The document discusses the township's plans to increase sustainability. It outlines corporate initiatives to inventory greenhouse gas emissions, set reduction targets in accordance with provincial climate action goals, and develop sustainability charters and policies. It also describes engineering projects to improve energy efficiency in facilities, transition the vehicle fleet to more fuel efficient and alternative fuel vehicles, enhance active transportation infrastructure, increase waste diversion, and implement asset management strategies. The overall aim is to reduce emissions and environmental impacts through a combination of corporate actions and community initiatives.
4. CORPORATE PLANS
Corporate GHG Emissions Inventory (2004)
5,161 Tonnes in 2000
Buildings 43%, Fleet 36%
BC Climate Action Charter (2007)
Goal of Carbon Neutrality by 2012
5. CORPORATE PLANS cont’d
Corporate GHG Emissions Reduction Plan
10% Reduction (2000 levels) by 2012
6. CORPORATE PLANS cont’d
Corporate GHG Emissions Reduction Plan
10% Reduction (2000 levels) by 2012
Community Energy Emissions Plan (CEEP)
(2011 completion)
2009 Community Emissions – 962,590 T
CEEP seeks to reduce GHG emissions through
number of strategies and actions
Target reductions to be established for 2020 and 2030
Combination of TOL Actions / Resident Actions / Higher
Governments
7. CORPORATE PLANS cont’d
TOL Sustainability Charter
Vision
Principles
Goals
Social
Economic
Environmental
Policy Framework
11. FACILITIES
Civic Facility
LEED Silver (first Municipal Hall in Canada)
Geo-exchange (45-250’ deep wells)
Low flow fixtures
Waste & Recycling Collection (inc. food waste)
12. FACILITIES
Civic Facility
LEED Silver (first Municipal Hall in Canada)
Geo-exchange (45-250’ deep wells)
Low flow fixtures
Waste & Recycling Collection (inc. food waste)
Aldergrove Water Treatment plant
Heat recovery from ground water
95% Reduction in natural gas usage
$319 opposed to $6,500 for heat
Cost Approx. $158,000, payback 7 Years
13. FACILITIES cont’d
ENERGY EFFICIENCY INTITIATIVES
Contributions from
BC Hydro PowerSmart
Climate Action Revenue Incentive Program
General Revenue
14. FACILITIES cont’d
ENERGY EFFICIENCY INTITIATIVES
Contributions from
BC Hydro PowerSmart
Climate Action Revenue Incentive Program
General Revenue
Typical Projects
WC Blair Boiler Replacement
Low Flow and Automatic Water Fixtures
Lighting – LED and Flourescent
15. FACILITIES cont’d
ENERGY EFFICIENCY INTITIATIVES
Contributions from
BC Hydro PowerSmart
Climate Action Revenue Incentive Program
General Revenue
Typical Projects
WC Blair Boiler Replacement
Low Flow and Automatic Water Fixtures
Lighting – LED and Fluorescent
Use Grant Monies for EEI Projects – seed
funds rather than going to “big pot”
16. Biodiesel
Full fleet and equipment
B20 blend
Plan to pilot higher blends
in the future
FLEET
17. Using fuel efficient, appropriately sized
compact vehicles
FLEET cont’d
The Township has
purchased two
SmartCars, three hybrid
Honda Civics and three
hybrid Ford Escapes
18. FLEET cont’d
E3 Fleet
Only the Third Municipality in Canada to Earn
Rating – Silver
Developed Action Plan
Training
Awareness
Revised purchasing
Revised Operations and Maintenance Programs
19. FLEET cont’d
Anti-idling Strategy
One Minute Policy
Awareness campaign focused on
staff training and posters
Clear vinyl window decals and
bumper stickers on all units
20. FLEET cont’d
E3 Program Summary;
Median fleet fuel efficiency up 8.5%
Units with low utilization down 10%
Units reporting high fuel consumption down
52%
Overall GHG intensity down 6.1%
25. TRANSPORTATION cont’d
Pedestrian Improvement Program
Goal to enhance walkability
Improved connectivity
Sidewalks and crosswalks
Neighbourhood Planning
Transportation Component to include multi-
modal transportation options
Bike Lanes, Trails, Greenways, Traffic Calming,
Pedestrians
Curreently updating Aldergrove Core Plan, Central
Gordon and Latimar Plans
26. SOLID WASTE
Integrated Solid Waste Management Plan
Implementation – Metro Vancouver
Organics Collection (starting April 2011)
Increased Diversion
Recycling
Use of CBSM to encourage participation
27. SOLID WASTE
Integrated Solid Waste Management Plan
Implementation – Metro Vancouver
Organics Collection (starting April 2011)
Increased Diversion
Recycling
Use of CBSM to encourage participation
Working to Waste Reduction (not to Zero
Waste perhaps)
28. UTILITIES
Water
Water Management Plan
Quality – agriculture, well management
Quantity – conservation
Education
29. UTILITIES cont’d
Water
Water Management Plan
Quality – agriculture, well management
Quantity – conservation
Education
Sanitary Sewer
Inflow and Infiltration Reduction Program
30. UTILITIES
Water
Water Management Plan
Quality – agriculture, well management
Quantity – conservation
Education
Sanitary Sewer
Inflow and Infiltration Reduction Program
Drainage
Water Quality
Integrated Storm Water Management Plans
33. ASSET MGMT cont’d
Challenges
Balance aging Infrastructure with Demands from
New Growth
Stopping Growth or Ignoring Aging I/F is not a
Preferred Option
Temptation to defer / avoid Maintenance
Securing Sustainable Funding
34. ASSET MGMT cont’d
Seven Steps to Asset Management
What do we
own?
What is it
worth?
What is its
condition?
What needs
to be done?
When do we
need to do
it?
What is the
cost impact?
How will we
pay for it?
35. ASSET MGMT cont’d
Seven Steps to Asset Management
What do we
own?
What is it
worth?
What is its
condition?
What needs
to be done?
When do we
need to do
it?
What is the
cost impact?
How will we
pay for it?
TOL – 2010
36. ASSET MGMT cont’d
Infrastructure has a limited life and we need
to plan for its renewal / replacement
37. ASSET MGMT cont’d
Goals?
Sustainable Funding
Deliver sustainable and affordable levels of
service to preserve asset value
Manage existing I/F and plan effectively for
renewal / replacement