Middlefield-Ellis-Whisman (MEW)
        Superfund Study Area
        S     f     S


             EPA Update:
Site-Wide Groundwater Feasibility Study
                                y     y


NAS M ff tt Fi ld R t
    Moffett Field Restoration Advisory
                         ti   Ad i
                Board


              May 12, 2011
2
Purpose of Site-wide Groundwater
Feasibility Study

Evaluate alternative technologies to
 accelerate groundwater cleanup

 Current groundwater extraction &
  treatment system decreasing in
  efficiency

 Minimize the need for vapor mitigation
  by d i
  b reducing groundwater concentrations
                  d t          t ti
Key Feasibility Study Inputs

 Pilot tests

 Community Criteria and Suggested
  Strategy Paper
Community Criteria and Suggested
Strategy Paper
1) FS and Remedy Selection should focus on:

 Areas with high mass
 Areas that continue to act as sources
 A
  Areas of th plume that encroach on residential
         f the l     th t         h     id ti l
    neighborhoods, schools and other sensitive uses
   Reduce the need to long-term vapor intrusion mitigation
                          g         p                g
   Enable reasonable future reuse of property

2) Incorporate results from optimization evaluations

3) Consider specific technologies
Scope of Groundwater
Cleanup

• Large disperse
 commingled plume with
 multiple source areas

• FS strategy treatment of
 source & high conc. Areas

• Range of concentrations
 within plume

• Cleanup timeframes key
 component of FS
EPA Screening of Technologies
In Situ Treatment Technologies:
  In Situ Bioremediation, In Situ Chemical Oxidation (ISCO),
  and Abiotic Dechlorination using Zero Valent Iron (ZVI)

Extraction, Removal, Treatment and Disposal Technologies –
           ,        ,                   p              g
 – Physical Treatment with Air Sparging
 – Groundwater Extraction and Treatment
 –M li h
    Multiphase Extraction
               E      i
 – In Situ Thermal
 – Removal by Excavation
Barriers – Permeable reactive barriers, phytoremediation
Monitored Natural Attenuation
In Situ Treatment Technologies
• Evaluating In Situ Bioremediation, In Situ Chemical Oxidation
 (ISCO), and Abiotic Dechlorination using Zero valent iron

• Technologies rely on direct contact or create conditions to
 degrade contaminants.

• Typically used for hot spot treatment/limited area.

• Challenging to distribute material into heterogeneous
 subsurface. Multiple injections typically needed.

• Technologies piloted at the site with varying success.
Extraction, Removal, Treatment and
Disposal Technologies

  Air Sparging
  Air injected into sat rated
                    saturated
  zone at high pressure; strips
  solvents, which are extracted.

  In Situ Thermal
  Uses electrodes or heaters
  attached to power supplies to
  heat subsurface and
  volatilize VOCs; vapor
  collection.

  Multiphase Extraction
  Uses a high vacuum system
  to extract soil vapor and
  groundwater simultaneously.
Barriers
                                   Continuous
Permeable Reactive Barriers        Wall

• Intercepts and treats
  contaminants as groundwater
  flows through reactive barrier

• Common reactive media ZVI;

• C
  Construction – Depths
 generally less than 100 feet
                                                Funnel and
• Lifespan (15 to 25 years)                     Gate System
                                                (need to add
                                                photo)

• Issues – fouling/movement
                 g
 around wall
Monitored Natural Attenuation

 – Relies on natural processes to cleanup pollution in
  soil and groundwater.
           groundwater

 – Conditions monitored to ensure that contaminants are
  degrading and not migrating.

 – Criteria to demonstrate MNA:
   • Plume stability
   • Review of temporal trends in well
   • Geochemical and biological parameters indicate conditions
     supporting degradation


 – Component of alternative
Technologies Retained

1. Groundwater Extraction and Treatment
2. In Sit R d T h l i (i l di I Sit
2 I Situ Redox Technologies (including In Situ
   Bioremediation, In Situ Chemical Oxidation and Zero
   Valent Iron Injections) to treat high conc. areas
                 j       )            g
3. Permeable Reactive Barriers (PRB)
4. Monitored Natural Attenuation (as component of an
   alternative)
    lt    ti )
Projected VOC Plume – A Aquifer (0 to
45 feet bgs)


     1992           2009          2019
EPA Working Alternatives – Shallow A Aquifer
Alt. 1    No Action
Alt.      Extraction & Treatment (Existing & Optimized)
2A/2B
Alt. 3    Extraction & Treatment (Optimized), Monitored Natural Attenuation [MNA]*


Alt. 4    In Situ Redox (High Conc. Areas > 1,000 ppb)
          Optimized Extraction and Treatment (Remaining Areas), MNA*

Alt. 5A   In Situ Redox (High Conc. Areas > 1,000 ppb)
                        ( g                  ,    pp )
          Permeable Reactive Barriers (PRB)(Treatment downgradient of high
          concentrations areas)
          Optimized Extraction and Treatment (Remaining Areas), MNA*
Alt. 5B   Same as Alt. 5A except PRB would be replaced by barrier wells.

