
47
56
248

Table 2: Current transportation costs per unit
Warehouse
Inbound
Outbound
Atlanta
12
13
Boston
11.5
13
Chicago
11
13
Dallas
9
13
LA
7
13
Table 3: Transportation costs per unit in centralized system
Warehouse

Atlanta

Boston

Chicago

Dallas

Atlanta

13

14

14

15

LA
17

Boston
Chicago
Dallas
LA

14
14
15
17

13
22
15
17

22
13
15
16

15
15
13
22

17
16
22
13

Regions

Avg. Demand

STD

CV

Q

Inbound per Unit

Outbound per unit

Avg. Inbound Cost

Avg. Outbound Cost

Avg. Inv. Level
(SR = 90% and L=2)

Carrying Cost

Ordering cost

TC

Atlanta
Boston
Chicago
Dallas
LA

39.7
40.8
47.3
48.1
45.9

12.8
12.2
21.2
13.2
11.3

0.32
0.30
0.45
0.27
0.25

590.8
599.4
644.8
650.5
635.7

12
11.5
11
9
7

13
13
13
13
13

476.0
469.6
519.8
432.8
321.4

515.7
530.8
614.3
625.1
596.9

397.8
403.5
455.2
445.3
430.2

497.3
504.4
569.0
556.7
537.7

369.3
374.7
403.0
406.6
397.3

1858.2
1879.5
2106.1
2021.1
1853.4

221.8

37.5

0.17

1396.9

748.3

935.4

873.1

Centralized

Service Level 97% and lead time 0.5 week
Centralized
Atlanta
Boston
Chicago
Dallas
LA

Atlanta

Boston

Chicago

Dallas

LA

Inbound

Atlanta

Boston

Chicago

Dallas

LA

Inbound

13
14
14
15
17

14
13
22
15
17

14
22
13
15
16

15
15
15
13
22

17
17
16
22
13

18
17.25
16.5
13.5
10.5

515.7
555.3
555.3
595.0
674.3

571.7
530.8
898.3
612.5
694.2

661.5
1039.5
614.3
708.8
756.0

721.3
721.3
721.3
625.1
1057.8

780.6
780.6
734.7
1010.2
596.9

3991.5
3825.2
3658.9
2993.6
2328.4

With service level of 97% and lead time of 2 weeks:
Avg. Inventory Level =

798

With service level of 97% and lead time of 0.5 week:
Avg. Inventory Level =

748

Percentage reduction in inventory level (approx.) =

6.27%

So, by decreasing lead time from 2 weeks to 1/2 week, the company is expected to save 6.3% approximately in average inventory level.

Carrying + Ordering
Cost
1808.5
1808.5
1808.5
1808.5
1808.5

TC
9050.7
9261.2
8991.2
8353.6
7916.1
LA Warehouse
Table 1: Historical Data
Week
1
Atlanta
33
Boston
26
Chicago
44
Dallas
27
LA
32
Total
162

2
45
35
34
42
43
199

3
37
41
22
35
54
189

4
38
40
55
40
40
213

5
55
46
48
51
46
246

6
30
48
72
64
74
288

7
18
55
62
70
40
245

8
58
18
28
65
35
204

9
47
62
27
55
45
236

10
37
44
95
43
38
257

11
23
30
35
38
48
174

12
55
45
45
47
56
248

Table 2: Current transportation costs per unit
Warehouse
Inbound
Outbound
Atlanta
12
13
Boston
11.5
13
Chicago
11
13
Dallas
9
13
LA
7
13
Table 3: Transportation costs per unit in centralized system
Warehouse
Atlanta
Boston
Chicago Dallas

LA

Atlanta

13

14

14

15

17

Boston
Chicago
Dallas
LA

14
14
15
17

13
22
15
17

22
13
15
16

15
15
13
22

17
16
22
13

Regions

Avg. Demand

STD

CV

Q

Inbound per Unit

Outbound per unit

Avg. Inbound Cost

Avg. Outbound Cost

Avg. Inv. Level
(SR = 90% and L=2)

