Former NAS Moffett Field    BRAC
                            PMO WEST




Petroleum Program Update



        Wilson Doctor
     Navy Project Manager

       March 13, 2008
        RAB Meeting
Presentation Overview   BRAC
                                        PMO WEST



• Background

• Petroleum projects
   – Buildings 29 & 55 pipelines
   – Additional Building 29 pipelines
   – Building 55 sump
   – Site 14 South




                                            2
Background           BRAC
                                        PMO WEST




• 76 petroleum sites - closed to date


• 54 petroleum sites - in progress




                                            3
Building 29 & 55 Pipelines              BRAC
                                                       PMO WEST


• Two inactive pipelines not previously investigated

• Building 29 pipelines
   – Aviation gasoline
   – Near Hangar 1
   – Inactive since 1950s
   – 900 ft, 2-inch and 3-inch diameter, metal

• Building 55 pipeline
   – Boiler fuel
   – Near Hangars 2 & 3
   – Inactive since at least 1994
   – 1400 ft, 3-inch diameter, metal

                                                           4
Building 29 & 55 Pipelines              BRAC
                                                         PMO WEST




• Collected soil samples along pipelines every 20 feet

• Fieldwork completed

• Draft report




                                                             5
Building 29 & 55 Pipelines   BRAC
                             PMO WEST




                                 6
Additional Building 29 Pipelines   BRAC
                                               PMO WEST




• Background
   – 3-inch pipeline and 8-inch pipeline
      • 4,880 ft and 3,640 ft
   – Installed in 1930s and 1940s
   – Inactive since 1960s

• Sampled soil every 50 feet

• Fieldwork completed in November 2007

• Preparing draft report



                                                   7
Additional Building 29 Pipelines   BRAC
                                   PMO WEST




                                       8
Building 55 Sump                    BRAC
                                                        PMO WEST




• Sump installed during the Building 55 pipeline investigation
  in 2005

• 10-foot deep PVC pipe

• Removed sump and collected soil samples February 2008

• Four quarters of groundwater monitoring

• Prepare draft report



                                                             9
Building 55 Sump   BRAC
                   PMO WEST




                      10
Site 14 South Background   BRAC
                                            PMO WEST




• Fuel station

• Site covers about 1 acre

• Two 5,000-gal USTs (Tanks 19 & 20)
   – Removed in 1986
   – Contained gasoline and diesel




                                               11
Site 14 South Background   BRAC
                           PMO WEST




                              12
Site 14 South Background              BRAC
                                                     PMO WEST




• Previous Investigations:

   – Initial soil and groundwater (GW) assessment began
     1987

   – Periodic GW monitoring mid-1990s

   – Site assessment activities 2003




                                                          13
Site 14 South Background              BRAC
                                                     PMO WEST



• Previous investigations (continued):

   – Chemical oxidation January 2005

   – Quarterly groundwater monitoring 2005 to 2006
      • levels decreased initially
      • levels returned

• Previous investigation findings:
   – No free product observed at the site
   – Stable contaminant plume




                                                        14
Site 14 South                 BRAC
                                                       PMO WEST




Current investigation:

• Final Work Plan February 2008
   – Additional site characterization
   – Install seven additional groundwater monitoring wells
   – Four quarters groundwater sampling
      • New wells and nine existing wells
   – Evaluate data
   – Potential tank testing




                                                             15
Site 14 South   BRAC
                PMO WEST




                   16
Summary        BRAC
                                        PMO WEST




• Moffett petroleum program ongoing

• 76 petroleum sites - closed to date


• 54 petroleum sites - in progress




                                           17
Questions?   BRAC
             PMO WEST




                18

Mais conteúdo relacionado

Destaque (7)

determination of Cloud point
determination of Cloud point determination of Cloud point
determination of Cloud point
 
Specific Gravity, and API Gravity for petroleum products
Specific Gravity, and API Gravity for petroleum productsSpecific Gravity, and API Gravity for petroleum products
Specific Gravity, and API Gravity for petroleum products
 