Notes:    In Situ Redox = in situ bioremediation, in situ chemical oxidation, or zero
          valent i
             l t iron i j ti
                      injections
          *MNA = MNA where demonstrated
Conceptual Layout
Optimized Pump and Treat


  Nort                 Sout
  h of                 h of
  101                  101
Conceptual Layout
In Situ Redox in A Aquifer

• In Situ Redox in high
 concentrations areas
        t ti
 >1,000 ppb

• Optimized pump &
 treat for remaining
 areas of plume until
 MNA demonstrated
Conceptual Layout
with PRBs in A Aquifer

• PRBs downgradient of
 high
 hi h concentration
              t ti
 areas to treat residual
 contamination

• Modeling to determine
 number of PRBs

• Type of PRBs to be
 determined
Projected VOC Plume – B1/A2 Aquifer
(50 to 75 feet bgs)


       1992       2009        2019
VOC Plume (B2 Aquifer 75 to 110 feet bgs)
EPA Work Alternatives – Deeper Aquifer
Alt. 1    No Action

Alt.      Extraction & Treatment (Existing & Optimized)
2A/2B
Alt. 3    Extraction & Treatment (Optimized), Monitored Natural Attenuation [MNA]*
Alt. 4    Facility-Specific Source Areas
          In Situ Redox (Source Areas)
          Optimized Extraction and Treatment (Remaining Areas), MNA*

          Regional Plume Areas
          Optimized Extraction & Treatment, MNA*
Alt. 5A   Same as Alt. 4 except PRBs would be included to treat residual
          contamination from facility-specific source and Regional Plume Areas
                                    y p                     g

Alt. 5B   Same as Alt. 5A except PRBs would be replaced by barrier wells.

Notes:    In Situ Redox = in situ bioremediation, in situ chemical oxidation, or zero
          valent iron injections
          *MNA = MNA where demonstrated
Conceptual Layout with
PRBs in A2/B1 Aquifer

• PRBs more difficult to   DRAFT FOR
                           DISCUSSION ONLY

 install t deeper depths
 i t ll at d      d th     ALTERNATIVE 5A
                           CONCEPTUAL LAYOUT
                           B1/A2 Zone


                           PRBs Downgradient of
                           High Concentration Areas


• PRBs extended from       Optimized Extraction and
                           Treatment in Remaining
                           Areas


 A Aquifer in areas of           Regional Plume PRB

                           NOTES:

 elevated concentrations
  l   t d         t ti     1) PRB reactive media
                              may consist of
                              zero-valent iron,
                              chelators, sorbents,
                              or microbes
Groundwater Feasibility Study Challenges

• Scale of cleanup.

• Difficult to implement in situ technologies in developed
 areas.

• Geology & matrix diffusion effects limit ability to
 accelerate cleanup
            cleanup.

• Potential recontamination of areas treated within different
 portions of the plume.
     i     f h l

• Focusing on what we can do.
         g
EPA Site-wide Groundwater Feasibility
Study - Tentative Schedule

• Summer 2011 – Draft Feasibility Study Report for review
• F ll 2011 R
  Fall 2011 – Remedy Review Board
                   d R i B d
• Winter 2012 – Final Feasibility Study Report, Proposed Plan for 
  public review
  public review
• Spring 2012  – Public Meeting and Public Comment Period
• Fall 2012 – Groundwater ROD Amendment

**Community involvement activities throughout the process 
Community Advisory Board Meetings – February 9, March 31     
RAB Meetings – Regular Updates on Vapor Intrusion and Groundwater
Property Owner Meetings – February 15 
Upcoming Meetings – Property Owners Meeting – May 24
Discussion/Questions
Contact Information

For More Information

www.epa.gov/region9/mew
www.epa.gov/region9/moffettfield

Penny Reddy
Groundwater Project Manager
EPA Region 9 Superfund Division
415.972.3108
Reddy.Penny@epa.gov
Reddy Penny@epa gov
26
EPA Working Alternatives – Shallow A
Aquifer
Alt. 1 (No Action)          Description of Alternative
Alt. 2A (P&T/Slurry Wall)
        (         y     )   Existing Remedy
                                   g      y
Alt. 2B (P&T/Slurry Wall)   Existing Remedy Optimized for mass removal
Alt. 3 (P&T/Slurry Wall)    Existing Remedy Optimized for mass removal,
                            Monitored Natural Attenuation (MNA)*
                                                          (MNA)
Alt. 4                      Facility Specific Source Areas
                            In Situ Redox (High Conc. Areas > 1,000 ppb)
                            In Situ Redox or Optimized P&T (Med. & Low Conc
                                                           (Med          Conc.
                            Area), MNA*