Carrying Cost

Ordering cost

TC

Atlanta
Boston
Chicago
Dallas
LA

39.7
40.8
47.3
48.1
45.9

12.8
12.2
21.2
13.2
11.3

0.32
0.30
0.45
0.27
0.25

590.8
599.4
644.8
650.5
635.7

12
11.5
11
9
7

13
13
13
13
13

476.0
469.6
519.8
432.8
321.4

515.7
530.8
614.3
625.1
596.9

397.8
403.5
455.2
445.3
430.2

497.3
504.4
569.0
556.7
537.7

369.3
374.7
403.0
406.6
397.3

1858.2
1879.5
2106.1
2021.1
1853.4

221.8

37.5

0.17

1396.9

748.3

935.4

873.1

Centralized

Service Level 97% and lead time 0.5 week
Centralized
Atlanta
Boston
Chicago
Dallas
LA

Atlanta

Boston

Chicago

Dallas

LA

Inbound

Atlanta

Boston

Chicago

Dallas

LA

Inbound

13
14
14
15
17

14
13
22
15
17

14
22
13
15
16

15
15
15
13
22

17
17
16
22
13

18
17.25
16.5
13.5
10.5

515.7
555.3
555.3
595.0
674.3

571.7
530.8
898.3
612.5
694.2

661.5
1039.5
614.3
708.8
756.0

721.3
721.3
721.3
625.1
1057.8

780.6
780.6
734.7
1010.2
596.9

3991.5
3825.2
3658.9
2993.6
2328.4

LA Warehouse:
Increase in cost when lead time is changed from 2 to 0.5 week =

9.02%

If we use this strategy, we will be able to save only 6.3% of average inventory level by increasing 9% of total cost ($707) at LA warehouse. Hence, this strategy does not seem too attractive to be applied.

Carrying + Ordering
Cost
1808.5
1808.5
1808.5
1808.5
1808.5

TC
9050.7
9261.2
8991.2
8353.6
7916.1

Mais conteúdo relacionado

Mais procurados

Supply chain management of lg electronic
Supply chain management of lg electronicSupply chain management of lg electronic
Supply chain management of lg electronicVarun Shrivastava
 
HP Supply Chain Optimization
HP Supply Chain OptimizationHP Supply Chain Optimization
HP Supply Chain OptimizationSwapnil Pillai
 
Walmart Supply Chain Management
Walmart Supply Chain ManagementWalmart Supply Chain Management
Walmart Supply Chain ManagementSANAL C.WILSON
 
Nhom4 de 4
Nhom4  de 4Nhom4  de 4
Nhom4 de 4thomxuan
 
Seven Eleven Store - Case study - Answers
Seven Eleven Store - Case study - AnswersSeven Eleven Store - Case study - Answers
Seven Eleven Store - Case study - AnswersZaka Ul Hassan
 
Sports obermeyer case
Sports obermeyer caseSports obermeyer case
Sports obermeyer caseSaurabh Arora
 
Chuoi cung ung wal mart
Chuoi cung ung wal martChuoi cung ung wal mart
Chuoi cung ung wal martLuyến Hoàng
 
Dell PC & Laptop's Supply Chain Management
Dell PC & Laptop's Supply Chain ManagementDell PC & Laptop's Supply Chain Management
Dell PC & Laptop's Supply Chain ManagementFPT Univesity
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case StudyGourav Anvekar
 
Chuỗi cung ứng của dell (dell scm)
Chuỗi cung ứng của dell (dell scm)Chuỗi cung ứng của dell (dell scm)
Chuỗi cung ứng của dell (dell scm)dao minh
 
case study on Supply chain decisions
case study on Supply chain decisionscase study on Supply chain decisions
case study on Supply chain decisionsARUN G.P.
 