Laboratory role in petroleum industry
Laboratory role  in petroleum industryLaboratory role  in petroleum industry
Laboratory role in petroleum industry
 
Coal and petroleum
Coal and petroleumCoal and petroleum
Coal and petroleum
 
Petroleum Properties - Density and relative density
Petroleum Properties - Density and relative densityPetroleum Properties - Density and relative density
Petroleum Properties - Density and relative density
 
Aniline point for petroleum productes
Aniline point for petroleum productesAniline point for petroleum productes
Aniline point for petroleum productes
 
Petroleum
PetroleumPetroleum
Petroleum
 

Mais de Steve Williams

Mais de Steve Williams (20)

RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community Presentation
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory Board
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management Plan
 
EPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source InvestigationEPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source Investigation
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume Assessment
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
 

Último

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Último (20)

Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 

Petroleum Program Update

  • 1. Former NAS Moffett Field BRAC PMO WEST Petroleum Program Update Wilson Doctor Navy Project Manager March 13, 2008 RAB Meeting
  • 2. Presentation Overview BRAC PMO WEST • Background • Petroleum projects – Buildings 29 & 55 pipelines – Additional Building 29 pipelines – Building 55 sump – Site 14 South 2
  • 3. Background BRAC PMO WEST • 76 petroleum sites - closed to date • 54 petroleum sites - in progress 3
  • 4. Building 29 & 55 Pipelines BRAC PMO WEST • Two inactive pipelines not previously investigated • Building 29 pipelines – Aviation gasoline – Near Hangar 1 – Inactive since 1950s – 900 ft, 2-inch and 3-inch diameter, metal • Building 55 pipeline – Boiler fuel – Near Hangars 2 & 3 – Inactive since at least 1994 – 1400 ft, 3-inch diameter, metal 4
  • 5. Building 29 & 55 Pipelines BRAC PMO WEST • Collected soil samples along pipelines every 20 feet • Fieldwork completed • Draft report 5
  • 6. Building 29 & 55 Pipelines BRAC PMO WEST 6
  • 7. Additional Building 29 Pipelines BRAC PMO WEST • Background – 3-inch pipeline and 8-inch pipeline • 4,880 ft and 3,640 ft – Installed in 1930s and 1940s – Inactive since 1960s • Sampled soil every 50 feet • Fieldwork completed in November 2007 • Preparing draft report 7
  • 8. Additional Building 29 Pipelines BRAC PMO WEST 8
  • 9. Building 55 Sump BRAC PMO WEST • Sump installed during the Building 55 pipeline investigation in 2005 • 10-foot deep PVC pipe • Removed sump and collected soil samples February 2008 • Four quarters of groundwater monitoring • Prepare draft report 9
  • 10. Building 55 Sump BRAC PMO WEST 10
  • 11. Site 14 South Background BRAC PMO WEST • Fuel station • Site covers about 1 acre • Two 5,000-gal USTs (Tanks 19 & 20) – Removed in 1986 – Contained gasoline and diesel 11
  • 12. Site 14 South Background BRAC PMO WEST 12
  • 13. Site 14 South Background BRAC PMO WEST • Previous Investigations: – Initial soil and groundwater (GW) assessment began 1987 – Periodic GW monitoring mid-1990s – Site assessment activities 2003 13
  • 14. Site 14 South Background BRAC PMO WEST • Previous investigations (continued): – Chemical oxidation January 2005 – Quarterly groundwater monitoring 2005 to 2006 • levels decreased initially • levels returned • Previous investigation findings: – No free product observed at the site – Stable contaminant plume 14
  • 15. Site 14 South BRAC PMO WEST Current investigation: • Final Work Plan February 2008 – Additional site characterization – Install seven additional groundwater monitoring wells – Four quarters groundwater sampling • New wells and nine existing wells – Evaluate data – Potential tank testing 15
  • 16. Site 14 South BRAC PMO WEST 16
  • 17. Summary BRAC PMO WEST • Moffett petroleum program ongoing • 76 petroleum sites - closed to date • 54 petroleum sites - in progress 17
  • 18. Questions? BRAC PMO WEST 18