                            Regional Plume
                            In Situ Redox – High Conc. Areas (>1,000 ppb)
                            Optimized P&T (Remaining Areas), MNA*
Notes:                      In Situ Redox = in situ bioremediation, in situ chemical
                            oxidation, or zero valent iron injections
                            *MNA = MNA where demonstrated
Regional Groundwater Progress Update
• Semi-annual water level measurements of nearly 1000
    wells (Black Thursday)
•   Annual sampling of approximately 500 wells
•   Approximately 100 extraction wells pump over 450 gpm
•   Over 4.5 billion gallons groundwater treated through
    2009
•   Over 95,000 pounds of VOCs removed through 2009
MEW / NAS Moffett Field Site Background

• ROD Signed in 1989 to address soil and groundwater
• Enforcement – Admin Order Consent Decree Federal
                       Order,          Decree,
    Facility Agreement
•   Soil remedy (excavation and/or soil vapor extraction)
•   Groundwater remedy - slurry walls, seal conduits, and
    G      d            d    l      ll     l    d i      d
    pump and treat
•   Hydrogeology – interbedded sands, silts, clays (Bay mud)
     y     g    gy                      ,    ,  y ( y       )
•   Shallow groundwater – 5 to 20 feet bgs
•   Current TCE in shallow groundwater
    up to 40,000 ppb inside slurry walls
          40 000
•   Groundwater not used for potable use, but being cleaned
    up to its beneficial use
VOC Plume (B2 Aquifer 75 to 110 feet bgs)
B1/A2 Aquifer   B2 Aquifer
Conceptual Layout
with PRBs in A Aquifer

• PRBs downgradient of
 high concentration areas
 to treat residual
 contamination

• Modeling to determine
 number of PRBs

• Type of PRBs to be
 determined
Draft Conceptual Layout
In Situ Redox in A2/B1Aquifer

• Focusing treatment on Facility-
 Specific Source Areas and
 High Concentration

Mais conteúdo relacionado

Mais procurados

LID and Green Infrastructure
LID and Green InfrastructureLID and Green Infrastructure
LID and Green InfrastructureGreg Gearheart
 
Contaminated land technical_manual_june_2012
Contaminated land technical_manual_june_2012Contaminated land technical_manual_june_2012
Contaminated land technical_manual_june_2012Khaled Tarawneh
 
In-Situ Contaminant Stabilization and Brownfield Redevelopment
In-Situ Contaminant Stabilization and Brownfield RedevelopmentIn-Situ Contaminant Stabilization and Brownfield Redevelopment
In-Situ Contaminant Stabilization and Brownfield RedevelopmentDavid Bausmith
 
2011 12 13 Periconi Day Cle Powerpoint
2011 12 13 Periconi Day Cle Powerpoint2011 12 13 Periconi Day Cle Powerpoint
2011 12 13 Periconi Day Cle PowerpointAndrewDLent
 
Land Contamination Management & Site Remediation
Land Contamination Management & Site RemediationLand Contamination Management & Site Remediation
Land Contamination Management & Site RemediationManas Orpe
 
Remediation, Clean-up and other non-NEPM concepts
Remediation, Clean-up and other non-NEPM conceptsRemediation, Clean-up and other non-NEPM concepts
Remediation, Clean-up and other non-NEPM conceptsPeter Gringinger
 
Design build strategies to optimize cost effectiveness in aml v2
Design build strategies to optimize cost effectiveness in aml v2Design build strategies to optimize cost effectiveness in aml v2
Design build strategies to optimize cost effectiveness in aml v2Angelshoot
 
Zebra/CDM/NJDEP HAL Triad Presentation
Zebra/CDM/NJDEP HAL Triad PresentationZebra/CDM/NJDEP HAL Triad Presentation
Zebra/CDM/NJDEP HAL Triad PresentationZEBRA Environmental
 
Hangar One Update to the Moffett RAB
Hangar One Update to the Moffett RABHangar One Update to the Moffett RAB
Hangar One Update to the Moffett RABSteve Williams
 
Beacon Presentation EPA NARPM Annual Training
Beacon Presentation EPA NARPM Annual TrainingBeacon Presentation EPA NARPM Annual Training
Beacon Presentation EPA NARPM Annual TrainingHarryONeill
 
Kent Peterson Gulf Coast Green 2010
Kent Peterson Gulf Coast Green 2010Kent Peterson Gulf Coast Green 2010
Kent Peterson Gulf Coast Green 2010Hayley Pallister
 
Greenbass, regulation of sequenced aeration for activated sludge
Greenbass, regulation of sequenced aeration for activated sludgeGreenbass, regulation of sequenced aeration for activated sludge
Greenbass, regulation of sequenced aeration for activated sludgeDegrémont
 
agri_tdx_igarss2011_hajnsek_comp_final.pdf
agri_tdx_igarss2011_hajnsek_comp_final.pdfagri_tdx_igarss2011_hajnsek_comp_final.pdf
agri_tdx_igarss2011_hajnsek_comp_final.pdfgrssieee
 