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERSGRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERSAkhil Ayyakutty
 
Walmart value chain-analysis
Walmart value chain-analysisWalmart value chain-analysis
Walmart value chain-analysisMonica Mishra
 
Sports Obermeyer Case
Sports Obermeyer CaseSports Obermeyer Case
Sports Obermeyer CaseGeeta Hansdah
 

Mais procurados (20)

Supply chain management of lg electronic
Supply chain management of lg electronicSupply chain management of lg electronic
Supply chain management of lg electronic
 
HP Supply Chain Optimization
HP Supply Chain OptimizationHP Supply Chain Optimization
HP Supply Chain Optimization
 
Walmart Supply Chain Management
Walmart Supply Chain ManagementWalmart Supply Chain Management
Walmart Supply Chain Management
 
Reebok nfl
Reebok nflReebok nfl
Reebok nfl
 
Nhom4 de 4
Nhom4  de 4Nhom4  de 4
Nhom4 de 4
 
The bis corporation anubhaw
The bis corporation   anubhawThe bis corporation   anubhaw
The bis corporation anubhaw
 
Seven Eleven Store - Case study - Answers
Seven Eleven Store - Case study - AnswersSeven Eleven Store - Case study - Answers
Seven Eleven Store - Case study - Answers
 
Toyota edited
Toyota editedToyota edited
Toyota edited
 
Sports obermeyer case
Sports obermeyer caseSports obermeyer case
Sports obermeyer case
 
Chuoi cung ung wal mart
Chuoi cung ung wal martChuoi cung ung wal mart
Chuoi cung ung wal mart
 
Dell PC & Laptop's Supply Chain Management
Dell PC & Laptop's Supply Chain ManagementDell PC & Laptop's Supply Chain Management
Dell PC & Laptop's Supply Chain Management
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case Study
 
Chuỗi cung ứng của dell (dell scm)
Chuỗi cung ứng của dell (dell scm)Chuỗi cung ứng của dell (dell scm)
Chuỗi cung ứng của dell (dell scm)
 
case study on Supply chain decisions
case study on Supply chain decisionscase study on Supply chain decisions
case study on Supply chain decisions
 
Barilla
BarillaBarilla
Barilla
 
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERSGRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
GRAINGER AND MCMASTER CARR – MAINTENANCE REPAIR AND OPERATION SUPPLIERS
 
Walmart value chain-analysis
Walmart value chain-analysisWalmart value chain-analysis
Walmart value chain-analysis
 
Sports Obermeyer Case
Sports Obermeyer CaseSports Obermeyer Case
Sports Obermeyer Case
 
Case study 2
Case study 2Case study 2
Case study 2
 
Mashaweer Case Study
Mashaweer Case StudyMashaweer Case Study
Mashaweer Case Study
 

Destaque

Destaque (7)

Home Work; Chapter 8; Forecasting Supply Chain Requirements
Home Work; Chapter 8; Forecasting Supply Chain RequirementsHome Work; Chapter 8; Forecasting Supply Chain Requirements
Home Work; Chapter 8; Forecasting Supply Chain Requirements
 
Transport Management & Theory Practices (2)
Transport Management & Theory Practices (2)Transport Management & Theory Practices (2)
Transport Management & Theory Practices (2)
 
3rd party logistic
3rd party logistic3rd party logistic
3rd party logistic
 
5w 1h ppt
5w 1h ppt5w 1h ppt
5w 1h ppt
 
The new ISO 9001:2015
The new ISO 9001:2015The new ISO 9001:2015
The new ISO 9001:2015
 
ISO 9001:2015 Overview: Revisions & Impact - Part 1
ISO 9001:2015 Overview: Revisions & Impact - Part 1ISO 9001:2015 Overview: Revisions & Impact - Part 1
ISO 9001:2015 Overview: Revisions & Impact - Part 1
 
Introduction to ISO 9001:2015
Introduction to ISO 9001:2015Introduction to ISO 9001:2015
Introduction to ISO 9001:2015
 

Semelhante a Inventory management and risk pooling analysis for KLF Electronics

Distribution and logistics
Distribution and logisticsDistribution and logistics
Distribution and logisticsharshadevarkar
 
Global supply chains and distribution new competitive strategies project peropt
Global supply chains and distribution new competitive strategies project peroptGlobal supply chains and distribution new competitive strategies project peropt
Global supply chains and distribution new competitive strategies project peroptyvwang
 
supply chain management
supply chain management supply chain management
supply chain management Manish Kaushik
 
Bsop 330 entire course
Bsop 330 entire courseBsop 330 entire course
Bsop 330 entire coursekae bayno
 
3 session 3a risk_pooling
3 session 3a risk_pooling3 session 3a risk_pooling
3 session 3a risk_poolingkimsach
 
To prepare for this Assignment· Review this week’s Learning Res.docx
To prepare for this Assignment· Review this week’s Learning Res.docxTo prepare for this Assignment· Review this week’s Learning Res.docx
To prepare for this Assignment· Review this week’s Learning Res.docxjuliennehar
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...johann11371
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingjohann11370
 
A company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive yearsA company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive yearsjohann11369
 
Operations Management: SKB Healthcare India
Operations Management: SKB Healthcare IndiaOperations Management: SKB Healthcare India
Operations Management: SKB Healthcare IndiaTemi Vasco
 
A company must perform a maintenance project consisting
A company must perform a maintenance project consistingA company must perform a maintenance project consisting
A company must perform a maintenance project consistingjohann11369
 
Question 1 – Exercise 8.3Why is it not possible in Example 8.1 o.docx
Question 1 – Exercise 8.3Why is it not possible in Example 8.1 o.docxQuestion 1 – Exercise 8.3Why is it not possible in Example 8.1 o.docx
Question 1 – Exercise 8.3Why is it not possible in Example 8.1 o.docxIRESH3
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingjohann11370
 
Which of the following basic types of production layout
Which of the following basic types of production layoutWhich of the following basic types of production layout
Which of the following basic types of production layoutjohann11372
 
In designing a lean production facility layout
In designing a lean production facility layoutIn designing a lean production facility layout
In designing a lean production facility layoutjohann11371
 
Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...ramuaa128
 
Which of the following approaches to service design
Which of the following approaches to service designWhich of the following approaches to service design
Which of the following approaches to service designjohann11372
 
Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...ramuaa128
 
If the actual output of a piece of equipment
If the actual output of a piece of equipmentIf the actual output of a piece of equipment
If the actual output of a piece of equipmentjohann11371
 

Semelhante a Inventory management and risk pooling analysis for KLF Electronics (20)

Distribution and logistics
Distribution and logisticsDistribution and logistics
Distribution and logistics
 
Global supply chains and distribution new competitive strategies project peropt
Global supply chains and distribution new competitive strategies project peroptGlobal supply chains and distribution new competitive strategies project peropt
Global supply chains and distribution new competitive strategies project peropt
 
supply chain management
supply chain management supply chain management
supply chain management
 
Bsop 330 entire course
Bsop 330 entire courseBsop 330 entire course
Bsop 330 entire course
 
3 session 3a risk_pooling
3 session 3a risk_pooling3 session 3a risk_pooling
3 session 3a risk_pooling
 
To prepare for this Assignment· Review this week’s Learning Res.docx
To prepare for this Assignment· Review this week’s Learning Res.docxTo prepare for this Assignment· Review this week’s Learning Res.docx
To prepare for this Assignment· Review this week’s Learning Res.docx
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the following
 
Risk pooling 7.ppt
Risk pooling 7.pptRisk pooling 7.ppt
Risk pooling 7.ppt
 
A company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive yearsA company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive years
 
Operations Management: SKB Healthcare India
Operations Management: SKB Healthcare IndiaOperations Management: SKB Healthcare India
Operations Management: SKB Healthcare India
 
A company must perform a maintenance project consisting
A company must perform a maintenance project consistingA company must perform a maintenance project consisting
A company must perform a maintenance project consisting
 
Question 1 – Exercise 8.3Why is it not possible in Example 8.1 o.docx
Question 1 – Exercise 8.3Why is it not possible in Example 8.1 o.docxQuestion 1 – Exercise 8.3Why is it not possible in Example 8.1 o.docx
Question 1 – Exercise 8.3Why is it not possible in Example 8.1 o.docx
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the following
 
Which of the following basic types of production layout
Which of the following basic types of production layoutWhich of the following basic types of production layout
Which of the following basic types of production layout
 
In designing a lean production facility layout
In designing a lean production facility layoutIn designing a lean production facility layout
In designing a lean production facility layout
 
Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...
 