Peatland management impacts on flood regulation
Peatland management impacts on flood regulationPeatland management impacts on flood regulation
Peatland management impacts on flood regulationAberdeen CES
 
Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25retzcanter
 

Mais procurados (18)

LID and Green Infrastructure
LID and Green InfrastructureLID and Green Infrastructure
LID and Green Infrastructure
 
Contaminated land technical_manual_june_2012
Contaminated land technical_manual_june_2012Contaminated land technical_manual_june_2012
Contaminated land technical_manual_june_2012
 
21 Design Work Shop 7.30.2009
21 Design Work Shop 7.30.200921 Design Work Shop 7.30.2009
21 Design Work Shop 7.30.2009
 
In-Situ Contaminant Stabilization and Brownfield Redevelopment
In-Situ Contaminant Stabilization and Brownfield RedevelopmentIn-Situ Contaminant Stabilization and Brownfield Redevelopment
In-Situ Contaminant Stabilization and Brownfield Redevelopment
 
2011 12 13 Periconi Day Cle Powerpoint
2011 12 13 Periconi Day Cle Powerpoint2011 12 13 Periconi Day Cle Powerpoint
2011 12 13 Periconi Day Cle Powerpoint
 
Land Contamination Management & Site Remediation
Land Contamination Management & Site RemediationLand Contamination Management & Site Remediation
Land Contamination Management & Site Remediation
 
Kestrel pres feb 13, 13
Kestrel pres feb 13, 13Kestrel pres feb 13, 13
Kestrel pres feb 13, 13
 
Remediation, Clean-up and other non-NEPM concepts
Remediation, Clean-up and other non-NEPM conceptsRemediation, Clean-up and other non-NEPM concepts
Remediation, Clean-up and other non-NEPM concepts
 
Design build strategies to optimize cost effectiveness in aml v2
Design build strategies to optimize cost effectiveness in aml v2Design build strategies to optimize cost effectiveness in aml v2
Design build strategies to optimize cost effectiveness in aml v2
 
Zebra/CDM/NJDEP HAL Triad Presentation
Zebra/CDM/NJDEP HAL Triad PresentationZebra/CDM/NJDEP HAL Triad Presentation
Zebra/CDM/NJDEP HAL Triad Presentation
 
Hangar One Update to the Moffett RAB
Hangar One Update to the Moffett RABHangar One Update to the Moffett RAB
Hangar One Update to the Moffett RAB
 
Beacon Presentation EPA NARPM Annual Training
Beacon Presentation EPA NARPM Annual TrainingBeacon Presentation EPA NARPM Annual Training
Beacon Presentation EPA NARPM Annual Training
 
Kent Peterson Gulf Coast Green 2010
Kent Peterson Gulf Coast Green 2010Kent Peterson Gulf Coast Green 2010
Kent Peterson Gulf Coast Green 2010
 
Greenbass, regulation of sequenced aeration for activated sludge
Greenbass, regulation of sequenced aeration for activated sludgeGreenbass, regulation of sequenced aeration for activated sludge
Greenbass, regulation of sequenced aeration for activated sludge
 
agri_tdx_igarss2011_hajnsek_comp_final.pdf
agri_tdx_igarss2011_hajnsek_comp_final.pdfagri_tdx_igarss2011_hajnsek_comp_final.pdf
agri_tdx_igarss2011_hajnsek_comp_final.pdf
 
Insight into Innovative Decentralized Wastewater Technologies
Insight into Innovative Decentralized Wastewater TechnologiesInsight into Innovative Decentralized Wastewater Technologies
Insight into Innovative Decentralized Wastewater Technologies
 
Peatland management impacts on flood regulation
Peatland management impacts on flood regulationPeatland management impacts on flood regulation
Peatland management impacts on flood regulation
 
Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25Marengo lid symposium_2011-09-25
Marengo lid symposium_2011-09-25
 

Destaque

Moffett Restoration Advisory Board EPA Vapor Intrusion Update
Moffett Restoration Advisory Board EPA Vapor Intrusion UpdateMoffett Restoration Advisory Board EPA Vapor Intrusion Update
Moffett Restoration Advisory Board EPA Vapor Intrusion UpdateSteve Williams
 
Moffett RAB Agenda for May 12, 2011
Moffett RAB Agenda for May 12, 2011Moffett RAB Agenda for May 12, 2011
Moffett RAB Agenda for May 12, 2011Steve Williams
 
Windows phone7 By Subodh
Windows phone7 By Subodh Windows phone7 By Subodh
Windows phone7 By Subodh Prashant Singh
 
Video techniques in the classroom
Video techniques in the classroom Video techniques in the classroom
Video techniques in the classroom Dean Shareski
 
Moffett Restoration Advisory Board Hangar One Update July 14, 2011
Moffett Restoration Advisory Board Hangar One Update July 14, 2011Moffett Restoration Advisory Board Hangar One Update July 14, 2011
Moffett Restoration Advisory Board Hangar One Update July 14, 2011Steve Williams
 
Moffett Restoration Advisory Board Hangar One Re-Siding Project NASA OIG Repo...
Moffett Restoration Advisory Board Hangar One Re-Siding Project NASA OIG Repo...Moffett Restoration Advisory Board Hangar One Re-Siding Project NASA OIG Repo...
Moffett Restoration Advisory Board Hangar One Re-Siding Project NASA OIG Repo...Steve Williams
 

Destaque (6)

Moffett Restoration Advisory Board EPA Vapor Intrusion Update
Moffett Restoration Advisory Board EPA Vapor Intrusion UpdateMoffett Restoration Advisory Board EPA Vapor Intrusion Update
Moffett Restoration Advisory Board EPA Vapor Intrusion Update
 
Moffett RAB Agenda for May 12, 2011
Moffett RAB Agenda for May 12, 2011Moffett RAB Agenda for May 12, 2011
Moffett RAB Agenda for May 12, 2011
 
Windows phone7 By Subodh
Windows phone7 By Subodh Windows phone7 By Subodh
Windows phone7 By Subodh
 
Video techniques in the classroom
Video techniques in the classroom Video techniques in the classroom
Video techniques in the classroom
 
Moffett Restoration Advisory Board Hangar One Update July 14, 2011
Moffett Restoration Advisory Board Hangar One Update July 14, 2011Moffett Restoration Advisory Board Hangar One Update July 14, 2011
Moffett Restoration Advisory Board Hangar One Update July 14, 2011
 
Moffett Restoration Advisory Board Hangar One Re-Siding Project NASA OIG Repo...
Moffett Restoration Advisory Board Hangar One Re-Siding Project NASA OIG Repo...Moffett Restoration Advisory Board Hangar One Re-Siding Project NASA OIG Repo...
Moffett Restoration Advisory Board Hangar One Re-Siding Project NASA OIG Repo...
 

Semelhante a Moffett/Ellis/Whisman Presentation to the Moffett RAB

Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateMoffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateSteve Williams
 
Technical calculations for the biological treatment plant
Technical calculations for the biological treatment plantTechnical calculations for the biological treatment plant
Technical calculations for the biological treatment plantAlex Tagbo
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Fu Michael Justin
 
APR 23 10 LIVING WITH LID [Compatibility Mode]
APR 23 10 LIVING WITH LID [Compatibility Mode]APR 23 10 LIVING WITH LID [Compatibility Mode]
APR 23 10 LIVING WITH LID [Compatibility Mode]Mike Campbell, AICP, CPSWQ
 
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Michael Hewitt, GISP
 
Collie Hub presentation groundwater issues
Collie Hub presentation groundwater issuesCollie Hub presentation groundwater issues
Collie Hub presentation groundwater issuesGlobal CCS Institute
 
Successful ISCR-Enhanced Bioremediation - Summer 2010
Successful ISCR-Enhanced Bioremediation - Summer 2010Successful ISCR-Enhanced Bioremediation - Summer 2010
Successful ISCR-Enhanced Bioremediation - Summer 2010James Peale
 
Dolphin Mission Critical Story
Dolphin Mission Critical StoryDolphin Mission Critical Story
Dolphin Mission Critical StoryDolphinMC
 
Control of corrosion on underwater piles ppt
Control of corrosion on underwater piles pptControl of corrosion on underwater piles ppt
Control of corrosion on underwater piles pptLakshay Saxena
 
Moffett RAB EPA Vapor Intrusion Update, September 9, 2010
Moffett RAB EPA Vapor Intrusion Update, September 9, 2010Moffett RAB EPA Vapor Intrusion Update, September 9, 2010
Moffett RAB EPA Vapor Intrusion Update, September 9, 2010Steve Williams
 
Moffett RAB Site 25 Update
Moffett RAB Site 25 UpdateMoffett RAB Site 25 Update
Moffett RAB Site 25 UpdateSteve Williams
 
15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...Najam Ul Syed Hassan
 
Nutrient Leaching and Groundwater Quality Assessment near Integrated Construc...
Nutrient Leaching and Groundwater Quality Assessment near Integrated Construc...Nutrient Leaching and Groundwater Quality Assessment near Integrated Construc...
Nutrient Leaching and Groundwater Quality Assessment near Integrated Construc...Mawuli Dzakpasu
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsM.T.H Group
 
Activated sludge process design
Activated sludge process designActivated sludge process design
Activated sludge process designmohamedradi
 

Semelhante a Moffett/Ellis/Whisman Presentation to the Moffett RAB (20)

Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateMoffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
 
Technical calculations for the biological treatment plant
Technical calculations for the biological treatment plantTechnical calculations for the biological treatment plant
Technical calculations for the biological treatment plant
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
APR 23 10 LIVING WITH LID [Compatibility Mode]
APR 23 10 LIVING WITH LID [Compatibility Mode]APR 23 10 LIVING WITH LID [Compatibility Mode]
APR 23 10 LIVING WITH LID [Compatibility Mode]
 