Which of the following approaches to service design
Which of the following approaches to service designWhich of the following approaches to service design
Which of the following approaches to service design
 
Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...
 
If the actual output of a piece of equipment
If the actual output of a piece of equipmentIf the actual output of a piece of equipment
If the actual output of a piece of equipment
 

Último

Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 

Último (20)

Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 

Inventory management and risk pooling analysis for KLF Electronics

  • 1. Question 17: Chapter 2 Inventory Management and Risk Pooling KLF Electronics is an American manufacturer of electronic equipment. The company has a single manufacturing facility in San Jose, California. KLF Electronics distributes its products through five regional warehouses located in Atlanta, Boston, Chicago, Dallas, and Los Angeles. In the current distribution system, the United States is partitioned into five major markets, each of which is served by a single regional warehouse. Customers, typically retail outlets, receive items directly from the regional warehouse in their market. That is, in the current distribution system, each customer is assigned to a single market and receives deliveries from one regional warehouse. The warehouses receive items from the manufacturing facility. Typically, it takes about two weeks to satisfy an order placed by any of the regional warehouses. Currently, KLF provides their customers with a service level of about 90 percent. In recent years, KLF has seen a significant increase in competition and huge pressure from their customers to improve the service level and reduce costs. To improve the service level and reduce costs, KLF would like to consider an alternative distribution strategy in which the five regional warehouses are replaced with a single, central warehouse that will be in charge of all customer orders. This warehouse should be one of the existing warehouses. The company CEO insists that whatever distribution strategy is used, KLF will design the strategy so that service level is increased to about 97 percent. Answer the following three questions: Issue 1: a. A detailed analysis of customer demand in the five market areas reveals that the demand in the five regions is very similar; that is, it is common that if weekly demand in one region is above average, so is the weekly demand in the other regions. How does this observation affect the attractiveness of the new system? Issue 2: b. To perform a rigorous analysis, you have identified a typical product, Product A. Table 2-11 provides historical data and includes weekly demand for this product for the last 12 weeks in each of the market areas. An order (placed by a warehouse to the factory) costs $5,550 (per order), and holding inventory costs $1.25 per unit per week. In the current distribution system, the cost of transporting a product from the manufacturing facility to a warehouse is given in Table 2-12 (see the column “Inbound”). Table 2-12 also provides information about transportation cost per unit from each warehouse to the stores in its market area (see the column “Outbound”). Finally, Table 2-13 provides information about transportation costs per unit product from each existing regional warehouse to all other market areas, assuming this regional warehouse becomes the central warehouse. Suppose you are to compare the two systems for Product A only; what is your recommendation? To answer this question, you should compare costs and average inventory levels for the two strategies assuming demands occur according to the historical data. Also, you should determine which regional warehouse will be used as the centralized warehouse. Issue 3: c. It is proposed that in the centralized distribution strategy, that is, the one with a single warehouse, products will be distributed using UPS Ground Service, which guarantees that products will arrive at the warehouse in three days (0.5 week). Of course, in this case, transportation cost for shipping a unit product from a manufacturing facility to the warehouse increases. In fact, in this case, transportation costs increase by 50%. Thus, for instance, shipping one unit from the manufacturing facility to Atlanta will cost $18.Would you recommend using this strategy? Explain your answer.
  • 2. Answer (a) In this case, the demands from all warehouses are positively correlated. Therefore the benefits derived from proposed system would not be considerable and new centralized system wouldn’t be attractive.
  • 3. Part 2 Table 1: Historical Data Week Atlanta Boston Chicago Dallas LA Total 1 33 26 44 27 32 162 2 45 35 34 42 43 199 3 37 41 22 35 54 189 4 38 40 55 40 40 213 5 55 46 48 51 46 246 6 30 48 72 64 74 288 7 18 55 62 70 40 245 8 58 18 28 65 35 204 9 47 62 27 55 45 236 10 37 44 95 43 38 257 11 23 30 35 38 48 174 12 55 45 45 47 56 248 Table 2: Current transportation costs per unit Warehouse Inbound Outbound Atlanta 12 13 Boston 11.5 13 Chicago 11 13 Dallas 9 13 LA 7 13 Table 3: Transportation costs per unit in centralized system Warehouse Atlanta Boston Chicago Dallas Atlanta 13 14 14 15 17 Boston Chicago Dallas LA 17 16 22 13 14 14 15 17 13 22 15 17 22 13 15 16 15 15 13 22 LA Service Level 90% and lead time 2 weeks Avg. Demand Centralized CV Q Inbound per Unit Outbound per unit Avg. Inbound Cost Avg. Outbound Cost Avg. Inv. Level (SR = 90% and L=2) Carrying Cost Ordering cost TC 12.8 12.2 21.2 13.2 11.3 0.32 0.30 0.45 0.27 0.25 590.8 599.4 644.8 650.5 635.7 12 11.5 11 9 7 13 13 13 13 13 476.0 469.6 519.8 432.8 321.4 515.7 530.8 614.3 625.1 596.9 397.8 403.5 455.2 445.3 430.2 497.3 504.4 569.0 556.7 537.7 369.3 374.7 403.0 406.6 397.3 1858.2 1879.5 2106.1 2021.1 1853.4 221.8 Atlanta Boston Chicago Dallas LA STD 39.7 40.8 47.3 48.1 45.9 Regions 37.5 0.17 1396.9 766.4 958.0 873.1 Service Level 90% and lead time 2 weeks Centralized Atlanta Boston Chicago Dallas LA Inbound Atlanta Boston Chicago Dallas LA Inbound 13 14 14 15 17 Atlanta Boston Chicago Dallas LA 14 13 22 15 17 14 22 13 15 16 15 15 15 13 22 17 17 16 22 13 12 11.5 11 9 7 515.7 555.3 555.3 595.0 674.3 571.7 530.8 898.3 612.5 694.2 661.5 1039.5 614.3 708.8 756.0 721.3 721.3 721.3 625.1 1057.8 780.6 780.6 734.7 1010.2 596.9 2661.0 2550.1 2439.3 1995.8 1552.3 Decentralized System: Avg. Inventory = 2132.2 Centralized System: Avg. Inventory = 766.4 Percentage reduction in inventory level (approx.) = 64% So, by changing the system from decentralized to centralized, the company is expected to save 64% approximately in average inventory level. Comparing the costs for each regional warehouse, LA is selected to be the centralized warehouse due to its lowest TC. Carrying + Ordering Cost 1831.1 1831.1 1831.1 1831.1 1831.1 TC 7742.7 8008.7 7794.1 7378.3 7162.6