Aoc sediment update_part2
Aoc sediment update_part2Aoc sediment update_part2
Aoc sediment update_part2
 
Emerging Technologies in Onsite Wastewater Treatment
Emerging Technologies in Onsite Wastewater TreatmentEmerging Technologies in Onsite Wastewater Treatment
Emerging Technologies in Onsite Wastewater Treatment
 
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
 
Collie Hub presentation groundwater issues
Collie Hub presentation groundwater issuesCollie Hub presentation groundwater issues
Collie Hub presentation groundwater issues
 
Anaerobic ponds
Anaerobic pondsAnaerobic ponds
Anaerobic ponds
 
Successful ISCR-Enhanced Bioremediation - Summer 2010
Successful ISCR-Enhanced Bioremediation - Summer 2010Successful ISCR-Enhanced Bioremediation - Summer 2010
Successful ISCR-Enhanced Bioremediation - Summer 2010
 
Dolphin Mission Critical Story
Dolphin Mission Critical StoryDolphin Mission Critical Story
Dolphin Mission Critical Story
 
Control of corrosion on underwater piles ppt
Control of corrosion on underwater piles pptControl of corrosion on underwater piles ppt
Control of corrosion on underwater piles ppt
 
Concept of ems
Concept of emsConcept of ems
Concept of ems
 
Moffett RAB EPA Vapor Intrusion Update, September 9, 2010
Moffett RAB EPA Vapor Intrusion Update, September 9, 2010Moffett RAB EPA Vapor Intrusion Update, September 9, 2010
Moffett RAB EPA Vapor Intrusion Update, September 9, 2010
 
Moffett RAB Site 25 Update
Moffett RAB Site 25 UpdateMoffett RAB Site 25 Update
Moffett RAB Site 25 Update
 
15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...15) groundwater contamination, prevention and remedial techniques as on 27-05...
15) groundwater contamination, prevention and remedial techniques as on 27-05...
 
Nutrient Leaching and Groundwater Quality Assessment near Integrated Construc...
Nutrient Leaching and Groundwater Quality Assessment near Integrated Construc...Nutrient Leaching and Groundwater Quality Assessment near Integrated Construc...
Nutrient Leaching and Groundwater Quality Assessment near Integrated Construc...
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
 
Activated sludge process design
Activated sludge process designActivated sludge process design
Activated sludge process design
 
IRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 ExpansionIRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 Expansion
 

Mais de Steve Williams

RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationSteve Williams
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28Steve Williams
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community PresentationSteve Williams
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Steve Williams
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardSteve Williams
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateSteve Williams
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanSteve Williams
 
EPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source InvestigationEPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source InvestigationSteve Williams
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldSteve Williams
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewSteve Williams
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentSteve Williams
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1Steve Williams
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateSteve Williams
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateSteve Williams
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesSteve Williams
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013Steve Williams
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Steve Williams
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...Steve Williams
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesSteve Williams
 

Mais de Steve Williams (20)

RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
 
RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
 
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community Presentation
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
 
NASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory BoardNASA Ames Update to Restoration Advisory Board
NASA Ames Update to Restoration Advisory Board
 
Moffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area UpdateMoffett RAB: EPA MEW Superfund Study Area Update
Moffett RAB: EPA MEW Superfund Study Area Update
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management Plan
 
EPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source InvestigationEPA MEW Study Area TCE Source Investigation
EPA MEW Study Area TCE Source Investigation
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
 
Moffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year ReviewMoffett Site 1, 22, 26, and 28 Five Year Review
Moffett Site 1, 22, 26, and 28 Five Year Review
 
Orion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume AssessmentOrion Park Housing Area VOC Plume Assessment
Orion Park Housing Area VOC Plume Assessment
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
 
Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
 

Último

How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Osopher
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineCeline George
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPCeline George
 
Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxryandux83rd
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 

Último (20)

How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Spearman's correlation,Formula,Advantages,
Spearman's correlation,Formula,Advantages,Spearman's correlation,Formula,Advantages,
Spearman's correlation,Formula,Advantages,
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command Line
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERP
 
Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptx
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 