  • 4. Part 3 (L = 2) Table 1: Historical Data Week 1 Atlanta 33 Boston 26 Chicago 44 Dallas 27 LA 32 Total 162 2 45 35 34 42 43 199 3 37 41 22 35 54 189 4 38 40 55 40 40 213 5 55 46 48 51 46 246 6 30 48 72 64 74 288 7 18 55 62 70 40 245 8 58 18 28 65 35 204 9 47 62 27 55 45 236 10 37 44 95 43 38 257 11 23 30 35 38 48 174 12 55 45 45 47 56 248 Table 2: Current transportation costs per unit Warehouse Inbound Outbound Atlanta 12 13 Boston 11.5 13 Chicago 11 13 Dallas 9 13 LA 7 13 Table 3: Transportation costs per unit in centralized system Warehouse Atlanta Boston Chicago Dallas LA Atlanta 13 14 14 15 17 Boston Chicago Dallas LA 14 14 15 17 13 22 15 17 22 13 15 16 15 15 13 22 17 16 22 13 Regions Avg. Demand STD CV Q Inbound per Unit Outbound per unit Avg. Inbound Cost Avg. Outbound Cost Avg. Inv. Level (SR = 90% and L=2) Carrying Cost Ordering cost TC Atlanta Boston Chicago Dallas LA 39.7 40.8 47.3 48.1 45.9 12.8 12.2 21.2 13.2 11.3 0.32 0.30 0.45 0.27 0.25 590.8 599.4 644.8 650.5 635.7 12 11.5 11 9 7 13 13 13 13 13 476.0 469.6 519.8 432.8 321.4 515.7 530.8 614.3 625.1 596.9 397.8 403.5 455.2 445.3 430.2 497.3 504.4 569.0 556.7 537.7 369.3 374.7 403.0 406.6 397.3 1858.2 1879.5 2106.1 2021.1 1853.4 221.8 37.5 0.17 1396.9 798.2 997.8 873.1 Centralized Service Level 97% and lead time 2 weeks Centralized Atlanta Boston Chicago Dallas LA Atlanta Boston Chicago Dallas LA Inbound Atlanta Boston Chicago Dallas LA Inbound 13 14 14 15 17 14 13 22 15 17 14 22 13 15 16 15 15 15 13 22 17 17 16 22 13 12 11.5 11 9 7 515.7 555.3 555.3 595.0 674.3 571.7 530.8 898.3 612.5 694.2 661.5 1039.5 614.3 708.8 756.0 721.3 721.3 721.3 625.1 1057.8 780.6 780.6 734.7 1010.2 596.9 2661.0 2550.1 2439.3 1995.8 1552.3 Carrying + Ordering Cost 1870.8 1870.8 1870.8 1870.8 1870.8 TC 7782.5 8048.5 7833.9 7418.1 7202.3
  • 5. Part 3 (L = 0.5) Table 1: Historical Data Week 1 Atlanta 33 Boston 26 Chicago 44 Dallas 27 LA 32 Total 162 2 45 35 34 42 43 199 3 37 41 22 35 54 189 4 38 40 55 40 40 213 5 55 46 48 51 46 246 6 30 48 72 64 74 288 7 18 55 62 70 40 245 8 58 18 28 65 35 204 9 47 62 27 55 45 236 10 37 44 95 43 38 257 11 23 30 35 38 48 174 12 55 45 45 47 56 248 Table 2: Current transportation costs per unit Warehouse Inbound Outbound Atlanta 12 13 Boston 11.5 13 Chicago 11 13 Dallas 9 13 LA 7 13 Table 3: Transportation costs per unit in centralized system Warehouse Atlanta Boston Chicago Dallas Atlanta 13 14 14 15 LA 17 Boston Chicago Dallas LA 14 14 15 17 13 22 15 17 22 13 15 16 15 15 13 22 17 16 22 13 Regions Avg. Demand STD CV Q Inbound per Unit Outbound per unit Avg. Inbound Cost Avg. Outbound Cost Avg. Inv. Level (SR = 90% and L=2) Carrying Cost Ordering cost TC Atlanta Boston Chicago Dallas LA 39.7 40.8 47.3 48.1 45.9 12.8 12.2 21.2 13.2 11.3 0.32 0.30 0.45 0.27 0.25 590.8 599.4 644.8 650.5 635.7 12 11.5 11 9 7 13 13 13 13 13 476.0 469.6 519.8 432.8 321.4 515.7 530.8 614.3 625.1 596.9 397.8 403.5 455.2 445.3 430.2 497.3 504.4 569.0 556.7 537.7 369.3 374.7 403.0 406.6 397.3 1858.2 1879.5 2106.1 2021.1 1853.4 221.8 37.5 0.17 1396.9 748.3 935.4 873.1 Centralized Service Level 97% and lead time 0.5 week Centralized Atlanta Boston Chicago Dallas LA Atlanta Boston Chicago Dallas LA Inbound Atlanta Boston Chicago Dallas LA Inbound 13 14 14 15 17 14 13 22 15 17 14 22 13 15 16 15 15 15 13 22 17 17 16 22 13 18 17.25 16.5 13.5 10.5 515.7 555.3 555.3 595.0 674.3 571.7 530.8 898.3 612.5 694.2 661.5 1039.5 614.3 708.8 756.0 721.3 721.3 721.3 625.1 1057.8 780.6 780.6 734.7 1010.2 596.9 3991.5 3825.2 3658.9 2993.6 2328.4 With service level of 97% and lead time of 2 weeks: Avg. Inventory Level = 798 With service level of 97% and lead time of 0.5 week: Avg. Inventory Level = 748 Percentage reduction in inventory level (approx.) = 6.27% So, by decreasing lead time from 2 weeks to 1/2 week, the company is expected to save 6.3% approximately in average inventory level. Carrying + Ordering Cost 1808.5 1808.5 1808.5 1808.5 1808.5 TC 9050.7 9261.2 8991.2 8353.6 7916.1
  • 6. LA Warehouse Table 1: Historical Data Week 1 Atlanta 33 Boston 26 Chicago 44 Dallas 27 LA 32 Total 162 2 45 35 34 42 43 199 3 37 41 22 35 54 189 4 38 40 55 40 40 213 5 55 46 48 51 46 246 6 30 48 72 64 74 288 7 18 55 62 70 40 245 8 58 18 28 65 35 204 9 47 62 27 55 45 236 10 37 44 95 43 38 257 11 23 30 35 38 48 174 12 55 45 45 47 56 248 Table 2: Current transportation costs per unit Warehouse Inbound Outbound Atlanta 12 13 Boston 11.5 13 Chicago 11 13 Dallas 9 13 LA 7 13 Table 3: Transportation costs per unit in centralized system Warehouse Atlanta Boston Chicago Dallas LA Atlanta 13 14 14 15 17 Boston Chicago Dallas LA 14 14 15 17 13 22 15 17 22 13 15 16 15 15 13 22 17 16 22 13 Regions Avg. Demand STD CV Q Inbound per Unit Outbound per unit Avg. Inbound Cost Avg. Outbound Cost Avg. Inv. Level (SR = 90% and L=2) Carrying Cost Ordering cost TC Atlanta Boston Chicago Dallas LA 39.7 40.8 47.3 48.1 45.9 12.8 12.2 21.2 13.2 11.3 0.32 0.30 0.45 0.27 0.25 590.8 599.4 644.8 650.5 635.7 12 11.5 11 9 7 13 13 13 13 13 476.0 469.6 519.8 432.8 321.4 515.7 530.8 614.3 625.1 596.9 397.8 403.5 455.2 445.3 430.2 497.3 504.4 569.0 556.7 537.7 369.3 374.7 403.0 406.6 397.3 1858.2 1879.5 2106.1 2021.1 1853.4 221.8 37.5 0.17 1396.9 748.3 935.4 873.1 Centralized Service Level 97% and lead time 0.5 week Centralized Atlanta Boston Chicago Dallas LA Atlanta Boston Chicago Dallas LA Inbound Atlanta Boston Chicago Dallas LA Inbound 13 14 14 15 17 14 13 22 15 17 14 22 13 15 16 15 15 15 13 22 17 17 16 22 13 18 17.25 16.5 13.5 10.5 515.7 555.3 555.3 595.0 674.3 571.7 530.8 898.3 612.5 694.2 661.5 1039.5 614.3 708.8 756.0 721.3 721.3 721.3 625.1 1057.8 780.6 780.6 734.7 1010.2 596.9 3991.5 3825.2 3658.9 2993.6 2328.4 LA Warehouse: Increase in cost when lead time is changed from 2 to 0.5 week = 9.02% If we use this strategy, we will be able to save only 6.3% of average inventory level by increasing 9% of total cost ($707) at LA warehouse. Hence, this strategy does not seem too attractive to be applied. Carrying + Ordering Cost 1808.5 1808.5 1808.5 1808.5 1808.5 TC 9050.7 9261.2 8991.2 8353.6 7916.1