Moffett/Ellis/Whisman Presentation to the Moffett RAB

  • 1. Middlefield-Ellis-Whisman (MEW) Superfund Study Area S f S EPA Update: Site-Wide Groundwater Feasibility Study y y NAS M ff tt Fi ld R t Moffett Field Restoration Advisory ti Ad i Board May 12, 2011
  • 2. 2
  • 3. Purpose of Site-wide Groundwater Feasibility Study Evaluate alternative technologies to accelerate groundwater cleanup Current groundwater extraction & treatment system decreasing in efficiency Minimize the need for vapor mitigation by d i b reducing groundwater concentrations d t t ti
  • 4. Key Feasibility Study Inputs Pilot tests Community Criteria and Suggested Strategy Paper
  • 5. Community Criteria and Suggested Strategy Paper 1) FS and Remedy Selection should focus on:  Areas with high mass  Areas that continue to act as sources  A Areas of th plume that encroach on residential f the l th t h id ti l neighborhoods, schools and other sensitive uses  Reduce the need to long-term vapor intrusion mitigation g p g  Enable reasonable future reuse of property 2) Incorporate results from optimization evaluations 3) Consider specific technologies
  • 6. Scope of Groundwater Cleanup • Large disperse commingled plume with multiple source areas • FS strategy treatment of source & high conc. Areas • Range of concentrations within plume • Cleanup timeframes key component of FS
  • 7. EPA Screening of Technologies In Situ Treatment Technologies: In Situ Bioremediation, In Situ Chemical Oxidation (ISCO), and Abiotic Dechlorination using Zero Valent Iron (ZVI) Extraction, Removal, Treatment and Disposal Technologies – , , p g – Physical Treatment with Air Sparging – Groundwater Extraction and Treatment –M li h Multiphase Extraction E i – In Situ Thermal – Removal by Excavation Barriers – Permeable reactive barriers, phytoremediation Monitored Natural Attenuation
  • 8. In Situ Treatment Technologies • Evaluating In Situ Bioremediation, In Situ Chemical Oxidation (ISCO), and Abiotic Dechlorination using Zero valent iron • Technologies rely on direct contact or create conditions to degrade contaminants. • Typically used for hot spot treatment/limited area. • Challenging to distribute material into heterogeneous subsurface. Multiple injections typically needed. • Technologies piloted at the site with varying success.
  • 9. Extraction, Removal, Treatment and Disposal Technologies Air Sparging Air injected into sat rated saturated zone at high pressure; strips solvents, which are extracted. In Situ Thermal Uses electrodes or heaters attached to power supplies to heat subsurface and volatilize VOCs; vapor collection. Multiphase Extraction Uses a high vacuum system to extract soil vapor and groundwater simultaneously.
  • 10. Barriers Continuous Permeable Reactive Barriers Wall • Intercepts and treats contaminants as groundwater flows through reactive barrier • Common reactive media ZVI; • C Construction – Depths generally less than 100 feet Funnel and • Lifespan (15 to 25 years) Gate System (need to add photo) • Issues – fouling/movement g around wall
  • 11. Monitored Natural Attenuation – Relies on natural processes to cleanup pollution in soil and groundwater. groundwater – Conditions monitored to ensure that contaminants are degrading and not migrating. – Criteria to demonstrate MNA: • Plume stability • Review of temporal trends in well • Geochemical and biological parameters indicate conditions supporting degradation – Component of alternative
  • 12. Technologies Retained 1. Groundwater Extraction and Treatment 2. In Sit R d T h l i (i l di I Sit 2 I Situ Redox Technologies (including In Situ Bioremediation, In Situ Chemical Oxidation and Zero Valent Iron Injections) to treat high conc. areas j ) g 3. Permeable Reactive Barriers (PRB) 4. Monitored Natural Attenuation (as component of an alternative) lt ti )
  • 13. Projected VOC Plume – A Aquifer (0 to 45 feet bgs) 1992 2009 2019
  • 14. EPA Working Alternatives – Shallow A Aquifer Alt. 1 No Action Alt. Extraction & Treatment (Existing & Optimized) 2A/2B Alt. 3 Extraction & Treatment (Optimized), Monitored Natural Attenuation [MNA]* Alt. 4 In Situ Redox (High Conc. Areas > 1,000 ppb) Optimized Extraction and Treatment (Remaining Areas), MNA* Alt. 5A In Situ Redox (High Conc. Areas > 1,000 ppb) ( g , pp ) Permeable Reactive Barriers (PRB)(Treatment downgradient of high concentrations areas) Optimized Extraction and Treatment (Remaining Areas), MNA* Alt. 5B Same as Alt. 5A except PRB would be replaced by barrier wells. Notes: In Situ Redox = in situ bioremediation, in situ chemical oxidation, or zero valent i l t iron i j ti injections *MNA = MNA where demonstrated
  • 15. Conceptual Layout Optimized Pump and Treat Nort Sout h of h of 101 101
  • 16. Conceptual Layout In Situ Redox in A Aquifer • In Situ Redox in high concentrations areas t ti >1,000 ppb • Optimized pump & treat for remaining areas of plume until MNA demonstrated
  • 17. Conceptual Layout with PRBs in A Aquifer • PRBs downgradient of high hi h concentration t ti areas to treat residual contamination • Modeling to determine number of PRBs • Type of PRBs to be determined
  • 18. Projected VOC Plume – B1/A2 Aquifer (50 to 75 feet bgs) 1992 2009 2019
  • 19. VOC Plume (B2 Aquifer 75 to 110 feet bgs)
  • 20. EPA Work Alternatives – Deeper Aquifer Alt. 1 No Action Alt. Extraction & Treatment (Existing & Optimized) 2A/2B Alt. 3 Extraction & Treatment (Optimized), Monitored Natural Attenuation [MNA]* Alt. 4 Facility-Specific Source Areas In Situ Redox (Source Areas) Optimized Extraction and Treatment (Remaining Areas), MNA* Regional Plume Areas Optimized Extraction & Treatment, MNA* Alt. 5A Same as Alt. 4 except PRBs would be included to treat residual contamination from facility-specific source and Regional Plume Areas y p g Alt. 5B Same as Alt. 5A except PRBs would be replaced by barrier wells. Notes: In Situ Redox = in situ bioremediation, in situ chemical oxidation, or zero valent iron injections *MNA = MNA where demonstrated
  • 21. Conceptual Layout with PRBs in A2/B1 Aquifer • PRBs more difficult to DRAFT FOR DISCUSSION ONLY install t deeper depths i t ll at d d th ALTERNATIVE 5A CONCEPTUAL LAYOUT B1/A2 Zone PRBs Downgradient of High Concentration Areas • PRBs extended from Optimized Extraction and Treatment in Remaining Areas A Aquifer in areas of Regional Plume PRB NOTES: elevated concentrations l t d t ti 1) PRB reactive media may consist of zero-valent iron, chelators, sorbents, or microbes
  • 22. Groundwater Feasibility Study Challenges • Scale of cleanup. • Difficult to implement in situ technologies in developed areas. • Geology & matrix diffusion effects limit ability to accelerate cleanup cleanup. • Potential recontamination of areas treated within different portions of the plume. i f h l • Focusing on what we can do. g
  • 23. EPA Site-wide Groundwater Feasibility Study - Tentative Schedule • Summer 2011 – Draft Feasibility Study Report for review • F ll 2011 R Fall 2011 – Remedy Review Board d R i B d • Winter 2012 – Final Feasibility Study Report, Proposed Plan for  public review public review • Spring 2012  – Public Meeting and Public Comment Period • Fall 2012 – Groundwater ROD Amendment **Community involvement activities throughout the process  Community Advisory Board Meetings – February 9, March 31      RAB Meetings – Regular Updates on Vapor Intrusion and Groundwater Property Owner Meetings – February 15  Upcoming Meetings – Property Owners Meeting – May 24
  • 25. Contact Information For More Information www.epa.gov/region9/mew www.epa.gov/region9/moffettfield Penny Reddy Groundwater Project Manager EPA Region 9 Superfund Division 415.972.3108 Reddy.Penny@epa.gov Reddy Penny@epa gov
  • 26. 26
  • 27. EPA Working Alternatives – Shallow A Aquifer Alt. 1 (No Action) Description of Alternative Alt. 2A (P&T/Slurry Wall) ( y ) Existing Remedy g y Alt. 2B (P&T/Slurry Wall) Existing Remedy Optimized for mass removal Alt. 3 (P&T/Slurry Wall) Existing Remedy Optimized for mass removal, Monitored Natural Attenuation (MNA)* (MNA) Alt. 4 Facility Specific Source Areas In Situ Redox (High Conc. Areas > 1,000 ppb) In Situ Redox or Optimized P&T (Med. & Low Conc (Med Conc. Area), MNA* Regional Plume In Situ Redox – High Conc. Areas (>1,000 ppb) Optimized P&T (Remaining Areas), MNA* Notes: In Situ Redox = in situ bioremediation, in situ chemical oxidation, or zero valent iron injections *MNA = MNA where demonstrated
  • 28. Regional Groundwater Progress Update • Semi-annual water level measurements of nearly 1000 wells (Black Thursday) • Annual sampling of approximately 500 wells • Approximately 100 extraction wells pump over 450 gpm • Over 4.5 billion gallons groundwater treated through 2009 • Over 95,000 pounds of VOCs removed through 2009
  • 29. MEW / NAS Moffett Field Site Background • ROD Signed in 1989 to address soil and groundwater • Enforcement – Admin Order Consent Decree Federal Order, Decree, Facility Agreement • Soil remedy (excavation and/or soil vapor extraction) • Groundwater remedy - slurry walls, seal conduits, and G d d l ll l d i d pump and treat • Hydrogeology – interbedded sands, silts, clays (Bay mud) y g gy , , y ( y ) • Shallow groundwater – 5 to 20 feet bgs • Current TCE in shallow groundwater up to 40,000 ppb inside slurry walls 40 000 • Groundwater not used for potable use, but being cleaned up to its beneficial use
  • 30. VOC Plume (B2 Aquifer 75 to 110 feet bgs)
  • 31. B1/A2 Aquifer B2 Aquifer
  • 32. Conceptual Layout with PRBs in A Aquifer • PRBs downgradient of high concentration areas to treat residual contamination • Modeling to determine number of PRBs • Type of PRBs to be determined
  • 33. Draft Conceptual Layout In Situ Redox in A2/B1Aquifer • Focusing treatment on Facility- Specific Source Areas and High Concentration